EP0392309A2 - Engin de battage, procédé pour le transport et l'érection de l'engin de battage et procédé pour l'établissement d'une fondation - Google Patents

Engin de battage, procédé pour le transport et l'érection de l'engin de battage et procédé pour l'établissement d'une fondation Download PDF

Info

Publication number
EP0392309A2
EP0392309A2 EP90106279A EP90106279A EP0392309A2 EP 0392309 A2 EP0392309 A2 EP 0392309A2 EP 90106279 A EP90106279 A EP 90106279A EP 90106279 A EP90106279 A EP 90106279A EP 0392309 A2 EP0392309 A2 EP 0392309A2
Authority
EP
European Patent Office
Prior art keywords
mast
driving
machine
pile
axis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP90106279A
Other languages
German (de)
English (en)
Other versions
EP0392309B1 (fr
EP0392309A3 (fr
Inventor
Ole Holm Lucassen
Finn Rasmussen
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Per Aarsleff AS
Original Assignee
Per Aarsleff AS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Per Aarsleff AS filed Critical Per Aarsleff AS
Publication of EP0392309A2 publication Critical patent/EP0392309A2/fr
Publication of EP0392309A3 publication Critical patent/EP0392309A3/fr
Application granted granted Critical
Publication of EP0392309B1 publication Critical patent/EP0392309B1/fr
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/02Placing by driving
    • E02D7/06Power-driven drivers
    • E02D7/14Components for drivers inasmuch as not specially for a specific driver construction
    • E02D7/16Scaffolds or supports for drivers

Definitions

  • the present invention relates to a machine for pile-driving.
  • the machine is transported on railway and is able to drive piles from a position on the rails.
  • the invention furthermore relates to a method for transport and erection of such a machine and to a method for establishment of a foundation next to a track.
  • a large number of foundations is used along railway tracks for various equipment to be installed next to the track.
  • foundations of a substantial size are required due to the strict requirements for stability of the masts.
  • foundations of a size up to 1.5 tons and a length of up to 5.5 meters are used for masts for overhead traction wires.
  • the establishment of such foundations represents a major task, not only by new installations, but also in connection with renewal of existing installations, such as replacement of damaged foundations or replacement of existing foundations by more stable types of foundations, etc.
  • piling rigs normally comprise a vehicle with power supply and a driver's cab to which a mast with leader is connected, i.e. the slide guide for the hammer also called the pile hammer.
  • the mast is provided with a hoisting arrangement for the hammer assembly and for hoisting the pile.
  • the mast must be of a considerable length as there must be space for the entire length of the pile above ground, for the hammer assembly above the pile, which hammer assembly in itself may have a height of f. ex. 2 meters, and for the hoisting arrangement. Piles having a length of abt. 6 meters therefore require a mast of a length of about 10 meters, and it is obvious that transport and erection of such a mast can be a very difficult job. In practice, the mast must be transported lying in horizontal position and erected on location into practically vertical position, which often requires a good deal of assembling work.
  • a pile-driving rig which in its swayable upper part has a horizontally projecting, telescopically extensible boom, called the guide boom, to which the mast is hinged about a horizontal axis in such a manner that it can be swung about the hinge between its horizontal transport position and its vertical working position, said mast being supported by two stays holding the mast in the area near the middle and which is anchored at the upper rear portion of the swayable upper part of the vehicle.
  • This vehicle comprises an undercarriage with rubber wheels for driving on road and with uncoupled rail rollers which can be raised and lowered hydraulically to enable the vehicle to raise on these wheels for transport on railway.
  • the vehicle may be adjusted for combined support on both road and rail wheels, in such a manner that the rail wheels keep the vehicle on the track, while the contact of the road wheels against the rails enables the vehicle to transmit and utilize the normal power of propulsion of the road wheels. If the vehicle has to leave the track, this can be done by drawing the rail wheels upwards away from the rails, whereafter the vehicle can drive on the rubber wheels alone.
  • the upper part of the vehicle wherein the motor and the driver's cab are arranged, is mounted on the driving chassis so that it can swivel about a vertical axis called the swivel axis lying in the longitudinal middle plane of the driving chassis.
  • the machine can be mounted with leader and hammer carriage or hammer assembly for pile-driving, the mast with the leader being carried by a guide boom being pivotable about a horizontal axis of the upper cart of the machine, and where the leader is pivotable in relation to the guide boom about an axis parallel to the first axis.
  • the mast can be erected by hydraulic actuators and raised and lowered to a limited degree by swinging the guide boom, but there is no true possibility of adjusting the distance between the leader in the working position and the swivel axis.
  • the hoisting gears for hammer and pile are mounted on the upper part of the machine and it is, therefore, necessary to manually arrest and free the wires for erection and dismantling, respectively, of the mast.
  • a pile-driving machine for transport on railway is hereby achieved, which machine can operate from a position standing on the track and which in simple manner can be installed in working position and dismantled for transport.
  • a pile-driving machine of a particularly good flexibility is achieved, as the height of erection of the mast may be adjusted by tilting the boom about the axis in the upper part of the machine, and the mast in the working position may be displaced in direction towards or away from the swivel axis by extension of the boom.
  • the swivel mechanism of the machine may also be utilized for operation at right angles to the track or within an interval of oblique directions within the restrictions of space determined by the driving chassis.
  • the mast may operate in vertical positions or may be placed in inclined position by tilting about the axis of the outer end of the boom, if desired.
  • the machine is therefore suitable for placing foundations also on sloping locations, for example where the railway extends over an embankment or at low-level lines. If necessary, a foundation may also during driving be forced towards or away from the swivel axis by utilizing the telescope mechanism of the boom. Dismantling of the mast requires very little space, and, in particular, restricted height above the track, as the boom need to be only slightly raised to release the mast foot from the ground.
  • the mast is tilted about the hinge at the end of the boom and so far back as the upper part of the machine allows, whereafter mast and boom together can be tilted about the machine hinge until the mast lies in the substantially horizontal transport position. Furthermore, the double hinges and the possibility of extending the boom facilitate adjustment of the transport position of the mast to place the centre of gravity as favourably as possible.
  • a very important advantage according to the invention is achieved in that it is made possible to erect and dismantle a mast of a considerable length from a railway vehicle standing on a track with an overhead electric traction wire.
  • the boom is in its transport position contracted and sloping upwards from the supporting pivot in the upper part of the vehicle. It is hereby achieved that the mast top immediately at the beginning of the erection operation is moved towards the swivel axis so that the mast can be tilted upwardly into an inclined attitude, utilizing the maximum available space above the track, the mast extending in the longitudinal direction of the track and without any danger of collision between the mast top and the vehicle chassis.
  • the mast is of a suitable short length, it can thereafter be swivelled from the longitudinal direction into a direction transversely to the rails in such a manner that the mast top during swivelling does not intersect the structural gauge section for traffic hauled on the track.
  • power-driven and controlled means are provided for erection and dismantling of the mast, and according to a particular embodiment the hoisting gear comprises a winch mounted on the mast. It is hereby made possible to erect and dismantle the mast automatically from a control panel.
  • the means for tilting the mast about the hinge at the end of the guide boom comprises a linear actuator acting on the mast at a point which in the vertical working position of the mast lies below the tilting point of the mast.
  • the mast is divided into a plurality of mutually sliding parts, and the hoisting means may comprise a pivotable mast top with wire roller. It is hereby made possible to arrange a relatively long effective mast within the narrow space being available, if erection of the mast is required under the above-mentioned confined conditions.
  • control means controlling the movements of the upper part of the machine and the mast are provided with blocking means so that the mast can only swivel to one side of the track, and possibly only in a predetermined oblique position of the mast.
  • the machine can hereby operate on one side of a double track, placing foundations along the outside of the track and with sufficient safety of operation to permit simultaneous traffic on the neighbour track.
  • the blocking means is, of course, arranged in such a manner that it can optionally be switched to one side or the other under observance of appropriate precautionary measures.
  • a method for transport and erection of a pile-driving machine is provided, as stated in Claim 13.
  • a very uncomplicated and flexible erection of the mast is hereby achieved, as described above. Dismantling of the mast is, of course, carried out in the reverse sequence of operation.
  • the mast is provided with a plurality of mutually sliding parts, whereby it is achieved that the mast has a greater effective length of operation, simultaneously being relatively compact for dismantling and transport.
  • a fast prefabrication of foundations under controlled conditions, f. ex. in a factory, is hereby made possible, whereafter the foundations can be installed on location with a minimum of inconveniences for the railway traffic. Furthermore, the installation can be carried out with very limited use of manpower.
  • a method as stated in Claim 19 is provided, where the distance of a foundation from a track is adjusted during ramming. It is hereby achieved that, if desired, the position of a foundation may readily and effectively be adjusted in relation to the track, whereby a very accurate position of the foundations is achieved.
  • a pile-driving machine or vehicle is shown, generally referred to by reference numeral 1, said machine comprising a driving chassis or carriage 3 and a machine top section 4.
  • the driving chassis 3 is provided with rubber wheels 6 which by means of control and driving means, not shown in detail, enable the machine to drive on an ordinary road.
  • the driving chassis 3 is, furthermore, at the ends provided with uncoupled track rollers or rail wheels 5 mounted on swing arms 11 so that they may be raised and lowered in relation to the driving chassis by means of controllable actuators 9. For road transport the rail wheels 5 are in raised position (not shown), whereafter the machine is carried by the rubber wheels 6.
  • the rail wheels 5 can be lowered so far downwardly that the rubber wheels are disengaged from the track, whereafter the machine 1 can be hauled.
  • the rail wheels are adjusted so that the weight of the machine is supported by both the rail wheels 5 and the rubber wheels 6.
  • the machine is hereby guided by the rails, i.e. it is moved as a railway vehicle, while the contact of the rubber wheels against the rails provides sufficient friction to enable the machine to utilize the normal propelling machinery of the rubber wheels, and the machine is thus self-propelling.
  • the driving engine 7 and the driver's cab 8 are provided in the upper part 4 of the machine, and upper eyes 44 and lower eyes 45 are provided, with horizontal, parallel axes, for carrying working equipment.
  • the engine is provided with a hydraulic system, not shown in detail, so that it may provide hydraulic power for various manoeuvering and working functions.
  • the upper part 4 of the machine is mounted on the driving chassis 3 in such a manner that the upper part can turn or swivel about a vertical axis 13 by means of a power-driven swivel gear 14.
  • the machine is provided with supporting legs or feet 12 which are in raised position during transport and which can be lowered to provide a stable support for the machine during the working operations.
  • the mast is seen at the top, with the hammer assembly or hammer carriage 16 being transported in substantially horizontal position.
  • the mast 15 comprises a slide guide or leader 17 for the hammer assembly, the leader being displaceable in relation to the part of the mast called the slide guide 18.
  • the mast foot 19 is shown to the right in the figure and may likewise be extended in relation to the slide guide 18.
  • the mast top 23 is shown to the left.
  • Mast and hammer assembly are supported by the guide boom 27 which comprises a base part 28 pivotally mounted about a horizontal axis through the hinge eyes 44, and a telescopically extensible part 29 connected to the slide guide 18 at the pivot point 37.
  • the base part of the guide boom can be tilted up and down in relation to the top part of the machine by means of the lifting actuators 36.
  • the mast is tiltable in relation to the guide boom about the hinge point 37 guided by an actuator 46 and in a manner to be described in more detail below. When the mast is in the folded position as shown, the whole equipment lies within the normal clearance profile for vehicles moving on rails.
  • the machine can in this way be driven on the rails to the working location where it is stopped, the feet 12 are placed on the sleepers or on the ground to provide a stable support for the machine. Thereafter the actuator 36 is slightly contracted, whereby the guide boom and mast in a fixed mutual angular relation are tilted about the hinge eye 44 into a position being defined by the clearance of the driving chassis and which may be defined by the maximum height available above the track.
  • Fig. 2 illustrates the same components as Fig. 1 as well as the side limit 42 for the free gauge section for equipment moving on the track and a profile 47 indicating the area within which an overhead wire for electric traction would be placed. It appears clearly from Fig. 2 that already a limited inclination of the mast brings the mast top closer towards the swivel axis 13 which gives a better possibility of swivelling the machine in this position, without bringing the mast top into interference with the neighbour track or to collide with other fixed objects which may be situated along the track.
  • the driving chassis does no longer block the tilting of the lowermost end of the mast, and the mast may then be tilted further from the position shown in Fig. 2, still with the mast and guide boom in the same mutual angular relation about the eye 44, into the position shown in Fig. 3.
  • the leader 17 may be extended telescopically along the slide guide 18 and slightly downwards for decreasing the requirement of free height above the machine during the upward tilting.
  • the guide boom 27 is substantially horizontal, and the mast top is so close to the overhead wire gauge section 47 that the mast cannot be tilted further upwards.
  • the mast foot 19 has been swung down to a position slightly above the level of the top of the rails. It is important that the machine can operate, also if the ground lies in this level, and the equipment is therefore designed so that the mast may be swung upwardly without the mast foot thereby moving below the level of the upper edges of the rails.
  • the telescopic guide boom is hereafter extended so that the extensible part 29 is brought into its outermost position, as shown in Fig. 4. It is hereby observed that the actuator 46 tilting the mast in relation to the guide boom in a manner to be explained later with reference to Figs. 8, 9, and 10, is acting between the mast and an attachment point in the extensible part 29 of the guide boom that an extension of the guide boom causes a strictly parallel extension of the mast.
  • the mast can be tilted about the hinge point 37, the equipment being so adapted that there is still some space left before the mast foot hits the ground.
  • the leader 17 and the mast foot 19 are so arranged that they are extensible in longitudinal direction with respect to the slide guide 18, and it is consequently possible, when the mast is tilted in a certain angular position, to extend the leader 17, the mast foot 19, and the mast top 23 upwardly as soon as the mast top is clear of the overhead wire gauge section 47, as seen in Fig. 5.
  • This extension may be performed gradually, simultaneously with the tilting so that no point of the mast will ever get below the level of the upper edges of the rails.
  • the mast will reach substantially vertical position as shown in Fig. 6, where it is also shown how the mast top 23 by means of an actuator, not shown, can be swung upwardly.
  • the operating position is shown in Fig. 7, and it appears herefrom how the mast foot 19 has been extended downwardly, preferably until it has reached a position standing on the ground, while the leader 17 has been extended upwardly into its highest position and the hammer assembly or ram 16 likewise have been hoisted straight up into their highest position. It appears from Fig. 7 how an actuator 50 is arranged between the slide guide 18 and the mast foot 19, whereby the mast foot may be raised and lowered. It can furthermore be seen how the leader 17 is supported by an actuator 51 attached to the mast foot 19.
  • a wire is fastened to a pile 2 which in advance has been laid on location so that it can be hoisted into position just below the hammer assembly 16 and be brought into position ready to be driven. Hoisting of the hammer assembly and pile is effected by means of wires 25 guided over wire rollers 24 at the tiltable mast top 23.
  • the hoisting gear comprises two winches 26 arranged in the slide guide 18.
  • the hammer assembly is driven by hydraulic means, hydraulic power being conveyed from the machine engine 7 through hydraulic hoses, not shown in detail. As the pile is being driven, the hammer assembly 16 follows the pile downwards. As can be understood from Fig.
  • the leader 17 is of limited length, and the necessary operational length is achieved thereby that the leader 17 can be extended downwardly in the slide guide 18 straight down to the mast foot 19, as shown in Fig. 2, whereby the hammer assembly 16 can be guided and can operate at a level lying below the top of the rails.
  • the hoisting gear has sufficient strength to pull up a pile which might have been placed in a wrong position. If it appears that a pile, after ramming has been initiated, has not been placed in a correct distance from the track, it will be possible, even while the pile is being driven, to force it in direction towards the track or away therefrom by means of the machine.
  • the telescopic extension mechanism of the guide boom is used herefor, being dimensioned of sufficient strength for this purpose.
  • the pile 2 may be fastened to the mast foot 19 by means of chains or the like, or an intermediate plate, such as a wooden plate, may be laid between the pile and the mast foot.
  • the mast also by means of the actuator 46, may be tilted about the hinge point 37 towards the median plane of the rails or in direction away therefrom in case it is desired to drive piles in oblique directions. Inclinations in a plane parallel to the median plane of the rails can be effected by utilizing the possibility of adjusting the positions of the feet 12 of the machine, it being possible to raise and lower said feet so as to tilt the entire machine and thereby also the mast.
  • the base part of the guide boom comprises a box-formed beam
  • the extensible part 29 of the guide boom likewise a box-formed beam, but of a dimension so that the extensible part may move within the base part 28.
  • the two parts are provided with corresponding slide bars 31, to secure a well-controlled guidance of the two parts.
  • the extension of the parts of the guide boom may be performed by an actuator 30 mounted within the boom and acting between the bearing points 32.
  • the base part of the guide boom is at one end (left side of Fig.
  • the extensible part 29 of the guide boom is provided with eyes at 37 for hinged connection to hinge eyes 49 in the slide guide 18 by means of a suitable pivot pin 10 as shown in Fig. 8.
  • a projection or lug 38 with an attachment eye is provided at the lower end of the extensible part 29 of the guide boom.
  • the base part 28 of the guide boom is on the underside provided with an opening 35, through which the projection 38 extends. It is hereby secured that the parts of the guide boom can be designed with suitable overlapping to secure a good stability and, at the same time, the boom may be sufficiently contracted.
  • the base part 28 of the guide boom may be tilted in upward and downward direction in relation to the machine about the eyes 44 by means of the previously mentioned lifting actuators 36 being linked to a pivot pin 10 through the lowermost hinge eyes 45 of the machine.
  • the lifting actuators 36 are connected to the base part 28 of the guide boom by means of pivot pins 34, a lifting actuator 36 being placed on each side of the base part 28 of the guide boom.
  • Fig. 8 shows how the slide guide is arranged around the end of the guide boom and is provided with slide claws 21 by means of which the slide guide grips around slide bars 20 mounted on the leader 17. On the opposite side, the leader 17 is provided with further slide bars 20 for guiding the hammer assembly 16, gripping with suitable slide claws 21.
  • FIG. 11 showing a plane view of the machine in the operative position.
  • This Figure also clearly shows the rails 39 and the sleepers 40; it furthermore shows the position of the rubber wheels 6 and the rail wheels 5 and illustrates how the feet or supporting legs 12 are positioned so as to only just rest on the outermost ends of the sleepers.
  • the position of the double swivel eyes 44 and the double supporting eyes 45 on the machine, as well as the two lifting actuators 36 on both sides of the guide boom 27, are shown.
  • the machine can swivel a considerable angle to both sides, and this possibility in combination with the extensibility of the guide boom 27 means that the machine can cover the entire working area designated 48.
  • the position of the pile may be varied from approx. 3.0 meters to approx. 3.5 meters from the swivel axis 13, and the angle of operation of the machine can be extended to 50° on each side of the line perpendicularly to the middle line 41 of the rails.
  • all manoeuvering functions including transport, winches and all actuators are driven hydraulically by power being transmitted through suitable tubes and hose connections from the engine 7 of the machine and controlled from a manoeuvering panel (not shown) in the driver's cab. It is obvious that there are numerous other ways of transferring and controlling the manoeuvering power, such as by means of mechanical connection, compressed air or electricity, and the invention comprises all such variants.

Landscapes

  • Engineering & Computer Science (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Piles And Underground Anchors (AREA)
  • Auxiliary Devices For And Details Of Packaging Control (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Containers And Plastic Fillers For Packaging (AREA)
  • Vending Machines For Individual Products (AREA)
  • Decoration By Transfer Pictures (AREA)
  • Basic Packing Technique (AREA)
  • Forklifts And Lifting Vehicles (AREA)
EP90106279A 1989-04-11 1990-04-02 Engin de battage, procédé pour le transport et l'érection de l'engin de battage et procédé pour l'établissement d'une fondation Expired - Lifetime EP0392309B1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DK173289A DK167577B1 (da) 1989-04-11 1989-04-11 Maskine til paeleramning, fremgangsmaade til transport og opstilling af maskine til paeleramning og fremgangsmaade til etablering af fundament
DK1732/89 1989-04-11

Publications (3)

Publication Number Publication Date
EP0392309A2 true EP0392309A2 (fr) 1990-10-17
EP0392309A3 EP0392309A3 (fr) 1991-09-04
EP0392309B1 EP0392309B1 (fr) 1994-08-10

Family

ID=8107613

Family Applications (1)

Application Number Title Priority Date Filing Date
EP90106279A Expired - Lifetime EP0392309B1 (fr) 1989-04-11 1990-04-02 Engin de battage, procédé pour le transport et l'érection de l'engin de battage et procédé pour l'établissement d'une fondation

Country Status (5)

Country Link
EP (1) EP0392309B1 (fr)
AT (1) ATE109845T1 (fr)
DE (2) DE392309T1 (fr)
DK (2) DK167577B1 (fr)
ES (1) ES2021566T3 (fr)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0984105A1 (fr) 1998-08-31 2000-03-08 Per Aarsleff A/S Ensemble de positionnement d'une tête de battage
CN100455729C (zh) * 2004-07-23 2009-01-28 湖南山河智能机械股份有限公司 电动液压履带式桩架
WO2010124386A1 (fr) * 2009-05-01 2010-11-04 Jay Gunnarson Système d'avance télescopique
EP2557232A1 (fr) 2012-05-31 2013-02-13 Per Aarsleff A/S Ensemble de commande d'empilage
JP2016141937A (ja) * 2015-01-29 2016-08-08 日本車輌製造株式会社 杭打機
WO2022228833A1 (fr) * 2021-04-29 2022-11-03 Rtg Rammtechnik Gmbh Machine souterraine

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT398323B (de) * 1992-06-10 1994-11-25 Elin Energieversorgung Einrichtung zum rammen einer fundierung vorzugsweise für einen mast
EP0777018A1 (fr) 1995-12-01 1997-06-04 Per Aarsleff A/S Méthode et appareil pour la réalisation d'une colonne creuse dans le sol et colonne creuse ainsi réalisée
AU7002696A (en) 1996-09-26 1998-04-17 Tom Toralv Roynestad A method in piling tubular bases, a combined drilling and piling rig, as well as use of the drill hammer of said rig
DE10235858B4 (de) * 2002-08-05 2012-03-15 Ltb Leitungsbau Gmbh Verfahren zum Erneuern und Sanieren von Fundamenten
CN103482176A (zh) * 2013-10-11 2014-01-01 昆山市华浦塑业有限公司 一种瓶体带有刻度线的瓶子

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1814767A1 (de) * 1968-12-14 1970-06-25 Otto Reimann Auf einem Eisenbahnwaggon angeordnete Vorrichtung mit einem Maekler oder Arbeitsgeruest,insbesondere Ramme
DE2013279A1 (de) * 1970-03-20 1971-10-07 Delmag Maschinenfabrik Reinhold Dornfeld, 7300 Esslingen Maklerabstutzung
CH663638A5 (de) * 1982-07-28 1987-12-31 Fietz & Leuthold Ag Einrichtung zum einrammen von fundamentpfaehlen fuer leitungsmasten an einem bahngeleise.

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0984105A1 (fr) 1998-08-31 2000-03-08 Per Aarsleff A/S Ensemble de positionnement d'une tête de battage
CN100455729C (zh) * 2004-07-23 2009-01-28 湖南山河智能机械股份有限公司 电动液压履带式桩架
WO2010124386A1 (fr) * 2009-05-01 2010-11-04 Jay Gunnarson Système d'avance télescopique
US8764347B2 (en) 2009-05-01 2014-07-01 Northstar Energy Services Inc. Telescoping leader system
EP2557232A1 (fr) 2012-05-31 2013-02-13 Per Aarsleff A/S Ensemble de commande d'empilage
JP2016141937A (ja) * 2015-01-29 2016-08-08 日本車輌製造株式会社 杭打機
WO2022228833A1 (fr) * 2021-04-29 2022-11-03 Rtg Rammtechnik Gmbh Machine souterraine
KR20230170067A (ko) * 2021-04-29 2023-12-18 알티지 람테크니크 게엠베하 토목공학 기계
CN117280097A (zh) * 2021-04-29 2023-12-22 Rtg拉姆技术有限公司 地下工程机械
JP2024517205A (ja) * 2021-04-29 2024-04-19 エルテーゲー ラフテヒニク ゲーエムベーハー 土木機械
US12486633B2 (en) 2021-04-29 2025-12-02 Rtg Rammtechnik Gmbh Civil engineering machine

Also Published As

Publication number Publication date
ES2021566A4 (es) 1991-11-16
EP0392309B1 (fr) 1994-08-10
ES2021566T3 (es) 1994-12-01
DE69011381D1 (de) 1994-09-15
DK173289D0 (da) 1989-04-11
DK167577B1 (da) 1993-11-22
DK0392309T3 (da) 1994-10-03
EP0392309A3 (fr) 1991-09-04
DK173289A (da) 1990-10-12
ATE109845T1 (de) 1994-08-15
DE392309T1 (de) 1993-08-12
DE69011381T2 (de) 1995-03-02

Similar Documents

Publication Publication Date Title
US9334668B2 (en) Modular drilling rig system
US5582467A (en) Displaceable working apparatus with extensible boom
US8060966B2 (en) Method and apparatus for bridge construction
US5113969A (en) Displaceable working platform with extensible boom
EP0392309B1 (fr) Engin de battage, procédé pour le transport et l'érection de l'engin de battage et procédé pour l'établissement d'une fondation
EP0392310B1 (fr) Machine pour battre les pieux, méthode de transport et d'érection de ladite machine, et méthode pour former des fondations au voisinage de rails
US5549176A (en) Bridge construction machinery and method for constructing bridges
CN109183620B (zh) 伸缩托架、钢箱梁吊装设备及吊装方法
US5947308A (en) Bridge erection system
JP4489872B2 (ja) 橋梁の架設方法および装置
WO2000060211A1 (fr) Ensemble de forage pour mine souterraine
CN110552357A (zh) 一种塔吊式高陡边坡锚固施工方法
EP0351694B1 (fr) Dispositif d'arrêt pour force de réaction rotative
CN118405601A (zh) 一种翻转下放装置、安装方法及钢管施工方法
CN112554074B (zh) 钢索塔的自爬式安装系统
CN115233730A (zh) 一种用于v形柱的顶板顶升装置及顶升施工方法
PL176295B1 (pl) Urządzenie do wbijania pali i sposób wbijania pali
US20120051846A1 (en) Telescoping leader system
US20240228241A9 (en) Lifting systems and methods for performing operations on a structure
CN116104520B (zh) 一种隧道施工平台车及施工方法
CA2813772C (fr) Procede et appareil pour la construction de ponts
CN220704323U (zh) 一体化架桥设备
KR100307288B1 (ko) 교량용상판안착장치및그방법
CN120666896A (zh) 一种公路边坡治理施工用移动平台操作装置
ZA200104786B (en) A drill rig for use in an underground mine.

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE CH DE DK ES FR GB GR IT LI LU NL SE

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE CH DE DK ES FR GB GR IT LI LU NL SE

17P Request for examination filed

Effective date: 19911212

17Q First examination report despatched

Effective date: 19921216

ITCL It: translation for ep claims filed

Representative=s name: BARZANO' E ZANARDO MILANO S.P.A.

DET De: translation of patent claims
GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

ITF It: translation for a ep patent filed
AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE CH DE DK ES FR GB GR IT LI LU NL SE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Effective date: 19940810

REF Corresponds to:

Ref document number: 109845

Country of ref document: AT

Date of ref document: 19940815

Kind code of ref document: T

REF Corresponds to:

Ref document number: 69011381

Country of ref document: DE

Date of ref document: 19940915

REG Reference to a national code

Ref country code: DK

Ref legal event code: T3

REG Reference to a national code

Ref country code: GR

Ref legal event code: FG4A

Free format text: 3012920

ET Fr: translation filed
REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2021566

Country of ref document: ES

Kind code of ref document: T3

NLV1 Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act
EAL Se: european patent in force in sweden

Ref document number: 90106279.4

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 19970407

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 19970408

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 19970409

Year of fee payment: 8

Ref country code: CH

Payment date: 19970409

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GR

Payment date: 19970415

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: LU

Payment date: 19970428

Year of fee payment: 8

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19980402

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19980403

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19980430

Ref country code: GR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19980430

Ref country code: FR

Free format text: THE PATENT HAS BEEN ANNULLED BY A DECISION OF A NATIONAL AUTHORITY

Effective date: 19980430

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19980430

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19980430

BERE Be: lapsed

Owner name: PER AARSLEFF A/S

Effective date: 19980430

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20000503

REG Reference to a national code

Ref country code: GB

Ref legal event code: IF02

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 20040401

Year of fee payment: 15

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20040402

Year of fee payment: 15

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DK

Payment date: 20040416

Year of fee payment: 15

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 20040423

Year of fee payment: 15

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20040430

Year of fee payment: 15

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.

Effective date: 20050402

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20050402

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20050402

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20050403

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20050502

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20051101

REG Reference to a national code

Ref country code: DK

Ref legal event code: EBP

EUG Se: european patent has lapsed
GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20050402