EP2022934A3 - Methode zur Evaluierung eines Produktionsschemas von unterirdischen Quellvorkommen unter Berücksichtigung von Unsicherheitsfaktoren - Google Patents
Methode zur Evaluierung eines Produktionsschemas von unterirdischen Quellvorkommen unter Berücksichtigung von Unsicherheitsfaktoren Download PDFInfo
- Publication number
- EP2022934A3 EP2022934A3 EP08290725A EP08290725A EP2022934A3 EP 2022934 A3 EP2022934 A3 EP 2022934A3 EP 08290725 A EP08290725 A EP 08290725A EP 08290725 A EP08290725 A EP 08290725A EP 2022934 A3 EP2022934 A3 EP 2022934A3
- Authority
- EP
- European Patent Office
- Prior art keywords
- model
- production scheme
- degree
- precision
- simulator
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| FR0705740A FR2919932B1 (fr) | 2007-08-06 | 2007-08-06 | Methode pour evaluer un schema de production d'un gissement souterrain en tenant compte des incertitudes |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| EP2022934A2 EP2022934A2 (de) | 2009-02-11 |
| EP2022934A3 true EP2022934A3 (de) | 2011-06-15 |
Family
ID=39156699
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP08290725A Ceased EP2022934A3 (de) | 2007-08-06 | 2008-07-25 | Methode zur Evaluierung eines Produktionsschemas von unterirdischen Quellvorkommen unter Berücksichtigung von Unsicherheitsfaktoren |
Country Status (4)
| Country | Link |
|---|---|
| US (1) | US8392164B2 (de) |
| EP (1) | EP2022934A3 (de) |
| CA (1) | CA2638227C (de) |
| FR (1) | FR2919932B1 (de) |
Families Citing this family (41)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2009075945A1 (en) | 2007-12-13 | 2009-06-18 | Exxonmobil Upstream Research Company | Parallel adaptive data partitioning on a reservoir simulation using an unstructured grid |
| US8061444B2 (en) * | 2008-05-22 | 2011-11-22 | Schlumberger Technology Corporation | Methods and apparatus to form a well |
| AU2010245112B2 (en) * | 2009-04-27 | 2013-03-14 | Schlumberger Technology B.V. | Method for uncertainty quantification in the performance and risk assessment of a carbon dioxide storage site |
| GB2474275B (en) * | 2009-10-09 | 2015-04-01 | Senergy Holdings Ltd | Well simulation |
| US8775142B2 (en) | 2010-05-14 | 2014-07-08 | Conocophillips Company | Stochastic downscaling algorithm and applications to geological model downscaling |
| US9665836B2 (en) | 2010-08-10 | 2017-05-30 | X Systems, Llc | System and method for analyzing data |
| US9652726B2 (en) | 2010-08-10 | 2017-05-16 | X Systems, Llc | System and method for analyzing data |
| US9665916B2 (en) | 2010-08-10 | 2017-05-30 | X Systems, Llc | System and method for analyzing data |
| US9176979B2 (en) | 2010-08-10 | 2015-11-03 | X Systems, Llc | System and method for analyzing data |
| US8849638B2 (en) | 2010-08-10 | 2014-09-30 | X Systems, Llc | System and method for analyzing data |
| US8805659B2 (en) * | 2011-02-17 | 2014-08-12 | Chevron U.S.A. Inc. | System and method for uncertainty quantification in reservoir simulation |
| EP2707827B1 (de) * | 2011-05-10 | 2020-03-11 | Chevron U.S.A., Inc. | System und verfahren zur kennzeichnung von unsicherheiten bei der bewertung einer reservoirformierung |
| US20130110483A1 (en) * | 2011-10-31 | 2013-05-02 | Nikita V. Chugunov | Method for measurement screening under reservoir uncertainty |
| US9201164B2 (en) * | 2011-11-15 | 2015-12-01 | Chevron U.S.A. Inc. | System and method of using spatially independent subsets of data to calculate property distribution uncertainty of spatially correlated reservoir data |
| US20150285950A1 (en) * | 2012-02-10 | 2015-10-08 | Landmark Graphics Corporation | Systems and Methods for Selecting Facies Model Realizations |
| WO2013191693A1 (en) | 2012-06-21 | 2013-12-27 | Halliburton Energy Services, Inc. | Method and apparatus for formation tester data interpretation with diverse flow models |
| FR2993310B1 (fr) * | 2012-07-13 | 2014-08-29 | IFP Energies Nouvelles | Procede d'exploitation d'un reservoir geologique a partir d'un modele de reservoir cale par le calcul d'une loi analytique de distribution conditionnelle de parametres incertains du modele |
| WO2014116896A1 (en) | 2013-01-25 | 2014-07-31 | Services Petroliers Schlumberger | Pressure transient testing with sensitivity analysis |
| US20140278110A1 (en) * | 2013-03-15 | 2014-09-18 | Schlumberger Technology Corporation | Targeted survey design under uncertainty |
| US9726001B2 (en) * | 2013-08-28 | 2017-08-08 | Schlumberger Technology Corporation | Method for adaptive optimizing of heterogeneous proppant placement under uncertainty |
| WO2015156792A1 (en) * | 2014-04-09 | 2015-10-15 | Landmark Graphics Corporation | Parameter measurement refinement in oil exploration operations |
| WO2015175216A1 (en) * | 2014-05-16 | 2015-11-19 | Apache Corporation | Methods for statistical of well production and reserves |
| US11598185B2 (en) * | 2014-11-24 | 2023-03-07 | Schlumberger Technology Corporation | Methods for adaptive optimization of enhanced oil recovery performance under uncertainty |
| MX2017004831A (es) * | 2014-11-26 | 2017-07-20 | Halliburton Energy Services Inc | Determinacion de la profundidad de las zonas de perdida en las formaciones subterraneas. |
| US10280731B2 (en) * | 2014-12-03 | 2019-05-07 | Baker Hughes, A Ge Company, Llc | Energy industry operation characterization and/or optimization |
| US10690801B2 (en) | 2015-07-10 | 2020-06-23 | Halliburton Energy Services, Inc. | Skin effect correction for focused electrode devices based on analytical model |
| CN106855863A (zh) * | 2015-12-09 | 2017-06-16 | 上海渤元信息科技有限公司 | 一种新的大数据分析算法 |
| WO2017206182A1 (en) * | 2016-06-03 | 2017-12-07 | Schlumberger Technology Corporation | Detecting events in well reports |
| GB2590260B (en) * | 2018-08-30 | 2022-08-31 | Landmark Graphics Corp | Automated production history matching using Bayesian optimization |
| US11914671B2 (en) | 2018-10-01 | 2024-02-27 | International Business Machines Corporation | Performing uncertainty quantification analysis with efficient two dimensional random fields |
| CN110348137B (zh) * | 2019-07-15 | 2022-04-22 | 西南石油大学 | 一种基于向量自回归模型的水驱油藏渗流场评价方法 |
| CN110851957B (zh) * | 2019-10-15 | 2024-05-28 | 南京航空航天大学 | 一种基于深度学习的大气数据传感系统解算方法 |
| CN111173507B (zh) * | 2020-03-17 | 2023-04-07 | 中国石油化工股份有限公司 | 高含水油田剩余油预测方法 |
| CN111739579B (zh) * | 2020-05-26 | 2022-06-14 | 浙江省农业科学院 | 一种肉鸡产业链沙门氏菌的定量风险评估方法 |
| WO2022099311A1 (en) * | 2020-11-06 | 2022-05-12 | Schlumberger Technology Corporation | Agent guided drilling assessment |
| CN112818471A (zh) * | 2021-02-18 | 2021-05-18 | 西北工业大学 | 一种坦克行进间发射的不确定性分析方法 |
| CN112983406B (zh) * | 2021-03-15 | 2022-03-25 | 西南石油大学 | 一种天然气水合物储层参数指标评价方法 |
| CN113656900B (zh) * | 2021-07-06 | 2023-06-20 | 扬州大学 | 基于灵敏度修正的收割机结构强度影响因素分析方法 |
| CN116498385B (zh) * | 2022-12-26 | 2026-04-14 | 中国石油化工股份有限公司 | 一种盐穴储库扩槽方法 |
| CN116090914B (zh) * | 2023-02-01 | 2023-09-05 | 中国水利水电科学研究院 | 微咸水用于农业灌溉的矿化度安全阈值识别方法及系统 |
| CN116305593B (zh) * | 2023-05-23 | 2023-08-01 | 西安交通大学 | 一种具有强可移植性的全局敏度分析方法 |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20030220775A1 (en) * | 2002-04-02 | 2003-11-27 | Astrid Jourdan | Method for quantifying uncertainties related to continuous and discrete parameters descriptive of a medium by construction of experiment designs and statistical analysis |
| US20030225606A1 (en) * | 2002-05-29 | 2003-12-04 | Schlumberger Technology Corporation | Tools for decision-making in reservoir risk management |
| US20040148147A1 (en) * | 2003-01-24 | 2004-07-29 | Martin Gregory D. | Modeling in-situ reservoirs with derivative constraints |
| EP1484704A1 (de) * | 2003-06-02 | 2004-12-08 | Institut Francais Du Petrole | Verfahren zur Entscheidungshilfe für die Verwaltung von Erdölvorkommen bei Vorliegen unsicherer technischer und ökonomischer Parameter |
| FR2874706A1 (fr) * | 2004-08-30 | 2006-03-03 | Inst Francais Du Petrole | Methode de modelisation de la production d'un gisement petrolier |
| US20070179767A1 (en) * | 2006-01-31 | 2007-08-02 | Alvin Stanley Cullick | Methods, systems, and computer-readable media for fast updating of oil and gas field production models with physical and proxy simulators |
Family Cites Families (18)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4969130A (en) * | 1989-09-29 | 1990-11-06 | Scientific Software Intercomp, Inc. | System for monitoring the changes in fluid content of a petroleum reservoir |
| US5992519A (en) * | 1997-09-29 | 1999-11-30 | Schlumberger Technology Corporation | Real time monitoring and control of downhole reservoirs |
| US6980940B1 (en) * | 2000-02-22 | 2005-12-27 | Schlumberger Technology Corp. | Intergrated reservoir optimization |
| US7136787B2 (en) * | 2001-12-19 | 2006-11-14 | Archimedes, Inc. | Generation of continuous mathematical model for common features of a subject group |
| GB2413871A (en) * | 2003-02-27 | 2005-11-09 | Schlumberger Holdings | Estimation of formation characteristics in wells |
| FR2852710B1 (fr) * | 2003-03-18 | 2005-04-29 | Inst Francais Du Petrole | Methode pour former rapidement un modele stochastique representatif de la distribution d'une grandeur physique dans un milieu heterogene par une selection appropriee de realisations geostatistiques |
| FR2855631A1 (fr) * | 2003-06-02 | 2004-12-03 | Inst Francais Du Petrole | Methode pour optimiser la production d'un gisement petrolier en presence d'incertitudes |
| US20050004833A1 (en) * | 2003-07-03 | 2005-01-06 | Reaction Design, Llc | Method and system for integrated uncertainty analysis |
| US7725302B2 (en) * | 2003-12-02 | 2010-05-25 | Schlumberger Technology Corporation | Method and system and program storage device for generating an SWPM-MDT workflow in response to a user objective and executing the workflow to produce a reservoir response model |
| CN1973110A (zh) * | 2004-06-25 | 2007-05-30 | 国际壳牌研究有限公司 | 从地下地层控制生产碳氢化合物流体用的闭环控制系统 |
| US7590518B2 (en) * | 2004-09-02 | 2009-09-15 | Cadence Design Systems, Inc. | Circuit analysis utilizing rank revealing factorization |
| US7809538B2 (en) * | 2006-01-13 | 2010-10-05 | Halliburton Energy Services, Inc. | Real time monitoring and control of thermal recovery operations for heavy oil reservoirs |
| CN101379271B (zh) * | 2006-01-31 | 2012-11-07 | 兰德马克绘图公司 | 使用代理仿真器的用于实时油气田生产优化的方法、系统和计算机可读介质 |
| US7877246B2 (en) * | 2006-09-22 | 2011-01-25 | Schlumberger Technology Corporation | System and method for performing oilfield simulation operations |
| EP2118738A4 (de) * | 2006-12-28 | 2014-07-02 | Chevron Usa Inc | Verfahren, system und programmspeichereinrichtung zur vorgeschichteabstimmung und vorhersage von kohlenwasserstoff führenden reservoirs unter verwendung von proxi für wahrscheinlichkeitsfunktionen |
| US8046314B2 (en) * | 2007-07-20 | 2011-10-25 | Schlumberger Technology Corporation | Apparatus, method and system for stochastic workflow in oilfield operations |
| US20090164186A1 (en) * | 2007-12-20 | 2009-06-25 | Bhp Billiton Innovation Pty Ltd. | Method for determining improved estimates of properties of a model |
| US7894991B2 (en) * | 2008-02-01 | 2011-02-22 | Schlumberger Technology Corp. | Statistical determination of historical oilfield data |
-
2007
- 2007-08-06 FR FR0705740A patent/FR2919932B1/fr not_active Expired - Fee Related
-
2008
- 2008-07-25 EP EP08290725A patent/EP2022934A3/de not_active Ceased
- 2008-08-01 CA CA2638227A patent/CA2638227C/fr not_active Expired - Fee Related
- 2008-08-04 US US12/185,161 patent/US8392164B2/en not_active Expired - Fee Related
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20030220775A1 (en) * | 2002-04-02 | 2003-11-27 | Astrid Jourdan | Method for quantifying uncertainties related to continuous and discrete parameters descriptive of a medium by construction of experiment designs and statistical analysis |
| US20030225606A1 (en) * | 2002-05-29 | 2003-12-04 | Schlumberger Technology Corporation | Tools for decision-making in reservoir risk management |
| US20040148147A1 (en) * | 2003-01-24 | 2004-07-29 | Martin Gregory D. | Modeling in-situ reservoirs with derivative constraints |
| EP1484704A1 (de) * | 2003-06-02 | 2004-12-08 | Institut Francais Du Petrole | Verfahren zur Entscheidungshilfe für die Verwaltung von Erdölvorkommen bei Vorliegen unsicherer technischer und ökonomischer Parameter |
| FR2874706A1 (fr) * | 2004-08-30 | 2006-03-03 | Inst Francais Du Petrole | Methode de modelisation de la production d'un gisement petrolier |
| US20070179767A1 (en) * | 2006-01-31 | 2007-08-02 | Alvin Stanley Cullick | Methods, systems, and computer-readable media for fast updating of oil and gas field production models with physical and proxy simulators |
Non-Patent Citations (1)
| Title |
|---|
| CULLICK A S ET AL: "Improved and more-rapid history matching with a nonlinear proxy and global optimization", SPE ANNUAL TECHNICAL CONFERENCE AND EXHIBITION, XX, XX, vol. 2, no. paper 101933, 24 September 2006 (2006-09-24), pages 728 - 740, XP009086566 * |
Also Published As
| Publication number | Publication date |
|---|---|
| EP2022934A2 (de) | 2009-02-11 |
| FR2919932A1 (fr) | 2009-02-13 |
| US8392164B2 (en) | 2013-03-05 |
| FR2919932B1 (fr) | 2009-12-04 |
| CA2638227C (fr) | 2016-09-27 |
| US20090043555A1 (en) | 2009-02-12 |
| CA2638227A1 (fr) | 2009-02-06 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP2022934A3 (de) | Methode zur Evaluierung eines Produktionsschemas von unterirdischen Quellvorkommen unter Berücksichtigung von Unsicherheitsfaktoren | |
| Tang et al. | A deep-learning-based surrogate model for data assimilation in dynamic subsurface flow problems | |
| Arsenault | HMETS—A simple and efficient hydrology model for teaching hydrological modelling, flow forecasting and climate change impacts | |
| Schenke et al. | An energy conservative method to predict the erosive aggressiveness of collapsing cavitating structures and cavitating flows from numerical simulations | |
| Pirulli | Numerical modelling of landslide runout. A continuum mechanics approach | |
| Cunge | Of data and models | |
| EA201070342A1 (ru) | Способ прогнозирования в системе добычи нефти/газа | |
| WO2008014089A3 (en) | Method and apparatus for predicting outcomes of a home equity line of credit | |
| Aragones et al. | New methodology for describing the equilibrium beach profile applied to the Valencia's beaches | |
| Tripoppoom et al. | Characterizing hydraulic and natural fractures properties in shale oil well in Permian basin using assisted history matching | |
| NO20081293L (no) | Simulator system and method | |
| CN108170765A (zh) | 基于在校行为数据多维分析的贫困生资助推荐方法 | |
| EA201492211A1 (ru) | Способы и устройства для моделирования характеристик глинистых сланцев в буровых растворах на водной основе с помощью искусственной нейронной сети | |
| Tarawneh et al. | Optimization of resilient modulus prediction from FWD results using artificial neural network | |
| Yang et al. | Watershed hydrograph model based on surface flow diffusion | |
| Nguyen et al. | Applications of data analysis techniques for oil production prediction | |
| Zio et al. | Bayesian assessment of uncertainty in viscosity closure models for turbidity currents computations | |
| EA200970227A1 (ru) | Способ контроля параметров, используемый в системе добычи нефти и/или газа | |
| CN104484701B (zh) | 环境问题的神经元网络评价方法 | |
| Vidová et al. | Analysis of the 2D hydraulic equations for the fish pass modeling | |
| Wang et al. | Combined finite volume–finite element method for shallow water equations | |
| Khamehchi et al. | Continuous gas lift optimization using genetic algorithm | |
| McAlpin et al. | Uncertainty for the ISSDOTV2 bedload measurement method | |
| Baraldi et al. | Sensitivity analysis of scale deposition on equipment of oil wells plants | |
| El Garroussi et al. | Mixture of polynomial chaos expansions for uncertainty propagation |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MT NL NO PL PT RO SE SI SK TR |
|
| AX | Request for extension of the european patent |
Extension state: AL BA MK RS |
|
| RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: IFP ENERGIES NOUVELLES |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R079 Free format text: PREVIOUS MAIN CLASS: E21B0041000000 Ipc: E21B0043000000 |
|
| PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
| AK | Designated contracting states |
Kind code of ref document: A3 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MT NL NO PL PT RO SE SI SK TR |
|
| AX | Request for extension of the european patent |
Extension state: AL BA MK RS |
|
| RIC1 | Information provided on ipc code assigned before grant |
Ipc: E21B 43/00 20060101AFI20110512BHEP |
|
| 17P | Request for examination filed |
Effective date: 20111215 |
|
| AKX | Designation fees paid |
Designated state(s): GB NO |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R108 Effective date: 20120222 |
|
| RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: IFP ENERGIES NOUVELLES |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
| 17Q | First examination report despatched |
Effective date: 20180425 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION HAS BEEN REFUSED |
|
| 18R | Application refused |
Effective date: 20211008 |