Detailed Description
The following describes the detailed implementation of the embodiments of the present invention with reference to the drawings. It should be understood that the detailed description and specific examples, while indicating and illustrating the invention, are not intended to limit the invention.
It should be noted that, without conflict, the embodiments of the present invention and features of the embodiments may be combined with each other.
In the present invention, "first," "second," etc. are merely for convenience of description and for convenience of distinction, and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it should also be noted that, unless explicitly specified and limited otherwise, the terms "mounted," "connected," and the like are to be construed broadly and may be, for example, fixedly connected, detachably connected, or integrally connected; can be directly connected or indirectly connected; either a wired connection or a wireless connection. The specific meaning of the above terms in the present invention can be understood as appropriate by those of ordinary skill in the art.
The invention will be described in detail below with reference to the drawings in connection with embodiments.
The embodiment of the invention provides an elastic heat recovery system for improving the variable load rate of a coal-fired power generation unit, which consists of a coal-fired power generation subsystem and a heat storage peak regulation subsystem. The coal-fired power generation subsystem is used for completing coal-fired power generation and can comprise a steam turbine, a generator, a condenser, a steam extraction pipeline, a steam exhaust pipeline, a first heat recovery unit, a boiler and other structures; the heat storage peak shaving subsystem is used for adjusting the load capacity of the coal-fired power generation unit and can comprise a heat storage unit.
Specifically, in the whole elastic heat recovery system, a generator is connected with a steam turbine, an inlet of the steam turbine is connected with an outlet of a boiler, a first outlet of the steam turbine is connected with a first inlet of a first heat recovery unit through a steam extraction pipeline, a second outlet of the steam turbine is connected with an inlet of a condenser through a steam exhaust pipeline, an outlet of the condenser is connected with a second inlet of the first heat recovery unit, and an outlet of the first heat recovery unit is connected with an inlet of the boiler. The first heat recovery unit is used for heating condensation water output by the condenser by utilizing heat energy of steam extracted by the steam turbine, the first heat recovery unit can be arranged as heaters, the number of the heaters can be one or more, and the number of the heaters can be determined according to heat recovery requirements of the whole elastic heat recovery system. Therefore, the high-temperature and high-pressure steam generated by the boiler can be used for driving the steam turbine to rotate and drive the generator to generate power, meanwhile, the condensed water formed by condensing the steam discharged by the steam turbine is recovered, and part of heat energy of the steam extracted by the steam turbine is used for heating the condensed water, and the heated condensed water can be used as boiler feed water to enter the boiler to generate high-temperature and high-pressure steam again for subsequent power generation.
The heat storage unit is used for storing a part of steam turbine extraction steam when the coal-fired power generation unit is under high load and releasing the pre-stored steam turbine extraction steam for heating condensation water when the coal-fired power generation unit is under low load. The heat storage unit may include a heat storage tank, a sprayer, and a spray water pipe, wherein the sprayer is disposed in the heat storage tank, the spray water pipe is connected with the sprayer through a first inlet of the heat storage tank, a first outlet of the steam turbine is connected with a second inlet of the heat storage tank through a steam extraction pipe, and a first outlet of the heat storage tank is connected with a first inlet of the first heat regeneration unit. Therefore, when the load of the coal-fired generator set needs to be reduced, the steam extracted from the steam turbine enters the heat storage tank through the steam extraction pipeline, and water is sprayed into the heat storage tank through the sprayer to reduce the temperature, so that the temperature in the heat storage tank can be maintained to be the saturated temperature t 1 corresponding to the steam extraction pressure in the steam extraction pipeline. Because the extraction steam is continuously condensed into water, a pressure difference is formed in the heat storage tank, the extraction steam in the extraction steam pipeline can continuously enter the heat storage tank until the heat storage tank reaches the maximum heat storage volume. When the load of the coal-fired generator set needs to be increased, the working medium (namely, a mixture formed by steam extraction and water spraying) stored in the heat storage tank can automatically flow into the first heat recovery unit by means of pressure difference caused by liquid formed by condensation of the working medium in the first heat recovery unit, and condensation water output by the condenser is heated in the first heat recovery unit.
Further, in a possible embodiment, the elastic heat recovery system may further include a second heat recovery unit, and the second heat recovery unit is used for recovering heat energy extracted from the heat storage tank for heating boiler feed water. The second heat recovery unit may include a heat exchanger, a water pipe, and a drain pipe, wherein a heat source inlet of the heat exchanger is connected with a second outlet of the heat storage tank, a heat source inlet of the heat exchanger is connected with an outlet of the water pipe, a heat source outlet of the heat exchanger is connected with an inlet of the boiler, and a heat source outlet of the heat exchanger is connected with an inlet of the drain pipe. Therefore, when the load of the coal-fired power generation unit needs to be increased, the extraction steam stored in the heat storage tank not only can flow into the first heat recovery unit automatically to participate in heating of the condensed water, but also can enter the heat exchanger to exchange heat with the bypass condensed water, and the hot water obtained in the two ways can be used as boiler feed water to be conveyed to a boiler, so that the extraction steam quantity of the steam turbine is reduced rapidly.
Further, in one possible embodiment, the steam turbine is composed of a plurality of cylinders with different pressure levels, and the number of the first heat recovery unit, the second heat recovery unit and the heat storage unit can be one or more. The single first regenerative unit may be connected with at least one cylinder within the steam turbine, the single heat storage unit may be connected with at least one cylinder within the steam turbine, and the single second regenerative unit may be connected with at least one heat storage unit. In other words, the first heat recovery unit is matched with a plurality of cylinders in the steam turbine, and can be arranged in a one-to-one or one-to-many mode; similarly, the heat storage units are matched with a plurality of cylinders in the steam turbine for use, and can be arranged in a one-to-one or one-to-many mode; the second heat recovery unit and the heat storage unit are matched for use, and can be arranged in a one-to-one or one-to-many mode.
Further, in one possible embodiment, a deaerator and a pump stack may be provided between the condenser and the first regenerator unit. The deaerator is used for removing oxygen in the condensed water so as to prevent the oxygen in the condensed water from corroding and damaging the steam turbine and related equipment. The pump set is used for lifting the condensation water pressure.
Further, in one possible embodiment, a check valve is provided at the first outlet of the steam turbine, the check valve being used to prevent the extraction steam in the extraction steam pipe from flowing back to the steam turbine.
Further, in one possible embodiment, the inlet of the hydrophobic conduit and/or the water conduit may be connected with the outlet of the condenser. When the load of the coal-fired power generation unit needs to be increased, condensed water conveyed by the condenser can enter the heat exchanger through the water conveying pipeline to exchange heat with the extraction steam released in the heat storage tank, the condensed water after heat exchange is used for boiler water supply, and the drainage water after heat exchange can flow into the first heat recovery unit through the drainage pipeline to participate in the heating process of other condensed water, so that the cyclic utilization of the condensed water can be realized, the energy utilization rate is improved, and the energy consumption and the emission of the coal-fired power plant are reduced.
Further, in one possible embodiment, the inlet of the spray water pipe may be connected to the cold source outlet of the unit reheater.
The embodiment of the invention also provides an elastic heat recovery method for improving the variable load rate of the coal-fired power generation unit, which is realized by the elastic heat recovery system for improving the variable load rate of the coal-fired power generation unit in the embodiment and comprises three stages of a normal operation stage, a load reduction stage and a load rising stage.
Specifically, in the normal operation stage, the condensed water formed by condensing the steam turbine exhaust is heated in the first regenerative unit by utilizing the heat energy of a part of the steam turbine exhaust, and the heated condensed water is used as boiler feed water to be conveyed to a boiler.
In the load reduction stage, part of steam turbine extraction steam is stored in the heat storage tank in advance, and the temperature in the heat storage tank is maintained to be the saturation temperature corresponding to the steam extraction pressure in the steam extraction pipeline by spraying water into the heat storage tank.
In the load lifting stage, a part of working medium (i.e. a mixture formed by steam extraction and water spraying) stored in the heat storage tank automatically flows into the first heat recovery unit by means of pressure difference caused by condensation of the working medium in the first heat recovery unit to form liquid, and the process of heating condensed water by steam extraction of the steam turbine is participated in the first heat recovery unit.
Further, in one possible embodiment, the elastic backheating method further includes: and in the load lifting stage, releasing a part of working medium in the heat storage tank for heating the water supply of the boiler, simultaneously conveying the other part of working medium stored in the heat storage tank to the second heat recovery unit to exchange heat with cold water, conveying the hot water after heat exchange to the boiler as water supply of the boiler, and conveying the drain water after heat exchange to the first heat recovery unit as condensed water.
Further, in one possible embodiment, the water temperature at the outlet of the first regenerative unit may be the same as the water temperature at the outlet of the heat source of the second regenerative unit.
For a better understanding of the above-described exemplary embodiments of the present invention, it is further described below with reference to specific examples and drawings.
Example 1
As shown in fig. 1, the elastic heat recovery system for improving the variable load rate of the coal-fired power generation unit consists of a high-pressure storage/heat supply flexible regulation part, a low-pressure storage/heat supply flexible regulation part and a primary coal-fired power generation unit part. The high-pressure heat accumulating/supplying flexible regulating part consists of a high-pressure heat accumulating tank, a water supplying bypass heater, corresponding pipelines, valves, a tee joint and other equipment, the low-pressure heat accumulating/supplying flexible regulating part consists of a high-pressure heat accumulating tank, a condensed water bypass heater, corresponding pipelines, valves, a tee joint and other equipment, and the original coal-fired generating set part can be a coal-fired generating set in any form, and typical components comprise a boiler, a steam turbine, a generator, a condenser, a heater, a regenerative pipeline, a pump and the like.
Specifically, in the high-pressure storage/heat supply flexible regulation part, the high-pressure heat storage tank 16 is connected with the turbine high-pressure steam extraction pipe tee 116 through the high-pressure heat storage tank energy storage pipeline 112, and the other end of the turbine high-pressure steam extraction pipe tee 116 is connected with the high-pressure steam extraction pipeline 315 of the turbine high-pressure cylinder 33. To prevent backflow of extraction steam into the turbine, a high pressure check valve 114 is added to the high pressure extraction steam line 315. The high-pressure heat storage tank energy storage pipeline 112 is provided with a high-pressure heat storage tank energy storage pipeline regulating valve group 113, and the regulating valve group comprises any number of shutoff valves, regulating valves and pressure reducing valves.
A high-pressure sprayer 17 is arranged in the high-pressure heat storage tank 16, and the high-pressure sprayer 17 is connected with spray water through a high-pressure spray water supply pipeline 19. A high pressure spray water supply line 19 is provided with a high pressure spray regulator valve block 18 comprising any number of shut-off, regulator and pressure relief valves. The spray water on the high-pressure spray water supply pipeline 19 is preferably the unit reheater desuperheating water or the overheat desuperheating water, and is matched according to the pressure of the high-pressure heat storage tank 16.
The high-pressure heat storage tank 16 is furthermore connected to the feedwater bypass heater 13 via a high-pressure heat storage tank supply line 14. The feedwater bypass heater is preferably a plate heat exchanger and the heat exchange media is steam from the high pressure heat storage tank 16 and water from the feedwater bypass 12. The high-pressure heat storage tank energy supply pipeline 14 is provided with a high-pressure heat storage tank energy supply pipeline regulating valve group 15 which comprises any number of shutoff valves, regulating valves and pressure reducing valves.
The steam from the high pressure thermal storage tank 16 transfers heat to the water from the feedwater bypass 12 within the feedwater bypass heater 13 and then enters the deaerator 312 via the high pressure power supply conduit drain 115.
The water from the water supply bypass 12 is supplied from a bypass water supply intake (tee) 111 at the outlet of a water supply pump 313, is heated by steam passing through a high-pressure heat storage tank 16, is heated, and then enters a bypass water supply inlet (tee) 11, and finally enters a boiler 31. The feedwater bypass 12 is provided with a feedwater bypass valve block 110 including any number of shut-off, regulator and pressure relief valves.
In the low-pressure storage/heat supply flexible regulation part, the low-pressure heat storage tank 26 is connected with a turbine low-pressure steam extraction pipe tee joint 216 through a low-pressure heat storage tank energy storage pipeline 212, and the other end of the turbine low-pressure steam extraction pipe tee joint 216 is connected with a low-pressure steam extraction pipeline 311 of a turbine low-pressure cylinder 35. To prevent the backflow of the extracted steam into the turbine, a low-pressure check valve 214 is added to the low-pressure steam extraction pipe 311. The low pressure thermal storage tank energy storage pipeline 212 is provided with a low pressure thermal storage tank energy storage pipeline regulating valve group 213 which comprises any number of shut-off valves, regulating valves and pressure reducing valves.
The low-pressure heat storage tank 26 comprises a low-pressure sprayer 27, and the low-pressure sprayer 27 is connected with spray water through a low-pressure spray water pipeline 29. The low pressure spray water line 29 is provided with a low pressure spray water regulator valve block 28 comprising any number of shut-off, regulator and pressure relief valves. The spray water on the low pressure spray water line 29 is preferably condensate from the outlet of the condenser 37.
The low-pressure heat storage tank 26 is furthermore connected to the condensate bypass heater 23 via a low-pressure heat storage tank supply line 24. The condensate bypass heater is preferably a plate heat exchanger and the heat exchange medium is steam from the low pressure thermal storage tank 26 and water from the condensate bypass 22. The low pressure thermal storage tank supply pipe 24 is provided with a low pressure thermal storage tank supply pipe regulating valve group 25 comprising any number of shut-off valves, regulating valves and pressure reducing valves.
The steam in the low-pressure heat storage tank 26 transfers heat to the water in the condensate bypass 22 in the condensate bypass heater 23, and then enters the condenser 37 through the low-pressure energy supply pipeline drain 215.
The water from the condensate bypass 22 comes from the condensate intake (tee) 211 at the outlet of the condensate pump 37, heats up after being heated by the steam passing through the low-pressure heat storage tank 26, enters the condensate inlet (tee) 21, and finally enters the deaerator 312. The condensate bypass 22 is provided with a condensate bypass damper group 210 comprising any number of shut-off, damper and pressure relief valves.
In the raw coal-fired power unit section, the turbine includes a turbine high pressure cylinder 33 and a turbine low pressure cylinder 35. The high-pressure cylinder 33 of the steam turbine is a high-pressure part of a steam turbine system and can be an ultrahigh-pressure cylinder, a high-pressure cylinder and the like of a coal-fired power generation unit; the low-pressure cylinder 35 of the steam turbine is a low-pressure part of the steam turbine system, and can be a medium-pressure cylinder, a low-pressure cylinder and the like of the coal-fired power generation unit.
The high-pressure heater group 316 is disposed on the water feed pipe 314 and is connected to the turbine high-pressure cylinder 33 through the high-pressure steam extraction pipe 315. The low pressure heater group 310 is disposed on the condensed water pipe 39 and is connected to the turbine low pressure cylinder 35 through a low pressure steam extraction pipe 311.
The high pressure steam pipe 32 connects the boiler 31 and the turbine high pressure cylinder 33. The low pressure steam pipe 34 connects the turbine high pressure cylinder 33 and the turbine low pressure cylinder 35. The exhaust pipe 36 connects the low pressure cylinder 35 and the condenser 37. The condensed water pipe 39 connects the condenser 37 and the deaerator 312. The water feed line 314 connects the deaerator 312 and the boiler 31.
A condensate pump 38 is located between the condenser 37 and the low pressure heater bank 310. A feedwater pump 313 is located between the deaerator 312 and the high-pressure heater bank 316.
The principle of the elastic heat recovery system in the example for adjusting the variable load rate of the coal-fired power generation unit is as follows: the high-pressure storage/heating flexible adjusting part and the low-pressure storage/heating flexible adjusting part are utilized to quickly adjust the steam extraction quantity of the steam turbine, so that the output of the steam turbine is changed, and the load is further adjusted. When the unit needs to reduce load, the heat storage tank is used for increasing the extraction of steam from the steam turbine and storing the steam in the heat storage tank, so that the load reduction rate of the unit is improved; when the unit needs to lift load, the steam is discharged from the heat storage tank and enters the first heat recovery unit and the second heat recovery unit simultaneously, so that the steam extraction of the steam turbine is reduced, and the lifting load rate of the unit is improved.
When the load reduction rate of the coal-fired unit needs to be improved, a specific flow of carrying out heat storage and peak shaving by using the elastic heat regenerative system in the example is as follows.
Step A1: and when the coal-fired unit runs under high load, receiving a load reducing instruction.
Step A2: the flexible regulation part of accumulating energy to high pressure holds/supplies heat specifically does: the high-pressure heat storage tank energy storage pipeline regulating valve group 113 is opened, and the extracted steam is stored into the high-pressure heat storage tank 16 through the steam turbine high-pressure steam extraction pipe tee 116. When the extracted steam enters the high-pressure heat storage tank 16, the high-pressure spray regulating valve group 18 is opened to spray water into the high-pressure heat storage tank 16 for reducing the temperature, and the temperature in the high-pressure heat storage tank 16 is maintained to be the saturation temperature t 1 corresponding to the steam extraction pressure in the high-pressure steam extraction pipeline 315. Because the extracted steam is continuously condensed into water, a pressure difference is formed in the high-pressure heat storage tank 16, the extracted steam in the three-way pipe 116 of the high-pressure steam extraction pipe of the steam turbine can continuously enter the high-pressure heat storage tank 16 until the high-pressure heat storage tank 16 reaches the maximum heat storage volume.
Step A3: the energy charging of the low-pressure storage/heat supply flexible regulation part is specifically as follows: the low-pressure heat storage tank energy storage pipeline regulating valve group 213 is opened, and the extraction steam is stored into the low-pressure heat storage tank 26 through the turbine low-pressure extraction steam pipe tee 216. When the extraction steam enters the low-pressure heat storage tank 26, the low-pressure spray water regulating valve group 28 is opened to spray water into the low-pressure heat storage tank 26 for reducing the temperature, and the temperature in the low-pressure heat storage tank 26 is maintained to be the saturation temperature t 2 corresponding to the extraction steam pressure in the low-pressure steam extraction pipeline 311. Because the extracted steam is continuously condensed into water, a pressure difference is formed in the low-pressure heat storage tank 26, the extracted steam in the three-way pipe 216 of the low-pressure steam extraction pipe of the steam turbine can continuously enter the low-pressure heat storage tank 26 until the low-pressure heat storage tank 26 reaches the maximum heat storage volume.
The steps A2 and A3 can be operated simultaneously or independently, and the steam extraction amount of the steam turbine can be improved through the steps A2 and A3 and stored in the elastic heat recovery system, so that the load reduction capacity of the coal-fired power generation unit is enhanced. Meanwhile, as the steam extraction amount of the steam turbine is increased, the cold source loss is reduced, and the economy of the coal-fired generator set can be improved.
When the load lifting rate of the coal-fired unit needs to be improved, a specific flow of carrying out heat storage and peak shaving by using the elastic heat regenerative system in the example is as follows.
Step B1: and when the coal-fired unit runs under low load, receiving a load lifting instruction.
Step B2: the high-pressure energy storage/heat supply flexible regulation part can be discharged, and specifically comprises the following steps: the high-pressure heat storage tank energy supply pipeline regulating valve group 15 and the water supply bypass regulating valve group 110 are opened, heat stored in the high-pressure heat storage tank 16 is released to water of the water supply bypass, water flow of the water supply bypass and heat release of the high-pressure heat storage tank energy supply pipeline are controlled, and the outlet water temperature of the water supply bypass heater 13 is kept consistent with the outlet water temperature of the high-pressure heater group 316. After the working fluid in the high-pressure heat storage tank 16 releases heat, the generated drain water enters the deaerator 312 through the high-pressure energy supply pipeline drain water 115.
Step B3: the low-pressure energy storage/heat supply flexible regulation part can be discharged, and specifically comprises the following steps: the low-pressure heat storage tank energy supply pipeline regulating valve group 25 and the condensed water bypass regulating valve group 210 are opened, heat stored in the low-pressure heat storage tank 26 is released to water of the condensed water bypass, and the water flow rate of the condensed water bypass and the heat release quantity of the low-pressure heat storage tank energy supply pipeline are controlled, so that the outlet water temperature of the condensed water bypass heater 23 is kept consistent with the outlet water temperature of the low-pressure heater group 310. After the working medium of the low-pressure heat storage tank 26 releases heat, the generated drain water enters the condenser 37 through the drain water 215 of the low-pressure energy supply pipeline.
The steps B2 and B3 can be operated simultaneously or independently, and the heat stored in the elastic heat recovery system can be released to the heat recovery unit of the steam turbine through the steps B2 and B3 to exhaust the steam extraction amount of the steam turbine, so that the load lifting capacity of the coal-fired power generation unit is enhanced.
Example 2
As shown in fig. 2, the elastic heat recovery system for improving the variable load rate of the coal-fired power generation unit comprises a high-pressure storage/heat supply flexible regulation part, a low-pressure storage/heat supply flexible regulation part and a primary coal-fired power generation unit part. The high-pressure heat accumulation/supply flexible regulation part consists of a high-pressure heat accumulation tank, a corresponding pipeline, a valve, a tee joint and other equipment, the low-pressure heat accumulation/supply flexible regulation part consists of the high-pressure heat accumulation tank, the corresponding pipeline, the valve, the tee joint and the other equipment, and the primary coal-fired generator set part can be any type of coal-fired generator set, and typical components comprise a boiler, a steam turbine, a generator, a condenser, a heater, a regenerative pipeline, a pump and the like. In contrast to the elastic regenerative system in the above example, the present example is not provided with the feedwater bypass heater 13 and the condensate bypass heater 23 and the corresponding piping and valves.
Specifically, in the high-pressure storage/heat supply flexible regulation part, the high-pressure heat storage tank 16 is connected with the turbine high-pressure steam extraction pipe tee 116 through the high-pressure heat storage tank energy storage pipeline 112, and the other end of the turbine high-pressure steam extraction pipe tee 116 is connected with the high-pressure steam extraction pipeline 315 of the turbine high-pressure cylinder 33. To prevent backflow of extraction steam into the turbine, a high pressure check valve 114 is added to the high pressure extraction steam line 315. The high-pressure heat storage tank energy storage pipeline 112 is provided with a high-pressure heat storage tank energy storage pipeline regulating valve group 113, and the regulating valve group comprises any number of shutoff valves, regulating valves and pressure reducing valves.
A high-pressure sprayer 17 is arranged in the high-pressure heat storage tank 16, and the high-pressure sprayer 17 is connected with spray water through a high-pressure spray water supply pipeline 19. A high pressure spray water supply line 19 is provided with a high pressure spray regulator valve block 18 comprising any number of shut-off, regulator and pressure relief valves. The spray water on the high-pressure spray water supply pipeline 19 is preferably the unit reheater desuperheating water or the overheat desuperheating water, and is matched according to the pressure of the high-pressure heat storage tank 16.
In the low-pressure storage/heat supply flexible regulation part, a low-pressure heat storage tank 26 is connected with a turbine low-pressure steam extraction pipe tee joint 216 through a low-pressure heat storage tank energy storage pipeline 212, and the other end of the turbine low-pressure steam extraction pipe tee joint 216 is connected with a low-pressure steam extraction pipeline 311 at the outlet of a turbine low-pressure cylinder 35. In order to prevent the backflow of the extracted steam into the turbine, a low-pressure check valve 214 is added to the low-pressure steam extraction pipe 311. The low pressure thermal storage tank energy storage pipeline 212 is provided with a low pressure thermal storage tank energy storage pipeline regulating valve group 213 which comprises any number of shut-off valves, regulating valves and pressure reducing valves.
The low-pressure heat storage tank 26 comprises a low-pressure sprayer 27, and the low-pressure sprayer 27 is connected with spray water through a low-pressure spray water pipeline 29. The low pressure spray water line 29 is provided with a low pressure spray water regulator valve block 28 comprising any number of shut-off, regulator and pressure relief valves. The spray water on the low pressure spray water line 29 is preferably the condensate water from the unit condenser 37 outlet.
In the raw coal-fired power unit section, the turbine includes a turbine high pressure cylinder 33 and a turbine low pressure cylinder 35. The high-pressure cylinder 33 of the steam turbine is a high-pressure part of a steam turbine system and can be an ultrahigh-pressure cylinder, a high-pressure cylinder and the like of a coal-fired power generation unit; the low-pressure cylinder 35 of the steam turbine is a low-pressure part of the steam turbine system, and can be a medium-pressure cylinder, a low-pressure cylinder and the like of the coal-fired power generation unit.
The high-pressure heater group 316 is disposed on the water feed pipe 314 and is connected to the turbine high-pressure cylinder 33 through the high-pressure steam extraction pipe 315. The low pressure heater group 310 is disposed on the condensed water pipe 39 and is connected to the turbine low pressure cylinder 35 through a low pressure steam extraction pipe 311.
The high pressure steam pipe 32 connects the boiler 31 and the turbine high pressure cylinder 33. The low pressure steam pipe 34 connects the turbine high pressure cylinder 33 and the turbine low pressure cylinder 35. The exhaust pipe 36 connects the low pressure cylinder 35 and the condenser 37. The condensed water pipe 39 connects the condenser 37 and the deaerator 312. The water feed line 314 connects the deaerator 312 and the boiler 31.
A condensate pump 38 is located between the condenser 37 and the low pressure heater bank 310. A feedwater pump 313 is located between the deaerator 312 and the high-pressure heater bank 316.
The principle of the elastic heat recovery system in the example for adjusting the variable load rate of the coal-fired power generation unit is as follows: the high-pressure storage/heating flexible adjusting part and the low-pressure storage/heating flexible adjusting part are utilized to quickly adjust the steam extraction quantity of the steam turbine, so that the output of the steam turbine is changed, and the load is further adjusted. When the unit needs to reduce load, the heat storage tank is used for increasing the extraction of steam from the steam turbine and storing the steam in the heat storage tank, so that the load reduction rate of the unit is improved; when the unit needs to lift load, the steam is discharged from the heat storage tank and enters the first heat recovery unit, so that the steam extraction of the steam turbine is reduced, and the lifting load rate of the unit is improved.
When the load reduction rate of the coal-fired unit needs to be improved, the flow of carrying out heat storage and peak shaving by using the elastic heat regenerative system in the example is the same as the flow in the example, and specifically comprises the following steps:
step A1: and when the coal-fired unit runs under high load, receiving a load reducing instruction.
Step A2: the flexible regulation part of accumulating energy to high pressure holds/supplies heat specifically does: the high-pressure heat storage tank energy storage pipeline regulating valve group 113 is opened, and the extracted steam is stored into the high-pressure heat storage tank 16 through the steam turbine high-pressure steam extraction pipe tee 116. When the extracted steam enters the high-pressure heat storage tank 16, the high-pressure spray regulating valve group 18 is opened to spray water into the high-pressure heat storage tank 16 for reducing the temperature, and the temperature in the high-pressure heat storage tank 16 is maintained to be the saturation temperature t 1 corresponding to the steam extraction pressure in the high-pressure steam extraction pipeline 315.
Step A3: the energy charging of the low-pressure storage/heat supply flexible regulation part is specifically as follows: the low-pressure heat storage tank energy storage pipeline regulating valve group 213 is opened, and the extraction steam is stored into the low-pressure heat storage tank 26 through the turbine low-pressure extraction steam pipe tee 216. When the extraction steam enters the low-pressure heat storage tank 26, the low-pressure spray water regulating valve group 28 is opened to spray water into the low-pressure heat storage tank 26 for reducing the temperature, and the temperature in the low-pressure heat storage tank 26 is maintained to be the saturation temperature t 2 corresponding to the extraction steam pressure in the low-pressure steam extraction pipeline 311.
The steps A2 and A3 can be operated simultaneously or independently,
When the load-up rate of the coal-fired unit needs to be increased, the water supply bypass heater 13 and the condensate bypass heater 23 are not present in the elastic heat recovery system in the present example, and the high-pressure heat storage tank 16 and the low-pressure heat storage tank 26 need to be returned to the high-pressure heater group 316 and the low-pressure heater group 310 by means of the high-pressure heat storage tank energy storage pipeline 112 and the low-pressure heat storage tank energy storage pipeline 212 in the load-up stage. The specific flow of heat storage peak shaving by using the elastic heat regenerative system in this example is as follows.
Step C1: and when the coal-fired unit runs under low load, receiving a load lifting instruction.
Step C2: the high-pressure energy storage/heat supply flexible regulation part can be discharged, and specifically comprises the following steps: the high-pressure heat storage tank energy storage pipeline regulating valve group 113 is opened, and the stored working medium in the high-pressure heat storage tank 16 automatically flows into the high-pressure heater group 316 by means of pressure difference caused by condensing the working medium and the working medium in the high-pressure heater group 316 to form liquid, and exchanges heat with water in the water supply pipeline 314 in the high-pressure heater group 316, so that extraction steam in the high-pressure cylinder 33 of the steam turbine is displaced, and the unit load lifting rate is improved.
Step C3: the low-pressure energy storage/heat supply flexible regulation part can be discharged, and specifically comprises the following steps: the low-pressure heat storage tank energy storage pipeline regulating valve group 213 is opened, and the working medium stored in the low-pressure heat storage tank 26 automatically flows into the low-pressure heater group 310 by means of pressure difference caused by condensing the working medium and the working medium in the low-pressure heater group 310 to form liquid, and exchanges heat with water in the condensed water pipeline 310 in the low-pressure heater group 310 to exhaust the extraction steam in the low-pressure cylinder 35 of the steam turbine, so that the load lifting rate of the unit is improved.
The steps C2 and C3 can be operated simultaneously or independently,
Compared with the elastic heat recovery system in the above example, the elastic heat recovery system in the present example is not provided with the water supply bypass heater 13 and the condensate bypass heater 23 and corresponding pipes and valves, so that the heat stored in the elastic heat recovery system is returned to the original heater through the energy storage pipe to exchange heat with water, and the system is more compact.
The preferred embodiments of the present invention have been described in detail above with reference to the accompanying drawings, but the present invention is not limited to the specific details of the above embodiments, and various simple modifications can be made to the technical solution of the present invention within the scope of the technical concept of the present invention, and all the simple modifications belong to the protection scope of the present invention.
In addition, the specific features described in the above embodiments may be combined in any suitable manner, and in order to avoid unnecessary repetition, various possible combinations are not described further.
Moreover, any combination of the various embodiments of the invention can be made without departing from the spirit of the invention, which should also be considered as disclosed herein.