EP0401551A1 - Procédé et produit de revêtement de panneaux de coffrage - Google Patents

Procédé et produit de revêtement de panneaux de coffrage Download PDF

Info

Publication number
EP0401551A1
EP0401551A1 EP90109050A EP90109050A EP0401551A1 EP 0401551 A1 EP0401551 A1 EP 0401551A1 EP 90109050 A EP90109050 A EP 90109050A EP 90109050 A EP90109050 A EP 90109050A EP 0401551 A1 EP0401551 A1 EP 0401551A1
Authority
EP
European Patent Office
Prior art keywords
panels
formwork
plates
coating material
parts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP90109050A
Other languages
German (de)
English (en)
Other versions
EP0401551B1 (fr
Inventor
Heinz Hoffmann
Alfred Fritzen
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
hewa bauschalungs GmbH
Original Assignee
hewa bauschalungs GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by hewa bauschalungs GmbH filed Critical hewa bauschalungs GmbH
Priority to AT90109050T priority Critical patent/ATE92569T1/de
Publication of EP0401551A1 publication Critical patent/EP0401551A1/fr
Application granted granted Critical
Publication of EP0401551B1 publication Critical patent/EP0401551B1/fr
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G9/00Forming or shuttering elements for general use
    • E04G9/02Forming boards or similar elements
    • E04G9/05Forming boards or similar elements the form surface being of plastics
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G9/00Forming or shuttering elements for general use
    • E04G9/02Forming boards or similar elements
    • E04G2009/023Forming boards or similar elements with edge protection
    • E04G2009/025Forming boards or similar elements with edge protection by a flange of the board's frame

Definitions

  • the invention relates to a method for coating formwork panels, in particular made of plywood, for concrete formwork and the materials used.
  • Formwork panels of this type are very often installed in a metal frame and together form what are known as formwork elements, which are provided with suitable connecting elements and with the aid of which form large formwork surfaces, as are required in concrete building and civil engineering.
  • the known plywood formwork panels which have a thickness between 12 and 30 mm and consist of a large number of layers of different fiber directions glued together, have a brown, smooth and often glossy surface in order to detach themselves as easily as possible from the hardened concrete. Nevertheless, concrete sticks after repeated use of the formwork panel increasingly stuck to it and cleaning the panels becomes labor-intensive. After a maximum of thirty to forty uses, these formwork panels must be taken out of operation and often enough, refurbishing and re-coating is no longer possible.
  • the invention has for its object to increase the stability of formwork panels and to facilitate their cleaning, if necessary at all.
  • this object is achieved by a coating method which has the characterizing features of claim 1.
  • Formwork panels coated in this way although their surface is not smooth but feels rough due to the granulate inclusions, have a significantly higher stability of eighty or more uses.
  • the surface layer adheres better to the wood, detaches better from the concrete and is much easier to clean with scraping tools.
  • Another advantage is that the surface layer is relatively tough and, in contrast to the known formwork panels, does not peel off when a nail is hammered in at the point of impact.
  • the water permeability is also significantly lower than that of known formwork panels, so that the coated panels have less tendency to swell.
  • the base layer is advantageously applied in such a way that the liquid coating material is run through a horizontal slot and thereby forms a liquid curtain through which the plates are passed in the horizontal direction.
  • the plates should be turned after the base layer has hardened and then coated on the back in the same way. In the case of the materials to be explained below, curing can be accelerated by further transport of the plates in a cabinet in which a particularly high level of air humidity is maintained.
  • the plates are preferably passed under a multiple spray head which is reciprocating in the transverse direction and on which a first spray nozzle, a blow pipe for the granules and a second spray nozzle are arranged at equal intervals in the running direction of the plates.
  • a multiple spray head which is reciprocating in the transverse direction and on which a first spray nozzle, a blow pipe for the granules and a second spray nozzle are arranged at equal intervals in the running direction of the plates.
  • the panels with a metal frame are to be used as so-called complete formwork elements, it is proposed that the panels be cut to size after the two-sided application of the base layer, sealed at the cut edges, in particular with the coating material of the base layer, in an associated frame with an elevated the surrounding edge and fastened to it by screws, rivets or the like used the top layer is applied.
  • a mixture for the base layer and a mixture for the cover layer.
  • These mixtures are preferably stirred together from the constituents specified in claims 6 and 7, the quantitative ratio should correspond at least approximately to the information given there.
  • the mixtures then have a consistency which makes it possible to produce a free-falling, coherent liquid curtain for applying the base layer or to spray the likewise liquid coating material for the cover layer with nozzles under pressure.
  • a granulate is introduced into the cover layer, preferably a very fine-grained powder made of hollow aluminum silicate balls, which have an average grain size of 0.01 to 0.35 mm. This powder can be conveyed pneumatically and blown out through a suitable pipe or nozzle and thereby finely distributed.
  • FIG. 1 shows the schematic cross section above of a storage channel 1, the length of which is at least equal to the width of the formwork panels 2 to be coated.
  • the horizontally mounted trough has a straight, narrow longitudinal slot below, through which the stored liquid mixture runs out as a complete liquid curtain 3.
  • a collecting channel 4 is provided at the bottom, which then receives the liquid curtain as indicated by dash-dotted lines and discharges it into a collecting container 5.
  • the formwork panels 2 are carried out one after the other on a roller conveyor with driven rollers 6 in the direction of the arrow 7, ie perpendicular to the liquid curtain 3 at a uniform speed under the storage channel 1.
  • the liquid curtain is thus deposited on the formwork panels 2 and these then pass into a transport system which is encapsulated as possible and in which there is high atmospheric humidity in order to accelerate the curing process.
  • the base layer After about an hour, the base layer has hardened to such an extent that the panels can be turned and driven through the system with the underside facing upwards.
  • the formwork panels thus coated on both sides are now cut to size so that they fit into the usual steel frames 8 of formwork elements.
  • An example is shown in FIG. 2.
  • the frame 8 consists of a rectangular hollow profile tube which has a raised edge 9 on one side, which surrounds the formwork element all around and covers the cut edges of the formwork panel 2. Nevertheless, in order to prevent the ingress of moisture, the cut edges are sealed, for example by applying the coating material according to Table A, before the panels are inserted into the frame. Usually the edge 9 protrudes a little beyond the plate thickness.
  • the formwork panels 2 are fastened to the frame by means of countersunk screws or preferably by shooting in bolts 10.
  • FIG. 3 shows the further treatment of the assembled components. These are moved horizontally in steps in the direction of arrow 13 with a step length of 20 cm, directly abutting one another by means of a suitable conveyor device, in the example a belt conveyor 12.
  • Fig. 3 shows the frame 8 seen from the side.
  • the plates 2 are on top.
  • a carriage 14 moves back and forth over the components. He has roles 15 that in corresponding guide rails 16 run and these are fastened over the belt conveyor.
  • the carriage carries three downwardly directed nozzles 17, 18 and 19, which are supplied via two hose lines 20 and 21.
  • the nozzles are arranged in the direction of movement 13 of the formwork elements at a mutual distance of 20 cm.
  • the front and rear nozzles 17 and 19 are connected to the hose line 20 and the hose line 21 supplies the nozzle 18.
  • the nozzles 17 and 19 spray a coating material according to Table B, while from the nozzle 18 a fine dust made of hollow aluminum silicate balls average grain size of 0.01 to 0.35 mm is blown out.
  • a powder which is marketed under the label STIFF 100/0 by the company Schwarzisselder Textil-Werke Heinrich Kautzmann GmbH, 7623 Schenkenzell, has proven to be particularly suitable.
  • the movement of the carriage 14 is coordinated with the forward movement of the formwork elements so that the latter always take a step when the carriage 14 reverses its direction of movement in the side areas, preferably outside the formwork panels 2. If one considers a transverse strip area of the plates, this is first sprayed with the coating liquid by the nozzle 19, then the powder is inflated onto the still liquid lower cover layer via the nozzle 18 and finally the aluminum silicate particles adhering to the lower cover layer are released from the nozzle 17 sprayed, so that they are finally firmly embedded in the top layer. After the surface layer has hardened in the air, the formwork elements are ready and can be used.
  • the arrangement of the different layers is illustrated in the right part of FIG. 2 in an exaggerated thickness.
  • the base layers on both sides are marked with A and the cover layer only on the upper, used side is marked with B.
  • Recipes for these layers are listed in the corresponding tables A and B.
  • the top layer B has a rough surface due to the aluminum silicate inclusions, which smoothes out when rubbed with a hard object. This could be due to the fact that the hollow spheres collapse, but this does not impair the extraordinary wear resistance of the layer.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Application Of Or Painting With Fluid Materials (AREA)
  • Laminated Bodies (AREA)
EP90109050A 1989-06-08 1990-05-14 Procédé et produit de revêtement de panneaux de coffrage Expired - Lifetime EP0401551B1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AT90109050T ATE92569T1 (de) 1989-06-08 1990-05-14 Verfahren und werkstoff zur beschichtung von schalplatten.

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE3918664A DE3918664A1 (de) 1989-06-08 1989-06-08 Verfahren und werkstoff zur beschichtung von schalplatten
DE3918664 1989-06-08

Publications (2)

Publication Number Publication Date
EP0401551A1 true EP0401551A1 (fr) 1990-12-12
EP0401551B1 EP0401551B1 (fr) 1993-08-04

Family

ID=6382319

Family Applications (1)

Application Number Title Priority Date Filing Date
EP90109050A Expired - Lifetime EP0401551B1 (fr) 1989-06-08 1990-05-14 Procédé et produit de revêtement de panneaux de coffrage

Country Status (3)

Country Link
EP (1) EP0401551B1 (fr)
AT (1) ATE92569T1 (fr)
DE (2) DE3918664A1 (fr)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1993000494A1 (fr) * 1991-06-25 1993-01-07 Taraldsson Leif B Panneau de coffrage, couche de contact et procede de production de panneaux de coffrage
EP0608199A3 (fr) * 1993-01-19 1994-10-05 Otto Heinzle Coffrage à segment pour murs en béton circulaires.
AT1017U1 (de) * 1995-09-25 1996-09-25 Thyssen Huennebeck Gmbh Verfahren zum beschichten von oberflächen
AT405289B (de) * 1995-09-25 1999-06-25 Thyssen Huennebeck Gmbh Verfahren zum beschichten von oberflächen
AT406685B (de) * 1995-09-25 2000-07-25 Thyssen Huennebeck Gmbh Verfahren zum beschichten von oberflächen
DE10029081A1 (de) * 2000-06-13 2002-01-03 Meinhard Meier Oberflächenvergütungs- und Oberflächenreparaturverfahren für Betonschaltafeln mittels Kunststoffverpackungsabfällen
EP1394338A1 (fr) * 2002-08-19 2004-03-03 Dirk Hoffmann Procédé de revêtement de panneaux, en particulier de panneaux en bois, et panneau revêtu
WO2005064099A1 (fr) * 2003-12-23 2005-07-14 I.L.P.A. Industria Legno Pasotti Srl Structure destinee a des formes modulaires prefabriquees en beton coule permettant de fabriquer des parois verticales, des parois horizontales, telles que des plafonds, des dalles ou analogue et des colonnes ou des piliers
EP1647651A2 (fr) 2004-10-15 2006-04-19 Hünnebeck GmbH Panneau de coffrage revêtu
US20120037540A1 (en) * 2009-04-21 2012-02-16 Albemarle Europe Sprl Hydrotreating Catalyst Containing Phosphorus And Boron

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4226789A1 (de) * 1992-08-13 1994-02-17 Sigri Great Lakes Carbon Gmbh Faserverstärkte Kunststoffwalze mit äußerer, verschleißfester, füllerhaltiger Kunststoffschicht
DE102005015508B3 (de) * 2005-04-05 2007-02-08 Peri Gmbh Betonschalelement

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3468690A (en) * 1961-08-22 1969-09-23 Us Plywood Champ Papers Inc Form boards and coatings therefor
US3650795A (en) * 1969-01-27 1972-03-21 John H Willingham Concrete form surfacing
FR2468705A1 (fr) * 1979-10-26 1981-05-08 Halle Wohnungsbau Coffrage de grande surface sans joints de raccord et procede pour sa fabrication
WO1987005353A1 (fr) * 1986-03-05 1987-09-11 Rolf Zollinger Element en forme de planche, notamment pour coffrages a beton

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3468690A (en) * 1961-08-22 1969-09-23 Us Plywood Champ Papers Inc Form boards and coatings therefor
US3650795A (en) * 1969-01-27 1972-03-21 John H Willingham Concrete form surfacing
FR2468705A1 (fr) * 1979-10-26 1981-05-08 Halle Wohnungsbau Coffrage de grande surface sans joints de raccord et procede pour sa fabrication
WO1987005353A1 (fr) * 1986-03-05 1987-09-11 Rolf Zollinger Element en forme de planche, notamment pour coffrages a beton

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1993000494A1 (fr) * 1991-06-25 1993-01-07 Taraldsson Leif B Panneau de coffrage, couche de contact et procede de production de panneaux de coffrage
US5454545A (en) * 1991-06-25 1995-10-03 Taraldsson; Leif B. Shuttering panel, contact layer and a method for producing shuttering panels
EP0608199A3 (fr) * 1993-01-19 1994-10-05 Otto Heinzle Coffrage à segment pour murs en béton circulaires.
AT1017U1 (de) * 1995-09-25 1996-09-25 Thyssen Huennebeck Gmbh Verfahren zum beschichten von oberflächen
AT405289B (de) * 1995-09-25 1999-06-25 Thyssen Huennebeck Gmbh Verfahren zum beschichten von oberflächen
AT406685B (de) * 1995-09-25 2000-07-25 Thyssen Huennebeck Gmbh Verfahren zum beschichten von oberflächen
DE10029081A1 (de) * 2000-06-13 2002-01-03 Meinhard Meier Oberflächenvergütungs- und Oberflächenreparaturverfahren für Betonschaltafeln mittels Kunststoffverpackungsabfällen
EP1394338A1 (fr) * 2002-08-19 2004-03-03 Dirk Hoffmann Procédé de revêtement de panneaux, en particulier de panneaux en bois, et panneau revêtu
WO2005064099A1 (fr) * 2003-12-23 2005-07-14 I.L.P.A. Industria Legno Pasotti Srl Structure destinee a des formes modulaires prefabriquees en beton coule permettant de fabriquer des parois verticales, des parois horizontales, telles que des plafonds, des dalles ou analogue et des colonnes ou des piliers
EP1647651A2 (fr) 2004-10-15 2006-04-19 Hünnebeck GmbH Panneau de coffrage revêtu
US20120037540A1 (en) * 2009-04-21 2012-02-16 Albemarle Europe Sprl Hydrotreating Catalyst Containing Phosphorus And Boron

Also Published As

Publication number Publication date
ATE92569T1 (de) 1993-08-15
EP0401551B1 (fr) 1993-08-04
DE3918664A1 (de) 1990-12-20
DE59002162D1 (de) 1993-09-09

Similar Documents

Publication Publication Date Title
EP0401551A1 (fr) Procédé et produit de revêtement de panneaux de coffrage
DE4126891A1 (de) Elektrostatische pulver-spruehbeschichtungsanlage fuer automobil-karosserien
DE2728741A1 (de) Einrichtung zum auftragen einer schutzschicht auf die schweissnaht von dosenruempfen
DE69706880T2 (de) Beschichtungsklinge
DE2823958A1 (de) Verfahren und vorrichtung zur spritzbehandlung, insbesondere zum spritzlackieren von gegenstaenden
EP0636467B1 (fr) Méthode et appareil pour le revêtement de corps en rotation
EP0791118B1 (fr) Appareillage pour l'application d'un revetement sur des surfaces de batiments au moyen de produits liquides epais durcissables
DE69223975T2 (de) Schalungstafel und verfahren zur herstellung der schalungstafel
DE2840803A1 (de) Lackiereinrichtung
DE19632844C1 (de) Verfahren und Vorrichtung zum Aufbringen von Mörtel auf die Unterseite eines Bausteins
DE19615298A1 (de) Bodenbelag und Verfahren zur Herstellung desselben
DE3326701A1 (de) Verfahren zur aufbringung eines rauhen oberflaechenbelages auf einem werkstueck
DE4029356C1 (en) Paint sprayer for board - has pair of distributor brushes and upper and lower dispersal rollers
CH443385A (de) Verfahren zur Strassenmarkierung und Vorrichtung zur Durchführung des Verfahrens
DE20204460U1 (de) Farbspritzanlage
DE9306821U1 (de) Pulverkabine
DE3300502C2 (de) Verfahren und Vorrichtung zum Aufbringen eines Mörtels oder eines Bindemittels bei der Herstellung vorgefertigter Mauersteintafeln
DE29706089U1 (de) Trägerprofil
WO1985001457A1 (fr) Installation de traitement de grandes surfaces verticales, en particulier, de surfaces exterieures de recipients cylindriques verticaux
AT504264B1 (de) Vorrichtung und verfahren zum auftragen einer abbindbaren schicht auf wandungen von bauteilen
EP0937841A1 (fr) Méthode de restauration de constructions en acier
WO1998041373A1 (fr) Dispositif d'application d'un agent de separation sur des pieces de coffrage
AT279770B (de) Vorrichtung zum Anstreichen von Plattenbauelementen
AT400461B (de) Verfahren und vorrichtung zum kontinuierlichen auftragen einer bewehrungsschicht auf eine poröse, mineralische bauplatte
DE1458262C (de) Verfahren zum Verdichten eines elektrophoretisch auf einen Draht aufgebrachten Metallüberzuges

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH DE DK FR IT LI LU NL SE

17P Request for examination filed

Effective date: 19910610

17Q First examination report despatched

Effective date: 19911128

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE CH DE DK FR IT LI LU NL SE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRE;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.SCRIBED TIME-LIMIT

Effective date: 19930804

Ref country code: DK

Effective date: 19930804

Ref country code: BE

Effective date: 19930804

Ref country code: NL

Effective date: 19930804

REF Corresponds to:

Ref document number: 92569

Country of ref document: AT

Date of ref document: 19930815

Kind code of ref document: T

REF Corresponds to:

Ref document number: 59002162

Country of ref document: DE

Date of ref document: 19930909

ET Fr: translation filed
NLV1 Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19940531

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
EAL Se: european patent in force in sweden

Ref document number: 90109050.6

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20000524

Year of fee payment: 11

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 20000526

Year of fee payment: 11

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 20000531

Year of fee payment: 11

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 20000808

Year of fee payment: 11

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20010514

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20010515

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20010613

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20010613

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20020131

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20021115

Year of fee payment: 13

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20031202