CN211846830U - Lifting appliance and lifting device - Google Patents
Lifting appliance and lifting device Download PDFInfo
- Publication number
- CN211846830U CN211846830U CN201922287375.1U CN201922287375U CN211846830U CN 211846830 U CN211846830 U CN 211846830U CN 201922287375 U CN201922287375 U CN 201922287375U CN 211846830 U CN211846830 U CN 211846830U
- Authority
- CN
- China
- Prior art keywords
- load
- bearing
- lifting
- bearing beam
- arms
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
Description
技术领域technical field
本公开属于起重机械领域,特别涉及一种吊具及起吊装置。The disclosure belongs to the field of hoisting machinery, and in particular relates to a hoisting tool and a hoisting device.
背景技术Background technique
在生产抽油机的过程中,需要用到大量的板状零件,例如驴头侧板、尾平衡翼板、减速机底座板等。为保证这些板状零件后续加工工序轴孔的同轴度,以及提高转运吊装时的效率,通常会将同一类的板状零件共边后分别点焊成组摆放,然后通过钢板起重钳进行转运吊装。In the process of producing the pumping unit, a large number of plate-shaped parts are needed, such as the side plate of the donkey head, the balance plate of the tail, and the base plate of the reducer. In order to ensure the coaxiality of the shaft holes in the subsequent processing of these plate-shaped parts, and to improve the efficiency of transfer and hoisting, the plate-shaped parts of the same type are usually spot-welded and placed in groups after being co-edged, and then placed in groups by steel plate lifting clamps. Carry out transfer hoisting.
然而,由于钢板起重钳的卡口尺寸固定,对板状零件的厚度有限制,所以在成组点焊时,对板状零件的厚度和叠设在一起的数量都有限制,影响了转运吊装的效率。并且,由于板状零件形状各异,而钢板起重钳的承力面积较小,所以板状零件的重心不易确定,需要反复调整多个钢板起重钳的平衡吊点,导致板状零件的转运吊装进一步地被影响。However, due to the fixed size of the bayonet of the steel plate lifting pliers, the thickness of the plate-shaped parts is limited, so during spot welding in groups, the thickness of the plate-shaped parts and the number of stacking together are limited, which affects the transfer. Lifting efficiency. In addition, due to the different shapes of the plate-shaped parts and the small bearing area of the steel plate lifting clamp, the center of gravity of the plate-shaped parts is not easy to determine, and it is necessary to repeatedly adjust the balance lifting points of the plate-shaped parts. Transfer hoisting is further affected.
实用新型内容Utility model content
本公开实施例提供了一种吊具及起吊装置,可以提高转运吊装效率。所述技术方案如下:The embodiments of the present disclosure provide a spreader and a hoisting device, which can improve the efficiency of transfer and hoisting. The technical solution is as follows:
一方面,本公开实施例提供了一种吊具,所述吊具包括承重梁和两个限位臂,两个所述限位臂均包括连接端和吊装端,一个所述限位臂的连接端垂直连接在所述承重梁的一端,另一个所述限位臂的连接端垂直连接在所述承重梁的另一端,两个所述限位臂的吊装端均背向所述承重梁延伸,且两个所述限位臂的吊装端的延伸方向相同,所述承重梁和两个所述限位臂之间围成用于容置待吊物的凹陷,两个所述吊装端上均设置有吊装孔,每个所述吊装孔的轴线均垂直于所述承重梁和所述限位臂,且两个所述吊装孔的圆心的连线平行于所述承重梁,所述承重梁上设置有承重裙边,所述承重裙边沿所述承重梁的长度方向延伸,且所述承重裙边位于所述凹陷内。On the one hand, an embodiment of the present disclosure provides a spreader, the spreader includes a load-bearing beam and two limit arms, both of the limit arms include a connection end and a hoisting end, one of the limit arms has The connecting end is vertically connected to one end of the load-bearing beam, the connecting end of the other limit arm is vertically connected to the other end of the load-bearing beam, and the hoisting ends of the two limit arms both face away from the load-bearing beam extension, and the extension directions of the hoisting ends of the two limit arms are the same, the load-bearing beam and the two limit arms form a recess for accommodating the objects to be hoisted, and the two hoist ends are Both are provided with hoisting holes, the axis of each hoisting hole is perpendicular to the load-bearing beam and the limit arm, and the line connecting the centers of the two hoisting holes is parallel to the load-bearing beam, the load-bearing beam The beam is provided with a load-bearing skirt, the load-bearing skirt extends along the length direction of the load-bearing beam, and the load-bearing skirt is located in the recess.
在本公开的一种实现方式中,所述承重裙边为板状结构,所述承重裙边垂直于两个所述限位臂的轴线。In an implementation manner of the present disclosure, the load-bearing skirt is a plate-like structure, and the load-bearing skirt is perpendicular to the axes of the two limiting arms.
在本公开的另一种实现方式中,所述承重梁为板状结构,所述承重裙边的两侧边在所述承重梁的厚度方向上凸出于所述承重梁。In another implementation manner of the present disclosure, the load-bearing beam is a plate-like structure, and two sides of the load-bearing skirt protrude from the load-bearing beam in the thickness direction of the load-bearing beam.
在本公开的又一种实现方式中,所述承重裙边相对于所述承重梁对称布置。In yet another implementation of the present disclosure, the load-bearing skirt is arranged symmetrically with respect to the load-bearing beam.
在本公开的又一种实现方式中,所述承重裙边和所述承重梁焊接在一起。In yet another implementation of the present disclosure, the load-bearing skirt and the load-bearing beam are welded together.
在本公开的又一种实现方式中,两个所述限位臂的吊装端上均设置有端部倒角。In yet another implementation manner of the present disclosure, end chamfers are provided on the hoisting ends of the two limiting arms.
在本公开的又一种实现方式中,两个所述限位臂的连接端和所述承重梁的连接处均设置有内倒角和外倒角,所述内倒角位于所述凹陷内,所述外倒角位于所述凹陷外。In yet another implementation manner of the present disclosure, an inner chamfer and an outer chamfer are provided at the connection ends of the two limit arms and the load-bearing beam, and the inner chamfer is located in the recess. , the outer chamfer is located outside the recess.
在本公开的又一种实现方式中,所述承重梁和两个所述限位臂为一体式结构。In yet another implementation manner of the present disclosure, the load-bearing beam and the two limiting arms are integral structures.
在本公开的又一种实现方式中,所述吊具为钢结构件。In yet another implementation manner of the present disclosure, the spreader is a steel structural member.
另一方面,本公开实施例提供了一种起吊装置,所述起吊装置包括吊钩、钢丝绳、航车和至少两个上述的吊具,所述吊钩、所述钢丝绳和所述吊装孔一一对应,所述吊钩吊装在对应的所述吊装孔中,所述钢丝绳的一端与对应的所述吊钩固定连接,所述钢丝绳的另一端设置在所述航车上。On the other hand, an embodiment of the present disclosure provides a hoisting device, the hoisting device includes a hook, a wire rope, a vehicle, and at least two of the above-mentioned slings, the hoisting hook, the wire rope and the hoisting hole are one Correspondingly, the hook is hoisted in the corresponding hoisting hole, one end of the wire rope is fixedly connected with the corresponding hook, and the other end of the wire rope is set on the vehicle.
本公开实施例提供的技术方案带来的有益效果是:The beneficial effects brought by the technical solutions provided by the embodiments of the present disclosure are:
通过本公开实施例提供的吊具对板状零件(待吊物)进行吊装时,可以将各板状零件依次叠放在承重梁和所述限位臂之间围成的凹陷中。在凹陷中的板状零件搁置在承重裙边上,承重裙边受到的重力被均匀的分散至承重梁上,以避免了吊具应力集中。而位于承重梁两端的限位臂则实现了对板状零件的限位,以避免板状零件滑落。由于本公开提供的吊具中,其凹陷内具有足够的空间,所以可以容置足够厚的板状零件和足够多的板状零件,提高了转运吊装的效率。另外,由于吊具中配置有承重裙边,所以吊具对于板状零件的承力面积较大,因此在转运吊装的过程中,可以较为容易的适应各种不同形状的板状零件,避免了因寻找板状零件的重心,而反复调整平衡吊点的问题,从而进一步地提高了转运吊装的效率。When the plate-shaped parts (objects to be hoisted) are hoisted by the hoisting tool provided in the embodiment of the present disclosure, the plate-shaped parts can be stacked in sequence in the depressions enclosed between the load-bearing beams and the limiting arms. The plate-shaped parts in the recess rest on the load-bearing skirt, and the gravity of the load-bearing skirt is evenly distributed to the load-bearing beam, so as to avoid the stress concentration of the spreader. The limit arms located at both ends of the load-bearing beam realize the limit of the plate-shaped parts, so as to avoid the plate-shaped parts from sliding down. Since the sling provided by the present disclosure has enough space in the recess, it can accommodate enough thick plate-shaped parts and enough plate-shaped parts, which improves the efficiency of transfer and hoisting. In addition, because the load-bearing skirt is arranged in the spreader, the load-bearing area of the spreader for the plate-shaped parts is relatively large, so in the process of transfer and hoisting, it can be easily adapted to plate-shaped parts of various shapes, avoiding the need for Due to finding the center of gravity of the plate-shaped parts, the problem of repeatedly adjusting the balance lifting point further improves the efficiency of transfer and lifting.
附图说明Description of drawings
为了更清楚地说明本公开实施例中的技术方案,下面将对实施例描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本公开的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to illustrate the technical solutions in the embodiments of the present disclosure more clearly, the following briefly introduces the accompanying drawings used in the description of the embodiments. Obviously, the accompanying drawings in the following description are only some embodiments of the present disclosure. For those of ordinary skill in the art, other drawings can also be obtained from these drawings without creative effort.
图1是本公开实施例提供的吊具的正视图;1 is a front view of a spreader provided by an embodiment of the present disclosure;
图2是本公开实施例提供的吊具的仰视图;2 is a bottom view of a spreader provided by an embodiment of the present disclosure;
图3是本公开实施例提供的起吊装置的结构示意图。FIG. 3 is a schematic structural diagram of a hoisting device provided by an embodiment of the present disclosure.
图中各符号表示含义如下:The meanings of the symbols in the figure are as follows:
1、承重梁;2、限位臂;21、连接端;22、吊装端;23、吊装孔;3、凹陷;4、承重裙边;51、端部倒角;52、内倒角;53、外倒角;100、吊钩;200、钢丝绳;300、航车;400、吊具。1. Load-bearing beam; 2. Limit arm; 21. Connection end; 22. Lifting end; 23. Lifting hole; 3. Recess; 4. Load-bearing skirt; 51. End chamfer; 52, Inner chamfer; 53 , External chamfer; 100, hook; 200, wire rope; 300, aircraft; 400, spreader.
具体实施方式Detailed ways
为使本公开的目的、技术方案和优点更加清楚,下面将结合附图对本公开实施方式作进一步地详细描述。In order to make the objectives, technical solutions and advantages of the present disclosure clearer, the embodiments of the present disclosure will be further described in detail below with reference to the accompanying drawings.
本公开实施例提供的一种吊具,如图1所示,吊具包括承重梁1和两个限位臂2,两个限位臂2均包括连接端21和吊装端22,一个限位臂2的连接端21垂直连接在承重梁1的一端,另一个限位臂2的连接端21垂直连接在承重梁1的另一端,两个限位臂2的吊装端22均背向承重梁1延伸,且两个限位臂2的吊装端22的延伸方向相同,承重梁1和两个限位臂2之间围成用于容置待吊物的凹陷3,两个吊装端22上均设置有吊装孔23,每个吊装孔23的轴线均垂直于承重梁1和限位臂2,且两个吊装孔23的圆心的连线平行于承重梁1,承重梁1上设置有承重裙边4,承重裙边4沿承重梁1的长度方向延伸,且承重裙边4位于凹陷3内。A spreader provided by the embodiment of the present disclosure, as shown in FIG. 1 , the spreader includes a load-bearing
通过本公开实施例提供的吊具对板状零件(待吊物)进行吊装时,可以将各板状零件依次叠放在承重梁1和限位臂2之间围成的凹陷3中。在凹陷3中的板状零件搁置在承重裙边4上,承重裙边4受到的重力被均匀的分散至承重梁1上,以避免了吊具应力集中。而位于承重梁1两端的限位臂2则实现了对板状零件的限位,以避免板状零件滑落。由于本公开提供的吊具中,其凹陷3内具有足够的空间,所以可以容置足够厚的板状零件和足够多的板状零件,提高了转运吊装的效率。另外,由于吊具中配置有承重裙边4,所以吊具对于板状零件的承力面积较大,因此在转运吊装的过程中,可以较为容易的适应各种不同形状的板状零件,避免了因寻找板状零件的重心,而反复调整平衡吊点的问题,从而进一步地提高了转运吊装的效率。When the plate-shaped parts (objects to be hung) are hoisted by the hoisting tool provided in the embodiment of the present disclosure, the plate-shaped parts can be stacked in sequence in the
在本实施例中,两个限位臂2的吊装端22上均设置有端部倒角51。In this embodiment,
在上述实现方式中,由于限位臂2的吊装端22直接朝上凸出于承重梁1,所以在每个吊装端22上均设置端部倒角51,可以避免人员伤害。另外,端部倒角51也可以避免与吊装孔23中安装的吊钩产生干涉碰撞,起到了保护吊钩的作用。In the above implementation manner, since the hoisting
可选地,两个限位臂2的连接端21和承重梁1的连接处均设置有内倒角52和外倒角53,内倒角52位于凹陷3内,外倒角53位于凹陷3外。Optionally, the connection ends 21 of the two
在上述实现方式中,外倒角53和端部倒角51的作用相似,也主要起到避免人员伤害的作用,消除了安全隐患。而内倒角52则是为了保护待吊物,避免待吊物被划伤。In the above-mentioned implementation manner, the functions of the
可选地,承重梁1和两个限位臂2为一体式结构。Optionally, the load-
在上述实现方式中,如此设置,可以保证吊具的结构整体性,不仅提高了吊具的整体结构强度,还便于吊具的生产制造。In the above implementation manner, this arrangement can ensure the structural integrity of the spreader, which not only improves the overall structural strength of the spreader, but also facilitates the production and manufacture of the spreader.
在其他实施例中,承重梁1和两个限位臂2之间的连接方式还可以根据实际需求进行调整,例如承重梁1和两个限位臂2之间还可以通过焊接的手段连接在一起,本公开对此不作限制。In other embodiments, the connection between the load-
示例性地,吊具可以为钢结构件。Illustratively, the spreader may be a structural steel member.
在上述实现方式中,将吊具设置为钢结构件,可以保证吊具的结构强度。In the above implementation manner, the spreader is set as a steel structural member, which can ensure the structural strength of the spreader.
举例来说,当承重梁1和两个限位臂2为一体式结构时,承重梁1和两个限位臂2可以由同一块钢板切割得到。For example, when the load-
需要说明的是,在其他实施例中,吊具的材质也可以根据实际需求调整为其他材料,本公开对此不作限制。It should be noted that, in other embodiments, the material of the spreader can also be adjusted to other materials according to actual needs, which is not limited in the present disclosure.
在本实施例中,承重裙边4为板状结构,承重裙边4垂直于两个限位臂2的轴线。In this embodiment, the load-
在上述实现方式中,将承重裙边4设置为板状结构,可以进一步地提高承重裙边4的承重面积,以避免应力集中。而由于当板状零件搁置在承重裙边4上时,板状零件将平行于承重裙边4,所以将承重裙边4垂直于两个限位臂2的轴线,可以保证搁置在承重裙边4上的板状零件也可以垂直于两个限位臂2的轴线,从而更便于两个限位臂2对板状零件进行限位。In the above implementation manner, the load-
示例性地,为了避免板状零件滑落,当吊具被吊装起来时,承重梁1、承重裙边4,以及两个吊装孔23的圆心的连线均水平布置,而两个限位臂2则垂直于水平面竖直布置。Exemplarily, in order to prevent the plate-shaped parts from slipping off, when the spreader is hoisted, the load-
图2为吊具的仰视图,结合图2,可选地,承重梁1为板状结构,承重裙边4的两侧边在承重梁1的厚度方向a上凸出于承重梁1。FIG. 2 is a bottom view of the spreader. With reference to FIG. 2 , optionally, the load-
在上述实现方式中,由于承重梁1为板状结构,所以为了包装承重裙边4的承重面积足够,将承重裙边4的两侧边凸出于承重梁1。In the above implementation manner, since the load-
可选地,承重裙边4相对于承重梁1对称布置。Optionally, the load-
在上述实现方式中,如此设置,可以提高吊具的整体平衡性,避免了吊具在被吊装的过程中产生倾斜,提高了吊具的可靠性。In the above implementation manner, this arrangement can improve the overall balance of the spreader, prevent the spreader from tilting during the hoisting process, and improve the reliability of the spreader.
示例性地,承重裙边4和承重梁1焊接在一起。Illustratively, the load-
在上述实现方式中,由于承重裙边4的两侧边凸出于承重梁1,所以不方便将承重裙边4与承重梁1一体式制造。将承重裙边4和承重梁1通过焊接的方式安装在一起,可以降低吊具的制造工艺难度。In the above implementation manner, since both sides of the load-
图3为本公开实施例提供的起吊装置的结构示意图,结合图3,在本实施例中,起吊装置包括吊钩100、钢丝绳200、航车300和至少两个如图1所示的吊具400,吊钩100、钢丝绳200和吊装孔23一一对应,吊钩100吊装在对应的吊装孔23中,钢丝绳200的一端与对应的吊钩100固定连接,钢丝绳200的另一端设置在航车300上。FIG. 3 is a schematic structural diagram of a hoisting device provided by an embodiment of the present disclosure. With reference to FIG. 3 , in this embodiment, the hoisting device includes a
在上述实现方式中,由于板状零件(待吊物)通常均有一定的长度,因此可以采用至少两个吊具400,沿板状零件的长度方向依次承托,以保证转运吊装的可靠性。In the above implementation manner, since the plate-shaped parts (objects to be hoisted) usually have a certain length, at least two
下面简单介绍一下本公开实施例提供的起吊装置的转运吊装过程:The following briefly introduces the transfer and hoisting process of the hoisting device provided by the embodiment of the present disclosure:
首先选择与板状零件尺寸相符合的吊具400,并将各吊具400沿板状零件的长度方向依次排列好。First, a
接着将板状零件搁置在各吊具400的凹陷3内。Next, the plate-shaped parts are placed in the
然后将各吊钩100吊装在各自对应的吊装孔23中,以保证每个吊装孔23中均吊装有一个吊钩100。Then, the
最后通过航车300起吊吊具400,以完成板状零件的转运吊装。Finally, the
以上所述仅为本公开的较佳实施例,并不用以限制本公开,凡在本公开的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本公开的保护范围之内。The above descriptions are only preferred embodiments of the present disclosure, and are not intended to limit the present disclosure. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present disclosure shall be included in the protection of the present disclosure. within the range.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201922287375.1U CN211846830U (en) | 2019-12-17 | 2019-12-17 | Lifting appliance and lifting device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201922287375.1U CN211846830U (en) | 2019-12-17 | 2019-12-17 | Lifting appliance and lifting device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN211846830U true CN211846830U (en) | 2020-11-03 |
Family
ID=73215830
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201922287375.1U Active CN211846830U (en) | 2019-12-17 | 2019-12-17 | Lifting appliance and lifting device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN211846830U (en) |
-
2019
- 2019-12-17 CN CN201922287375.1U patent/CN211846830U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN211846830U (en) | Lifting appliance and lifting device | |
| CN202284117U (en) | Auxiliary lifting appliance | |
| CN210763881U (en) | Marine crane | |
| CN201553534U (en) | Novel lifting appliance for transformer coil | |
| CN211198358U (en) | Lifting appliance | |
| CN213141136U (en) | I-steel lifting hook and lifting appliance thereof | |
| CN204281215U (en) | The forklift slings of coil of strip class goods in a kind of loading and unloading container | |
| JP2022019184A (en) | Hanging holder | |
| CN208103732U (en) | Special hanger is used in a kind of processing of piston ring blank | |
| CN217996490U (en) | Hoisting tool with bracket battery pack | |
| CN217535208U (en) | Four-lifting-point rigid anti-swing electromagnetic hanging beam trolley for hoisting long workpiece | |
| CN222877438U (en) | Hoisting structure capable of adjusting hoisting position and energy storage container | |
| CN214399491U (en) | Aluminum anode steel claw body flat-laying lifting appliance | |
| CN213651602U (en) | Plate hoisting equipment | |
| CN218968600U (en) | Building engineering rigid member turnover combined type safety lifting appliance | |
| CN210480598U (en) | Hoisting claw for wheel shell type workpiece | |
| CN217972241U (en) | Special lifting appliance for shell-making conveying chain | |
| JP2010100351A (en) | Drum can gripping tool | |
| CN202414964U (en) | Travelling crane hoisting auxiliary device | |
| CN214828347U (en) | A lifting device for metal plates | |
| CN103832920A (en) | Tool for lifting container loaded with workpiece by crane | |
| CN214527671U (en) | A spreader for compressor rotor | |
| CN116022634A (en) | Ship unit module hanging bracket | |
| CN110550538A (en) | Lifting appliance | |
| CN206538090U (en) | One kind lifting steel plate steel shoulder pole |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |