CN118564318B - Elastic heat regeneration system and method for improving variable load rate of coal-fired generator set - Google Patents

Elastic heat regeneration system and method for improving variable load rate of coal-fired generator set

Info

Publication number
CN118564318B
CN118564318B CN202410468467.2A CN202410468467A CN118564318B CN 118564318 B CN118564318 B CN 118564318B CN 202410468467 A CN202410468467 A CN 202410468467A CN 118564318 B CN118564318 B CN 118564318B
Authority
CN
China
Prior art keywords
pressure
heat
storage tank
heat storage
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202410468467.2A
Other languages
Chinese (zh)
Other versions
CN118564318A (en
Inventor
陈国庆
黄林滨
刘志坦
何陆灿
延寒
葛荣存
谭锐
程文煜
耿显葳
高行龙
解奎元
沈小兵
张海峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guoneng Changzhou Second Power Generation Co ltd
Guoneng Nanjing Electric Power Test Research Co ltd
Guoneng Yuedian Taishan Power Generation Co ltd
CHN Energy Group Science and Technology Research Institute Co Ltd
Original Assignee
Guoneng Changzhou Second Power Generation Co ltd
Guoneng Nanjing Electric Power Test Research Co ltd
Guoneng Yuedian Taishan Power Generation Co ltd
CHN Energy Group Science and Technology Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guoneng Changzhou Second Power Generation Co ltd, Guoneng Nanjing Electric Power Test Research Co ltd, Guoneng Yuedian Taishan Power Generation Co ltd, CHN Energy Group Science and Technology Research Institute Co Ltd filed Critical Guoneng Changzhou Second Power Generation Co ltd
Priority to CN202410468467.2A priority Critical patent/CN118564318B/en
Publication of CN118564318A publication Critical patent/CN118564318A/en
Application granted granted Critical
Publication of CN118564318B publication Critical patent/CN118564318B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01K—STEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K13/00—General layout or general methods of operation of complete plants
    • F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01K—STEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K11/00—Plants characterised by the engines being structurally combined with boilers or condensers
    • F01K11/02—Plants characterised by the engines being structurally combined with boilers or condensers the engines being turbines
    • F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01K—STEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K13/00—General layout or general methods of operation of complete plants
    • F01K13/006—Auxiliaries or details not otherwise provided for
    • F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22—STEAM GENERATION
    • F22D—PREHEATING, OR ACCUMULATING PREHEATED, FEED-WATER FOR STEAM GENERATION; FEED-WATER SUPPLY FOR STEAM GENERATION; CONTROLLING WATER LEVEL FOR STEAM GENERATION; AUXILIARY DEVICES FOR PROMOTING WATER CIRCULATION WITHIN STEAM BOILERS
    • F22D1/00—Feed-water heaters, i.e. economisers or like preheaters
    • F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22—STEAM GENERATION
    • F22D—PREHEATING, OR ACCUMULATING PREHEATED, FEED-WATER FOR STEAM GENERATION; FEED-WATER SUPPLY FOR STEAM GENERATION; CONTROLLING WATER LEVEL FOR STEAM GENERATION; AUXILIARY DEVICES FOR PROMOTING WATER CIRCULATION WITHIN STEAM BOILERS
    • F22D11/00—Feed-water supply not provided for in other main groups
    • F22D11/02—Arrangements of feed-water pumps
    • F22D11/06—Arrangements of feed-water pumps for returning condensate to boiler

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Water Supply & Treatment (AREA)
  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

The invention provides an elastic heat recovery system and method for improving the variable load rate of a coal-fired power generator unit, and belongs to the field of heat storage and peak shaving. The system comprises a steam turbine, a generator, a condenser, a steam extraction pipeline, a steam exhaust pipeline, a first heat recovery unit, a heat storage tank, a sprayer, a spray water pipeline and a boiler, wherein the generator is connected with the steam turbine, an inlet of the steam turbine is connected with an outlet of the boiler, a first outlet of the steam turbine is connected with a first inlet of the first heat recovery unit through the steam extraction pipeline, the condenser is arranged between a second outlet of the steam turbine and a second inlet of the first heat recovery unit, an outlet of the first heat recovery unit is connected with an inlet of the boiler, the sprayer is arranged in the heat storage tank, the spray water pipeline is connected with the sprayer, an inlet of the heat storage tank is connected with the first outlet of the steam turbine, and the first outlet of the heat storage tank is connected with the first inlet of the first heat recovery unit. The system provided by the invention can further enhance the deep peak regulation capacity and the rapid load change capacity of the steam turbine generator unit.

Description

Elastic heat regeneration system and method for improving variable load rate of coal-fired generator set
Technical Field
The invention relates to the technical field of heat storage peak shaving, in particular to an elastic heat recovery system for improving the variable load rate of a coal-fired power generation unit and an elastic heat recovery method for improving the variable load rate of the coal-fired power generation unit.
Background
At present, in the load lifting stage of the coal-fired generator set, the control of the load of the generator set is realized mainly by adjusting the fuel quantity of the boiler side entering and the main valve opening of the steam turbine side, so that the requirement of the generator set on the load response speed is met. This type of regulation is often accompanied by numerous problems of considerable fluctuations in the main steam parameters of the unit, reduced economics, etc. In addition, the large delay inertia of the boiler system also limits the quick load changing capacity of the unit, so that the peak regulation rate of the existing boiler with the power of more than 300MW grade under 50% -100% rated load is about 1.5% rated load/min, and the peak regulation rate under the state of deep peak regulation of 30% load is generally less than 1% rated load/min. However, as the new energy duty ratio increases, the variable load rate of about 1% -1.5% cannot meet the requirement of rapid peak shaving.
In conclusion, the improvement of the variable load rate of the coal-fired power generation unit has important significance for guaranteeing the safe and stable operation of the power system.
Disclosure of Invention
Aiming at the technical problem that the variable load speed of the coal-fired power generator unit cannot meet the requirement of rapid peak regulation in the prior art, the invention provides an elastic heat recovery system and a method for improving the variable load speed of the coal-fired power generator unit.
In order to achieve the aim, the invention provides an elastic heat recovery system for improving the variable load rate of a coal-fired power generation unit, which comprises a steam turbine, a generator, a condenser, a steam extraction pipeline, a steam exhaust pipeline, a first heat recovery unit, a heat storage unit and a boiler, wherein the generator is connected with the steam turbine, an inlet of the steam turbine is connected with an outlet of the boiler, a first outlet of the steam turbine is connected with a first inlet of the first heat recovery unit through the steam extraction pipeline, a second outlet of the steam turbine is connected with an inlet of the condenser through the steam exhaust pipeline, an outlet of the condenser is connected with a second inlet of the first heat recovery unit, an outlet of the first heat recovery unit is connected with an inlet of the boiler, the first heat recovery unit is composed of at least one heater, the heat storage unit comprises a heat storage tank, a sprayer and a spray water pipeline, the sprayer is arranged in the heat storage tank, the spray water pipeline is connected with the sprayer through a first inlet of the heat storage tank, the second inlet of the heat storage tank is connected with a first outlet of the steam turbine, and the first outlet of the heat storage tank is connected with a first inlet of the first heat recovery unit.
In an exemplary embodiment of the invention, the elastic heat recovery system may further comprise a second heat recovery unit including a heat exchanger, a water pipe and a drain pipe, wherein a heat source inlet of the heat exchanger is connected with a second outlet of the heat storage tank, a heat source inlet of the heat exchanger is connected with an outlet of the water pipe, a heat source outlet of the heat exchanger is connected with an inlet of the boiler, and a heat source outlet of the heat exchanger is connected with an inlet of the drain pipe.
In an exemplary embodiment of the present invention, the steam turbine is composed of a plurality of cylinders of different pressure levels, and the number of the first heat recovery unit, the second heat recovery unit and/or the heat storage unit may be at least one, and a single first heat recovery unit and/or heat storage unit is connected to at least one cylinder within the steam turbine, and a single second heat recovery unit is connected to at least one heat storage unit.
In an exemplary embodiment of the present invention, a deaerator and a pump stack may be provided between the condenser and the first regeneration unit.
In an exemplary embodiment of the present invention, a check valve may be provided at the first outlet of the steam turbine.
In an exemplary embodiment of the present invention, the inlet of the water drain pipe and/or the water transport pipe may be connected with the outlet of the condenser.
In one exemplary embodiment of the invention, the inlet of the spray water conduit may be connected to the cold source outlet of the unit reheater.
The invention also provides an elastic heat recovery method for improving the variable load rate of the coal-fired power generator unit, which is realized by the elastic heat recovery system, and comprises a normal operation stage, a load reduction stage and a load rising stage; in the normal operation stage, the heat energy of a part of turbine steam extraction is utilized to heat condensed water formed by condensing the turbine steam extraction in a first heat recovery unit, the heated condensed water is used as boiler feed water to be conveyed to a boiler, in the load reduction stage, the part of turbine steam extraction is prestored in a heat storage tank, the temperature in the heat storage tank is maintained to be the saturated temperature corresponding to the steam extraction pressure in a steam extraction pipeline through spraying water into the heat storage tank, in the load rising stage, a part of working medium stored in the heat storage tank automatically flows into the first heat recovery unit by means of the pressure difference between the working medium and the pressure difference caused by the condensation of the working medium in the first heat recovery unit to form liquid, and the process of heating the condensed water by utilizing the turbine steam extraction is participated in the first heat recovery unit, and the working medium is a mixture formed by the steam extraction and the water spraying.
In another exemplary embodiment of the present invention, the elastic heat recovery method may further include transferring another part of the working medium stored in the heat storage tank to the second heat recovery unit to exchange heat with cold water during a load rising stage, transferring hot water after heat exchange to the boiler as boiler feed water, and transferring hydrophobic water after heat exchange to the first heat recovery unit as condensed water.
In another exemplary embodiment of the present invention, the water temperature of the outlet of the first heat recovery unit may be the same as the water temperature of the outlet of the heat source of the second heat recovery unit.
Through the technical scheme provided by the invention, the invention has at least the following technical effects:
(1) The elastic heat recovery system can store the steam extraction heat energy in the steam turbine power generation system through the heat storage tank when the coal-fired power generation unit is in high load, and release the steam extraction heat energy stored in the heat storage tank when the coal-fired power generation unit is in low load for heating boiler water supply, so that the load changing rate of the coal-fired power generation unit is improved, and the stability and the power supply quality of the power system are improved;
(2) The invention has the advantages that the design of the heat storage tank enables the storage and release of the heat of the extracted steam to be more efficient, reduces the energy loss and improves the economy of the elastic heat recovery system.
Additional features and advantages of the invention will be set forth in the detailed description which follows.
Drawings
The accompanying drawings are included to provide a further understanding of embodiments of the invention and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain, without limitation, the embodiments of the invention. In the drawings:
FIG. 1 is a schematic structural diagram of an elastic heat recovery system for increasing the variable load rate of a coal-fired power unit according to an embodiment of the present invention;
fig. 2 is a schematic structural diagram of another elastic heat recovery system for improving a variable load rate of a coal-fired power unit according to an embodiment of the present invention.
Description of the reference numerals
11-A water supply bypass inlet, 12-a water supply bypass, 13-a water supply bypass heater, 14-a high-pressure heat storage tank energy supply pipeline, 15-a high-pressure heat storage tank energy supply pipeline regulating valve bank, 16-a high-pressure heat storage tank, 17-a high-pressure sprayer, 18-a high-pressure spraying regulating valve bank, 19-a high-pressure spraying water supply pipeline, 110-a water supply bypass regulating valve bank, 111-a water intake of a water supply bypass, 112-a high-pressure heat storage tank energy storage pipeline, 113-a high-pressure heat storage tank energy storage pipeline regulating valve bank, 114-a high-pressure check valve, 115-a high-pressure energy supply pipeline for dewatering, 116-a steam turbine high-pressure steam extraction pipe tee joint, 21-a condensed water bypass inlet, 22-a condensed water bypass, 23-a condensed water bypass heater, 24-a low-pressure heat storage tank energy supply pipeline, 25-low pressure heat storage tank energy supply pipeline regulating valve group, 26-low pressure heat storage tank, 27-low pressure sprayer, 28-low pressure spray water regulating valve group, 29-low pressure spray water pipeline, 210-condensate bypass regulating valve group, 211-condensate bypass water intake, 212-low pressure heat storage tank energy storage pipeline, 213-low pressure heat storage tank energy storage pipeline regulating valve group, 214-low pressure check valve, 215-low pressure energy supply pipeline drainage, 216-turbine low pressure steam extraction pipe tee joint, 31-boiler, 32-high pressure steam pipeline, 33-turbine high pressure cylinder, 34-low pressure steam pipeline, 35-turbine low pressure cylinder, 36-steam extraction pipeline, 37-condenser, 38-condensate water pump, 39-condensate water pipeline, 310-low pressure heater group, 311-low pressure steam extraction pipeline, 312-deaerator, 313-water supply pump, 314-water supply pipeline, 315-high pressure steam extraction pipeline, 316-high pressure heater group, 317-generator.
Detailed Description
The following describes the detailed implementation of the embodiments of the present invention with reference to the drawings. It should be understood that the detailed description and specific examples, while indicating and illustrating the invention, are not intended to limit the invention.
It should be noted that, without conflict, the embodiments of the present invention and features of the embodiments may be combined with each other.
In the present invention, "first," "second," etc. are merely for convenience of description and for convenience of distinction, and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it should also be noted that, unless explicitly specified and limited otherwise, the terms "mounted," "connected," and the like are to be construed broadly, and may be, for example, fixedly connected, detachably connected, integrally connected, directly connected, indirectly connected, or wirelessly connected. The specific meaning of the above terms in the present invention can be understood as appropriate by those of ordinary skill in the art.
The invention will be described in detail below with reference to the drawings in connection with embodiments.
The embodiment of the invention provides an elastic heat recovery system for improving the variable load rate of a coal-fired power generation unit, which consists of a coal-fired power generation subsystem and a heat storage peak regulation subsystem. The heat storage peak regulation subsystem is used for adjusting the load capacity of the coal-fired power generation unit and can comprise a heat storage unit.
Specifically, in the whole elastic heat recovery system, a generator is connected with a steam turbine, an inlet of the steam turbine is connected with an outlet of a boiler, a first outlet of the steam turbine is connected with a first inlet of a first heat recovery unit through a steam extraction pipeline, a second outlet of the steam turbine is connected with an inlet of a condenser through a steam exhaust pipeline, an outlet of the condenser is connected with a second inlet of the first heat recovery unit, and an outlet of the first heat recovery unit is connected with an inlet of the boiler. The first heat recovery unit is used for heating condensation water output by the condenser by utilizing heat energy of steam extracted by the steam turbine, the first heat recovery unit can be arranged as heaters, the number of the heaters can be one or more, and the number of the heaters can be determined according to heat recovery requirements of the whole elastic heat recovery system. Therefore, the high-temperature and high-pressure steam generated by the boiler can be used for driving the steam turbine to rotate and drive the generator to generate power, meanwhile, the condensed water formed by condensing the steam discharged by the steam turbine is recovered, and part of heat energy of the steam extracted by the steam turbine is used for heating the condensed water, and the heated condensed water can be used as boiler feed water to enter the boiler to generate high-temperature and high-pressure steam again for subsequent power generation.
The heat storage unit is used for storing a part of steam turbine extraction steam when the coal-fired power generation unit is under high load and releasing the pre-stored steam turbine extraction steam for heating condensation water when the coal-fired power generation unit is under low load. The heat storage unit may include a heat storage tank, a sprayer, and a spray water pipe, wherein the sprayer is disposed in the heat storage tank, the spray water pipe is connected with the sprayer through a first inlet of the heat storage tank, a first outlet of the steam turbine is connected with a second inlet of the heat storage tank through a steam extraction pipe, and a first outlet of the heat storage tank is connected with a first inlet of the first heat regeneration unit. Therefore, when the load of the coal-fired generator set needs to be reduced, the steam extracted from the steam turbine enters the heat storage tank through the steam extraction pipeline, and water is sprayed into the heat storage tank through the sprayer to reduce the temperature, so that the temperature in the heat storage tank can be maintained to be the saturated temperature t 1 corresponding to the steam extraction pressure in the steam extraction pipeline. Because the extraction steam is continuously condensed into water, a pressure difference is formed in the heat storage tank, the extraction steam in the extraction steam pipeline can continuously enter the heat storage tank until the heat storage tank reaches the maximum heat storage volume. When the load of the coal-fired generator set needs to be increased, the working medium (namely, a mixture formed by steam extraction and water spraying) stored in the heat storage tank can automatically flow into the first heat recovery unit by means of pressure difference caused by liquid formed by condensation of the working medium in the first heat recovery unit, and condensation water output by the condenser is heated in the first heat recovery unit.
Further, in a possible embodiment, the elastic heat recovery system may further include a second heat recovery unit, and the second heat recovery unit is used for recovering heat energy extracted from the heat storage tank for heating boiler feed water. The second heat recovery unit may include a heat exchanger, a water pipe, and a drain pipe, wherein a heat source inlet of the heat exchanger is connected with a second outlet of the heat storage tank, a heat source inlet of the heat exchanger is connected with an outlet of the water pipe, a heat source outlet of the heat exchanger is connected with an inlet of the boiler, and a heat source outlet of the heat exchanger is connected with an inlet of the drain pipe. Therefore, when the load of the coal-fired power generation unit needs to be increased, the extraction steam stored in the heat storage tank not only can flow into the first heat recovery unit automatically to participate in heating of the condensed water, but also can enter the heat exchanger to exchange heat with the bypass condensed water, and the hot water obtained in the two ways can be used as boiler feed water to be conveyed to a boiler, so that the extraction steam quantity of the steam turbine is reduced rapidly.
Further, in one possible embodiment, the steam turbine is composed of a plurality of cylinders with different pressure levels, and the number of the first heat recovery unit, the second heat recovery unit and the heat storage unit can be one or more. The single first regenerative unit may be connected with at least one cylinder within the steam turbine, the single heat storage unit may be connected with at least one cylinder within the steam turbine, and the single second regenerative unit may be connected with at least one heat storage unit. In other words, the first heat recovery unit is matched with a plurality of cylinders in the steam turbine in a one-to-one or one-to-many mode, the heat storage unit is matched with a plurality of cylinders in the steam turbine in a one-to-one or one-to-many mode, and the second heat recovery unit is matched with the heat storage unit in a one-to-one or one-to-many mode.
Further, in one possible embodiment, a deaerator and a pump stack may be provided between the condenser and the first regenerator unit. The deaerator is used for removing oxygen in the condensed water so as to prevent the oxygen in the condensed water from corroding and damaging the steam turbine and related equipment. The pump set is used for lifting the condensation water pressure.
Further, in one possible embodiment, a check valve is provided at the first outlet of the steam turbine, the check valve being used to prevent the extraction steam in the extraction steam pipe from flowing back to the steam turbine.
Further, in one possible embodiment, the inlet of the hydrophobic conduit and/or the water conduit may be connected with the outlet of the condenser. When the load of the coal-fired power generation unit needs to be increased, condensed water conveyed by the condenser can enter the heat exchanger through the water conveying pipeline to exchange heat with the extraction steam released in the heat storage tank, the condensed water after heat exchange is used for boiler water supply, and the drainage water after heat exchange can flow into the first heat recovery unit through the drainage pipeline to participate in the heating process of other condensed water, so that the cyclic utilization of the condensed water can be realized, the energy utilization rate is improved, and the energy consumption and the emission of the coal-fired power plant are reduced.
Further, in one possible embodiment, the inlet of the spray water pipe may be connected to the cold source outlet of the unit reheater.
The embodiment of the invention also provides an elastic heat recovery method for improving the variable load rate of the coal-fired power generation unit, which is realized by the elastic heat recovery system for improving the variable load rate of the coal-fired power generation unit in the embodiment and comprises three stages of a normal operation stage, a load reduction stage and a load rising stage.
Specifically, in the normal operation stage, the condensed water formed by condensing the steam turbine exhaust is heated in the first regenerative unit by utilizing the heat energy of a part of the steam turbine exhaust, and the heated condensed water is used as boiler feed water to be conveyed to a boiler.
In the load reduction stage, part of steam turbine extraction steam is stored in the heat storage tank in advance, and the temperature in the heat storage tank is maintained to be the saturation temperature corresponding to the steam extraction pressure in the steam extraction pipeline by spraying water into the heat storage tank.
In the load lifting stage, a part of working medium (i.e. a mixture formed by steam extraction and water spraying) stored in the heat storage tank automatically flows into the first heat recovery unit by means of pressure difference caused by condensation of the working medium in the first heat recovery unit to form liquid, and the process of heating condensed water by steam extraction of the steam turbine is participated in the first heat recovery unit.
Further, in a possible implementation mode, the elastic heat recovery method further comprises the steps of releasing a part of working media in the heat storage tank for heating boiler water supply in a load lifting stage, conveying the other part of working media stored in the heat storage tank to the second heat recovery unit to exchange heat with cold water, conveying hot water after heat exchange to the boiler as boiler water supply, and conveying the drain water after heat exchange to the first heat recovery unit as condensed water.
Further, in one possible embodiment, the water temperature at the outlet of the first regenerative unit may be the same as the water temperature at the outlet of the heat source of the second regenerative unit.
For a better understanding of the above-described exemplary embodiments of the present invention, it is further described below with reference to specific examples and drawings.
Example 1
As shown in fig. 1, the elastic heat recovery system for improving the variable load rate of the coal-fired power generation unit consists of a high-pressure storage/heat supply flexible regulation part, a low-pressure storage/heat supply flexible regulation part and a primary coal-fired power generation unit part. The high-pressure heat accumulating/supplying flexible regulating part consists of a high-pressure heat accumulating tank, a water supplying bypass heater, corresponding pipelines, valves, a tee joint and other equipment, the low-pressure heat accumulating/supplying flexible regulating part consists of a high-pressure heat accumulating tank, a condensed water bypass heater, corresponding pipelines, valves, a tee joint and other equipment, and the original coal-fired generating set part can be a coal-fired generating set in any form, and typical components comprise a boiler, a steam turbine, a generator, a condenser, a heater, a regenerative pipeline, a pump and the like.
Specifically, in the high-pressure storage/heat supply flexible regulation part, the high-pressure heat storage tank 16 is connected with the turbine high-pressure steam extraction pipe tee 116 through the high-pressure heat storage tank energy storage pipeline 112, and the other end of the turbine high-pressure steam extraction pipe tee 116 is connected with the high-pressure steam extraction pipeline 315 of the turbine high-pressure cylinder 33. To prevent backflow of extraction steam into the turbine, a high pressure check valve 114 is added to the high pressure extraction steam line 315. The high-pressure heat storage tank energy storage pipeline 112 is provided with a high-pressure heat storage tank energy storage pipeline regulating valve group 113, and the regulating valve group comprises any number of shutoff valves, regulating valves and pressure reducing valves.
A high-pressure sprayer 17 is arranged in the high-pressure heat storage tank 16, and the high-pressure sprayer 17 is connected with spray water through a high-pressure spray water supply pipeline 19. A high pressure spray water supply line 19 is provided with a high pressure spray regulator valve block 18 comprising any number of shut-off, regulator and pressure relief valves. The spray water on the high-pressure spray water supply pipeline 19 is preferably the unit reheater desuperheating water or the overheat desuperheating water, and is matched according to the pressure of the high-pressure heat storage tank 16.
The high-pressure heat storage tank 16 is furthermore connected to the feedwater bypass heater 13 via a high-pressure heat storage tank supply line 14. The feedwater bypass heater is preferably a plate heat exchanger and the heat exchange media is steam from the high pressure heat storage tank 16 and water from the feedwater bypass 12. The high-pressure heat storage tank energy supply pipeline 14 is provided with a high-pressure heat storage tank energy supply pipeline regulating valve group 15 which comprises any number of shutoff valves, regulating valves and pressure reducing valves.
The steam from the high pressure thermal storage tank 16 transfers heat to the water from the feedwater bypass 12 within the feedwater bypass heater 13 and then enters the deaerator 312 via the high pressure power supply conduit drain 115.
The water from the water supply bypass 12 is supplied from a bypass water supply intake (tee) 111 at the outlet of a water supply pump 313, is heated by steam passing through a high-pressure heat storage tank 16, is heated, and then enters a bypass water supply inlet (tee) 11, and finally enters a boiler 31. The feedwater bypass 12 is provided with a feedwater bypass valve block 110 including any number of shut-off, regulator and pressure relief valves.
In the low-pressure storage/heat supply flexible regulation part, the low-pressure heat storage tank 26 is connected with a turbine low-pressure steam extraction pipe tee joint 216 through a low-pressure heat storage tank energy storage pipeline 212, and the other end of the turbine low-pressure steam extraction pipe tee joint 216 is connected with a low-pressure steam extraction pipeline 311 of a turbine low-pressure cylinder 35. To prevent the backflow of the extracted steam into the turbine, a low-pressure check valve 214 is added to the low-pressure steam extraction pipe 311. The low pressure thermal storage tank energy storage pipeline 212 is provided with a low pressure thermal storage tank energy storage pipeline regulating valve group 213 which comprises any number of shut-off valves, regulating valves and pressure reducing valves.
The low-pressure heat storage tank 26 comprises a low-pressure sprayer 27, and the low-pressure sprayer 27 is connected with spray water through a low-pressure spray water pipeline 29. The low pressure spray water line 29 is provided with a low pressure spray water regulator valve block 28 comprising any number of shut-off, regulator and pressure relief valves. The spray water on the low pressure spray water line 29 is preferably condensate from the outlet of the condenser 37.
The low-pressure heat storage tank 26 is furthermore connected to the condensate bypass heater 23 via a low-pressure heat storage tank supply line 24. The condensate bypass heater is preferably a plate heat exchanger and the heat exchange medium is steam from the low pressure thermal storage tank 26 and water from the condensate bypass 22. The low pressure thermal storage tank supply pipe 24 is provided with a low pressure thermal storage tank supply pipe regulating valve group 25 comprising any number of shut-off valves, regulating valves and pressure reducing valves.
The steam in the low-pressure heat storage tank 26 transfers heat to the water in the condensate bypass 22 in the condensate bypass heater 23, and then enters the condenser 37 through the low-pressure energy supply pipeline drain 215.
The water from the condensate bypass 22 comes from the condensate intake (tee) 211 at the outlet of the condensate pump 37, heats up after being heated by the steam passing through the low-pressure heat storage tank 26, enters the condensate inlet (tee) 21, and finally enters the deaerator 312. The condensate bypass 22 is provided with a condensate bypass damper group 210 comprising any number of shut-off, damper and pressure relief valves.
In the raw coal-fired power unit section, the turbine includes a turbine high pressure cylinder 33 and a turbine low pressure cylinder 35. The high-pressure steam turbine cylinder 33 is a high-pressure part of a steam turbine system and can be an ultrahigh-pressure cylinder, a high-pressure cylinder and the like of a coal-fired power generation unit, and the low-pressure steam turbine cylinder 35 is a low-pressure part of the steam turbine system and can be a medium-pressure cylinder, a low-pressure cylinder and the like of the coal-fired power generation unit.
The high-pressure heater group 316 is disposed on the water feed pipe 314 and is connected to the turbine high-pressure cylinder 33 through the high-pressure steam extraction pipe 315. The low pressure heater group 310 is disposed on the condensed water pipe 39 and is connected to the turbine low pressure cylinder 35 through a low pressure steam extraction pipe 311.
The high pressure steam pipe 32 connects the boiler 31 and the turbine high pressure cylinder 33. The low pressure steam pipe 34 connects the turbine high pressure cylinder 33 and the turbine low pressure cylinder 35. The exhaust pipe 36 connects the low pressure cylinder 35 and the condenser 37. The condensed water pipe 39 connects the condenser 37 and the deaerator 312. The water feed line 314 connects the deaerator 312 and the boiler 31.
A condensate pump 38 is located between the condenser 37 and the low pressure heater bank 310. A feedwater pump 313 is located between the deaerator 312 and the high-pressure heater bank 316.
The principle of the elastic heat recovery system in the example for adjusting the variable load rate of the coal-fired power generation unit is that the high-pressure storage/heat supply flexible adjusting part and the low-pressure storage/heat supply flexible adjusting part are utilized for rapidly adjusting the steam extraction quantity of the steam turbine, so that the output of the steam turbine is changed, and the load is further adjusted. When the unit needs to be loaded, the steam is discharged from the heat storage tank and enters the first heat recovery unit and the second heat recovery unit at the same time, so that the steam extraction of the steam turbine is reduced, and the load lifting rate of the unit is improved.
When the load reduction rate of the coal-fired unit needs to be improved, a specific flow of carrying out heat storage and peak shaving by using the elastic heat regenerative system in the example is as follows.
And A1, receiving a load reducing instruction when the coal-fired unit operates under high load.
And step A2, flexibly adjusting partial charging energy for high-pressure storage/heat supply, namely opening an energy storage pipeline adjusting valve group 113 of the high-pressure heat storage tank, and storing the extracted steam into the high-pressure heat storage tank 16 through a high-pressure steam extraction pipe tee 116 of the steam turbine. When the extracted steam enters the high-pressure heat storage tank 16, the high-pressure spray regulating valve group 18 is opened to spray water into the high-pressure heat storage tank 16 for reducing the temperature, and the temperature in the high-pressure heat storage tank 16 is maintained to be the saturation temperature t 1 corresponding to the steam extraction pressure in the high-pressure steam extraction pipeline 315. Because the extracted steam is continuously condensed into water, a pressure difference is formed in the high-pressure heat storage tank 16, the extracted steam in the three-way pipe 116 of the high-pressure steam extraction pipe of the steam turbine can continuously enter the high-pressure heat storage tank 16 until the high-pressure heat storage tank 16 reaches the maximum heat storage volume.
And step A3, flexibly adjusting partial charging energy for low-pressure storage/heat supply, namely opening an energy storage pipeline adjusting valve group 213 of the low-pressure heat storage tank, and storing the extracted steam into the low-pressure heat storage tank 26 through a low-pressure steam extraction pipe tee 216 of the steam turbine. When the extraction steam enters the low-pressure heat storage tank 26, the low-pressure spray water regulating valve group 28 is opened to spray water into the low-pressure heat storage tank 26 for reducing the temperature, and the temperature in the low-pressure heat storage tank 26 is maintained to be the saturation temperature t 2 corresponding to the extraction steam pressure in the low-pressure steam extraction pipeline 311. Because the extracted steam is continuously condensed into water, a pressure difference is formed in the low-pressure heat storage tank 26, the extracted steam in the three-way pipe 216 of the low-pressure steam extraction pipe of the steam turbine can continuously enter the low-pressure heat storage tank 26 until the low-pressure heat storage tank 26 reaches the maximum heat storage volume.
The steps A2 and A3 can be operated simultaneously or independently, and the steam extraction amount of the steam turbine can be improved through the steps A2 and A3 and stored in the elastic heat recovery system, so that the load reduction capacity of the coal-fired power generation unit is enhanced. Meanwhile, as the steam extraction amount of the steam turbine is increased, the cold source loss is reduced, and the economy of the coal-fired generator set can be improved.
When the load lifting rate of the coal-fired unit needs to be improved, a specific flow of carrying out heat storage and peak shaving by using the elastic heat regenerative system in the example is as follows.
And B1, receiving a load increasing instruction when the coal-fired unit runs under low load.
And step B2, the high-pressure heat storage/supply flexible regulation part releases energy, namely opening a high-pressure heat storage tank energy supply pipeline regulation valve group 15 and a water supply bypass regulation valve group 110, releasing heat stored in the high-pressure heat storage tank 16 to water of a water supply bypass, and controlling water flow of the water supply bypass and the heat release quantity of the high-pressure heat storage tank energy supply pipeline to keep the outlet water temperature of the water supply bypass heater 13 consistent with the outlet water temperature of the high-pressure heater group 316. After the working fluid in the high-pressure heat storage tank 16 releases heat, the generated drain water enters the deaerator 312 through the high-pressure energy supply pipeline drain water 115.
And step B3, the low-pressure heat storage/supply flexible regulation part is released, namely, the low-pressure heat storage tank energy supply pipeline regulation valve group 25 and the condensate bypass regulation valve group 210 are opened, the heat stored in the low-pressure heat storage tank 26 is released to the water of the condensate bypass, the condensate bypass water flow and the low-pressure heat storage tank energy supply pipeline heat release are controlled, and the outlet water temperature of the condensate bypass heater 23 is kept consistent with the outlet water temperature of the low-pressure heater group 310. After the working medium of the low-pressure heat storage tank 26 releases heat, the generated drain water enters the condenser 37 through the drain water 215 of the low-pressure energy supply pipeline.
The steps B2 and B3 can be operated simultaneously or independently, and the heat stored in the elastic heat recovery system can be released to the heat recovery unit of the steam turbine through the steps B2 and B3 to exhaust the steam extraction amount of the steam turbine, so that the load lifting capacity of the coal-fired power generation unit is enhanced.
Example 2
As shown in fig. 2, the elastic heat recovery system for improving the variable load rate of the coal-fired power generation unit comprises a high-pressure storage/heat supply flexible regulation part, a low-pressure storage/heat supply flexible regulation part and a primary coal-fired power generation unit part. The high-pressure heat accumulation/supply flexible regulation part consists of a high-pressure heat accumulation tank, a corresponding pipeline, a valve, a tee joint and other equipment, the low-pressure heat accumulation/supply flexible regulation part consists of the high-pressure heat accumulation tank, the corresponding pipeline, the valve, the tee joint and the other equipment, and the primary coal-fired generator set part can be any type of coal-fired generator set, and typical components comprise a boiler, a steam turbine, a generator, a condenser, a heater, a regenerative pipeline, a pump and the like. In contrast to the elastic regenerative system in the above example, the present example is not provided with the feedwater bypass heater 13 and the condensate bypass heater 23 and the corresponding piping and valves.
Specifically, in the high-pressure storage/heat supply flexible regulation part, the high-pressure heat storage tank 16 is connected with the turbine high-pressure steam extraction pipe tee 116 through the high-pressure heat storage tank energy storage pipeline 112, and the other end of the turbine high-pressure steam extraction pipe tee 116 is connected with the high-pressure steam extraction pipeline 315 of the turbine high-pressure cylinder 33. To prevent backflow of extraction steam into the turbine, a high pressure check valve 114 is added to the high pressure extraction steam line 315. The high-pressure heat storage tank energy storage pipeline 112 is provided with a high-pressure heat storage tank energy storage pipeline regulating valve group 113, and the regulating valve group comprises any number of shutoff valves, regulating valves and pressure reducing valves.
A high-pressure sprayer 17 is arranged in the high-pressure heat storage tank 16, and the high-pressure sprayer 17 is connected with spray water through a high-pressure spray water supply pipeline 19. A high pressure spray water supply line 19 is provided with a high pressure spray regulator valve block 18 comprising any number of shut-off, regulator and pressure relief valves. The spray water on the high-pressure spray water supply pipeline 19 is preferably the unit reheater desuperheating water or the overheat desuperheating water, and is matched according to the pressure of the high-pressure heat storage tank 16.
In the low-pressure storage/heat supply flexible regulation part, a low-pressure heat storage tank 26 is connected with a turbine low-pressure steam extraction pipe tee joint 216 through a low-pressure heat storage tank energy storage pipeline 212, and the other end of the turbine low-pressure steam extraction pipe tee joint 216 is connected with a low-pressure steam extraction pipeline 311 at the outlet of a turbine low-pressure cylinder 35. In order to prevent the backflow of the extracted steam into the turbine, a low-pressure check valve 214 is added to the low-pressure steam extraction pipe 311. The low pressure thermal storage tank energy storage pipeline 212 is provided with a low pressure thermal storage tank energy storage pipeline regulating valve group 213 which comprises any number of shut-off valves, regulating valves and pressure reducing valves.
The low-pressure heat storage tank 26 comprises a low-pressure sprayer 27, and the low-pressure sprayer 27 is connected with spray water through a low-pressure spray water pipeline 29. The low pressure spray water line 29 is provided with a low pressure spray water regulator valve block 28 comprising any number of shut-off, regulator and pressure relief valves. The spray water on the low pressure spray water line 29 is preferably the condensate water from the unit condenser 37 outlet.
In the raw coal-fired power unit section, the turbine includes a turbine high pressure cylinder 33 and a turbine low pressure cylinder 35. The high-pressure steam turbine cylinder 33 is a high-pressure part of a steam turbine system and can be an ultrahigh-pressure cylinder, a high-pressure cylinder and the like of a coal-fired power generation unit, and the low-pressure steam turbine cylinder 35 is a low-pressure part of the steam turbine system and can be a medium-pressure cylinder, a low-pressure cylinder and the like of the coal-fired power generation unit.
The high-pressure heater group 316 is disposed on the water feed pipe 314 and is connected to the turbine high-pressure cylinder 33 through the high-pressure steam extraction pipe 315. The low pressure heater group 310 is disposed on the condensed water pipe 39 and is connected to the turbine low pressure cylinder 35 through a low pressure steam extraction pipe 311.
The high pressure steam pipe 32 connects the boiler 31 and the turbine high pressure cylinder 33. The low pressure steam pipe 34 connects the turbine high pressure cylinder 33 and the turbine low pressure cylinder 35. The exhaust pipe 36 connects the low pressure cylinder 35 and the condenser 37. The condensed water pipe 39 connects the condenser 37 and the deaerator 312. The water feed line 314 connects the deaerator 312 and the boiler 31.
A condensate pump 38 is located between the condenser 37 and the low pressure heater bank 310. A feedwater pump 313 is located between the deaerator 312 and the high-pressure heater bank 316.
The principle of the elastic heat recovery system in the example for adjusting the variable load rate of the coal-fired power generation unit is that the high-pressure storage/heat supply flexible adjusting part and the low-pressure storage/heat supply flexible adjusting part are utilized for rapidly adjusting the steam extraction quantity of the steam turbine, so that the output of the steam turbine is changed, and the load is further adjusted. When the unit needs to be loaded, the steam is discharged from the heat storage tank and enters the first heat recovery unit, so that the steam extraction of the steam turbine is reduced, and the load lifting rate of the unit is improved.
When the load reduction rate of the coal-fired unit needs to be improved, the flow of carrying out heat storage and peak shaving by using the elastic heat regenerative system in the example is the same as the flow in the example, and specifically comprises the following steps:
and A1, receiving a load reducing instruction when the coal-fired unit operates under high load.
And step A2, flexibly adjusting partial charging energy for high-pressure storage/heat supply, namely opening an energy storage pipeline adjusting valve group 113 of the high-pressure heat storage tank, and storing the extracted steam into the high-pressure heat storage tank 16 through a high-pressure steam extraction pipe tee 116 of the steam turbine. When the extracted steam enters the high-pressure heat storage tank 16, the high-pressure spray regulating valve group 18 is opened to spray water into the high-pressure heat storage tank 16 for reducing the temperature, and the temperature in the high-pressure heat storage tank 16 is maintained to be the saturation temperature t 1 corresponding to the steam extraction pressure in the high-pressure steam extraction pipeline 315.
And step A3, flexibly adjusting partial charging energy for low-pressure storage/heat supply, namely opening an energy storage pipeline adjusting valve group 213 of the low-pressure heat storage tank, and storing the extracted steam into the low-pressure heat storage tank 26 through a low-pressure steam extraction pipe tee 216 of the steam turbine. When the extraction steam enters the low-pressure heat storage tank 26, the low-pressure spray water regulating valve group 28 is opened to spray water into the low-pressure heat storage tank 26 for reducing the temperature, and the temperature in the low-pressure heat storage tank 26 is maintained to be the saturation temperature t 2 corresponding to the extraction steam pressure in the low-pressure steam extraction pipeline 311.
The steps A2 and A3 can be operated simultaneously or independently,
When the load-up rate of the coal-fired unit needs to be increased, the water supply bypass heater 13 and the condensate bypass heater 23 are not present in the elastic heat recovery system in the present example, and the high-pressure heat storage tank 16 and the low-pressure heat storage tank 26 need to be returned to the high-pressure heater group 316 and the low-pressure heater group 310 by means of the high-pressure heat storage tank energy storage pipeline 112 and the low-pressure heat storage tank energy storage pipeline 212 in the load-up stage. The specific flow of heat storage peak shaving by using the elastic heat regenerative system in this example is as follows.
And step C1, receiving a load increasing instruction when the coal-fired unit runs under low load.
And step C2, the flexible regulation part of high-pressure heat accumulation/supply is used for discharging energy, specifically, the energy storage pipeline regulating valve group 113 of the high-pressure heat accumulation tank is opened, the stored working medium in the high-pressure heat accumulation tank 16 automatically flows into the high-pressure heater group 316 by virtue of pressure difference caused by condensing the working medium with the working medium in the high-pressure heater group 316 to form liquid, and heat exchange is formed between the working medium and water in the water supply pipeline 314 in the high-pressure heater group 316, and extraction steam in the high-pressure cylinder 33 of the steam turbine is discharged, so that the load lifting rate of the unit is improved.
And step C3, the low-pressure heat storage/supply flexible regulation part is used for discharging energy, specifically, the low-pressure heat storage tank energy storage pipeline regulating valve group 213 is opened, the working medium stored in the low-pressure heat storage tank 26 automatically flows into the low-pressure heater group 310 by means of pressure difference caused by condensing the working medium and the working medium in the low-pressure heater group 310 to form liquid, heat exchange is formed between the working medium and water in the condensed water pipeline 310 in the low-pressure heater group 310, and extraction steam in the low-pressure cylinder 35 of the steam turbine is discharged, so that the load lifting rate of the unit is improved.
The steps C2 and C3 can be operated simultaneously or independently,
Compared with the elastic heat recovery system in the above example, the elastic heat recovery system in the present example is not provided with the water supply bypass heater 13 and the condensate bypass heater 23 and corresponding pipes and valves, so that the heat stored in the elastic heat recovery system is returned to the original heater through the energy storage pipe to exchange heat with water, and the system is more compact.
The preferred embodiments of the present invention have been described in detail above with reference to the accompanying drawings, but the present invention is not limited to the specific details of the above embodiments, and various simple modifications can be made to the technical solution of the present invention within the scope of the technical concept of the present invention, and all the simple modifications belong to the protection scope of the present invention.
In addition, the specific features described in the above embodiments may be combined in any suitable manner, and in order to avoid unnecessary repetition, various possible combinations are not described further.
Moreover, any combination of the various embodiments of the invention can be made without departing from the spirit of the invention, which should also be considered as disclosed herein.

Claims (7)

1. The elastic heat recovery system for improving the variable load rate of the coal-fired power generation unit is characterized by comprising a steam turbine, a generator, a condenser, a steam extraction pipeline, a steam exhaust pipeline, a first heat recovery unit, a second heat recovery unit, a heat storage unit and a boiler;
The generator is connected with the steam turbine, the inlet of the steam turbine is connected with the outlet of the boiler, the first outlet of the steam turbine is connected with the first inlet of the first heat recovery unit through a steam extraction pipeline, the second outlet of the steam turbine is connected with the inlet of the condenser through a steam exhaust pipeline, the outlet of the condenser is connected with the second inlet of the first heat recovery unit, the outlet of the first heat recovery unit is connected with the inlet of the boiler, the first heat recovery unit comprises a high-pressure heater group and a low-pressure heater group, the high-pressure heater group is arranged on a water supply pipeline, the low-pressure heater group is arranged on a condensed water pipeline, the condensed water pipeline is connected with the condenser and the deaerator, and the water supply pipeline is connected with the deaerator and the boiler;
The high-pressure heat storage tank is internally provided with the high-pressure sprayer, the high-pressure spray water supply pipeline is connected with the high-pressure sprayer through a first inlet of the high-pressure heat storage tank, a second inlet of the high-pressure heat storage tank is connected with a first outlet of the steam turbine, a first outlet of the high-pressure heat storage tank is connected with a first inlet of the high-pressure heater group, a low-pressure sprayer is arranged in the low-pressure heat storage tank, the low-pressure spray water supply pipeline is connected with the low-pressure sprayer through a first inlet of the low-pressure heat storage tank, a second inlet of the low-pressure heat storage tank is connected with a first outlet of the steam turbine, a first outlet of the low-pressure heat storage tank is connected with a first inlet of the low-pressure heater group, the high-pressure sprayer is used for maintaining the temperature in the high-pressure heat storage tank to be saturated temperature corresponding to the extraction pressure in the extraction pipeline, the spray water on the high-pressure water supply pipeline is set reheater or the superheated water, and the low-pressure sprayer is used for maintaining the temperature in the low-pressure heater to be saturated temperature in the extraction pipeline in the low-pressure heater group in the load stage;
the second regenerative unit comprises a condensed water bypass heater and a water supply bypass heater;
The heat source inlet of the water supply bypass heater is connected with the second outlet of the high-pressure heat storage tank, the cold source inlet of the water supply bypass heater is connected with the water intake of the water supply bypass, the heat source outlet of the water supply bypass heater is connected with the inlet of the boiler, and the cold source outlet of the water supply bypass heater is connected with the inlet of the deaerator;
The heat source inlet of the condensed water bypass heater is connected with the second outlet of the low-pressure heat storage tank, the cold source inlet of the condensed water bypass heater is connected with the water intake of the condensed water bypass, the heat source outlet of the condensed water bypass heater is connected with the inlet of the deaerator, and the cold source outlet of the condensed water bypass heater is connected with the outlet of the condenser.
2. The elastic heat recovery system for increasing the variable load rate of a coal-fired power generation unit according to claim 1, wherein the steam turbine is composed of a plurality of cylinders with different pressure levels, the number of the first heat recovery units, the second heat recovery units and/or the heat storage units is at least one, a single first heat recovery unit and/or the heat storage units are connected with at least one cylinder in the steam turbine, and a single second heat recovery unit is connected with at least one heat storage unit.
3. The elastic heat recovery system for improving the variable load rate of the coal-fired power generation unit according to claim 1, wherein a pump group is arranged between the condenser and the first heat recovery unit.
4. The elastic regenerative system for increasing the variable load rate of a coal-fired power generation unit according to claim 1, wherein a check valve is arranged at the first outlet of the steam turbine.
5. An elastic heat recovery method for improving the variable load rate of a coal-fired power generation unit is characterized by comprising a normal operation stage, a load reduction stage and a load increase stage, wherein the elastic heat recovery method is realized by the elastic heat recovery system for improving the variable load rate of the coal-fired power generation unit according to any one of claims 1-4;
In the normal operation stage, heating condensed water formed by condensing steam turbine exhaust in a first regenerative unit by utilizing heat energy of a part of steam turbine exhaust, and conveying the heated condensed water to a boiler as boiler feed water;
In the load reduction stage, a part of steam turbine extraction steam is stored in a heat storage tank in advance, and the temperature in the heat storage tank is maintained to be the saturation temperature corresponding to the steam extraction pressure in a steam extraction pipeline by spraying water into the heat storage tank;
In the load lifting stage, a part of working medium stored in the heat storage tank automatically flows into the first heat recovery unit by means of pressure difference caused by condensing the working medium in the heat recovery unit to form liquid, and the working medium is a mixture formed by steam extraction and water spraying in the process of heating condensed water by using steam extraction of a steam turbine in the first heat recovery unit.
6. The elastic backheating method for increasing the variable load rate of a coal-fired power unit according to claim 5, further comprising:
And in the load lifting stage, the other part of working medium stored in the heat storage tank is conveyed to the second heat recovery unit to exchange heat with cold water, hot water after heat exchange is conveyed to the boiler as boiler feed water, and drainage water after heat exchange is conveyed to the first heat recovery unit as condensation water.
7. The method for elastically regenerating a coal-fired power unit according to claim 6, wherein the water temperature at the outlet of the first regenerating unit is the same as the water temperature at the outlet of the heat source of the second regenerating unit.
CN202410468467.2A 2024-04-18 2024-04-18 Elastic heat regeneration system and method for improving variable load rate of coal-fired generator set Active CN118564318B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202410468467.2A CN118564318B (en) 2024-04-18 2024-04-18 Elastic heat regeneration system and method for improving variable load rate of coal-fired generator set

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202410468467.2A CN118564318B (en) 2024-04-18 2024-04-18 Elastic heat regeneration system and method for improving variable load rate of coal-fired generator set

Publications (2)

Publication Number Publication Date
CN118564318A CN118564318A (en) 2024-08-30
CN118564318B true CN118564318B (en) 2026-06-09

Family

ID=92477260

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202410468467.2A Active CN118564318B (en) 2024-04-18 2024-04-18 Elastic heat regeneration system and method for improving variable load rate of coal-fired generator set

Country Status (1)

Country Link
CN (1) CN118564318B (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN219264247U (en) * 2023-02-09 2023-06-27 西安热工研究院有限公司 A system that uses steam accumulators to improve the flexibility of thermal power plants
CN117489428A (en) * 2023-11-02 2024-02-02 华北电力大学 An energy storage peak-shaving system and method integrating molten salt heat storage and steam accumulator

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110735676B (en) * 2019-10-25 2020-12-22 西安交通大学 A kind of flexible adjustment system and adjustment method of coal-fired unit adopting water make-up tank
CN114837763B (en) * 2022-05-27 2023-05-05 华能国际电力股份有限公司 Flexible regulation and control system of thermal power unit integrated with steam accumulator and working method
CN115199349B (en) * 2022-08-16 2025-03-21 华能国际电力股份有限公司 A coal-fired power generation system coupled with steam energy storage and operation method
CN115435626B (en) * 2022-09-20 2025-09-23 西安西热锅炉环保工程有限公司 A thermal power unit steam extraction thermal storage peak regulation system based on molten salt heat storage and its working method
CN219433883U (en) * 2023-02-22 2023-07-28 中国长江三峡集团有限公司 Electricity storage and heat storage system
CN116906138B (en) * 2023-07-13 2026-04-03 西安交通大学 Coupled systems and control methods for improving the variable load performance of coal-fired power units using medium-temperature energy storage

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN219264247U (en) * 2023-02-09 2023-06-27 西安热工研究院有限公司 A system that uses steam accumulators to improve the flexibility of thermal power plants
CN117489428A (en) * 2023-11-02 2024-02-02 华北电力大学 An energy storage peak-shaving system and method integrating molten salt heat storage and steam accumulator

Also Published As

Publication number Publication date
CN118564318A (en) 2024-08-30

Similar Documents

Publication Publication Date Title
CN115247580B (en) A multi-stage heat storage peak regulation system and method for thermal power units
CN110454769A (en) A control system and control method for a large-scale generator set with a high back pressure steam-driven feed water pump
CN112856363B (en) System and method for improving heat supply steam parameters of deep peak shaving heat supply unit
CN114718676A (en) Coal-fired unit steam heating fused salt store thermal system
CN118111264A (en) A thermal storage peak-shaving system and method for coal-fired units
JP2012102711A (en) Temperature reducing device steam heat recovery facilities
CN220625002U (en) Coal-fired power generation unit heat storage and steam supply system
CN113280390B (en) Deep peak regulation heat supply grade improving system and method based on heat pump boosting reheating
CN113187570A (en) Double-extraction industrial steam supply system and method based on heat storage tank
CN114776396B (en) Quick starting system and operation method for coal-fired power plant
CN109028999B (en) Steam-water system
JP2012102980A (en) Blow tank and method of using the same
CN120007387A (en) A method for improving the load-following flexibility of pressurized water reactor power
CN210069822U (en) High-pressure high-temperature condensed water flash evaporation recovery system
CN118564318A (en) Elastic heat recovery system and method for improving variable load rate of coal-fired power generation units
CN113294217A (en) Back pressure type steam turbine heat regeneration system with small steam turbine and thermodynamic balance design method
CN220395784U (en) Wide-load efficient multi-unit combined industrial steam supply system
CN116241861B (en) A thermal system suitable for low-load operation
CN119063057A (en) Thermal power plant heating system and operation method based on two-phase flow ejector and molten salt heat storage
JP2012092734A (en) Blow fluid treatment equipment in ejector main steam system
CN214221275U (en) An extraction steam cogeneration unit suitable for primary frequency modulation of large extraction steam
CN214741514U (en) A dual extraction industrial steam supply system based on heat storage tank
CN116378787A (en) Coal-fired unit power generation system
CN208139239U (en) A kind of low grade residual heat steam is applied to high parameter steam generating system
CN222011960U (en) Waste heat recovery equipment and flue gas treatment system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant