EP0727385A2 - Grue mobile sur rails - Google Patents
Grue mobile sur rails Download PDFInfo
- Publication number
- EP0727385A2 EP0727385A2 EP95250316A EP95250316A EP0727385A2 EP 0727385 A2 EP0727385 A2 EP 0727385A2 EP 95250316 A EP95250316 A EP 95250316A EP 95250316 A EP95250316 A EP 95250316A EP 0727385 A2 EP0727385 A2 EP 0727385A2
- Authority
- EP
- European Patent Office
- Prior art keywords
- guide
- vehicle
- mobile crane
- longitudinal axis
- track
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/18—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
- B66C23/36—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes mounted on road or rail vehicles; Manually-movable jib-cranes for use in workshops; Floating cranes
- B66C23/50—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes mounted on road or rail vehicles; Manually-movable jib-cranes for use in workshops; Floating cranes mounted on railway vehicles, e.g. breakdown cranes
Definitions
- the invention relates to a track-bound mobile crane with a height-adjustable support device arranged on the vehicle frame, to which a guide beam extending in the longitudinal direction of the mobile crane is fastened with a longitudinally movable trolley of a hoist.
- Track-bound mobile cranes are among others for track and bridge construction. as well as for salvage work and must be designed so that they can be maneuvered well even in confined working conditions.
- Known tools of the generic type are equipped with short rigid guide supports on which trolleys with lifting mechanisms can be moved to support them in the longitudinal direction of the vehicle.
- the tracks of these cats correspond approximately to the length of the vehicle, so that the working range of the known tools is restricted.
- the lifting and lowering of loads to the side of the track of the mobile crane is difficult because the maneuverability of the hoist is restricted due to the rigid arrangement of the trolley track.
- Track-bound mobile cranes are also known, in which - as with mobile cranes on the road - superstructures with crane jibs are rotatably arranged on the center of the undercarriage, but the use of such cranes is often hindered or impossible because the loading profile is due to unfavorable terrain and the risk to traffic on adjacent tracks or when working under overhead contact wire. Handling loads and working in tunnels, especially on single-track routes, is also difficult with known mobile cranes.
- the object of the present invention is to improve a generic track-bound mobile crane in such a way that it can be used in a wide variety of ways, in particular where space is restricted, such as in tunnels or under contact wires, as is the conveying of loads from the front of the working machine its back.
- the carrying device consists of two height-adjustable columns arranged at each vehicle end opposite each other on both sides of the vehicle's longitudinal axis and connected to one another by cross bars, on the cross bars of which the guide support is guided parallel and obliquely to the vehicle's longitudinal axis and can be lifted by height adjustment of the columns. and can be lowered.
- loads e.g. Raising and lowering containers for ballast, track yokes, construction equipment, etc.
- transporting them from the respective working side to the other side of the working device on the guide beam under the portal-like cross bars.
- loads placed on the side can also be picked up and set down.
- the guide bracket can also be inclined to the longitudinal axis of the vehicle, which extends the travel range of the trolleys. Due to the height adjustment of the columns, the guide beam can be moved from a lower transport position to an upper working position together with the cross bars supporting it, without the safety distance from the contact wire being undershot. In this way, a very flexible working device is created which, with simple means, has great maneuverability.
- a guide bracket extension corresponding to the dimensions of the guide bracket is placed on the vehicle frame and can be manipulated and assembled or disassembled with the help of the guide bracket.
- the working range of the mobile crane is significantly expanded in that with the help of the guide beam and
- the lifting device protrudes on the front side of the guide beam extensions on both sides far beyond the vehicle length.
- the guide beam extensions are placed in the transport position of the mobile crane on its chassis and can be picked up with the guide beam and brought into the position in which they are connected to the guide beam.
- the flanged and bolted cantilevered guide beam extensions can be swiveled with their free ends out of the longitudinal axis of the vehicle by pivoting the guide beam on its crossbars and are thus able to easily take loads placed next to the track and to transport or transport them into the area of the chassis to pass through the vehicle to the opposite side.
- the lifting mechanism which is arranged in the center of the guide bracket, serves as the lifting device, possibly in conjunction with the cross bars that can be raised and lowered by the height-adjustable columns and that carry the guide bracket.
- the horizontal movement of the trolley is preferably carried out by a cable winch which is mounted in an end region of the guide support.
- the ropes in the end area of the guide beam are designed to be separable so that lifting and driving ropes of the trolley do not have to be completely re-engaged or disassembled during every assembly and disassembly.
- cantilevered brackets are provided on the vehicle frame, which can be pivoted in the area of the pillars about vertical axes from an operative position transverse to the longitudinal axis of the vehicle in a rest position parallel to the longitudinal axis of the vehicle. In the rest position, the passage area for the load guided on the guide carrier is considerably enlarged by the pivoting out of these brackets, so that larger loads can also be easily transported through the vehicle with the help of the trolley.
- the guide carrier engages around the cross bars with window-like openings provided at its end regions.
- the proposed working method enables the mobile crane to be upgraded in the smallest of spaces and in the shortest possible time. All the necessary aids are arranged on the vehicle frame and can be manipulated with the help of the trolley on the guide bracket.
- the height-adjustable columns 6 can be seen as well as the cross bars 7 articulated thereon at 14, on which the guide beam 8 can be displaced in the direction of the arrow 15.
- the trolley On the guide beam 8, indicated at 10, the trolley can be moved perpendicular to the plane of the drawing; the guide carrier extensions 12 are stored on the consoles 13 described on both sides of the guide carrier 8 in the drawing figure representing the transport position.
- One of the containers 11 is visibly suspended in the vehicle frame 1.
- the entire mobile crane is located within the clearance profile 16, which is indicated by the dash-dotted line.
- FIG 3 the working position of the mobile crane is shown, in which the height-adjustable columns 6 are shown in their telescopic position.
- the cross member 7 is in its upper position and has raised the guide beam 8 into its working position.
- the trolley 10 can receive the container 11 shown in broken lines with the hooks 17 and can transport it through the space formed between the columns 6, the vehicle frame 11 and the cross member 7 through the mobile crane perpendicular to the plane of the drawing.
- FIG. 4 shows a side view of the upgraded mobile crane and shows that the container 11a can be picked up from a position far in front of the mobile crane and transported through it into the position of the container 11b.
- This can be located, for example, on the loading platform of the transport carriage 18, which is overhanged by the guide carrier extension 12.
- the opposite guide beam extension 12 can be pivoted by transverse displacement and simultaneous inclination of the guide beam 8 on the cross bars 7 into the dash-dotted positions 12a and 12b, so that loads can also be absorbed outside the track 3.
- the cross bars 7 are in a lowered position, the guide carrier extensions 12 resting on the brackets 13 on both sides of the guide carrier 8.
- the cross bars 7 are raised together with the guide carrier 8 to an upper end position, as shown in the view and in cross section in FIGS. 5a and 6a.
- the trolley 10 is moved over the right guide support extension 12 and this is attached to the articulation means 19.
- Figure 6c i.e. H.
- the trolley 10 is moved perpendicular to the plane of the drawing, the guide carrier extension 12 being shifted out of the area of the vehicle frame 1, as can be seen in FIG. 5b.
- the freely cantilevered part of the guide support extension 12 is placed on support stands 20 which, provided with wheels 21, roll on the track 3.
- the guide bracket extension 12 can be seen placed on the two trestles 20.
- the left guide carrier extension 12 (FIG. 6) is now picked up by the guide carrier 8 and transported to the opposite side of the other guide carrier extension from the area of the vehicle frame 1 and likewise placed on support stands 20
- the guide bracket 8 is lowered, if necessary after the guide bracket extensions have been brought into the appropriate position by moving the support frames, into a position in which the end faces of the guide bracket 8 and the guide bracket extension are directly opposite.
- the columns are retracted, as a result of which the crossbars 7, together with the guide carrier 8, reach the desired lowered position.
- lifting and driving ropes of the trolley are coupled and the guide bracket 8 and the guide bracket extension 12 are bolted together.
- the Trestles 12 can be adjusted in their height to the mounting position of guide bracket 8 and guide bracket extension.
- the guide beam 8 is raised together with the guide beam extensions 12 by extending the columns 6 into the working position; the mobile crane is ready for use.
- FIG. 5e shows the completely upgraded position of the two guide carrier extensions and of the guide carrier 8, as can be found in FIG. 4.
- the mobile crane according to the invention is disassembled in the reverse order until the transport position of the mobile crane according to FIG. 2 is reached.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Jib Cranes (AREA)
- Leg Units, Guards, And Driving Tracks Of Cranes (AREA)
- Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)
- Machines For Laying And Maintaining Railways (AREA)
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE19506856A DE19506856C2 (de) | 1995-02-14 | 1995-02-14 | Gleisgebundener Mobilkran |
| DE19506856 | 1995-02-14 |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| EP0727385A2 true EP0727385A2 (fr) | 1996-08-21 |
| EP0727385A3 EP0727385A3 (fr) | 1997-03-26 |
| EP0727385B1 EP0727385B1 (fr) | 1998-07-29 |
Family
ID=7755186
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP95250316A Expired - Lifetime EP0727385B1 (fr) | 1995-02-14 | 1995-12-28 | Grue mobile sur rails |
Country Status (6)
| Country | Link |
|---|---|
| US (1) | US5657888A (fr) |
| EP (1) | EP0727385B1 (fr) |
| JP (1) | JP2683730B2 (fr) |
| AT (1) | ATE168968T1 (fr) |
| DE (2) | DE19506856C2 (fr) |
| ES (1) | ES2119307T3 (fr) |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP0849211A1 (fr) * | 1996-12-19 | 1998-06-24 | MANNESMANN Aktiengesellschaft | Grue, en particulier pour voie ferrée |
| WO2011151015A1 (fr) * | 2010-06-04 | 2011-12-08 | Robel Bahnbaumaschinen Gmbh | Combinaison de véhicules pour le transport de rails |
| WO2014072650A3 (fr) * | 2012-11-08 | 2014-11-27 | Societe Des Anciens Etablissements L. Geismar | Train de chargement de transport |
| CN108495774A (zh) * | 2016-01-27 | 2018-09-04 | 罗贝尔铁路建筑机械有限责任公司 | 维护车辆 |
| CN109305180A (zh) * | 2018-08-21 | 2019-02-05 | 中车南京浦镇车辆有限公司 | 一种隧道检测车车体钢结构 |
| AT16416U1 (de) * | 2017-10-19 | 2019-08-15 | Plasser & Theurer Export Von Bahnbaumaschinen Gmbh | Gleisbaufahrzeug |
| CN111979855A (zh) * | 2020-07-21 | 2020-11-24 | 中国水利水电第十二工程局有限公司 | 斜井轨道安装的专用运输施工车和施工方法 |
Families Citing this family (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE19638359B4 (de) * | 1996-09-19 | 2013-07-18 | Pax Ag | Einbruchsicherung |
| US5921415A (en) * | 1997-07-03 | 1999-07-13 | Markelz; Paul H. | Bridge erection system |
| DE19800218A1 (de) * | 1998-01-06 | 1999-07-15 | Butzbacher Weichenbau Gmbh | Verfahren und Vorrichtung zum Transportieren eines Gleisabschnitts |
| RU2193617C2 (ru) * | 2000-05-31 | 2002-11-27 | Центральное Конструкторское Бюро Тяжелых Путевых Машин | Путеукладочный кран |
| JP3788279B2 (ja) | 2001-07-09 | 2006-06-21 | 株式会社日立製作所 | パターン検査方法及び装置 |
| AT507333B1 (de) * | 2008-10-09 | 2011-09-15 | Hans Kuenz Ges M B H | Portalkran |
| DE102013009357A1 (de) * | 2012-06-11 | 2013-12-12 | Liebherr-Werk Ehingen Gmbh | Modularer Mobilkran |
| AT15568U1 (de) | 2016-08-03 | 2018-01-15 | Plasser & Theurer Export Von Bahnbaumaschinen Gmbh | Gleisbauwagen zum Aufnehmen und/oder Verlegen von Gleisjochen |
| EP3568371B1 (fr) * | 2017-01-13 | 2023-06-07 | Bridge And Track Crane LLC D/B/A Rcrane | Systèmes et procédés associés à une grue mobile |
| US11976424B2 (en) * | 2018-02-16 | 2024-05-07 | Bridge and Track Crane LLC | Railroad maintenance systems and methods |
Family Cites Families (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE472511C (de) * | 1929-03-01 | Becker & Van Huellen | Gleisumbauwagen mit einer zwischen profilfreien Querjochen laengsverschiebbaren Kranbahn von Wagenlaenge | |
| US1745045A (en) * | 1926-08-14 | 1930-01-28 | Robert T Romine | Portable crane |
| DE930279C (de) * | 1952-04-18 | 1955-07-14 | Demag Ag | Verladebruecke |
| US3076559A (en) * | 1961-06-21 | 1963-02-05 | Eugene E Crile | Crane with tilt-up boom |
| NL6404055A (fr) * | 1964-04-15 | 1965-10-18 | ||
| FR1479459A (fr) * | 1966-03-22 | 1967-05-05 | Perfectionnements apportés aux installations à portiques déplaçables sur voies de roulement, notamment pour travaux de renouvellement de voies ferrées | |
| US3602375A (en) * | 1969-02-10 | 1971-08-31 | Koehring Co | Piggyback load handling crane |
| GB1535502A (en) * | 1975-12-15 | 1978-12-13 | Mactaggart Scott & Co Ltd | Machine for use in performing rail works |
| AT351576B (de) * | 1977-06-16 | 1979-08-10 | Plasser Bahnbaumasch Franz | Fahrbare einrichtung zum verlegen von gleisen |
| DD145850A3 (de) * | 1978-07-27 | 1981-01-14 | Horst Bendix | Ausleger,insbesondere fuer einen e senbahnkran |
| DE2931421C2 (de) * | 1979-08-02 | 1981-11-26 | Reich Maschinen GmbH, 7911 Nersingen | Auslegerturmkran mit verlängerbarem Katzausleger |
| DE3303524A1 (de) * | 1983-02-03 | 1984-08-09 | Wilhelm 5020 Frechen König | Turmdrehkran |
-
1995
- 1995-02-14 DE DE19506856A patent/DE19506856C2/de not_active Expired - Fee Related
- 1995-12-28 DE DE59502983T patent/DE59502983D1/de not_active Expired - Fee Related
- 1995-12-28 EP EP95250316A patent/EP0727385B1/fr not_active Expired - Lifetime
- 1995-12-28 AT AT95250316T patent/ATE168968T1/de not_active IP Right Cessation
- 1995-12-28 ES ES95250316T patent/ES2119307T3/es not_active Expired - Lifetime
-
1996
- 1996-02-07 JP JP8045336A patent/JP2683730B2/ja not_active Expired - Fee Related
- 1996-02-14 US US08/601,576 patent/US5657888A/en not_active Expired - Fee Related
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP0849211A1 (fr) * | 1996-12-19 | 1998-06-24 | MANNESMANN Aktiengesellschaft | Grue, en particulier pour voie ferrée |
| WO2011151015A1 (fr) * | 2010-06-04 | 2011-12-08 | Robel Bahnbaumaschinen Gmbh | Combinaison de véhicules pour le transport de rails |
| CN102933768A (zh) * | 2010-06-04 | 2013-02-13 | 罗贝尔铁路建筑机械有限责任公司 | 用于运送导轨的组合车辆 |
| WO2014072650A3 (fr) * | 2012-11-08 | 2014-11-27 | Societe Des Anciens Etablissements L. Geismar | Train de chargement de transport |
| CN108495774A (zh) * | 2016-01-27 | 2018-09-04 | 罗贝尔铁路建筑机械有限责任公司 | 维护车辆 |
| AT16416U1 (de) * | 2017-10-19 | 2019-08-15 | Plasser & Theurer Export Von Bahnbaumaschinen Gmbh | Gleisbaufahrzeug |
| CN109305180A (zh) * | 2018-08-21 | 2019-02-05 | 中车南京浦镇车辆有限公司 | 一种隧道检测车车体钢结构 |
| CN111979855A (zh) * | 2020-07-21 | 2020-11-24 | 中国水利水电第十二工程局有限公司 | 斜井轨道安装的专用运输施工车和施工方法 |
Also Published As
| Publication number | Publication date |
|---|---|
| EP0727385A3 (fr) | 1997-03-26 |
| DE19506856C2 (de) | 2000-06-08 |
| ATE168968T1 (de) | 1998-08-15 |
| US5657888A (en) | 1997-08-19 |
| EP0727385B1 (fr) | 1998-07-29 |
| DE19506856A1 (de) | 1996-08-22 |
| JP2683730B2 (ja) | 1997-12-03 |
| JPH08245161A (ja) | 1996-09-24 |
| DE59502983D1 (de) | 1998-09-03 |
| ES2119307T3 (es) | 1998-10-01 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| DE19506856C2 (de) | Gleisgebundener Mobilkran | |
| EP0276646B1 (fr) | Appareillage pour la dépose ou la pose ainsi que le transport des tronçons assemblés de la voie | |
| DE69204189T2 (de) | Vorrichtung zum Ver- und Ersetzen von Eisenbahnelementen und Verfahren zur Verwendung dieser Vorrichtung. | |
| DE4402905C2 (de) | Kran, insbesondere gleisgebundener Mobilkran | |
| DE9116635U1 (de) | Weichentransportwagen | |
| DE102008059711A1 (de) | Vorrichtung zum Umsetzen von Gegenständen sowie Förderanlagen mit einer solchen Vorrichtung | |
| DE69015461T2 (de) | Fliessband für Unterhalt und Reparatur von Fahrzeug-Aufbauten. | |
| DE4437815C2 (de) | Vorrichtung zum Güterumschlag von Containern | |
| DE3213421C2 (fr) | ||
| DE3425428C2 (de) | Fahrzeug zum Transportieren vorgefertigter Gebäudeteile | |
| DE2450003C2 (de) | Fahrzeugkran mit Kabine mit verschiedenen Stellungen | |
| DE10135748C1 (de) | Vorrichtung und Verfahren zur Herstellung einer bewehrten Betoninnenschale eines Tunnels | |
| DE69619060T2 (de) | Bewegliche Plattform für die Überwachung von Höhenunterschieden | |
| DE3435690A1 (de) | Portalfahrzeug | |
| DE3044953A1 (de) | "vorrichtung zum handhaben von lasten" | |
| DE2653458C3 (de) | Greiferkrananlage für landwirtschaftliche Futterbergehallen | |
| DE3114526A1 (de) | "foerderwagenkippgeraet" | |
| DE2742461C2 (de) | Eisenbahnfahrzeug zum Umsetzen von Behältern, wie Containern | |
| DE1530945C3 (de) | Einrichtung zum Transportieren von Betonkörpern, insbesondere von Betonhohlkörpern wie Fertiggaragen oder dergleichen schlüsselfertigen Räumen | |
| DE3340737A1 (de) | Gleisbaumaschine zum greifen und tragen von montierten gleisabschnitten und/oder gleisverbindungen | |
| WO1995013979A1 (fr) | Systemes de chargement et de dechargement pour bateaux et vehicules de transport de grande capacite similaires | |
| DE3050550C2 (de) | Vorrichtung zum hängenden Transport von komplett zusammengebauten Strebausbaugestellen | |
| DD287919A5 (de) | Verfahrbare auswechselvorrichtung fuer girlandentragrollenstationen | |
| DE2518438B2 (de) | Vorrichtung zum Beladen von Großraumtransportmitteln mit Stück- und Schüttgut | |
| DE1756918A1 (de) | Bordeigene Krananlage fuer Container-Schiffe |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AT BE CH DE DK ES FR GB GR IE IT LI NL PT SE |
|
| PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
| AK | Designated contracting states |
Kind code of ref document: A3 Designated state(s): AT BE CH DE DK ES FR GB GR IE IT LI NL PT SE |
|
| 17P | Request for examination filed |
Effective date: 19970325 |
|
| 17Q | First examination report despatched |
Effective date: 19970715 |
|
| GRAG | Despatch of communication of intention to grant |
Free format text: ORIGINAL CODE: EPIDOS AGRA |
|
| GRAG | Despatch of communication of intention to grant |
Free format text: ORIGINAL CODE: EPIDOS AGRA |
|
| GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
| GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE CH DE DK ES FR GB GR IE IT LI NL PT SE |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 19980729 Ref country code: GR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19980729 |
|
| REF | Corresponds to: |
Ref document number: 168968 Country of ref document: AT Date of ref document: 19980815 Kind code of ref document: T |
|
| ET | Fr: translation filed | ||
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
| ITF | It: translation for a ep patent filed | ||
| REF | Corresponds to: |
Ref document number: 59502983 Country of ref document: DE Date of ref document: 19980903 |
|
| REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2119307 Country of ref document: ES Kind code of ref document: T3 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 19981029 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 19981029 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 19981029 |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: GERMAN |
|
| GBT | Gb: translation of ep patent filed (gb section 77(6)(a)/1977) |
Effective date: 19981029 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19981231 |
|
| NLV1 | Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act | ||
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19990504 |
|
| PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
| BERE | Be: lapsed |
Owner name: MANNESMANN A.G. Effective date: 19981231 |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: FD4D |
|
| 26N | No opposition filed | ||
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19991231 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19991231 |
|
| REG | Reference to a national code |
Ref country code: GB Ref legal event code: IF02 |
|
| REG | Reference to a national code |
Ref country code: GB Ref legal event code: 732E |
|
| REG | Reference to a national code |
Ref country code: FR Ref legal event code: TP |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: AT Payment date: 20061213 Year of fee payment: 12 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20061218 Year of fee payment: 12 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20061221 Year of fee payment: 12 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20061228 Year of fee payment: 12 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20061231 Year of fee payment: 12 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20061212 Year of fee payment: 12 |
|
| GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20071228 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20071228 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20080701 |
|
| REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST Effective date: 20081020 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20071228 |
|
| REG | Reference to a national code |
Ref country code: ES Ref legal event code: FD2A Effective date: 20071229 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20071231 Ref country code: ES Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20071229 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20071228 |