EP0032959B1 - Procédé et faux-oeuvre pour la construction de ponts en béton précontraint - Google Patents

Procédé et faux-oeuvre pour la construction de ponts en béton précontraint Download PDF

Info

Publication number
EP0032959B1
EP0032959B1 EP80100241A EP80100241A EP0032959B1 EP 0032959 B1 EP0032959 B1 EP 0032959B1 EP 80100241 A EP80100241 A EP 80100241A EP 80100241 A EP80100241 A EP 80100241A EP 0032959 B1 EP0032959 B1 EP 0032959B1
Authority
EP
European Patent Office
Prior art keywords
scaffold
bridge
section
parts
shuttering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
EP80100241A
Other languages
German (de)
English (en)
Other versions
EP0032959A1 (fr
Inventor
Rainer Dipl.-Ing. Schweer
Manfred Dipl.-Ing. Steidle-Sailer
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Emil Steidle GmbH and Co KG
Original Assignee
Emil Steidle GmbH and Co KG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=8186574&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=EP0032959(B1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Emil Steidle GmbH and Co KG filed Critical Emil Steidle GmbH and Co KG
Priority to DE8080100241T priority Critical patent/DE3067233D1/de
Priority to EP80100241A priority patent/EP0032959B1/fr
Priority to AT80100241T priority patent/ATE6878T1/de
Priority to JP56500577A priority patent/JPS57500654A/ja
Priority to PCT/DE1981/000015 priority patent/WO1981002032A1/fr
Priority to BR8106031A priority patent/BR8106031A/pt
Publication of EP0032959A1 publication Critical patent/EP0032959A1/fr
Application granted granted Critical
Publication of EP0032959B1 publication Critical patent/EP0032959B1/fr
Expired legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/10Cantilevered erection
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/28Concrete reinforced prestressed

Definitions

  • the use of a few rails is generally possible from only two rails, while in the known case at least two rails were required for each individual advancing unit.
  • the rails can be arranged according to claim 2 on those auxiliary foundations that are erected between the support pillars for the auxiliary supports.
  • the object is further achieved by a scaffolding structure with the features of the characterizing part of claim 3.
  • the external turrets have vertical, braced supports 34 which rest on the foundation blocks 28 and are retracted during the displacement process, the self-loading of the external turret being borne only by the cantilevered cross members.
  • interchangeable strut supports could be provided, which are articulated on the central scaffold body, as is indicated in FIG. 3 by the broken supports 50.
  • two or a corresponding number of central teaching scaffold bodies are arranged, each of which runs on a track formed by two rails 32 and is in turn connected laterally to external scaffolding, which, however, can also be separated in sections.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Reinforcement Elements For Buildings (AREA)

Claims (8)

1. Procédé de construction par tronçons de ponts en béton précontraint selon lequel, partant d'une extrémité du pont, on construit successivement les tronçons de pont en utilisant un coffrage porté par un cintre de bétonnage avançant, les différents tronçons de pont (18, 20) étant armés et bétonnés sur place, sur le coffrage (17) reposant sur le cintre de bétonnage (16) et, après l'achèvement d'un tronçon, le cintre de bétonnage étant abaissé avec le coffrage prenant appui sur lui et étant déplacé de la longueur d'un tronçon de pont sur une voie d'avancement (32) qui suit le sens longitudinal du pont, les éléments ou parties du cintre de bétonnage et de coffrage dont le trajet de déplacement passerait par la zone d'une pile (12) étant déplacés vers l'extérieur de cette zone par roulement et le cintre de bétonnage, après que le tronçon de pont suivant a été atteint, étant soulevé jusqu'au niveau du tablier du pont, après quoi un tronçon de pont faisant suite au tronçon ayant été construit en dernier lieu est armé et bétonné, caractérisé en ce que l'on construit des tronçons de pont ( 18, 20) d'une longueur qui est égale à 1/2, 1/3 ou 1/4 de la portée du pont entre deux piles (12), les tronçons de pont (20) qui se situent comme un tout entre deux piles de pont étant soutenus directement par des étais auxiliaires (30), qui sont maintenus jusqu'à ce que la précontrainte d'une pile de pont à une autre soit achevée, en ce que le cintre de bétonnage est déplacé pas à pas de chaque tronçon sur une voie de déplacement (32) montée sur le sol, et en ce que les éléments ou parties de cintre de bétonnage et de coffrage dont le trajet de déplacement passerait par la zone d'une pile de pont (12) ou d'un étai auxiliaire (30) ne sont enlevés par déplacement et/ou par rabattement que sur la longueur d'un pas d'avancement et sont ramenés pour le pas d'avancement suivant, les éléments ou parties n'ayant pas été écartés maintenant constamment le cintre de bétonnage avec ses parties faisant saillie latéralement en une unité de construction mobile.
2. Procédé suivant la revendication 1, caractérisé en ce que l'on pose, entre les fondations principales (10) des piles de pont (12), dans le sens longitudinal du pont, des fondations auxiliaires (22) sur lesquelles on pose, à l'extérieur de la zone des piles de pont, les deux rails de la voie d'avancement (32) et sur lesquelles on dresse, à l'intérieur de la zone des piles de pont, les étais auxiliaires (30) pour les tronçons de pont (20) qui se trouveront entre les tronçons de pont (18) soutenus par les piles de pont.
3. Montage de cintre de bétonnage mobile pour la mise en oeuvre du procédé suivant l'une ou l'autre des revendications 1 et 2, porté par des cylindres de pression (36) dont les pistons peuvent être dégagés hydrauliquement, caractérisé en ce qu'il comporte des poutres longitudinales (48) qui sont prévues à côté de la poutre principale ou des poutres principales du pont, en dessous du coffrage (17) de la plaque de chaussée et/ou de la partie en saillie de trottoir, et en ce que des poutres transversales (40) du cintre de bétonnage qui peuvent être déplacées et/ou être rabattues sont prévues suspendues en dessous des poutres longitudinales (48) de telle façon que, lors de l'avancement du cintre de bétonnage, elles puissent être localement sorties des zones des piles de pont et des étais auxiliaires.
4. Montage de cintre de bétonnage suivant la revendication 3, caractérisé en ce que, lorsqu'il s'agit de ponts qui comportent deux piles prévues l'une à côté de l'autre dans le sens transversal du pont, le cintre de bétonnage se compose d'un corps de cintre de bétonnage interne et de deux parties de cintre de bétonnage externes comprenant chacun des poutres longitudinales (48) qui, à chaque stade de la construction - même lors de l'avancement - restent assemblées au corps de cintre de bétonnage central par quelques-unes des poutres transversales (40) pouvant être déplacées ou pouvant être rabattues (figure 3).
5. Montage de cintre de bétonnage suivant la revendication 3, caractérisé en ce que, lorsqu'il s'agit de ponts qui comportent trois piles prévues l'une à côté de l'autre dans le sens transversal du pont, ou un plus grand nombre de telles piles, il est prévu deux ou plusieurs corps de cintre de bétonnage internes à chacun desquels sont adjointes deux parties de cintre de bétonnage externes qui, à chaque stade de la construction - même lors de l'avancement - restent assemblées aux corps de cintre de bétonnage internes par quelques-unes des poutres transversales (40) pouvant être déplacées ou pouvant être rabattues (figure 4).
6. Montage de cintre de bétonnage suivant la revendication 3, caractérisé en ce que, lorsqu'il s'agit de ponts qui comportent une poutre principale médiane et des piles de pont placées en position médiane, il est prévu deux parties de cintre de bétonnage externes comprenant des poutres longitudinales, parties de cintre de bétonnage qui, à chaque stade de la construction - même lors de l'avancement - restent assemblées au corps de cintre de bétonnage central par quelques-unes des poutres transversales (40) pouvant être déplacées ou pouvant être rabattues (figure 2).
7. Montage de cintre de bétonnage suivant l'une ou l'autre des revendications 4et 5, caractérisé en ce que les parties de cintre de bétonnage externes comportent des étais étançonnés (34) qui peuvent prendre appui sur les blocs de fondation (28) des fondations auxiliaires (22) et qui peuvent être rentrés pour l'opération d'avancement.
8. Montage de cintre de bétonnage suivant l'une ou l'autre des revendications 4et 5, caractérisé en ce qu'il ne prend appui, dans son ensemble, que par deux unités de roulement sur chacun des deux rails de la voie d'avancement (32) et en ce que les parties de cintre de bétonnage externes ne sont soutenues que par des jambes de force (50) articulées au corps de cintre de bétonnage interne ou aux corps de cintre de bétonnage internes (figure 3).
EP80100241A 1980-01-18 1980-01-18 Procédé et faux-oeuvre pour la construction de ponts en béton précontraint Expired EP0032959B1 (fr)

Priority Applications (6)

Application Number Priority Date Filing Date Title
DE8080100241T DE3067233D1 (en) 1980-01-18 1980-01-18 Method and falsework for constructing bridges of prestressed concrete
EP80100241A EP0032959B1 (fr) 1980-01-18 1980-01-18 Procédé et faux-oeuvre pour la construction de ponts en béton précontraint
AT80100241T ATE6878T1 (de) 1980-01-18 1980-01-18 Verfahren und lehrgeruestaufbau zur herstellung von spannbetonbruecken.
JP56500577A JPS57500654A (fr) 1980-01-18 1981-01-17
PCT/DE1981/000015 WO1981002032A1 (fr) 1980-01-18 1981-01-17 Procede et cintre pour la construction de ponts en beton arme
BR8106031A BR8106031A (pt) 1980-01-18 1981-01-17 Processo e combre para a producao de pontes de concreto de aco

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP80100241A EP0032959B1 (fr) 1980-01-18 1980-01-18 Procédé et faux-oeuvre pour la construction de ponts en béton précontraint

Publications (2)

Publication Number Publication Date
EP0032959A1 EP0032959A1 (fr) 1981-08-05
EP0032959B1 true EP0032959B1 (fr) 1984-03-28

Family

ID=8186574

Family Applications (1)

Application Number Title Priority Date Filing Date
EP80100241A Expired EP0032959B1 (fr) 1980-01-18 1980-01-18 Procédé et faux-oeuvre pour la construction de ponts en béton précontraint

Country Status (3)

Country Link
EP (1) EP0032959B1 (fr)
AT (1) ATE6878T1 (fr)
DE (1) DE3067233D1 (fr)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3247326C2 (de) * 1982-12-21 1984-11-22 Emil Steidle Gmbh & Co, 7480 Sigmaringen Verfahren und Lehrgerüst zur abschnittsweisen Herstellung von Stahlbetonbrücken
DE3836568C2 (de) * 1988-10-27 1999-03-18 Reiner Dipl Ing Schweer Lehrgerüst für Stahlbetonbrücken für universellen Einsatz als stationäres und Verschiebegerüst
CN102108784B (zh) * 2011-03-18 2012-05-30 北城致远集团有限公司 异型附着升降脚手架
CN109457619B (zh) * 2018-12-11 2023-12-19 中交第二航务工程局有限公司 一种用于混凝土主梁现浇施工的复合型多功能移动支架
CN109797657B (zh) * 2019-01-29 2024-04-05 中铁九局集团第二工程有限公司 现浇桥梁模板支架体系装置及桥梁现浇施工方法
CN110670491A (zh) * 2019-10-29 2020-01-10 中国铁建大桥工程局集团有限公司 一种前锚室顶板现浇施工装置以及施工方法
US11479929B2 (en) 2020-08-07 2022-10-25 Peri Se Formwork system and method
CN111827126A (zh) * 2020-08-07 2020-10-27 中铁大桥局集团第二工程有限公司 一种斜拉桥钢梁架设期间放样铁路挡渣墙边线的方法
CN113430959A (zh) * 2021-08-04 2021-09-24 刘澜涛 延长高速公路桥梁径向宽度的施工方法
CN114606873B (zh) * 2022-01-14 2024-06-18 浙江交工宏途交通建设有限公司 一种钢箱梁悬臂混凝土浇筑托架
CN115627707A (zh) * 2022-11-11 2023-01-20 浙江交工集团股份有限公司 现浇混泥土桥梁施工用挂篮
CN116463956A (zh) * 2023-05-04 2023-07-21 中交四航局第一工程有限公司 一种连续梁桥低墩曲面空心柱无损支撑模板体系及施工方法
CN116556675B (zh) * 2023-05-23 2025-06-27 上海建工四建集团有限公司 一种异形旋转混凝土结构的施工方法

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT230931B (de) * 1959-01-27 1964-01-10 Polensky & Zoellner Verfahren zur Herstellung einer weitgespannten Brücke aus Spannbeton
DE1234759B (de) * 1962-12-10 1967-02-23 Polensky & Zoellner Verfahren zum Einschalen der einzelnen UEberbaufelder einer vielfeldrigen Bruecke
DE1201384B (de) * 1962-12-14 1965-09-23 Adolf Lupp K G Vorbauruestung zum Bau von Hochstrassen und Bruecken
DE2436088C2 (de) * 1974-07-24 1984-09-27 Peiner Maschinen- Und Schraubenwerke Ag, 3150 Peine Verfahrbare Raumschalung
DE2533734A1 (de) * 1975-07-28 1977-02-10 Kunz Alfred & Co Vorrichtung zur herstellung von auf im abstand voneinander angeordneten pfeilern abgestuetzten betonbruecken

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Wittfoht: Triumph der Spannweiten, Betonverlag Düsseldorf Seiten 230-232 *

Also Published As

Publication number Publication date
DE3067233D1 (en) 1984-05-03
EP0032959A1 (fr) 1981-08-05
ATE6878T1 (de) 1984-04-15

Similar Documents

Publication Publication Date Title
DE2240678C3 (de) Einrichtung zum abschnittsweisen freien Vorbau von Brückentragwerken aus Stahl- oder Spannbeton
DE2607805C3 (de) Einrichtung zum abschnittsweisen freien Vorbau von mehrfeldrigen Briickentragwerken aus Stahl- oder Spannbeton
EP0133850A1 (fr) Procédé et appareil pour la construction d'un tablier de pont en béton précontraint
DE2743273C2 (de) Verfahren zum Herstellen von langgestreckten Tragwerken, insbesondere mehrfeldrigen Brückenüberbautem aus Stahl- oder Spannbeton
CH637443A5 (de) Verfahren zur abschnittweisen herstellung einer ortbetonplatte und einrichtung mit einem schalboden und einem bewehrungsboden zur durchfuehrung des verfahrens.
EP0032959A1 (fr) Procédé et faux-oeuvre pour la construction de ponts en béton précontraint
DE3247326C2 (de) Verfahren und Lehrgerüst zur abschnittsweisen Herstellung von Stahlbetonbrücken
DE2510015C2 (de) Vorrichtung und Verfahren zum abschnittsweisen Herstellen der einzelnen Felder des Überbaues von Pfeilerbrücken oder ähnlichen Tragwerken
DE3527470C2 (fr)
DE2933061A1 (de) Verfahren zum umsetzen eines geruesttraegers zur herstellung von mehrfeldrigen brueckentragwerken aus spannbeton
DE2618259A1 (de) Verfahren und vorrichtung zum abschnittsweisen herstellen eines mehrfeldrigen brueckentragwerks aus stahl- oder spannbeton
AT298553B (de) Einrichtung zum abschnittsweisen Herstellen eines auf Pfeilern gelagerten Bauwerkes, insbesondere einer mehrfeldrigen Brücke aus Stahlbeton oder Spannbeton
EP0134823A1 (fr) Appareil pour la construction tranche par tranche d'un tablier de pont en béton précontraint
EP0056422A1 (fr) Procédé et faux-oeuvre pour la construction de ponts en béton armé
DE1041408B (de) Vorrichtung zum Herstellen von gekruemmten und/oder verwundenen Betonbalken
DE3733627A1 (de) Verfahren und vorrichtung zur gelaendeunabhaengigen abschnittweisen herstellung von spannbetonbruecken
DE2533734A1 (de) Vorrichtung zur herstellung von auf im abstand voneinander angeordneten pfeilern abgestuetzten betonbruecken
DE2660087C2 (de) Einrichtung zum abschnittsweisen freien Vorbau von mehrfeldrigen Brückentragwerken aus Stahl- oder Spannbeton
DE1263806B (de) Verfahren zum Herstellen mehrfeldriger Brueckentragwerke aus Stahlbeton oder Spannbeton und Einrichtung hierfuer
WO1981002032A1 (fr) Procede et cintre pour la construction de ponts en beton arme
DE1201384B (de) Vorbauruestung zum Bau von Hochstrassen und Bruecken
DE4141331A1 (de) Fachwerkbruecke und verfahren zu deren herstellung sowie vorrichtung zur durchfuehrung des verfahrens
EP0133849B1 (fr) Système de fixation d'une matrice d'impression par stencil sur un tambour d'impression
DE2251475A1 (de) Verfahren und ruesttraeger zum herstellen eines tragwerkes, insbesondere einer bruecke aus spannbeton
DE2216972C3 (de) Verfahren zum Weitertransportieren einer Schalung und Vorrichtung zum Durchführen des Verfahrens

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Designated state(s): AT BE CH DE FR GB IT LU NL SE

17P Request for examination filed

Effective date: 19811028

ITF It: translation for a ep patent filed
GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Designated state(s): AT BE CH DE FR GB IT LU NL SE

REF Corresponds to:

Ref document number: 6878

Country of ref document: AT

Date of ref document: 19840415

Kind code of ref document: T

REF Corresponds to:

Ref document number: 3067233

Country of ref document: DE

Date of ref document: 19840503

PLBI Opposition filed

Free format text: ORIGINAL CODE: 0009260

26 Opposition filed

Opponent name: STRABAG BAU-AG

Effective date: 19840818

EN Fr: translation not filed
PLBI Opposition filed

Free format text: ORIGINAL CODE: 0009260

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 19841231

Year of fee payment: 6

Ref country code: BE

Payment date: 19841231

Year of fee payment: 6

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19850131

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 19850131

Year of fee payment: 6

26 Opposition filed

Opponent name: DYCKERHOFF & WIDMANN AG

Effective date: 19841130

NLR1 Nl: opposition has been filed with the epo

Opponent name: DYCKERHOFF & WIDMANN AG

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Effective date: 19860118

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Effective date: 19860119

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Effective date: 19860131

BERE Be: lapsed

Owner name: EMIL STEIDLE G.M.B.H. & CO.

Effective date: 19860131

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Effective date: 19860801

GBPC Gb: european patent ceased through non-payment of renewal fee
NLV4 Nl: lapsed or anulled due to non-payment of the annual fee
PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 19861222

Year of fee payment: 8

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Effective date: 19880118

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

RDAG Patent revoked

Free format text: ORIGINAL CODE: 0009271

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: PATENT REVOKED

27W Patent revoked

Effective date: 19890414

GBPR Gb: patent revoked under art. 102 of the ep convention designating the uk as contracting state
EUG Se: european patent has lapsed

Ref document number: 80100241.1

Effective date: 19860813