EP1218596A1 - Plaque prefabriquee en beton arme - Google Patents

Plaque prefabriquee en beton arme

Info

Publication number
EP1218596A1
EP1218596A1 EP00962509A EP00962509A EP1218596A1 EP 1218596 A1 EP1218596 A1 EP 1218596A1 EP 00962509 A EP00962509 A EP 00962509A EP 00962509 A EP00962509 A EP 00962509A EP 1218596 A1 EP1218596 A1 EP 1218596A1
Authority
EP
European Patent Office
Prior art keywords
precast
prefabricated
plate
panel
joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP00962509A
Other languages
German (de)
English (en)
Other versions
EP1218596B1 (fr
Inventor
Dieter Reichel
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Max Boegl Bauunternehmung GmbH and Co KG
Original Assignee
Max Boegl Bauunternehmung GmbH and Co KG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Max Boegl Bauunternehmung GmbH and Co KG filed Critical Max Boegl Bauunternehmung GmbH and Co KG
Publication of EP1218596A1 publication Critical patent/EP1218596A1/fr
Application granted granted Critical
Publication of EP1218596B1 publication Critical patent/EP1218596B1/fr
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/06Pavings made of prefabricated single units made of units with cement or like binders
    • E01C5/08Reinforced units with steel frames
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B3/00Transverse or longitudinal sleepers; Other means resting directly on the ballastway for supporting rails
    • E01B3/28Transverse or longitudinal sleepers; Other means resting directly on the ballastway for supporting rails made from concrete or from natural or artificial stone
    • E01B3/40Slabs; Blocks; Pot sleepers; Fastening tie-rods to them
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/005Making of concrete parts of the track in situ
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B3/00Transverse or longitudinal sleepers; Other means resting directly on the ballastway for supporting rails
    • E01B3/28Transverse or longitudinal sleepers; Other means resting directly on the ballastway for supporting rails made from concrete or from natural or artificial stone
    • E01B3/32Transverse or longitudinal sleepers; Other means resting directly on the ballastway for supporting rails made from concrete or from natural or artificial stone with armouring or reinforcement
    • E01B3/34Transverse or longitudinal sleepers; Other means resting directly on the ballastway for supporting rails made from concrete or from natural or artificial stone with armouring or reinforcement with pre-tensioned armouring or reinforcement
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2204/00Characteristics of the track and its foundations
    • E01B2204/06Height or lateral adjustment means or positioning means for slabs, sleepers or rails
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2204/00Characteristics of the track and its foundations
    • E01B2204/09Ballastless systems
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2204/00Characteristics of the track and its foundations
    • E01B2204/10Making longitudinal or transverse sleepers or slabs in situ or embedding them

Definitions

  • the invention relates to a precast reinforced concrete slab according to the preamble of claim 1 and a method according to the preamble of claim 22.
  • a generic precast reinforced concrete slab is known from DE 197 33 909 A1.
  • the precast reinforced concrete slab is intended for the construction of a composite slab construction, in particular a solid track for high-speed rail traffic.
  • At least two steel rods extending in the longitudinal direction of the plate and protruding beyond the two end faces are arranged in the precast reinforced concrete slab.
  • Each steel rod is immovably anchored at only one point in the precast reinforced concrete slab and is otherwise freely stretchable. This provides an expansion path which is always the length of each precast concrete slab and, as a result, exerts a great tension on the concrete inserted in the butt joint.
  • predetermined breaking points which are arranged at regular intervals in the precast reinforced concrete slab, are bridged by the bracing of the steel bars and thus lose their function.
  • unavoidable cracks in the precast reinforced concrete slab occur at unpredictable locations, especially not in the area of the intended breaking points.
  • the method also proposed in this DE 197 33 909 A1 for producing a composite panel construction, in particular a fixed one Roadway for high-speed rail traffic consists in first connecting the ends of the steel bars with one another in a force-fitting manner, and then pressing the two precast reinforced concrete slabs apart with a defined force of the steel bars.
  • the precast reinforced concrete slabs are held in this position and the entire butt joint between the two adjacent faces of the precast reinforced concrete slabs is filled with a solidified filling compound. Then the defined force is released and the filling compound is clamped by the now occurring clamping force of the steel rods.
  • DE 26 21 793 discloses a method for producing a grate or panel composite construction from prestressed precast concrete parts.
  • the joints between the precast concrete elements are prestressed after the precast concrete elements have been joined together and aligned.
  • tendon ends protrude from the precast concrete parts, with which a connection is made between adjacent precast concrete parts.
  • the resulting joint is pressed apart by means of a pressing device, a mass is introduced into this joint as a joint filling, and the pressing device is relaxed and removed only after the joint filling has hardened or set. After this mass has set, turnbuckles, which were arranged at the tendon ends were tightened with a controlled force.
  • the filled joints come under tension. Then the concrete slabs are underfilled or pressed.
  • the object of the present invention is to avoid the disadvantages of the prior art and in particular to ensure a precise alignment of the precast reinforced concrete slabs.
  • the steel rod is anchored in the area between the end face of the precast slab and the first predetermined breaking point and, based on this anchoring in the direction of the respective end face, is essentially freely movable in its longitudinal direction. This ensures that the predetermined breaking point is not pressurized and may therefore lose its effect.
  • the predetermined breaking point is a dummy joint extending transversely to the longitudinal direction of the prefabricated panel, the predetermined breaking point can be produced in a simple manner in the casting of the prefabricated panel.
  • the thickness of the precast slab is reduced at this point by the dummy joint. Cracks then appear in the immediate vicinity of this dummy joint and can therefore be checked for their size in a targeted manner. The condition of the precast slab is therefore easy to check.
  • the anchoring of the steel rod is provided approximately 50 cm from the end face of the prefabricated panel. This gives the steel rod a sufficient length to stretch it according to the requirements for a permanent connection of several precast panels. Due to the expansion, a pressure force is applied to the joint, which can cause water to penetrate and thus destroy the joint or the concrete.
  • the steel rod be in the area between the end face of the prefabricated plate and the anchoring of a pipe or hose, in particular is covered by a shrink hose.
  • a shrink hose This can ensure that the steel rod inside the tube or hose or, if the shrink hose has been reduced from a larger diameter to a smaller diameter after the concrete has set, is arranged in its longitudinal direction in the precast slab.
  • the anchor point of the steel rod is in turn in the first segment of the finished plate. From this anchor point to the end of the steel bar, the steel bar is then to be stretched relative to the precast slab.
  • a safe corrosion Protection in the non-concreted area also provides a so-called ten-so bandage.
  • the sheathing of the steel rod has a larger inner diameter than the outer diameter of the steel rod, sliding of the steel rod within the sheathing is possible.
  • the casing is firmly connected to the concrete, while the steel rod is stretchable within the casing.
  • sliding between the concrete and the shrink tube is possible.
  • fastening means for connecting the steel rod of the one prefabricated panel to a steel rod of the adjacent prefabricated panel can be simply inserted.
  • the pocket also allows the span of the steel rod to be sufficiently long.
  • the underside of the prefabricated panel thus essentially forms a straight line along the end face of the prefabricated panel, so that appropriate sealants can be easily designed. In addition, with this straight edge, it is easier to seal the base and less sealing material is required.
  • the bag has an undercut in plan view, additional clawing occurs when the bag is poured out with concrete, for example of the neighboring precast slabs.
  • the pocket thus causes the prefabricated panels to be fixed vertically to one another, so that additional security is provided against unintentional displacement of the prefabricated panels relative to one another.
  • a wide joint is created between the adjacent prefabricated panels. This wide joint is in turn suitable for receiving fasteners for the two prefabricated panels and facilitates access to these fasteners during their assembly. In addition, there is sufficient space for tensioning the steel bars.
  • a potting compound can be introduced between the two precast panels in a defined manner.
  • a connecting means for connecting the steel rod of one prefabricated panel to the steel rod of the adjacent prefabricated panel can be arranged within the wide joint.
  • the assembly of the precast slabs is thus considerably simplified.
  • the accessibility of the connecting means is relatively easy if the prefabricated panel is to be dismantled.
  • adjustment devices, in particular spindles, are arranged on the precast plate, the height of the precast plate can be adjusted to the required extent.
  • the precast slab is made of fiber reinforced concrete, some of the conventional reinforcement can be omitted. In addition to this advantage, there is also the further advantage of smaller crack widths.
  • the narrow joint and / or the wide joint between two prefabricated panels is poured with a casting compound, in particular with concrete, then when the tensile force is applied to the steel bars, support of the two prefabricated panels is ensured via the poured narrow joint. As a result, the narrow joint is pressed together, which reliably prevents water from penetrating.
  • an infusion compound in particular a bitumen-cement mortar
  • This viscous casting compound is introduced through filling openings in the prefabricated panel from above or laterally from the edge of the panel into the cavity between the prefabricated panel and the substrate.
  • the hardening of this casting compound is largely independent of temperature, i.e. that the prefabricated panel cures regardless of the outside temperature in the previously precisely aligned position. The fine adjustment of the precast plate is therefore largely retained.
  • the casting compound is coated in particular with a sealing element, in particular an elastic, preferably porous plastic, then a complex, different seal is used when casting in the prefabricated parts. plate avoided.
  • the sealing element is so elastic that it still has contact with the underside of the prefabricated plate and with the top of the substrate when the prefabricated plate is adjusted in height for the alignment of the prefabricated plate. Leakage of the underpour is thereby avoided. Even with the partially required inclinations of the roadway, a reliable pouring out of the substrate is effected with the aid of these particularly advantageous sealing elements.
  • Sealing elements which have proven to be particularly advantageous are a rubber mat, in particular made of neoprene, or a sponge.
  • the elements can either be left in place after the casting has hardened or can be used for re-use when casting in another prefabricated panel.
  • a sponge it is also possible for air to be pressed through the sponge by means of the sealing compound and thus not to lead to inclusions under the prefabricated panel.
  • the adjacent prefabricated panels can also be fixed with them in order to be able to tension the steel bars.
  • the spacers can be arranged in the area of the narrow or wide joints.
  • the joint can be poured out in one piece particularly advantageously.
  • the spacers are used to hold the precast panels in the fine-tuned position after the leveling and before or after tensioning the steel bars.
  • the spacers are advantageously wedges that can be adjusted to the exact spacing position.
  • a method according to the invention for producing a composite panel construction from precast reinforced concrete slabs with at least two steel bars extending in the longitudinal direction of the precast slab and projecting beyond their concrete surface on the end face and with a joint between The precast slab is first laid down and finely aligned with neighboring precast slabs. Subsequently, the finely finished prefabricated panel is poured with an under-molding compound and, after the under-molding has hardened, the prefabricated panel is connected to the neighboring prefabricated panel by pouring the joint and connecting the steel bars.
  • the individual prefabricated panel is first brought into its exact position and largely fixed in this position.
  • Another major advantage is that if a prefabricated panel is damaged, for example when a train is derailed, individual prefabricated panels can be removed from a composite panel construction and replaced with a new prefabricated panel.
  • An assembly-friendliness with the manufacturing method according to the invention is hereby achieved, which includes great advantages not only in the initial assembly but also in the repair.
  • the steel rods are advantageously stretched to connect the adjacent prefabricated panels. This creates a tension between the adjacent prefabricated panels, which additional fixation and watertight connection of a joint between the precast panels guaranteed.
  • narrow joints and wide joints are provided on the panel joint, it is particularly advantageous if the narrow joints are first cast with a casting compound, then the steel bars are tensioned and finally the wide joints are closed. This results in a uniform load on the precast panels and the sealing compound.
  • the joints between the precast panels are advantageously pressed together. This compensates for the shrinkage of the casting compound during setting and provides a watertight connection between the precast panels.
  • bitumen-cement mortar has proven to be particularly advantageous as the casting compound.
  • the bitumen-cement mortar is viscous and, on the one hand, suitable for completely filling the space between the precast slab and the subsurface without any bubbles. On the other hand, it creates a good connection with the precast slab and also with the subsoil, which is often a hydraulically bound base course or an asphalt base course.
  • This bitumen-cement mortar ensures that the prefabricated panel is precisely fixed to the substrate and that the precast panel, which was adjusted before the grouting compound is introduced, is fixed in its position.
  • an elastic, in particular porous, sealing element is used as the formwork for the casting, a particularly simple, inexpensive and efficient sealing of the intermediate space between the prefabricated panel and the substrate is obtained.
  • the sealing element prevents the casting from flowing out of this space.
  • the formwork can be laid out before the leveling, in particular before the precast slab is put down. Due to its elasticity, it adapts itself exactly to the space between the precast slab and the subsurface, even while it is being straightened, and seals the cavity.
  • the prefabricated plate is used as a carrier for rails, it has been found to be particularly advantageous that the rails are braced on the prefabricated plate in rail fastenings before the finished plate is straightened. Since the rails are decisive for the alignment of the precast panel, this is particularly advantageous because Accuracies in the rail fastenings can be compensated.
  • the spacers are arranged in the area of the narrow joints and / or the wide joints, the spacers are well supported on the two prefabricated panels.
  • the spacers can be relaxed or removed.
  • FIG. 1 shows a plan view of part of a precast reinforced concrete slab
  • FIG. 2 shows a section transverse to the longitudinal direction of a precast reinforced concrete slab, 3a - to 3d different process steps in the connection of two precast reinforced concrete slabs,
  • FIG. 4 shows a detailed view in longitudinal section of a precast reinforced concrete slab according to FIG. 3c
  • FIG. 5 shows a joint joint with spacers
  • FIG. 6 shows a spacer in top view
  • Figure 7 is a spacer in side view.
  • FIG. 1 shows a part of a precast reinforced concrete slab 10 in plan view.
  • the precast plate 10 has a plurality of bumps 12 in this embodiment. Alternatively, a continuous belt or a concrete channel that is continuous or interrupted is also possible.
  • the bumps 12 are arranged in two rows in the longitudinal direction of the prefabricated plate 10, as a result of which they can be used in the purpose shown here for fastening rails for, for example, high-speed trains.
  • a rail 30 is attached to each of the rows of bumps 12.
  • the rail 30 is fastened to each hump 12 with fastenings 31, which are only shown symbolically here.
  • the attachments 31 can be fixed in prefabricated dowels 32 or corresponding holes if necessary.
  • two bumps 12 are arranged on a segment of the precast plate 10.
  • the individual segments are separated from one another by dummy joints 15.
  • the dummy joints 15 act as predetermined breaking points, in which unavoidable small cracks in the precast reinforced concrete slab 10 are deliberately created in the precast slab 10. Through this targeted cracks occurring at these points, the remaining precast reinforced concrete slab 10 is largely spared from cracks and can therefore be carried out in a stable manner and can be easily checked for its condition.
  • the structure of the precast reinforced concrete slab 10 must therefore be selected such that the cracks actually occur in the area of the predetermined breaking points or dummy joint 15.
  • steel rods 19 which act as tie rods in the prefabricated panel 10, extend from one end of the prefabricated panel to the other end of the prefabricated panel 10. At the end faces 17 of the prefabricated panel 10, they protrude from the concrete surface and can, as will be described in detail later will be connected to the adjacent precast slab or its steel bars.
  • the end face 17 has an essentially straight continuous edge, as well as two recesses or pockets 24 in this exemplary embodiment.
  • the pockets 24 are recesses with respect to the rectilinear end face 17, in which the steel rods 19 protrude from the concrete surface.
  • the pockets 24 also have undercuts (shown in dashed lines) which additionally improve the stability of the connection of the prefabricated panel 10 to the adjacent prefabricated panel, not shown.
  • the later pouring of the joints between two precast panels 10 is more permanent, since the penetration of water is prevented by these undercuts, among other things.
  • the precast plate 10 has a plurality of filling openings 13 (only one shown here). A pouring agent is introduced through these filling openings 13 under the finished plate 10.
  • Figure 2 shows a part of a section transverse to the longitudinal axis of the prefabricated panel 10 and its background.
  • bumps 12 are arranged on the prefabricated plate 10, on which the rail 30 with fastenings 31 is arranged.
  • the fastenings 31 are fixed in dowels 32, which are introduced into the finished part plate 10.
  • the precast reinforced concrete slab can be constructed in the conventional way with the usual reinforcement. It is an alternative and particularly advantageous if the prefabricated panel 10 is made with fiber concrete. There are steel fibers in the fiber concrete, which give the precast panel 10 great strength.
  • the steel fibers can be bent, twisted or have another shape with which they support the interweaving in the concrete. This makes it possible to obtain an extremely strong reinforced concrete for the precast slab 10, which has particularly high strength and durability, particularly in the edge areas or in the areas in which the fastenings 31 are fixed.
  • a plurality of spindles 37 are arranged on the precast plate 10.
  • the spindle 37 interacts in a manner known per se with a nut 39 in such a way that the height of the precast plate 10 is aligned.
  • the spindle 37 is supported on a support plate 38 in order to find a firm and constant base in order to fine-tune the height of the plate 10.
  • the spindle 37 extends through a recess in the precast plate 10 in order to allow a large adjustment path.
  • an elastic formwork 41 is laid out in the edge area of the precast panel 1.
  • This formwork 41 serves to prevent an underfill 42 poured under the precast panel 10 after alignment of the precast panel 10 from running out.
  • the preferably viscous base 42 is covered by the formwork 41 the precast plate 10 held.
  • the formwork 41 is preferably an elastic plastic part. In particular, sponge-like materials with coarse pores or neoprene or similar plastics have proven to be advantageous.
  • the formwork 41 can either remain at this point after the under-casting has hardened and thus provide a certain degree of protection against moisture. If the formwork is to be used for further castings, it is also possible to pull this formwork 41 out from under the prefabricated panel 10 and to use it again.
  • the height of the precast plates 10 is precisely aligned by means of the spindles 37 and nuts 39.
  • the steel rods 19 of the two prefabricated panels to be connected are to be aligned with one another in their longitudinal axis. ( Figure 3a).
  • the prefabricated panel 10 is poured with a casting 42 through the filling openings 13.
  • the underpour 42 is preferably made of a bitumen-mortar concrete.
  • the lower casting 42 connects the prefabricated plate 10 to the hydraulically bound base layer 45 prepared below.
  • the narrow joints 26 located between the two plates 10 are poured out with a casting compound, preferably concrete (FIG.
  • the casting can only take place in the area of the butt joints 21 of the prefabricated panel 10, or else fill the lower area between the prefabricated panels 10, in which the wide joints 27 are located upwards.
  • the steel rods 19 are connected to one another by means of turnbuckles 25 and stretched. This creates a pressure on the potting compound 25 in the narrow joints 26 and thus effectively prevents water from entering.
  • this procedure does not change the exact alignment of the precast panels 10 when the steel bars 19 are clamped, since they are based on the Support casting compounds 25 and is fixed with respect to the substrate by means of the casting 42 ( Figure 3c).
  • the wide joint 27 can be closed to prevent corrosion (FIG. 3d).
  • This closing can also be carried out by introducing a casting compound 25, for example concrete.
  • a removable cover can also be provided here.
  • the two prefabricated panels 10 are more firmly connected by casting the wide joint 27, since this results in an additional interlocking of the prefabricated panels 10 with a corresponding design of the wide joint 27.
  • FIGS. 3a to 3d The procedure for the connection of the two prefabricated panels 10 was shown in FIGS. 3a to 3d each without a built-up rail 30. If the precast panels are used for high-speed rail traffic, it is advantageous if the rail 30 is already set up for aligning the precast panels 10, since the rail 30 is decisive for the alignment of the precast panels 10.
  • FIG. 4 shows the joint of the two prefabricated panels 10 prepared up to the working step of FIG. 3c in more detail.
  • the prefabricated panels 10 are cut lengthwise in the area of the steel rods 19.
  • the prefabricated panels 10 are arranged on a base 42, which is supported on a hydraulically bound base layer.
  • the formwork 41 prevents the underpour 42 from escaping from the area of the prefabricated panel 10 when the prefabricated panel 10 is being poured or pressed under.
  • the precast plate 10 has humps 12, on which with fasteners
  • precast plate 10 Represent precast plate 10.
  • a number of steel bars are be introduced 19.
  • the steel bars 19 are largely firmly anchored in the precast plate 10. Only in the area from the dummy joint 15 to the end of the respective prefabricated plate 10 is the steel rod 19 not connected to the concrete of the prefabricated plate and thus freely stretchable.
  • the steel rod 19 is located in a hose 20, which prevents the steel rod 19 from connecting to the concrete of the precast plate 10.
  • the narrow joints 26 are filled with a casting compound 25.
  • the steel rods 19 are connected to one another and stretched by means of a turnbuckle 28. The expansion causes the steel rods to be stretched in their free-moving area in the respective hose 20 and thus to cause a pretension.
  • the prestressing causes the casting compound 25 to be pressed or the composite construction to be stabilized, so that the penetration of water into the joints is prevented.
  • the precast panels 10 are pressed tightly against one another via the casting compound 25.
  • Characterized in that the steel rod 19 is movably mounted only in the area between the dummy joint 15 and the end of the precast plate 10, it is reliably ensured that the dummy joint 15 is not bridged with a compressive force and thus loses its function.
  • the force on the concrete body is applied only in the last segment, namely between the dummy joint 15 and the end of the precast plate 10 via the steel bars 19.
  • the underpour 42 can be removed in the event that the plate or the subsoil lowers in the course of using the plate.
  • the GE- is characterized in that the bottom casting 42 is pierced transversely to the longitudinal direction of the plate.
  • a saw in particular a saw cable, is inserted into the borehole and the bottom casting is sawn through under the plate. For example, with spindles, the plate can then be precisely aligned and re-grouted.
  • FIG. 5 shows the top view of a joint joint between two prefabricated panels 10 and 10 '.
  • Spacers 50 are arranged to fix the prefabricated panels 10 and 10 '.
  • the spacers 50 are each located in the area of a narrow joint.
  • 2 spacers 50 ' can be provided in the area of the wide joints. In each of the designs it is ensured that the fine-tuned condition of the precast panels 10 and 10 'is maintained during the tensioning of the steel bars.
  • FIG. 6 shows a top view of a spacer 50.
  • the spacer 50 consists of a base plate 51, which is attached to the precast plate 10 or 10 '.
  • This base plate 51 can either be cast into the prefabricated plate 10, 10 'or be attached subsequently.
  • One of the base plates 51 has guides 52 for a wedge 53.
  • the wedge 53 is inserted into the guides 52 between the two base plates 51 when the precast plates 10 and 10 'are aligned. This fixes the distance between the precast panels 10 and 10 ', so that when the steel bars are tensioned, the precast panels 10 and 10' cannot be moved towards each other and the orientation of the panels is not changed.
  • FIG. 7 shows a side view of the spacer 50.
  • the prefabricated panels 10 and 10 ' which are located on the base 42 or the support layer 45, are held at a defined distance by means of the wedge 53. This distance is permanently fixed after the steel rods are braced by pouring the joint with a casting compound 25. After the casting compound 25 has hardened, the position of the precast panels 10 and 10 'permanently fixed to each other. The wedge 53 can be removed if necessary and used for the next joint. In a special embodiment, the sealing compound 25 can also be at least temporarily left out in the area of the spacer 50. After the remaining casting compound 25 has hardened, the complete spacer 50 can be removed from the joint joint together with the wedge 53 and used for a further connection point.
  • the use of the spacers allows an immediate application of the tensile force to the steel bars and a later joint grouting of wide and narrow joints. This is particularly advantageous if there are unfavorable temperature and climatic conditions for grouting the joint. A more favorable temperature and a suitable climate can be awaited for the final pouring of the wide and narrow joints, so that the material is optimally processed.
  • the present invention is not limited to the embodiment shown.
  • the precast panels 10 can also be used for areas of application other than those described.
  • the steel bars 19 can also be prevented in another way from the connection with the concrete of the precast plate 10 in the last segment. Combinations of the individual features are of course also within the scope of the invention.

Landscapes

  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Engineering & Computer Science (AREA)
  • Road Paving Structures (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Laminated Bodies (AREA)
  • Bridges Or Land Bridges (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
  • Machines For Laying And Maintaining Railways (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
  • Silicon Compounds (AREA)
  • Compositions Of Macromolecular Compounds (AREA)
  • Crushing And Pulverization Processes (AREA)
  • Railway Tracks (AREA)
  • Rod-Shaped Construction Members (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

Plaque préfabriquée en béton armé, destinée à être utilisée en particulier comme élément de construction d'une voie sans ballast pour moyens de transport à grande vitesse, qui comporte au moins deux barres d'acier s'étendant dans le sens de la longueur de la plaque préfabriquée (10) en béton armé et dépassant de la surface de béton au niveau de la face avant (17). Ladite plaque préfabriquée (10) comporte au moins une et de préférence plusieurs lignes de rupture (15) qui s'étendent transversalement par rapport aux barres d'acier (19). La barre d'acier (19) est ancrée dans la zone située entre la face avant (17) de la plaque préfabriquée (10) et la première ligne de rupture (15) et montée de manière à se déplacer essentiellement librement dans le sens longitudinal, en direction de la face avant (17) correspondante. Selon un procédé de fabrication d'une construction constituée d'un ensemble de plaques préfabriquées (10) en béton armé, la plaque préfabriquée (10) est posée, puis placée avec exactitude. Du béton (42) est alors injecté sous la plaque préfabriquée posée avec exactitude. Après séchage du béton injecté (42), la plaque préfabriquée (10) est reliée à la plaque préfabriquée (10) voisine par coulage de béton dans la fente de séparation et liaison des barres d'acier (19).
EP00962509A 1999-10-06 2000-09-20 Plaque prefabriquee en beton arme Expired - Lifetime EP1218596B1 (fr)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
DE19948003A DE19948003A1 (de) 1999-10-06 1999-10-06 Stahlbetonfertigteilplatte
DE19948003 1999-10-06
PCT/EP2000/009188 WO2001025538A1 (fr) 1999-10-06 2000-09-20 Plaque prefabriquee en beton arme

Publications (2)

Publication Number Publication Date
EP1218596A1 true EP1218596A1 (fr) 2002-07-03
EP1218596B1 EP1218596B1 (fr) 2006-04-05

Family

ID=7924605

Family Applications (1)

Application Number Title Priority Date Filing Date
EP00962509A Expired - Lifetime EP1218596B1 (fr) 1999-10-06 2000-09-20 Plaque prefabriquee en beton arme

Country Status (25)

Country Link
US (1) US7556208B1 (fr)
EP (1) EP1218596B1 (fr)
JP (1) JP3829091B2 (fr)
KR (1) KR100692497B1 (fr)
CN (2) CN100346033C (fr)
AT (1) ATE322579T1 (fr)
AU (1) AU773566B2 (fr)
BG (1) BG64131B1 (fr)
BR (1) BR0014462A (fr)
CA (1) CA2387698A1 (fr)
CZ (1) CZ295073B6 (fr)
DE (2) DE19948003A1 (fr)
EA (1) EA003179B1 (fr)
EE (1) EE200200177A (fr)
ES (1) ES2260052T3 (fr)
HR (1) HRP20020284B1 (fr)
HU (1) HUP0202735A2 (fr)
IL (1) IL148754A (fr)
PL (1) PL208006B1 (fr)
PT (1) PT1218596E (fr)
SK (1) SK287688B6 (fr)
TR (1) TR200200900T2 (fr)
UA (1) UA71642C2 (fr)
WO (1) WO2001025538A1 (fr)
YU (1) YU21502A (fr)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR3034785A1 (fr) * 2015-04-10 2016-10-14 Antoine Marot Structure elementaire prefabriquee, assemblage d'une pluralite de telles structures, procede de fabrication et d'installation d'une telle structure
EP3263766A1 (fr) 2016-06-27 2018-01-03 Antoine Marot Dalle pour un véhicule ferroviaire et/ou un véhicule sur pneus guidés

Families Citing this family (32)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10216573B4 (de) * 2002-04-13 2013-04-04 Max Bögl Bauunternehmung GmbH & Co. KG Verfahren zur Lagerung eines Betonbauteiles und Feste Fahrbahn
DE10314926A1 (de) * 2003-04-01 2004-10-14 Max Bögl Bauunternehmung GmbH & Co. KG Verfahren und Richthilfe zum Einrichten der Lage einer Betonfertigteilplatte sowie Betonfertigteilplatte
DE102004019275B4 (de) * 2004-04-21 2006-09-07 Pfleiderer Infrastrukturtechnik Gmbh & Co. Kg Systemschalung für Querfugen bei festen Fahrbahnen
DE102004045766B4 (de) * 2004-09-21 2014-02-27 Polyplan Gmbh Polyurethan-Maschinen Fertigteilplatte und Verfahren zur Herstellung einer festen Fahrbahn mit einer derartigen Fertigteilplatte
ITMI20042465A1 (it) * 2004-12-23 2005-03-23 Seap Costruzioni Generali S P A Armamento modulare di binario e di apparecchi di binario per linee tranviarie e metropolitane e procedimento per la loro posa in opera
DE102006019549A1 (de) * 2006-04-27 2007-10-31 Max Bögl Bauunternehmung GmbH & Co. KG Fahrweg und Verfahren zur Herstellung von Betonfertigteilplatten
DE202006020860U1 (de) * 2006-05-18 2010-07-15 Thyssenkrupp Gft Gleistechnik Gmbh Fahrbahn für Umschlaganlagen
DE102006039100B4 (de) * 2006-08-19 2009-09-03 Leonhard Hanusch Verwendung eines Vergussklebers für das Aufkleben eines körperlichen Elementes auf einen festen Untergrund
DE102009039229A1 (de) * 2009-08-28 2011-03-03 Zürcher Bau GmbH Verfahren zum Verlegen von vorgefertigten Gleistragebauteilen im Gleisbau bei Bahnstrecken
DE102009049411A1 (de) * 2009-10-14 2011-04-21 Db Netz Ag Spannbetonschwelle sowie Verfahren zum Transport und Einbau einer Weiche mit Spannbetonschwellen
DE102010035675A1 (de) 2010-08-27 2012-03-01 Db Netz Ag Klappbare Weiche
CN102677565A (zh) * 2012-05-12 2012-09-19 中国十七冶集团有限公司 钢筋混凝土预制路面板及其安装施工方法
CN102758388B (zh) * 2012-07-06 2014-04-16 中铁十七局集团第二工程有限公司 双块式无碴轨道横向伸缩缝的模板装置及施工方法
US9410316B2 (en) 2013-12-24 2016-08-09 Reigstad & Associates, Inc. Post-tension concrete leave out splicing system and method
US9404254B2 (en) * 2013-12-24 2016-08-02 Reigstad & Associates, Inc. Post-tension concrete leave out splicing system and method
US9644369B2 (en) 2013-12-24 2017-05-09 Reigstad & Associates, Inc. Post-tension concrete leave out splicing system and method
CN105113352B (zh) * 2015-08-11 2017-11-07 惠州大亚湾市政基础设施有限公司 一种抗冲耐磨混凝土预装道路
CN105839504B (zh) * 2016-03-24 2018-01-16 济南长兴建设集团有限公司 装配式水泥路面施工方法
CN105823531A (zh) * 2016-05-20 2016-08-03 南昌航空大学 一种适用于腐蚀性液体的液位指示器
CA3288320A1 (en) * 2017-02-15 2025-11-29 Tindall Corporation Methods and apparatuses for constructing a concrete structure
CN108394013A (zh) * 2018-03-23 2018-08-14 中交航局第工程有限公司 一种码头磨耗层及道路堆场大板预制安装工艺
US12043975B2 (en) 2018-05-21 2024-07-23 Oldcastle Building Products Canada Inc. Concrete building block and methods
CN109910142B (zh) * 2018-12-03 2024-03-22 中交一公局集团有限公司 预制带承托桥面板整体式钢混镂空胎座模板
IT201900003219A1 (it) * 2019-03-06 2020-09-06 Wegh Group S P A Sistema di sostegno di un tratto di binario
CN110306397A (zh) * 2019-06-28 2019-10-08 宁夏建工集团有限公司 一种钢架支撑式混凝土组合拼接结构及其制作方法
CN110409244B (zh) * 2019-08-23 2021-06-25 中国建筑第七工程局有限公司 一种复合承载预制路面板及预制路面施工方法
IT201900021558A1 (it) * 2019-11-19 2021-05-19 Wegh Group S P A Supporto di un basamento di sostegno per almeno una rotaia
CN110820477A (zh) * 2019-11-29 2020-02-21 杭州宝力体育设施工程有限公司 一种透气性好的塑胶跑道
CN110983894B (zh) * 2019-12-23 2021-06-08 德州市公路工程总公司 预制装配式混凝土路面及施工方法
CN111472209A (zh) * 2020-05-25 2020-07-31 中铁二院工程集团有限责任公司 一种用于有砟轨道的变轨距轨枕单元及变轨距轨枕系统
CN113404091B (zh) * 2021-05-28 2022-10-11 内蒙古送变电有限责任公司 预制方涵基础与电缆沟基础包封拼接的施工方法
CN120608433B (zh) * 2025-08-12 2025-10-28 中铁隧道集团二处有限公司 一种crtsⅲ型底座板传力垫片的施工方法

Family Cites Families (64)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3156169A (en) * 1964-11-10 Finsterwalder
US338057A (en) * 1886-03-16 qearon
US375999A (en) * 1888-01-03 Construction of artificial-stone or concrete pavements
US1041736A (en) * 1912-01-22 1912-10-22 Fred Seymour Caldwell Railroad-tie.
US1279062A (en) * 1917-02-05 1918-09-17 Charles M Winter Railway grade-crossing.
US2067037A (en) * 1936-05-06 1937-01-05 Massey Concrete Products Corp Crossing slab
US2124247A (en) * 1936-11-09 1938-07-19 Frank E Fey Rail cross-over
US2260657A (en) * 1938-10-17 1941-10-28 Hauserman Co E F Metallic partition structure
US2340263A (en) * 1941-01-18 1944-01-25 Leon A Dodson Wall construction
US2655845A (en) * 1945-08-14 1953-10-20 Freyssinet Eugene Concrete pavement
US2672295A (en) * 1948-11-18 1954-03-16 Standard Oil Dev Co Structure and method of preparing same for railroad crossings
US2611262A (en) * 1949-10-21 1952-09-23 Glenn R Dodson Reinforcing rod connection in block walls
US2780150A (en) * 1950-08-26 1957-02-05 Texas Foundries Inc Method of laying prefabricated concrete slabs
US2971295A (en) * 1955-03-21 1961-02-14 Phillips Petroleum Co Prestressed concrete units and structures
US3145502A (en) * 1955-04-01 1964-08-25 Rubenstein David Structural element and method of making
US2984417A (en) * 1960-12-06 1961-05-16 Howard B Voorhees Adjustable railroad crossing plates
US3295286A (en) * 1961-05-31 1967-01-03 Owens Illinois Inc Cementitious slab with bolt means
DK101344C (da) * 1961-10-19 1965-03-22 Godtfred Kirk Christiansen Legetøjsbyggeelement.
US3237357A (en) * 1962-01-10 1966-03-01 Carl H Hutchings Wall and floor construction of prestressed concrete
US3173226A (en) * 1962-01-10 1965-03-16 Solnick Abraham Unitary floor and roof construction and method of assembly
US3237537A (en) * 1964-01-17 1966-03-01 Carl H Hutchings Prestressed concrete highway
US3317137A (en) * 1964-06-29 1967-05-02 Paul G Harmon Railroad crossing rail bed unit
GB1120836A (en) * 1964-10-13 1968-07-24 Cementation Co Ltd Improvements relating to the anchorage of structural tensile members
US3378969A (en) * 1966-09-07 1968-04-23 George K. Larger Prefabricated composite masonry panel formed of prelaid individual masonry modules bonded together
US3621624A (en) * 1970-04-13 1971-11-23 Evert W Gustafson Panel wall construction
US3678644A (en) * 1970-09-08 1972-07-25 Wates Ltd Method of gaining pre-cast concrete panels
US3736709A (en) * 1971-07-13 1973-06-05 Techcrete Inc Building system
US3820293A (en) * 1971-12-29 1974-06-28 Tokyo Plywood Kk Framed structural member and board structure composed of short timbers assembled
FR2124729A5 (fr) * 1972-01-04 1972-09-22 Soum Rene
US3819114A (en) * 1972-05-17 1974-06-25 Ny City Transit Authority Railroad track assembly
GB1384106A (en) * 1972-07-27 1975-02-19 Amey Roadstone Corp Tubular concrete bodies and the moulding thereof
US3863840A (en) * 1973-03-05 1975-02-04 Szarka Enterprises Vehicular supporting deck for a railroad grade crossing
FR2277953A1 (fr) * 1974-07-09 1976-02-06 Stup Procedes Freyssinet Tirants libres formes d'armatures d'acier tendues
GB1479050A (en) * 1974-12-18 1977-07-06 Golder Ass Ltd Building block
DE2621793C2 (de) * 1976-05-15 1986-10-30 Josef 8000 München Winklmann Verfahren zum Herstellen einer Rost- bzw. Plattenverbundkonstruktion aus vorgespannten Betonfertigteilen, insbesondere für Fahrbahndecken, Plätze oder dergleichen
US4267085A (en) * 1976-07-23 1981-05-12 Japanese National Railways Injection materials for railroad track beds
US4357784A (en) * 1977-08-29 1982-11-09 Grady Ii Clyde C Structural units and arrays therefrom
JPS54120410A (en) * 1978-03-10 1979-09-19 Kubota Ltd Construction method of built-up water tank
GB2016572B (en) * 1978-03-17 1982-02-17 Durell R B Liquid retaining walls
DE3121946A1 (de) * 1981-06-03 1982-12-23 Clouth Gummiwerke AG, 5000 Köln "matte aus elastischem werkstoff"
FR2565278B1 (fr) * 1984-06-01 1986-08-22 Alpha Composants Ensemble d'elements de construction pour l'edification de murs par post-contrainte
IT1176498B (it) * 1984-07-27 1987-08-18 I P A Ind Prefabbricati Affini Componenti per linee ferroviarie su piastre prefabbricate in cemento armato,senza massicciata
DE3434620A1 (de) * 1984-09-21 1986-04-03 Dyckerhoff & Widmann AG, 8000 München Abstuetzung eines freien zugglieds, vorzugsweise eines schraegseils einer schraegseilbruecke
US4648554A (en) * 1984-10-30 1987-03-10 Acme Plastics, Inc. Impact and vibration attenuating pad with offset dimples
GB8430835D0 (en) * 1984-12-06 1985-01-16 Southorn J A Paving
US4653956A (en) * 1984-12-12 1987-03-31 Lang Frederic A Highway pavement
FR2576335B1 (fr) * 1985-01-18 1987-06-12 Cazet Jean Aire de pesee prefabriquee en beton arme et son procede de construction
US4633700A (en) * 1986-01-21 1987-01-06 Press Technology Corporation Crosshead ties and clearance holes arrangement for easy removal of said ties without dismantling of entire crosshead
US4911360A (en) * 1986-06-09 1990-03-27 Urban Transportation Development Corporation Limited Precast railway crossing slab
DE3736943C1 (de) * 1987-10-31 1988-12-08 Dyckerhoff & Widmann Ag Eisenbahnoberbau,insbesondere fuer sehr hohe Fahrgeschwindigkeiten
HU207756B (en) * 1988-06-03 1993-05-28 Beton Es Vasbetonipari Muevek Arrangement for forming large-panel railroad permanent ways
JPH0729891B2 (ja) * 1988-09-06 1995-04-05 株式会社大塚製薬工場 害虫防除方法
CH677250A5 (fr) 1988-10-07 1991-04-30 Bsa Ingenieurs Conseils
US4909662A (en) * 1989-01-13 1990-03-20 Baker Robert L Roadway and method of construction
JP2604476B2 (ja) * 1989-10-24 1997-04-30 日本鉄道建設公団 スラブ軌道の構築方法
CN1044141A (zh) * 1990-02-20 1990-07-25 郑亚华 一种钢筋混凝土预制板
AT404037B (de) * 1991-05-31 1998-07-27 Porr Allg Bauges Schotterloser oberbau mit schienen
FR2677693B1 (fr) * 1991-06-13 1993-10-08 Freyssinet International Cie Perfectionnements aux procedes et dispositifs pour renforcer le beton a la compression et aux ouvrages en beton ainsi renforces.
DE19501277C2 (de) * 1995-01-18 2003-07-10 Dennert Kg Veit Beton-Fertigteil-Balkon
US5678952A (en) * 1995-11-16 1997-10-21 Shaw; Lee A. Concrete dowel placement apparatus
US5924630A (en) * 1997-07-21 1999-07-20 Oldcastle Precast, Inc. Precast reinforced concrete railway crossing slab
DE19733909B4 (de) * 1997-08-05 2006-07-06 Max Bögl Bauunternehmung GmbH & Co. KG Vorgefertigte Stahlbetonfertigteilplatte sowie Verfahren zu deren Herstellung
DE19837360C2 (de) * 1998-08-18 2002-02-21 Pfleiderer Infrastrukturt Gmbh Einbauverfahren für eine feste Schienenfahrbahn
US6142847A (en) * 1998-12-30 2000-11-07 90Degrees, Inc. Reflective I-rail interconnector

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See references of WO0125538A1 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR3034785A1 (fr) * 2015-04-10 2016-10-14 Antoine Marot Structure elementaire prefabriquee, assemblage d'une pluralite de telles structures, procede de fabrication et d'installation d'une telle structure
EP3263766A1 (fr) 2016-06-27 2018-01-03 Antoine Marot Dalle pour un véhicule ferroviaire et/ou un véhicule sur pneus guidés

Also Published As

Publication number Publication date
BG106500A (en) 2002-12-29
CZ2002964A3 (cs) 2002-08-14
US7556208B1 (en) 2009-07-07
JP3829091B2 (ja) 2006-10-04
DE50012538D1 (de) 2006-05-18
ES2260052T3 (es) 2006-11-01
UA71642C2 (en) 2004-12-15
AU7420500A (en) 2001-05-10
AU773566B2 (en) 2004-05-27
EE200200177A (et) 2003-04-15
ATE322579T1 (de) 2006-04-15
PL354319A1 (en) 2004-01-12
PT1218596E (pt) 2006-10-31
TR200200900T2 (tr) 2002-08-21
DE19948003A1 (de) 2001-04-12
CN100346033C (zh) 2007-10-31
SK287688B6 (sk) 2011-06-06
KR20020047202A (ko) 2002-06-21
EP1218596B1 (fr) 2006-04-05
CN100570057C (zh) 2009-12-16
BR0014462A (pt) 2002-10-22
CZ295073B6 (cs) 2005-05-18
EA003179B1 (ru) 2003-02-27
BG64131B1 (bg) 2004-01-30
HRP20020284B1 (en) 2009-05-31
JP2003511586A (ja) 2003-03-25
SK4532002A3 (en) 2002-10-08
YU21502A (sh) 2004-09-03
KR100692497B1 (ko) 2007-03-09
HRP20020284A2 (en) 2004-04-30
CN1377438A (zh) 2002-10-30
PL208006B1 (pl) 2011-03-31
IL148754A (en) 2005-09-25
CN1807757A (zh) 2006-07-26
EA200200420A1 (ru) 2002-10-31
WO2001025538A1 (fr) 2001-04-12
CA2387698A1 (fr) 2001-04-12
HUP0202735A2 (en) 2003-02-28
IL148754A0 (en) 2002-09-12

Similar Documents

Publication Publication Date Title
EP1218596B1 (fr) Plaque prefabriquee en beton arme
EP1417379B1 (fr) Procede pour la pose continue d'un rail sur une voie de circulation fixe, ainsi que dispositif d'ajustage et voie de circulation fixe
DE19733909B4 (de) Vorgefertigte Stahlbetonfertigteilplatte sowie Verfahren zu deren Herstellung
DE4411889A1 (de) Schotterloses Oberbausystem für zumindest ein Eisenbahngleis und Verfahren zur Herstellung
EP0894898B1 (fr) Méthode de réalisation d'une voie ferrée et dispositif pour le réglage en hauteur et le support temporaire des rails
EP1904682B1 (fr) Voie de circulation solide sur une construction de pont
EP1204798A1 (fr) Support a travees multiples
EP1317582A1 (fr) Procede et dispositif pour corriger la position d'un construction realisee a partir de plaques prefabriquees en beton
DE10004194C2 (de) Verfahren zur Fertigung einer festen Schienenfahrbahn auf einer Brücke
DE102004055727A1 (de) Verfahren zur Herstellung einer Plattenverbundkonstruktion aus Stahlbetonfertigteilplatten, Stahlbetonfertigplatte und Spanneinrichtung
EP0718438A1 (fr) Superstructure de voie ferrée comprenant une dalle porteuse continue et des dispositifs de fixation individuels pour les rails
DE4428706A1 (de) Gleisrost auf durchgehender Tragplatte und Verfahren zur Verlegung eines Gleisrostes auf durchgehender Tragplatte
DE10261641A1 (de) Verfahren zum Herstellen einer Festen Fahrbahn und Fahrweg
EP0952252B1 (fr) Coffrage pour l'encastrement d'un rail
DE10004626A1 (de) Verfahren zur Herstellung einer Entgleisungsschutzanordnung bei einer Schienenfahrbahn, eine Entgleisungsschutzanordnung umfassende Schienenfahrbahn und Entgleisungsschutzanordnung
EP2010713B1 (fr) Voie de circulation et procede pour la fabrication de plaques prefabriquees en beton
DE10064748B4 (de) Verfahren und Vorrichtung zur Lagekorrektur einer Plattenkonstruktion aus Betonfertigteilplatten
EP1636424B1 (fr) Procede de production d'une voie ferree pour vehicules ferroviaires
DE29520973U1 (de) Schotterloses Eisenbahnoberbausystem
DE102004045766B4 (de) Fertigteilplatte und Verfahren zur Herstellung einer festen Fahrbahn mit einer derartigen Fertigteilplatte
AT413553B (de) Gleis für schienenfahrzeuge sowie verfahren zum herstellen eines gleises
DE10226802B4 (de) Verfahren zum Herstellen einer lagegenauen Verbindung an einem Fahrweg und Fahrweg für ein spurgebundenes Fahrzeug
DE19920075A1 (de) Lagerung einer Schiene für Schienenfahrzeuge
DE10039493C1 (de) Verfahren zum Herstellen einer festen Fahrbahn für Schienenfahrzeuge
CH308512A (de) Eisenbahnschwelle aus vorgespanntem Stahlbeton und Verfahren zu ihrer Herstellung.

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20020302

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE

AX Request for extension of the european patent

Free format text: AL PAYMENT 20020302;LT PAYMENT 20020302;LV PAYMENT 20020302;MK;RO PAYMENT 20020302;SI PAYMENT 20020302

17Q First examination report despatched

Effective date: 20050118

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

RAX Requested extension states of the european patent have changed

Extension state: AL

Payment date: 20020302

Extension state: MK

Payment date: 20020302

Extension state: SI

Payment date: 20020302

Extension state: RO

Payment date: 20020302

Extension state: LT

Payment date: 20020302

Extension state: LV

Payment date: 20020302

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE

AX Request for extension of the european patent

Extension state: LT LV MK RO SI

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060405

Ref country code: IE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060405

RAX Requested extension states of the european patent have changed

Extension state: MK

Payment date: 20020302

Extension state: LV

Payment date: 20020302

Extension state: LT

Payment date: 20020302

Extension state: SI

Payment date: 20020302

Extension state: RO

Payment date: 20020302

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

GBT Gb: translation of ep patent filed (gb section 77(6)(a)/1977)

Effective date: 20060424

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: GERMAN

REF Corresponds to:

Ref document number: 50012538

Country of ref document: DE

Date of ref document: 20060518

Kind code of ref document: P

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060705

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060705

REG Reference to a national code

Ref country code: GR

Ref legal event code: EP

Ref document number: 20060402118

Country of ref document: GR

LTIE Lt: invalidation of european patent or patent extension

Effective date: 20060405

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20060930

REG Reference to a national code

Ref country code: PT

Ref legal event code: SC4A

Effective date: 20060612

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2260052

Country of ref document: ES

Kind code of ref document: T3

ET Fr: translation filed
REG Reference to a national code

Ref country code: IE

Ref legal event code: FD4D

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20070108

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20060920

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060405

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 20140921

Year of fee payment: 15

Ref country code: GR

Payment date: 20140929

Year of fee payment: 15

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 20140925

Year of fee payment: 15

Ref country code: ES

Payment date: 20140918

Year of fee payment: 15

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: PT

Payment date: 20140320

Year of fee payment: 15

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20140922

Year of fee payment: 15

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 20140921

Year of fee payment: 15

REG Reference to a national code

Ref country code: PT

Ref legal event code: MM4A

Free format text: LAPSE DUE TO NON-PAYMENT OF FEES

Effective date: 20160321

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: AT

Ref legal event code: MM01

Ref document number: 322579

Country of ref document: AT

Kind code of ref document: T

Effective date: 20150920

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160321

REG Reference to a national code

Ref country code: GR

Ref legal event code: ML

Ref document number: 20060402118

Country of ref document: GR

Effective date: 20160405

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20160531

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160405

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20150930

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20150930

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20150920

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20150930

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20161026

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20160919

Year of fee payment: 17

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20150921

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20150930

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20170929

Year of fee payment: 18

Ref country code: DE

Payment date: 20170818

Year of fee payment: 18

REG Reference to a national code

Ref country code: NL

Ref legal event code: MM

Effective date: 20171001

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20171001

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20180924

Year of fee payment: 19

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 50012538

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190402

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180920

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20190920

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190920