CN215620249U - Rebar preloaded multi-directional die forging hydraulic press frame - Google Patents

Rebar preloaded multi-directional die forging hydraulic press frame Download PDF

Info

Publication number
CN215620249U
CN215620249U CN202121685076.4U CN202121685076U CN215620249U CN 215620249 U CN215620249 U CN 215620249U CN 202121685076 U CN202121685076 U CN 202121685076U CN 215620249 U CN215620249 U CN 215620249U
Authority
CN
China
Prior art keywords
steel bar
cross beam
tightening
fixed
anchor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121685076.4U
Other languages
Chinese (zh)
Inventor
姜涛
王文甲
孙明扬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongye Heavy Industry Tangshan Co ltd
China 22MCC Group Corp Ltd
Original Assignee
Zhongye Heavy Industry Tangshan Co ltd
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongye Heavy Industry Tangshan Co ltd, China 22MCC Group Corp Ltd filed Critical Zhongye Heavy Industry Tangshan Co ltd
Priority to CN202121685076.4U priority Critical patent/CN215620249U/en
Application granted granted Critical
Publication of CN215620249U publication Critical patent/CN215620249U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The utility model relates to the technical field of a hydraulic press pre-tightening structure, in particular to a reinforcing steel bar pre-tightening type multidirectional die forging hydraulic press frame which comprises an upper cross beam, a lower cross beam, a press main cylinder, a perforation cylinder, an upright post, a longitudinal reinforcing steel bar pre-tightening assembly and a transverse reinforcing steel bar pre-tightening assembly, wherein the press main cylinder is arranged on the upper cross beam, the perforation cylinder is arranged on the upright post, the upper cross beam is connected with the lower cross beam through the upright post, the longitudinal reinforcing steel bar pre-tightening assembly penetrates through the upper cross beam, the upright post and the lower cross beam, and the upper end and the lower end of the longitudinal reinforcing steel bar pre-tightening assembly are respectively fixed on the upper cross beam and the lower cross beam; the transverse steel bar pre-tightening assembly is fixed on the upright post; the longitudinal steel bar pre-tightening assembly and the transverse steel bar pre-tightening assembly transmit pre-tightening force, so that the overall height of the machine body is reduced, and the problems of uneven radial distribution of load, low material utilization rate and the like are solved.

Description

Steel bar pre-tightening type multidirectional die forging hydraulic press frame
Technical Field
The utility model relates to the technical field of hydraulic press pre-tightening structures, in particular to a reinforcing steel bar pre-tightening type rack of a multidirectional die forging hydraulic press.
Background
At present, a pre-tightening structure of a multidirectional die forging press mainly adopts a pull rod type and a steel wire winding type; although the steel wire winding type structure has good fatigue strength, high bearing capacity and uniform load distribution of pretightening force in the steel bar, the steel wire winding type multidirectional die forging press needs to utilize a pad beam to transfer the pretightening force, the winding pretightening force needs to be directly applied to the bottom of a cylinder for a main cylinder with larger load through an arch beam and the pad beam, and a winding type rack needs to wrap the cylinder body of the main cylinder, so that the overall height of the press body is increased; the pull rod type is characterized in that a double-end stud transmits pretightening force, an oil cylinder with a long stroke can be arranged in the upper cross beam, the overall height of the machine body is reduced, but in a large-tonnage press, the pretightening pull rod is thick, the load is not uniformly distributed along the circular cross section of the pull rod in the radial direction, the fluctuation is large, and the utilization rate of the pull rod material is low.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the problems, and provides a multidirectional die forging hydraulic press reinforcing steel bar pre-tightening type rack and a pre-tightening method, which avoid the problems of nonuniform distribution and large fluctuation of pre-tightening pull rod load along the radial direction of a cross section.
Utility model solves the problem, the technical scheme who adopts is:
a steel bar pre-tightening type multidirectional die forging hydraulic press frame comprises an upper cross beam, a lower cross beam, a press main cylinder, a perforated cylinder, an upright post, a longitudinal steel bar pre-tightening assembly and a transverse steel bar pre-tightening assembly, wherein the press main cylinder is installed on the upper cross beam, the perforated cylinder is installed on the upright post, the upper cross beam is connected with the lower cross beam through the upright post, the longitudinal steel bar pre-tightening assembly penetrates through the upper cross beam, the upright post and the lower cross beam, and the upper end and the lower end of the longitudinal steel bar pre-tightening assembly are respectively fixed on the upper cross beam and the lower cross beam; the transverse steel bar pre-tightening assembly is fixed on the stand column.
Compared with the prior art, the utility model adopting the technical scheme has the outstanding characteristics that:
the longitudinal steel bar pre-tightening assembly and the transverse steel bar pre-tightening assembly transmit pre-tightening force, so that the overall height of the machine body is reduced, and the problems of uneven radial distribution of load, low material utilization rate and the like are solved.
Preferably, the further technical scheme of the utility model is as follows:
the longitudinal steel bar pre-tightening assembly comprises a first pre-stressed steel bar, an upper anchor backing plate, an upper working anchor plate, a lower anchor backing plate, a lower working anchor plate and two groups of tool clamping pieces; the upper end of the first prestressed reinforcement is fixed on the upper cross beam through an upper working anchor plate, an upper anchor backing plate and a tool clamping piece, and the lower end of the first prestressed reinforcement is fixed on the lower cross beam through a lower working anchor plate, a lower anchor backing plate and a tool clamping piece; the prestressed steel bars are fixed through the working anchor plate, the anchor backing plate and the tool clamping pieces, the stability of the prestressed steel bars during pre-tightening is improved, and all the prestressed steel bars in the two corresponding groups of tool clamping pieces in the upper cross beam, the lower cross beam and the stand columns on the two sides are subjected to the same prestress, so that unbalanced load is prevented.
The transverse steel bar pre-tightening assembly comprises a second pre-stressed steel bar, a left anchor base plate, a left working anchor plate, a right anchor base plate, a right working anchor plate and two groups of tool clamping pieces; the left end of the second prestressed reinforcement is fixed on the left upright post through the left working anchor plate, the left anchor backing plate and the tool clamping piece, and the right end of the second prestressed reinforcement is fixed on the right upright post through the right working anchor plate, the right anchor backing plate and the tool clamping piece; the impact force generated in the moment of unloading after pre-tightening is completed can be relieved through the base plate and the working anchor plate, and the function of the protection device is achieved.
A fixing block is arranged on the upright post, and the transverse steel bar pre-tightening assembly is fixed on the fixing block; the width of the rack is ensured to be unchanged, and the transverse steel bar pre-tightening assembly is stably fixed on the stand column of the rack.
The protective housing is arranged on the outer side of the transverse steel bar pre-tightening assembly, so that external impact is prevented, and the protective housing has the effect of a protective device.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic top view of the present invention;
FIG. 3 is a schematic side view of the present invention;
FIG. 4 is a schematic cross-sectional view at AA in FIG. 1;
FIG. 5 is a schematic cross-sectional view at BB in FIG. 1;
fig. 6 is a schematic cross-sectional view illustrating the left end of the second prestressed reinforcement bar of the present invention being fixed;
fig. 7 is a schematic cross-sectional view illustrating the right end of the second prestressed reinforcement bar according to the present invention.
Labeled as: an upper cross beam 1; a lower cross beam 2; a press master cylinder 3; a perforating cylinder 4; a column 5; a fixed block 501; a protective shell 6; a first prestressed reinforcement 7; an upper anchor pad 801; an upper work anchor plate 802; a lower anchor backing plate 901; a lower work anchor plate 902; a tool jaw 10; a second prestressed reinforcement 11; a left working anchor plate 1201; a left anchor pad 1202; a right work anchor plate 1301; a right anchor pad 1302; a longitudinal steel bar pre-tightening assembly A; a transverse steel bar pre-tightening component B; a tensioning jack 14; a bracket 15; and a stopper plate 16.
Detailed Description
The utility model will be further illustrated by the following examples, which are intended only for a better understanding of the present invention and therefore do not limit the scope of the utility model.
As shown in fig. 1 to 7, a steel bar pre-tightening type multidirectional die forging hydraulic press frame comprises an upper cross beam 1, a lower cross beam 2, a press main cylinder 3, a perforation cylinder 4, an upright post 5, a longitudinal steel bar pre-tightening assembly a and a transverse steel bar pre-tightening assembly B, wherein the press main cylinder 3 is installed in a main cylinder installation hole on the upper cross beam 1, the upright post 5 is provided with the perforation cylinder 4 and a square fixing block 501, the upper cross beam 1 is connected with the lower cross beam 2 through the upright post 5, the longitudinal steel bar pre-tightening assembly a penetrates through the upper cross beam 1, the upright post 5 and the lower cross beam 2, the transverse steel bar pre-tightening assembly B is fixed on the fixing block 501, the square fixing block 501 is provided with a protection shell 6 formed by building a protection plate, and the protection shell 6 is arranged on the outer side of the transverse steel bar pre-tightening assembly B to play a protection role; wherein, the fixing blocks 501 of the upper crossbeam 1, the lower crossbeam 2 and the two side columns 5 are all provided with corresponding conical holes for installing a working anchor plate and an anchor backing plate.
The longitudinal steel bar pre-tightening assembly A comprises a first pre-stressed steel bar 7, an upper anchor backing plate 801, an upper working anchor plate 802, a lower anchor backing plate 901, a lower working anchor plate 902 and two groups of tool clamping pieces 10, and the transverse steel bar pre-tightening assembly B comprises a second pre-stressed steel bar 11, a left anchor backing plate 1202, a left working anchor plate 1201, a right anchor backing plate 1302, a right working anchor plate 1301 and two groups of tool clamping pieces 10; the upper end of the first prestressed reinforcement 7 is bolted on the upper cross beam 1 through an upper working anchor plate 802, an upper anchor backing plate 801 and a tool clamping piece 10, and the lower end is bolted on the lower cross beam 2 through a lower working anchor plate 902, a lower anchor backing plate 901 and the tool clamping piece 10; the left end of the second prestressed reinforcement 11 is bolted on the fixed block 501 of the left upright post 5 through the left working anchor plate 1201, the left anchor backing plate 1201 and the tool clamping piece 10, and the right end is bolted on the fixed block 501 of the right upright post 5 through the right working anchor plate 1301, the right anchor backing plate 1302 and the tool clamping piece 10; all prestressed reinforcements in the two groups of tool clamps corresponding to the upper part and the lower part and the left part and the right part are subjected to the same prestress, so that unbalanced load is prevented, the base plate and the working anchor plate not only fix the prestressed reinforcements, the reinforcement pre-tightening stability is improved, but also impact force generated at the moment of unloading can be relieved, and the effect of a protection device is achieved; the upper working anchor plate, the upper anchor backing plate, the lower working anchor plate and the lower anchor backing plate are circular working anchor plates and anchor backing plates with round holes penetrating through the upper table top and the lower table top, and the left working anchor plate, the left anchor backing plate, the right working anchor plate and the right anchor backing plate are square working anchor plates and anchor backing plates with round holes penetrating through the upper table top and the lower table top.
When in use, the front clamping type tensioning jack 14 is firstly installed at the outer sides of the longitudinal steel bar pre-tightening component A and the transverse steel bar pre-tightening component B; longitudinal prestress and transverse prestress applied to the whole multidirectional die forging hydraulic press by the first prestressed reinforcement 7 and the second prestressed reinforcement 11 are adjusted through a front clamping type tensioning jack 14; after the prestress adjustment is finished, clamping the first prestress reinforcement 7 and the second prestress reinforcement 11 by using a tool clamping piece 10, and shearing the first prestress reinforcement 7 and the second prestress reinforcement 11 at a position 10-20cm away from the top end of the tool clamping piece 10; wherein, the hydraulic tensioning jack 14 can be matched with the limit plate 16 to adjust the longitudinal prestress and the transverse prestress.
This is novel by vertical reinforcing bar pretension subassembly A and horizontal reinforcing bar pretension subassembly B transmission pretightning force, has reduced the whole height of fuselage, has avoided the problem that load radial distribution is inhomogeneous, material utilization is low, has optimized the rack construction of multidirectional die forging hydraulic press, has played the effect of cost reduction increase.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the scope of the present invention, which is defined in the appended claims.

Claims (5)

1.一种钢筋预紧式多向模锻液压机机架,包括上横梁、下横梁、压机主缸、穿孔缸和立柱,上横梁上安装有压机主缸,立柱上安装有穿孔缸,上横梁和下横梁通过立柱连接,其特征在于:还包括纵向钢筋预紧组件和横向钢筋预紧组件;纵向钢筋预紧组件贯穿上横梁、立柱和下横梁,纵向钢筋预紧组件的上端和下端分别固定在上横梁和下横梁上,横向钢筋预紧组件固定在立柱上。1. A multi-directional die forging hydraulic press frame with steel bar pre-tightening, comprising an upper beam, a lower beam, a press master cylinder, a perforated cylinder and a column, the upper beam is provided with a press master cylinder, and the column is provided with a perforated cylinder, The upper beam and the lower beam are connected by a column, and it is characterized in that: it also includes a longitudinal steel bar preloading component and a transverse steel bar preloading component; They are respectively fixed on the upper beam and the lower beam, and the transverse reinforcement pre-tensioning components are fixed on the upright column. 2.根据权利要求1所述的钢筋预紧式多向模锻液压机机架,其特征在于:纵向钢筋预紧组件包括第一预应力钢筋、上锚垫板、上工作锚板、下锚垫板、下工作锚板和两组工具夹片;第一预应力钢筋的上端通过上工作锚板、上锚垫板和工具夹片固定在上横梁上,第一预应力钢筋的下端通过下工作锚板、下锚垫板和工具夹片固定在下横梁上。2 . The multi-directional die forging hydraulic press frame of the steel bar pretensioning type according to claim 1 , wherein the longitudinal steel bar pretensioning assembly comprises a first prestressing steel bar, an upper anchor pad, an upper working anchor plate, and a lower anchor pad. 3 . plate, lower working anchor plate and two sets of tool clips; the upper end of the first prestressed steel bar is fixed on the upper beam through the upper working anchor plate, the upper anchor pad and the tool clip, and the lower end of the first prestressed steel bar is fixed on the upper beam through the lower working The anchor plate, the lower anchor plate and the tool clip are fixed on the lower beam. 3.根据权利要求1所述的钢筋预紧式多向模锻液压机机架,其特征在于:横向钢筋预紧组件包括第二预应力钢筋、左锚垫板、左工作锚板、右锚垫板、右工作锚板和两组工具夹片;第二预应力钢筋的左端通过左工作锚板、左锚垫板和工具夹片固定在左侧的立柱上,第二预应力钢筋的右端通过右工作锚板、右锚垫板和工具夹片固定在右侧的立柱上。3. The multi-directional die forging hydraulic press frame of the steel bar pretensioning type according to claim 1, characterized in that: the transverse steel bar pretensioning assembly comprises the second prestressing steel bar, the left anchor pad, the left working anchor plate, and the right anchor pad plate, right working anchor plate and two sets of tool clips; the left end of the second prestressed steel bar is fixed on the left column through the left working anchor plate, left anchor pad and tool clip, and the right end of the second prestressed steel bar passes through The right working anchor plate, the right anchor pad and the tool clip are fixed on the right column. 4.根据权利要求1所述的钢筋预紧式多向模锻液压机机架,其特征在于:立柱上设置有固定块,横向钢筋预紧组件固定在固定块上。4 . The multi-directional die forging hydraulic press frame of the steel bar pretensioning type according to claim 1 , wherein a fixing block is arranged on the upright column, and the transverse steel bar pretensioning component is fixed on the fixing block. 5 . 5.根据权利要求1所述的钢筋预紧式多向模锻液压机机架,其特征在于:横向钢筋预紧组件外侧设置有保护壳。5 . The multi-directional die forging hydraulic press frame of the steel bar pretensioning type according to claim 1 , wherein a protective shell is provided on the outer side of the transverse steel bar pretensioning assembly. 6 .
CN202121685076.4U 2021-07-23 2021-07-23 Rebar preloaded multi-directional die forging hydraulic press frame Active CN215620249U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121685076.4U CN215620249U (en) 2021-07-23 2021-07-23 Rebar preloaded multi-directional die forging hydraulic press frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121685076.4U CN215620249U (en) 2021-07-23 2021-07-23 Rebar preloaded multi-directional die forging hydraulic press frame

Publications (1)

Publication Number Publication Date
CN215620249U true CN215620249U (en) 2022-01-25

Family

ID=79891821

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121685076.4U Active CN215620249U (en) 2021-07-23 2021-07-23 Rebar preloaded multi-directional die forging hydraulic press frame

Country Status (1)

Country Link
CN (1) CN215620249U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114632905A (en) * 2022-02-14 2022-06-17 天津市天锻压力机有限公司 Machine body structure applied to large-tonnage horizontal unilateral load of multidirectional die forging press

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114632905A (en) * 2022-02-14 2022-06-17 天津市天锻压力机有限公司 Machine body structure applied to large-tonnage horizontal unilateral load of multidirectional die forging press
CN114632905B (en) * 2022-02-14 2024-04-12 天津市天锻压力机有限公司 Be applied to fuselage structure of multidirectional die forging press large-tonnage horizontal unilateral load

Similar Documents

Publication Publication Date Title
CN215620249U (en) Rebar preloaded multi-directional die forging hydraulic press frame
CN209453864U (en) It is a kind of for producing the tensioning equipment of composite beam or superimposed sheet
CN212507073U (en) Adjustable slow bonding prestressed tendon positioning device
CN117734010A (en) Prestressed tendon deep-buried anchoring mechanism
CN205927585U (en) Welding bending stress remove device
CN209741942U (en) Prestressing force counter-force girder steel structure for pile foundation static load test
CN215966660U (en) Cutting tool for large-diameter steel bar plane
CN212836770U (en) Pre-tensioning method prestressed reinforcement quick-pulling-releasing cutting-free construction device
JP2019507018A (en) Forging press machine and forging method of workpiece in forging press machine
JP2010275709A (en) Beam reinforcement method
US12528114B2 (en) Multi-part machine frame for a forming machine
CN217992968U (en) Assembled precast concrete component tensioning equipment
CN217948795U (en) Prestress tensioning equipment
CN214738755U (en) An independent external prestressing loading device applied to metal beams
CN113550589B (en) Fixed knot of concrete placement platform constructs
CN214328527U (en) Plate girder reinforcing bar processing bed-jig
CN212639754U (en) Movable prestressing force stretch-draw jack suspension
CN209924415U (en) Steel beam holding reinforcing member for attached lifting scaffold
KR20110007309U (en) Supporting bar fixing tool for mold concrete column of construction
CN112875468A (en) Construction method for applying prestress to elevator bearing beam
CN209971097U (en) Pretensioning broken line prestressed tendon pull-down bending device
CN112550597A (en) Large wood wedge clamping method for slipway edge pier
CN212078717U (en) Steel strand prestress tensioning device
RU2846764C2 (en) Forging machine composite frame
JP4240203B2 (en) Press molding machine and installation method of press molding machine

Legal Events

Date Code Title Description
GR01 Patent grant