EP1468167A1 - Boulons d'ancrage a elements expansibles - Google Patents

Boulons d'ancrage a elements expansibles

Info

Publication number
EP1468167A1
EP1468167A1 EP03702186A EP03702186A EP1468167A1 EP 1468167 A1 EP1468167 A1 EP 1468167A1 EP 03702186 A EP03702186 A EP 03702186A EP 03702186 A EP03702186 A EP 03702186A EP 1468167 A1 EP1468167 A1 EP 1468167A1
Authority
EP
European Patent Office
Prior art keywords
expandable elements
expandable
drill pipe
elements
drill
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP03702186A
Other languages
German (de)
English (en)
Other versions
EP1468167B1 (fr
Inventor
Josef Mocivnik
Karl BÖHM
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Alwag Tunnelausbau GmbH
Techmo Entwicklungs und Vertriebs GmbH
Original Assignee
Alwag Tunnelausbau GmbH
Techmo Entwicklungs und Vertriebs GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Alwag Tunnelausbau GmbH, Techmo Entwicklungs und Vertriebs GmbH filed Critical Alwag Tunnelausbau GmbH
Priority to AT03702186T priority Critical patent/ATE307267T1/de
Publication of EP1468167A1 publication Critical patent/EP1468167A1/fr
Application granted granted Critical
Publication of EP1468167B1 publication Critical patent/EP1468167B1/fr
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0026Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by constructional features of the bolts
    • E21D21/004Bolts held in the borehole by friction all along their length, without additional fixing means

Definitions

  • the present invention relates to a method for drilling, in particular impact or rotary impact drilling, a hole in soil or rock material and for forming an anchor in the hole, a drill hole being formed by introducing a drill bit, and a device for drilling, in particular percussion or rotary percussion drilling, a hole in soil or rock material and for forming an anchor, a drill hole being formed by introducing a drill bit.
  • the drill pipe can be formed on its outer circumference with additional ribs and grooves, so that if the drill pipe remains in the borehole and is subsequently filled, a " correspondingly good anchorage effect can be achieved.
  • Borehole is introduced, for example EP-A 0 079 875, EP-B 0 047 727, EP-B 0 207 030, EP-B 0 016 742, EP-A 0 077 762, WO 97/31177, EP A 0 112 316, WO 91/06713, DE-A 40 24 869, WO 00/75489, DE-A 31 11 673 or US-A 4 636 115.
  • expandable anchor elements are introduced into the borehole, which are kept at a reduced diameter compared to the borehole when they are introduced into the borehole, whereupon they are expandable after being inserted into the borehole and during the Introduced folded or generally reduced in cross-section partial areas of the anchor device.
  • the folded regions do not readily permit a uniform expansion of the anchor device and thus a centered positioning of the anchor device, in particular if a plurality of anchor elements lying next to one another are provided.
  • a further disadvantage of this known prior art is the fact that the borehole must be produced in a first process step, after which, after removal of the drilling tool together with the drill pipe, the anchor device is introduced into the borehole, which may have a large length, after which it is subsequently carried out by widening the outside diameter of the anchor device, a plant on the borehole wall should succeed. It is immediately apparent that a correspondingly increased amount of time is required not only for the two separate work steps is necessary, but that a subsequent introduction of such an anchor device of great length may be difficult.
  • packers on the outer circumference of a drill pipe of a drilling device which, over a short partial area after completion of the drilling, permit widening in contact with the borehole wall and thus counteract pulling out or removing the drill pipe from the borehole.
  • packers cannot achieve a reliable anchoring effect, in particular when a plurality of anchors are to be provided next to one another, for stabilizing surrounding soil or rock material, so that additional means for anchoring, such as the application of hardening material, may have to be provided would.
  • the present invention therefore aims to provide a method and a device of the type mentioned at the outset, with a direct design and, in particular, reduced expenditure of time after the completion of a borehole, an anchoring can be formed, in particular to stabilize the surrounding soil or rock material.
  • a method of the type mentioned at the outset is essentially characterized in that after completion of the borehole, at least one expandable element of the drill rod or at least one cavity of at least one having at least one cavity which extends essentially in the longitudinal direction of the bore the expandable element connected to the drill pipe for at least partially expanding the outer circumference of the expandable element (s) to which the fluid is applied, a fluid under pressure is brought into contact with the borehole wall.
  • At least one expandable element is introduced together with the drill pipe directly during the formation of the borehole, or the drill pipe is formed by an at least partially expandable element, so that a proper anchoring can be achieved after completion of the borehole with a simplified construction.
  • At least the outer circumference or the outer contour of the at least one expandable element at least partially expanded or enlarged to come into contact with the borehole wall.
  • a plurality of expandable elements which are separate from one another and have cavities for expanding the outer circumference, be provided over the circumference and / or the length of the borehole to be produced.
  • a plurality of expandable elements By providing a plurality of expandable elements over the circumference of the borehole to be produced and / or over the length of the borehole, uniform application of force both over the circumference and over the length of the borehole and thus a correspondingly secure anchoring can be achieved.
  • a plurality of expandable elements are provided over the circumference of the borehole, it becomes possible to maintain a centered arrangement of the drilling device in the finished borehole while simultaneously expanding the expandable elements and to even out the application of force into surrounding soil or rock material.
  • a plurality of expandable elements each having a cavity are fixed to one another or on a central drill pipe, in particular welded over part of the length. Since the expandable elements, in particular in the event that they form the drill string directly, must be designed to be correspondingly resistant, in particular made of a metallic material, it is understandable that correspondingly large forces must be introduced to expand the expandable elements, so that the elements must be properly fixed to one another and / or to the drill pipe.
  • the drill rod with the expandable elements and / or the expandable elements forming the drill rod be extended via connecting elements, via which the fluid for widening the elements is conducted, such connecting elements ensuring that the fluid to be introduced into the expandable elements after completion of the bore can be safely introduced into the plurality of expandable elements.
  • the expandable elements form directly parts of the drill pipe, correspondingly resistant, expandable elements are to be provided, with fluid under high for proper expansion of the elements after completion of the bore in contact with the surrounding soil or rock material Pressure is to be introduced, it being proposed according to a further preferred embodiment that the fluid is introduced into the interior or the cavities of the expandable elements under a pressure of at least 100 bar, in particular at least 150 bar.
  • a device of the type mentioned is also characterized essentially in that the drill pipe of the drilling device of at least one expandable element with an essentially extending in the longitudinal direction of the bore cavity for introducing a fluid under pressure at least partially Widening the outer circumference of the expandable element is formed and / or that the drill pipe is connected to at least one expandable element, each with at least one cavity which extends substantially in the longitudinal direction of the bore for introducing a fluid under pressure to expand the outer circumference.
  • a plurality of expandable elements for forming the drill pipe are at least partially connected to one another along their length, in particular welded to adjoining edge regions, is.
  • a plurality of expandable elements in particular welded over part of the length, be fixed to a central drill pipe, whereby a secure fixation of the expandable elements on the drill pipe can be achieved during the drilling process.
  • a plurality of expandable elements during the subsequent anchoring and expansion, it is ensured that the drill pipe remains in a central or central position and a reliable anchoring effect can thus be achieved.
  • the drill pipe and the expandable elements or the expandable elements forming the drill pipe are extendable via connecting elements which pass through the fluid for the expansion of expandable elements.
  • the connecting elements partially overlap the adjoining expandable elements, in particular by extensions, and are connected, in particular welded, to the expandable elements.
  • Such areas or extensions of the connecting elements, which partially overlap the expandable elements, serve for the proper fixing of the expandable elements on the connecting element and / or to one another.
  • a plurality of expandable elements is provided for the formation of a uniform or central anchoring over the circumference of the bore to be produced, wherein in this connection it is proposed according to a further preferred embodiment that at least three expandable elements are provided in the circumferential direction Formation of the drill pipe are provided or are connected to a central drill pipe. If at least three expandable elements are provided, not only can the forces to be transferred to the drill bit to form the bore be properly and reliably applied, but it is ensured during the expansion process that that a corresponding central positioning of the anchor and thus a uniform " stabilization of the surrounding soil or rock material can be achieved.
  • the expandable elements are crescent-shaped in a normal cross-section in their longitudinal direction.
  • Such crescent-shaped tubular elements can be produced with simple tools with the appropriate contour and strength and subsequently enable simple attachment to one another or to a central drill pipe and ensure a favorable shape for the final expansion with a correspondingly low introduction of force by the fluid.
  • the expandable elements are connected to one another with subregions that extend essentially radially outwards or project radially outwards, or are fixed to a central drill pipe, according to a particularly preferred embodiment in this connection It is proposed that the expandable elements have or define a star-shaped outline in a plane that extends normally to the longitudinal direction of the borehole. Such a shaping enables the forces required for the formation of the bore to be introduced reliably, with the star-shaped outline making it possible to achieve proper centering in the borehole during the drilling process, while the widening the central or central position can also be maintained.
  • a fluid for cooling and / or flushing the drill bit can be introduced into the area of the drill bit through the drill pipe or a line during the drilling process ,
  • the drill bit is welded, screwed or the like. is fixed to the drill pipe or the expandable elements forming the drill pipe.
  • FIG. 1 shows a schematic side view of a first embodiment of a device according to the invention for carrying out the method according to the invention
  • FIG. 2 shows a side view of a modified embodiment of a device according to the invention in a perspective illustration
  • FIG. 3 shows a side view, partly in section, on an enlarged scale of a connecting element for extending a drill pipe and the expandable elements of a device according to the invention
  • 4 shows a sectional view of the embodiment according to FIG. 3, FIG. 4a showing a section along the line IV-IV of FIG. 3, FIG. 4b showing a section similar to FIG. 4a, with a partial by additional contour lines Expansion of the expandable elements is shown at a distance from the section line IV-IV of FIG. 3, and FIG. 4c indicates a section through the expandable elements after the expansion process has ended;
  • FIG. 5 shows, in a representation similar to FIG. 4a, different embodiments of an arrangement of expandable elements of devices according to the invention.
  • a drilling device is generally denoted by 1, a drill bit, indicated schematically by 2, being fixed to a drill rod consisting of several individual parts 3 and 4, the individual rod parts 3 and 4 being connected by a connecting element, indicated schematically by 5 are connected or extended, an embodiment is shown in detail in Fig. 3.
  • the rod parts 3 and 4 are formed from a plurality of expandable elements or a plurality of expandable elements are provided around a central drill rod, a device for introducing drilling and impact energy not shown in detail engages in the drill bit 2 at one end labeled 6.
  • expandable elements are expanded into the position indicated by dashed lines 3 'or 4' over the circumference and over the length of the drilling device 1, so that at least the Outer circumference or the outer contour overall, both a stable anchoring of the drilling device 1 in the not shown posed borehole and stabilization of surrounding soil or rock material can be achieved.
  • Fig. 1 it is also indicated that both in the area of the connecting element 5 and the closure element 6 and the fixing of the rod parts 3 and 4 on the drill bit 2 each have a portion 7 a definition of the expandable elements shown in the following figures in detail or generally rod parts 3 and 4 to each other as well as the connecting element 5, the end element 6 and the drill bit 2, so that a secure fixing can be made in these subregions 7, which also involves expansion when introducing a fluid under high pressure, for example from can withstand at least 100 bar into the interior of the expandable elements and, overall, a barrel-shaped or pillow-shaped outer contour 3 'or 4' can be achieved after the expansion to form the anchoring.
  • a fluid under high pressure for example from can withstand at least 100 bar into the interior of the expandable elements and, overall, a barrel-shaped or pillow-shaped outer contour 3 'or 4' can be achieved after the expansion to form the anchoring.
  • essentially semicircular expandable elements 9 are provided on a central drill pipe 8, which is in turn connected to the drill bit denoted by 2, the expandable elements 9 with the drill pipe in turn being 7 designated partial areas in the area of the connection to the drill bit 2 and also to a connection element, again schematically indicated by 5, are fixed, for example welded.
  • a connection element again schematically indicated by 5
  • an inlet opening is indicated by 10, via which, as will become apparent in particular in the illustration according to FIG. 3, it is possible to introduce fluid under pressure into the expandable element 9, so that after a completion of the hole in turn a widening of the expandable elements 9 to form an anchor can be achieved.
  • a connecting element 5 is shown in detail in FIG. 3.
  • a first connecting element 11 is fixed or in particular welded to a plurality of expandable elements 12, with extensions 13 at least partially overlapping the expandable elements 12, as can also be clearly seen in the sectional view according to FIG. 4a.
  • the connecting element 11 has an internal thread 14, into which a second connecting element 15 can be screwed via a corresponding external thread 16, the second connecting element 15 also being designed with corresponding extensions 13 in order to in turn at least partially expandable elements 12.
  • passages or passage channels 17 are formed, which on the one hand open into the cavities 18 of the expandable elements 12.
  • the passage channels also open into a connecting channel or passage 19 which is formed in a sleeve-like or sleeve-like element 20, the element 20 surrounding or enclosing the area of the connection of the connecting elements 11 and 15.
  • a passage of a fluid under pressure into all the cavities 18 of the adjoining expandable elements 12 is achieved via the passages 17 and 19, so that after the bore has been completed by the introduction of the fluid under pressure, for example with at least 100 or 150 bar, an expansion of the expandable elements 12 can be achieved.
  • a central drill string is not provided in this embodiment, so that the drill string is formed by three each sickle-like, expandable elements 12, the expandable elements in the area of the connecting elements 11 and 15 with the overlapping Subregions 13 are connected, in particular welded, as indicated by 22 in each case in FIGS. 4a and 4b.
  • the expandable elements 12 are also connected to one another via further welding points 23 over at least a partial region of their length.
  • 4b schematically indicates how, in some areas at a distance from the connecting elements 11 or 15 and in particular at a distance from the extensions 13 which partially extend over the expandable elements 12, an expansion after introduction of a fluid under pressure into the with 12 'or 12 "designated position is possible.
  • 4c shows how in a partial area at a greater distance from the connecting elements 11 and 15, after the expansion process has ended, the expanded elements 12 rest against the borehole wall 25, by providing three expandable elements 12 a corresponding central or central positioning can be achieved over the circumference of the borehole and thus a correspondingly uniform introduction of forces into the surrounding soil or rock material 26 as well as a uniform stabilization of the same is possible.
  • FIG. 5 shows further modified embodiments, wherein in the embodiment according to FIG. 5 a two expandable elements 28 are provided on a central or central drill pipe 27.
  • a two expandable elements 28 are provided on a central or central drill pipe 27.
  • essentially sickle-shaped, expandable elements 28 are used which, after completion of the bore by introducing a fluid under pressure, allow expansion and correspondingly reliable contact with the borehole wall, again designated 25, and thus enable reliable anchoring.
  • expandable elements are connected, in particular welded, to one another or to a central drill pipe at least over a portion of their length , and that a widening over a part of the length in a barrel or pillow-like outer contour results, as indicated schematically in Fig. 1.
  • An extension to achieve long drilling lengths is again carried out via corresponding connecting elements, as is indicated schematically in FIG. 3, for example.
  • two expandable elements 29 are again used, but in contrast to the embodiment according to FIG. 5a, a central drill pipe is not provided, so that the expandable elements 29, which are connected to one another at least over partial areas, with a welding point each indicated at 30, also assume the function of the drill pipe for introducing the drilling or impact energy.
  • fluid is again introduced under pressure into the cavity of the expandable elements 29, again designated 18, for abutment against the borehole wall 25 in order to achieve anchoring.
  • a central drill pipe 31 is again used, three expandable elements 32 being provided over the circumference, which are similar to the embodiment according to FIG. 4a with projections projecting outwards, and thus again an essentially star-shaped one External cross section result.
  • the expandable elements center the drill string 31 already during the drilling process by contacting the borehole wall 25, whereupon the centering is maintained after completion of the drilling and introduction of a fluid under pressure into the cavities 18 of the expandable elements 32 and an attachment to the borehole wall 25 can be achieved.
  • four expandable elements 32 are arranged symmetrically on the central drill pipe 31, each with outwardly projecting end sections, centering on the borehole wall 25 both during the drilling process and after expansion a correspondingly secure and centered anchorage can be achieved.
  • an additional line for introducing a flushing or cooling fluid can be provided in the central or central region, or the central drill pipe 27 or 31 can be used directly as a passage cross section for introducing a flushing or cooling fluid in the area of the drill bit can be used.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Earth Drilling (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

L'invention concerne un procédé et un dispositif de forage, en particulier percutant ou rotopercutant, d'un trou dans une matière de sol ou rocheuse et de formation d'un ancrage, un trou de forage étant formé par l'introduction d'une couronne de forage (2). Selon la présente invention, les tiges de forage du dispositif de forage sont formées par au moins un élément expansible (3, 4), présentant une cavité qui s'étend sensiblement dans le sens longitudinal du forage et servant à l'introduction d'un fluide sous pression pour l'expansion au moins partielle de la périphérie extérieure de cet élément expansible (3, 4), et/ou ces tiges de forage sont raccordées à au moins un élément expansible (3, 4), présentant au moins une cavité qui s'étend sensiblement dans le sens longitudinal du forage et servant à l'introduction d'un fluide sous pression pour l'expansion de la périphérie extérieure dudit élément. On obtient ainsi, avec une construction simplifiée, un ancrage fiable par l'expansion desdits éléments expansibles (3, 4) dans les sens périphérique et longitudinal dudit dispositif.
EP03702186A 2002-01-22 2003-01-21 Boulons d'ancrage a elements expansibles Expired - Lifetime EP1468167B1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AT03702186T ATE307267T1 (de) 2002-01-22 2003-01-21 Gebirgsanker mit aufweitbaren elementen

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
AT972002 2002-01-22
AT0009702A AT412739B (de) 2002-01-22 2002-01-22 Verfahren und vorrichtung zum bohren eines loches in boden- oder gesteinsmaterial und zum ausbilden einer verankerung
PCT/AT2003/000019 WO2003062599A1 (fr) 2002-01-22 2003-01-21 Boulons d'ancrage a elements expansibles

Publications (2)

Publication Number Publication Date
EP1468167A1 true EP1468167A1 (fr) 2004-10-20
EP1468167B1 EP1468167B1 (fr) 2005-10-19

Family

ID=27587154

Family Applications (1)

Application Number Title Priority Date Filing Date
EP03702186A Expired - Lifetime EP1468167B1 (fr) 2002-01-22 2003-01-21 Boulons d'ancrage a elements expansibles

Country Status (10)

Country Link
US (1) US7004686B2 (fr)
EP (1) EP1468167B1 (fr)
JP (1) JP2005515338A (fr)
AT (1) AT412739B (fr)
AU (1) AU2003205414B2 (fr)
CA (1) CA2473255C (fr)
DE (1) DE50301420D1 (fr)
TW (1) TW200302897A (fr)
WO (1) WO2003062599A1 (fr)
ZA (1) ZA200405365B (fr)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE526972C2 (sv) * 2003-11-13 2005-11-29 Atlas Copco Rock Drills Ab Modulärt bergbultsystem
SE526970C2 (sv) * 2003-11-13 2005-11-29 Atlas Copco Rock Drills Ab Självborrande bergbult
SE526971C2 (sv) * 2003-11-13 2005-11-29 Atlas Copco Rock Drills Ab Skarvbar självborrande bergbult
SE529459C2 (sv) * 2004-03-10 2007-08-14 Sandvik Intellectual Property Borrande apparatur
AT505335B1 (de) * 2007-04-19 2009-12-15 Techmo Entw & Vertriebs Gmbh Vorrichtung zum herstellen eines bohrloches in gesteinsmaterial
US9062547B2 (en) 2010-06-04 2015-06-23 Fci Holdings Delaware, Inc. Expandable bolt with shielded tip
CA2888554C (fr) * 2013-06-25 2016-10-18 Robert Cousineau Systeme d'ancrage a contre-depouille automatique
US9863248B2 (en) 2015-04-23 2018-01-09 Jason L. Moon Friction bolt
CN105221068A (zh) * 2015-11-10 2016-01-06 西南石油大学 利用冲击作用提高心部破岩效率的新型pdc钻头
CN110500060B (zh) * 2019-09-26 2025-02-18 中铁隧道局集团有限公司 一种分段前进式钻杆快速注浆装置、系统和注浆方法
CN114810171B (zh) * 2022-03-30 2023-03-10 西南交通大学 一种端头可膨胀式锚杆
CN119435068A (zh) * 2025-01-13 2025-02-14 中煤科工开采研究院有限公司 一种可变锚固力自锚固锚杆及其施工方法
CN121363377B (zh) * 2025-12-19 2026-03-03 洛阳农发黄河水利建设开发有限公司 砂砾地质体树根桩成孔装置及其成孔方法

Family Cites Families (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1368123A (fr) * 1963-01-28 1964-07-31 Ct Ex De Rech S Et D Etudes Du Procédé d'ancrage et dispositif d'ancrage amovible
US3349567A (en) * 1964-06-03 1967-10-31 John E Munn Mine roof support and method of providing same
USRE30929E (en) * 1977-09-28 1982-05-11 Collapsible tunnel liner section and method of lining a tunnel
SE427764B (sv) 1979-03-09 1983-05-02 Atlas Copco Ab Bergbultningsforfarande jemte rorformig bergbult
ZA811894B (en) * 1980-03-28 1982-04-28 R Thom An anchor bolt
NO159201C (no) 1980-09-08 1988-12-07 Atlas Copco Ab Fremgangsmaate ved bolting i fjell og kombinert ekspansjonsbolt og installasjonsanordning for samme.
US4636115A (en) 1980-11-10 1987-01-13 The Curators Of The University Of Missouri Expansion bolt and mine roof reinforcement therewith
SE8106165L (sv) 1981-10-19 1983-04-20 Atlas Copco Ab Forfarande for bergbultning och bergbult
SE436781B (sv) 1981-11-16 1985-01-21 Atlas Copco Ab Svellkropp
JPS5924030A (ja) * 1982-07-29 1984-02-07 Giken Seisakusho:Kk アンカ−
SE451268B (sv) 1982-12-21 1987-09-21 Atlas Copco Ab Svellkropp for i mark belegna konstruktioner
SE457894B (sv) * 1985-06-17 1989-02-06 Atlas Copco Ab Saett att stabilisera berg
BE1003914A3 (nl) * 1989-06-22 1992-07-14 Corstjens Helena Michel Werkwijze voor het vergroten van de doorgang van een pijp in de grond en daarbij gebruikte hogedrukslang.
HU208357B (en) * 1989-08-10 1993-09-28 Bakonyi Bauxitbanya Kft Device for making anchor particularly rock anchor and liquid afterhardening matter for injecting into rock or/and soil mass
WO1991006713A1 (fr) * 1989-10-24 1991-05-16 Groutco (Aust.) Pty. Ltd. Ancre terrestre gonflable
SE9600640L (sv) 1996-02-21 1997-03-17 Atlas Copco Rock Drills Ab Skarvning av en rörformad bergbult
CN1079880C (zh) 1996-11-12 2002-02-27 泰西莫开发销售有限公司 钻孔并同时加衬的方法和装置
AT408248B (de) 1997-06-18 2001-09-25 Techmo Entw & Vertriebs Gmbh Verfahren und vorrichtung zum bohren von löchern
SE9902065L (sv) * 1999-06-04 2000-05-22 Atlas Copco Rock Drills Ab Rörformad bergbult

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See references of WO03062599A1 *

Also Published As

Publication number Publication date
DE50301420D1 (de) 2006-03-02
WO2003062599A1 (fr) 2003-07-31
TW200302897A (en) 2003-08-16
ZA200405365B (en) 2005-03-22
CA2473255C (fr) 2010-04-20
AU2003205414B2 (en) 2007-12-13
EP1468167B1 (fr) 2005-10-19
CA2473255A1 (fr) 2003-07-31
US7004686B2 (en) 2006-02-28
AT412739B (de) 2005-06-27
JP2005515338A (ja) 2005-05-26
US20040231890A1 (en) 2004-11-25
ATA972002A (de) 2004-11-15

Similar Documents

Publication Publication Date Title
EP1885997B1 (fr) Procede et dispositif pour sonder, en particulier par percussion ou par rotopercussion, un trou dans le sol ou dans la roche
EP1381756B1 (fr) Procede et dispositif de forage d'un trou et de fixation d'un ancrage dans un trou de forage
EP0368838B1 (fr) Dispositif de consolidation de formations géologiques non ou peu stables
AT412739B (de) Verfahren und vorrichtung zum bohren eines loches in boden- oder gesteinsmaterial und zum ausbilden einer verankerung
EP0948701B1 (fr) Procede et dispositif pour forer et revetir en meme temps des trous
WO1993001363A1 (fr) Procede et tuyau d'injection pour la pose de boulons d'ancrage
DE112009000358T5 (de) Ausdehnbares Bohrlochstellelement, Verfahren zur Herstellung und Verfahren zur Betätigung
AT408248B (de) Verfahren und vorrichtung zum bohren von löchern
AT505959B1 (de) Verfahren und vorrichtung zum bohren insbesondere schlag- oder drehschlagbohren eines loches in boden- oder gesteinsmaterial und zum ausbilden einer verankerung
EP1888878B1 (fr) Procede et dispositif pour le forage, notamment pour le forage par percussion ou par roto-percussion, d'un trou dans le sol ou la roche
EP1119687B1 (fr) Gaine tubulaire pour dispositif de forage et d'ancrage
AT509159B1 (de) Verfahren und vorrichtung zum bohren, insbesondere schlag- oder drehschlagbohren, eines lochs in boden- oder gesteinsmaterial und zum ausbilden einer verankerung in dem loch
CH693934A5 (de) Verfahren zum Bohren und Verfuellen von Loechern.
EP2171210A1 (fr) Procédé et dispositif pour percer un trou dans le sol ou dans un matériau rocheux et pour former un ancrage
AT408472B (de) Verfahren und einrichtung zum bohren und auskleiden von löchern
AT5644U1 (de) Verfahren und vorrichtung zum bohren eines loches und zum festlegen einer verankerung in einem bohrloch
DE1955623A1 (de) Nachschneide- oder Erweiterungsbohrer
DE2715340A1 (de) Verfahren zum herstellen von wenigstens abschnittsweise radial erweiterten bohrloechern und vorrichtung dazu
AT7067U1 (de) Verfahren und vorrichtung zum bohren eines loches und zum festlegen einer verankerung in einem bohrloch
DE7634992U1 (de) Selbstbohrdübel mit bohrkrone
AT407895B (de) Verfahren und einrichtung zum bohren und auskleiden von bohrlöchern
AT3885U1 (de) Hüllrohr für eine vorrichtung zum bohren von löchern und ausbilden einer verankerung in boden- oder gesteinsmaterial

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20040621

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PT SE SI SK TR

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PT SE SI SK TR

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.

Effective date: 20051019

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20051019

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20051019

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20051019

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20051019

Ref country code: IE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20051019

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20051019

Ref country code: GB

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20051019

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: GERMAN

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060119

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060119

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060119

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060119

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060130

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20060131

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20060131

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20060131

REG Reference to a national code

Ref country code: CH

Ref legal event code: NV

Representative=s name: BUECHEL, KAMINSKI & PARTNER PATENTANWAELTE ESTABLI

REF Corresponds to:

Ref document number: 50301420

Country of ref document: DE

Date of ref document: 20060302

Kind code of ref document: P

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060320

NLV1 Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060420

GBV Gb: ep patent (uk) treated as always having been void in accordance with gb section 77(7)/1977 [no translation filed]

Effective date: 20051019

REG Reference to a national code

Ref country code: IE

Ref legal event code: FD4D

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20060720

REG Reference to a national code

Ref country code: CH

Ref legal event code: PUE

Owner name: "ALWAG" TUNNELAUSBAU GESELLSCHAFT MBH

Free format text: TECHMO ENTWICKLUNGS- UND VERTRIEBS GMBH#HAUPTSTRASSE 52#8753 FOHNSDORF (AT) $ ALWAG TUNNELAUSBAU GESELLSCHAFT MBH#WAGRAM 49#4061 PASCHING (AT) -TRANSFER TO- "ALWAG" TUNNELAUSBAU GESELLSCHAFT MBH#WAGRAM 49#4061 PASCHING (AT)

EN Fr: translation not filed
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20061208

BERE Be: lapsed

Owner name: ALWAG TUNNELAUSBAU -G. MBH

Effective date: 20060131

Owner name: TECHMO ENTWICKLUNGS- UND VERTRIEBS GMBH

Effective date: 20060131

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20051019

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20051019

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060131

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20051019

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20051019

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 20090114

Year of fee payment: 7

REG Reference to a national code

Ref country code: CH

Ref legal event code: PFA

Owner name: "ALWAG" TUNNELAUSBAU GESELLSCHAFT MBH

Free format text: "ALWAG" TUNNELAUSBAU GESELLSCHAFT MBH#WAGRAM 49#4061 PASCHING (AT) -TRANSFER TO- "ALWAG" TUNNELAUSBAU GESELLSCHAFT MBH#WAGRAM 49#4061 PASCHING (AT)

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20100131

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20100131

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20120118

Year of fee payment: 10

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 20120127

Year of fee payment: 10

REG Reference to a national code

Ref country code: AT

Ref legal event code: MM01

Ref document number: 307267

Country of ref document: AT

Kind code of ref document: T

Effective date: 20130131

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130801

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130131

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 50301420

Country of ref document: DE

Effective date: 20130801