EP0502352A2 EP92102596A EP92102596A EP0502352A2 EP 0502352 A2 EP0502352 A2 EP 0502352A2 EP 92102596 A EP92102596 A EP 92102596A EP 92102596 A EP92102596 A EP 92102596A EP 0502352 A2 EP0502352 A2 EP 0502352A2
Authority
EP
European Patent Office
Prior art keywords
tower
tower section
section
sections
telescopic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP92102596A
Other languages
German (de)
English (en)
Other versions
EP0502352A3 (en
EP0502352B1 (fr
Inventor
Erhard Ing.(Grad) Grunwald
Viktor Dipl.-Ing. Lis
Reinhard Dipl.-Ing. Wenzke
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liebherr Werk Biberach GmbH
Original Assignee
Liebherr Werk Biberach GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liebherr Werk Biberach GmbH filed Critical Liebherr Werk Biberach GmbH
Publication of EP0502352A2 publication Critical patent/EP0502352A2/fr
Publication of EP0502352A3 publication Critical patent/EP0502352A3/de
Application granted granted Critical
Publication of EP0502352B1 publication Critical patent/EP0502352B1/fr
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B66—HOISTING; LIFTING; HAULING
    • B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/26—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
    • B66C23/28—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail constructed to operate at successively higher levels
    • B66C23/30—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail constructed to operate at successively higher levels with frameworks composed of telescopic elements
    • B66C23/305—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail constructed to operate at successively higher levels with frameworks composed of telescopic elements with locking devices
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B66—HOISTING; LIFTING; HAULING
    • B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/26—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
    • B66C23/28—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail constructed to operate at successively higher levels
    • B66C23/30—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail constructed to operate at successively higher levels with frameworks composed of telescopic elements

Definitions

  • the invention relates to a telescopic tower of a mobile or tower crane or the like. with a plurality, preferably two, of an outer tower piece telescopic, consisting of tower sections inner tower pieces which can be locked together in the extended state and in intermediate positions.
  • the object of the invention is therefore to provide a telescopic tower of the type mentioned, which can be quickly assembled and disassembled even in confined spaces and can also be combined into a road-appropriate transport unit.
  • this object is achieved in a telescopic tower of the generic type in that the inner tower piece in the lower region of two of its corner posts is provided on one side with a climbing device which consists of a retractable and extendable lower cross member and an upper cross member, each with both sides extendable and retractable lower climbing and upper support pawls are provided up to the cross bars of the outer tower section, and that the stroke of the lower crossmember corresponds at least to the distance between two cross bars of the tower sections.
  • the tower according to the invention can be manufactured as a telescopic unit up to a size which corresponds to the permissible transport volume of approximately 2.45 mx 2.45 mx 15.45 m, although the maximum permissible transport weight of approximately 23 t must not be exceeded.
  • the tower according to the invention can be combined into a compact transport unit in that the telescoping shots only have to be pushed together.
  • the simple assembly possibility is given in that the individual tower sections can be pushed out and pushed together simply and quickly by the climbing device, which is an integral part of the inner tower section. Since the climbing device is only arranged in the area of two corner posts on one side of the inner tower section, a large interior space remains which can still be used for the arrangement of the ladder system.
  • hydraulic cylinders are articulated in the hollow profiles of the two corner pillars, the piston rods of which carry the lower crossmember.
  • the piston rods are articulated below the guideway of the climbing pawls on the lower cross member, so that this is stabilized and tilting moments are avoided.
  • the lower crossmember can also be raised and lowered by other means, for example by using Spindles provided with spindle drives.
  • each of the telescopic tower sections against the lower one is secured by pawls which can be swung in and out and which engage in the abutment of the other tower section. These pawls ensure the axial position of the telescoped tower sections relative to one another in a simple and safe manner.
  • the pawls pivotally mounted on the upper ends of the corner spars of the tower sections and each pawl or the like above its storage via a lever. is articulated to a socket which is axially displaceably guided on a rod which is pivotally mounted about an axis parallel to the ratchet axis and that the rod passes through two compression springs, one of which between the socket and an axial abutment and the other between the Bush and a nut screwed onto the upper end of the rod is clamped.
  • This configuration simplifies the handling of the pawl, because it forms, as it were, an adjustable three-joint system with the rod, which can be set in the snap-in direction or snap-out direction.
  • the lower spring tends to pivot the pawl inwards. If the pawl is loaded by the spring in the direction of its pivoted-in position, it automatically snaps into its detent position when it is run over by the detent abutment provided with a ramp. Conversely, the upper spring can be pretensioned by unscrewing the nut so much that it overcomes the force of the lower spring, so that the pawl is pivoted into its pivoted-out position when it is relieved when the latched shot is raised, so that it is released from the abutment is released.
  • the upper spring is expediently designed to be harder than that lower one, so that it can overcome the force of the lower spring by appropriate pre-tensioning via the nut.
  • the corner pillars are provided with rollers approximately at a distance from the clamping length of the telescopic shots. These rollers simplify the guiding and telescoping of the inner tower pieces relative to each other and to the outer tower piece.
  • two pairs of rollers are arranged in each inner angular region of the tower pieces, which run on the outside of the corner spars consisting of box sections.
  • the clamping points consist of pin-like projections on the outside of the corner spars that are at right angles to one another, which engage in complementary receptacles on the inside of the other tower section, with two projections each that are offset by 90 ° there are clamping screws that clamp the projections in the abutments formed by the receptacles.
  • each tower section containing a telescopic tower section is articulated at its lower end and is guided in guide rails, which in turn are longitudinally displaceable in socket-like guide sections of the telescopic tower section, which are provided with an end stop for the extended guide pieces, are guided such that the upper ladder is guided in guide rails of the telescopic tower section provided with stops, that the back guards are articulated to the conductors in the form of parallelogram rods that the telescopic tower section with a driver and the parallelogram linkage of the upper ladder is provided with a pivotable driver, each of which runs on sliders or guide rollers of the parallelogram linkage and opens the back guards.
  • This configuration makes it possible to extend the ladders immediately with the telescoping of the inner tower sections and to open their back guards.
  • This configuration takes into account that the length of the ladder may only be about 6 m in each case and that each ladder is to be secured at its lower end by an intermediate or transfer platform.
  • the intermediate platforms for the ladder lying above are expediently provided such that they can be folded up and down in the area of the flaps that can be folded up and down.
  • the ladders and intermediate platforms of the inner inner tower section can already be installed because this is the last one to be pushed into its operating position.
  • Fig. 1 shows the telescoped tower of a tower crane, which is mounted in a conventional manner on a frame supported on the floor, a chassis or a rotating platform if it is a tower crane rotating below.
  • a central inner tower section 3 and the inner inner tower section 4 can be telescoped out of the outer tower section 2 of the telescopic tower 1.
  • the middle tower section 3 with the outer tower section 2 and the inner tower section 4 with the central inner tower section 3 are connected by pawls 6 engaging in abutment 5 and in the area of the clamping planes 7, 8 and 9, 10 by projections or pressure plates which are at an angle to one another clamped, which engage in corresponding abutments.
  • a climbing device 11 is connected to the inner inner tower section, which pushes the individual tower sections by step-by-step attack on the cross bars 12, which are arranged at equal intervals, into their telescoped positions, in which they are pushed through the latches 6 and Clamping devices are clamped together.
  • the entire conductor system with back guards is held in the telescoped state is brought into its operating position when telescoping.
  • the climbing device 11 is in accordance with the views. 1-3 in the area of the left corner pillars of the inner tower section lying one behind the other. In order to be able to accommodate the hydraulic lifting devices in the corner spars of the inner tower section, they have been widened. In the area of the climbing device accommodated at the lower widened end areas of the corner spars, two superimposed platforms 15, 16 are fixedly arranged on the inner tower section, which serve as an operating platform and to accommodate units for the climbing device. These platforms 15, 16 occupy at most half the cross-section of the square inner surface of the inner tower. The platforms 15, 16 are connected to one another by a permanently installed ladder 17. The upper platform 16 is followed by conductors 18, 19 arranged in the tower section 4 with fixed back guards, a transfer platform 20 being provided between the conductors in the usual way.
  • the extendable conductor systems with back guards for the outer tower piece 2 and the middle inner tower piece 3 are arranged in the right-hand part of the inner tower piece with a rectangular cross section with reference to FIGS. 1 to 3.
  • the tower pieces have 2 to 4 square cross-sections with such a graduated side length that they can be telescoped into each other.
  • the individual tower sections consist of corner pillars with square box profiles, which are connected to one another in the manner shown by cross bars and diagonal bars.
  • rollers 21, which are arranged in pairs and at an angle to one another, are arranged on the tower pieces enclosing an inner tower piece and run in the manner shown on the outer sides of the corner spars of the telescopic tower sections. The roles two each Roller sets 21 can be arranged once above and once below the pawl.
  • latches 6 which can be latched into abutments 5 are pivotably mounted. These pawls snap into the abutment when the respective telescopic inner shot has been moved into its telescoped position so that it is locked in it.
  • the pawls 6 are pivoted in the manner shown in FIGS. 4 and 5 about axes 23 parallel to the diagonals of the tower cross sections, so that the respectively telescoped tower pieces are centered by their latching in their clamping positions.
  • the abutments 5 arranged on the central inner tower piece and on the inner inner tower piece on the corner spars have angular recesses into which the correspondingly shaped free ends of the pawls 6 snap.
  • the upper surfaces of the locking steps are slightly sloping towards the outside to ensure a good locking engagement.
  • a rod 28 is pivotally mounted about an axis 26 parallel to the axis 23 on the upper edge reinforcement 27 of the upper end of the outer tower piece, on which a bushing 29 is slidably guided in the axial direction.
  • the pawl 6 is provided on both sides with welded tabs 30 which are articulated to the socket 29 at their free ends via bolts, not shown.
  • the rod 28 passes through two coiled compression springs 31, 32.
  • the lower compression spring 21 is clamped between an articulated bearing bracket 33 of the rod 28 and the lower side of the bushing 29, while the upper compression spring 32 is clamped between the upper end of the bushing 29 and a nut 35 screwed onto an end thread of the rod 28.
  • the nut 35 is provided with a handle, so that it can be screwed up and down by hand.
  • the lower compression spring 31 is designed to be weaker than the upper compression spring 32. If the upper compression spring 32 is relieved by correspondingly unscrewing the nut 35, the lower compression spring 31 strives to push the pawl 6 to the right into its locked position so that it is in its position can snap into the latched position when it slips over the inclined nose-shaped ramp 37 of the abutment 5.
  • the climbing device 11 will now be described in more detail with reference to FIG. 6.
  • the corner spars 40 on one side of the inner tower section 4 are continued in their lower end regions by widened box profiles 41.
  • hydraulic cylinders 43 are pivotally mounted about axes 42, the piston rods 44 of which have forked bearing pieces 45 at their ends, which support bearing bolts 46, on which a climbing crossbar 47 consisting of a hollow profile is pivotably mounted.
  • climbing pawls 48 are guided axially displaceably but non-rotatably.
  • the climbing pawls 48 are provided with a device that extends and retracts in the same direction, which can consist, for example, of a piston-cylinder unit 49, the cylinder and the piston rod of which are articulated to one end of two-armed levers, the other ends of which are in sliding guides Engage pawls 48.
  • the two-armed levers 50 are shown in FIG Way on the crossbar 47 pivotally mounted.
  • the bearings 46 of the crossbeam 47 on the piston rods 44 lie below the displacement path of the climbing pawls 48, so that the climbing pawls 48 are supported against tilting on the cross bars 12.
  • a fixed cross-member 52 is provided in the upper region of the box profiles 41, in which support pawls 54 are displaceably guided in a corresponding manner.
  • the climbing and support pawls 48, 54 are optionally extendable and fully retractable up to the crossbars 12 of the outer tower section 2 or the crossbars 12 of the central inner tower section 3.
  • the middle tower section 3 and the inner tower section 4 are provided on the outside of their corner pillars with angled projections 60 which run parallel to the sides of the tower sections.
  • These projections 60 can be inserted in the clamping planes into complementary recesses 62 of holding plates 61 which are provided on the inside of the enclosing tower pieces.
  • the angled projections 60 on sides which are angled adjacent to one another can be clamped against the holding plates by pressure screws 63, 64, so that the angled projections 60 are clamped in the cutouts in the holding plates 62 in the manner shown.
  • Each tower section is provided with two adjoining conductors, each approximately 6 m long, with a transfer platform between each of the two conductors, which is located below the ladder that connects to the top or their back guards.
  • the lower ladder 60 of the outer tower section 2 is shown in FIGS. 10 and 12 in a side view, so that only a ladder bar represented by a line can be seen.
  • the rungs connecting the ladder bars are indicated by cross lines 61.
  • the ladder stiles have plate-shaped sliding pieces on their outer sides via short pins, which are guided in mutually parallel C-shaped guides 62.
  • the side rails of the ladder 61 are articulated at points 63 to cross bars 64 of the outer tower section 2.
  • the guides 62 are guided so as to be longitudinally displaceable in short guides 65 which are fastened to lower cross members 66 of the central inner tower section 3. Since the guides 62 are thus guided in the guides 65 so as to be freely displaceable, they are supported in the state of the tower sections telescoped from FIG.
  • the folded back guards in FIG. 10 can be opened in the manner of a parallelogram in the manner shown in FIG. 12.
  • the second upper conductor 70 of the outer tower section is held in the inner tower section.
  • the conductor 70 has lower stops 71 which, in the telescoped state, as can be seen in FIG. 10, are supported on an abutment 72 of the outer tower section 2.
  • the conductor 70 is guided in a longitudinally displaceable manner by means of lateral head-like sliders in short guides 73 with a C-shaped cross section, which are located at the lower end of the central inner tower piece 3 in FIG Way are attached.
  • two curved drivers 75 are fastened, which engage when sliding out the inner tower pieces 3, 4 under sliders or rollers 77, which are arranged in the region of the leg 78 connecting back web of the back protection of the ladder 70.
  • the sliders 77 are arranged in the region of the ends of the legs 78 or the web of the penultimate back protector connecting them.
  • the short guides 65 and 73 attached to its lower end move upward.
  • the short guides 65 first slide on the freely movable guide rails 62 until they abut the projecting upper edge 84 of the guides 62 and thereby take the guide 62 upwards.
  • the guide pieces of the ladder stiles of the ladder 60 slide down out of the guides 62.
  • the guides 62 hang on the short guide pieces 65 in the manner shown, while the conductor 60 is still held in the guides 62 via its lateral guide pieces.
  • the short guides 73 slide upward on the guide pieces of the spars of the ladder 70 until the upper edges of the guides 73 abut the stops 80 and take the ladder 70 upwards.
  • the two drivers 75 connected to the middle tower section engage under the sliding pieces or sliding rollers 77, so that on the last path to the telescoped end position, the back protection for the ladder 70 opens out in the manner shown in FIG. 12 becomes.
  • an intermediate platform 86 is pivotally articulated, which is additionally connected to the lateral drivers 87.
  • the intermediate platform 86 and the drivers are also pulled up via the back protection 78 by pulling rods 88 so that the drivers 87 engage under the sliding pieces or sliding rollers 88 which are arranged at the ends of the second uppermost legs of the back guards of the ladder 60.
  • the back guards 68 of the first conductors 60 are also drawn in this way.
  • the position of the folded conductors in the inner tower can be seen from FIG.
  • the conductors 60, 70 are offset at an angle and arranged rotated by 180 ° relative to one another.
  • the folded back guards can be seen as well as the short guides 65 for the C-shaped guides 62 for the sliders connected to the ladder stiles of the ladder 60.
  • the guide pieces of the ladder stiles of the ladder 70 are guided in the guides 73 which are U-shaped in cross section.
  • the conductors 90, 91 with folded back guards for the inner inner tower section can be seen from FIG. 9, which are only extended and unfolded when the inner inner tower section 4 is extended from the middle inner tower section 3 in a corresponding manner.
  • FIG. 14 shows a side view of an outer tower section, from which the two inner tower sections have already been telescoped together, so that the conductors in the outer tower section are extended and the back guards are erected.
  • Fig. 15 shows a section along the line XV-XV in Fig. 14 and shows the transition to the lower platform 15 for the hydraulic unit. From this one climbs through a flap onto the upper platform 16, which is the operating platform for the climbing device. The platform 86 can also be seen and the platform 95 fixed in the middle tower section 3, which is located below the ladder 90 or below its back protection. The conductors 90, 91 are only extended and their back guards are only opened when the inner inner tower section is extended from the central inner tower section.
  • the double telescopic tower according to the invention reduces the transport volume and the assembly time and enables the fast use of heavy mobile cranes with large lifting heights.
  • the climbing device for telescoping the tower sections is located in the area of the corner posts on one side of the inner tower.
  • the drive unit of the climbing device and the associated operating platform are arranged so that the climbing process can be easily controlled and monitored.
  • the climbing device itself and the ladder system with pedestals are located in the inner tower section.
  • the climbing crossbar is suspended from the piston rod heads of the hydraulic cylinders of the climbing device.
  • the extended tower sections are supported on the diagonally arranged climbing pawls, so that good centering is ensured.
  • a second crossbar which contains support pawls and which are extended so that the lower climbing crossbar can be pulled in.
  • Both inner towers are connected by a bolt connection and remain as a unit during the entire climbing process. After tower 3 has reached the final operating position, the connection is released and then the inner tower 4 is extended. Furthermore, the telescoped tower sections are locked together after each climbing step, so that the lower climbing traverse can be retightened.
  • the turrets are centered over the pawls so that the individual tower sections can be more easily fixed in their clamping points.
  • the vertical pawls are transferred directly from one corner rail to the other by the latches.
  • a tower section always includes two ladders, since a climbing height of 6 m without a resting platform must not be exceeded.
  • the conductors are next to each other offset by their width and are rotated by 180 ° relative to each other.
  • the back guards and transfer platforms are pivoted on the ladders and folded onto them when the tower is telescoped. They are telescoped with the tower sections and are brought into their working position in the manner described before the individual tower sections move into their end positions and are fixed in them.
  • the tower according to the invention can be climbed by its own climbing device from a low construction height of the crane (about 20 m) to the full hook height, so that no special mobile crane is required for assembly.
  • the assembly can be carried out very quickly since no additional tower section connections in the form of screws or bolts have to be attached. Because the tower is supported on latches.
  • Standard tower sections can be built on the inner inner tower section, so that it is possible to reach a further tower height above the existing tower height by means of a standard climbing device.
  • the telescopic tower can also be installed without a climbing cylinder.
  • the tower would have to be pulled out with a suitably large mobile crane and set down on the handles described.
  • This would be a cheaper version without a climbing device, which nevertheless enables retrofitting with the climbing device described.
  • the telescopic tower can also be installed using a corresponding rope reeving, which causes the individual shots to be telescoped out.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Transportation (AREA)
  • Mechanical Engineering (AREA)
  • Ladders (AREA)
EP92102596A 1991-03-07 1992-02-17 Mât télescopique d'une grue mobile ou grue à tour orientable Expired - Lifetime EP0502352B1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE4107344 1991-03-07
DE4107344A DE4107344A1 (de) 1991-03-07 1991-03-07 Teleskopierbarer turm eines mobil- oder turmdrehkrans

Publications (3)

Publication Number Publication Date
EP0502352A2 true EP0502352A2 (fr) 1992-09-09
EP0502352A3 EP0502352A3 (en) 1992-09-30
EP0502352B1 EP0502352B1 (fr) 1995-11-02

Family

ID=6426706

Family Applications (1)

Application Number Title Priority Date Filing Date
EP92102596A Expired - Lifetime EP0502352B1 (fr) 1991-03-07 1992-02-17 Mât télescopique d'une grue mobile ou grue à tour orientable

Country Status (2)

Country Link
EP (1) EP0502352B1 (fr)
DE (2) DE4107344A1 (fr)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2100843A1 (fr) * 2008-03-12 2009-09-16 KSD Kransysteme GmbH Grue dotée d'un tour télescopique
CN115531850A (zh) * 2022-09-26 2022-12-30 石家庄铁道大学 一种具有收纳功能的u型塔架及防风装置
CN116715156A (zh) * 2023-06-14 2023-09-08 江西中天智能装备股份有限公司 一种塔式起重机塔身组合装置及方法

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE9307900U1 (de) * 1993-05-25 1994-10-06 Liebherr-Werk Biberach GmbH, 88400 Biberach Vorrichtung zum selbsttätigen Verriegeln eines inneren austeleskopierbaren Turmschusses mit einem äußeren Turmschuß
DE102004014689B4 (de) * 2004-03-25 2012-05-16 Blowup Media Gmbh Trägergerüst für eine Informations- und/oder Werbefläche

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1194146A (fr) * 1959-11-06
FR64233E (fr) * 1953-04-27 1955-11-09 Chantiers Et Ateliers De Const Grue
DE1181879B (de) * 1963-03-14 1964-11-19 Wilhelm Reich Maschf Turmkran mit einem teleskopierbaren Turm
CH399692A (fr) * 1963-07-30 1965-09-30 Boilot Petolat S A Soc Nouv Ex Grue à tour télescopique
US3688455A (en) * 1970-10-23 1972-09-05 Sanders Associates Inc Telescoping support with double acting piston and latch and retaining means
US4196814A (en) * 1974-02-08 1980-04-08 E. H. Hans Liebherr Vertical telescoping lower crane
DE3303524A1 (de) * 1983-02-03 1984-08-09 Wilhelm 5020 Frechen König Turmdrehkran
DE3428998C1 (de) * 1984-08-07 1985-08-29 Salzgitter Maschinen Und Anlagen Ag, 3320 Salzgitter Teleskopmast mit einer Einrichtung zur gegenseitigen Verriegelung der Mastteile
IL84299A (en) * 1987-10-28 1994-08-26 Werber Manuel M Telescoping mast

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2100843A1 (fr) * 2008-03-12 2009-09-16 KSD Kransysteme GmbH Grue dotée d'un tour télescopique
CN115531850A (zh) * 2022-09-26 2022-12-30 石家庄铁道大学 一种具有收纳功能的u型塔架及防风装置
CN116715156A (zh) * 2023-06-14 2023-09-08 江西中天智能装备股份有限公司 一种塔式起重机塔身组合装置及方法

Also Published As

Publication number Publication date
DE4107344A1 (de) 1992-09-10
DE59204163D1 (de) 1995-12-07
EP0502352A3 (en) 1992-09-30
EP0502352B1 (fr) 1995-11-02

Similar Documents

Publication Publication Date Title
DE69101569T2 (de) Hebevorrichtung.
DE102017101113B3 (de) Teleskopausleger mit Stangenabspannsystem für einen Mobilkran und Abspannverfahren hierfür
LU86532A1 (de) Teleskopsaeule
EP1921249B1 (fr) Echelle hybride avec une plate-forme
EP0502352B1 (fr) Mât télescopique d'une grue mobile ou grue à tour orientable
DE3600245A1 (de) Geruest
DE3026746C2 (fr)
DE2949636A1 (de) Verriegelungsvorrichtung fuer die verriegelnde abstuetzung eines ausschiebbaren leiterteils einer freistehenden leiter
DE3437848C2 (fr)
DE1481809B2 (de) Vorrichtung zum Aufstellen und Umlegen von Masten, insbesondere eines Baukranmastes
DE1925578A1 (de) Turmkran
DE3329210A1 (de) Schraegaufzug
DE1247584B (de) Zusammenlegbarer Turmdrehkran
EP0490094B1 (fr) Pont démontable et véhicule pour la pose du pont
DE3433537A1 (de) Turmdrehkran
DE1905083A1 (de) Vorrichtung zum Nach-unten-Klappen bzw.Hochklappen der Planken an Transportfahrzeugen
EP0963501A1 (fr) Echelle telescopique
DE3634702A1 (de) Schraegaufzug, insbesondere material- oder personenaufzug
DE3348090C2 (fr)
DE3104981A1 (de) Stehleiter
DE2327053C3 (de) Leiter mit höhenverstellbaren Füssen
DE1481809C (de) Vorrichtung zum Aufstellen und Um legen von Masten, insbesondere eines Baukranmastes
EP1619312A1 (fr) Barrière de sécurité avec un passage
DE1781048C3 (de) Mehrteiliger teleskopischer Hubmast für Hublader
EP0383987B1 (fr) Dispositif d'entraînement pour ponts de transbordement pour rampes

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): DE FR IT NL

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): DE FR IT NL

17P Request for examination filed

Effective date: 19921215

17Q First examination report despatched

Effective date: 19931222

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): DE FR IT NL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRE;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.SCRIBED TIME-LIMIT

Effective date: 19951102

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 19951102

Ref country code: FR

Effective date: 19951102

REF Corresponds to:

Ref document number: 59204163

Country of ref document: DE

Date of ref document: 19951207

EN Fr: translation not filed
NLV1 Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act
PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Effective date: 19961101