EP3010186A1 - Tunnelverwaltungsverfahren, tunnelverwaltungsvorrichtung und kommunikationssystem - Google Patents

Tunnelverwaltungsverfahren, tunnelverwaltungsvorrichtung und kommunikationssystem Download PDF

Info

Publication number
EP3010186A1
EP3010186A1 EP15192231.7A EP15192231A EP3010186A1 EP 3010186 A1 EP3010186 A1 EP 3010186A1 EP 15192231 A EP15192231 A EP 15192231A EP 3010186 A1 EP3010186 A1 EP 3010186A1
Authority
EP
European Patent Office
Prior art keywords
node
tunnel management
request
failure
management request
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP15192231.7A
Other languages
English (en)
French (fr)
Other versions
EP3010186B1 (de
Inventor
Yu Yin
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nokia Technologies Oy
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=41550013&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=EP3010186(A1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Publication of EP3010186A1 publication Critical patent/EP3010186A1/de
Application granted granted Critical
Publication of EP3010186B1 publication Critical patent/EP3010186B1/de
Not-in-force legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/06Management of faults, events, alarms or notifications
    • H04L41/0654Management of faults, events, alarms or notifications using network fault recovery
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/07Responding to the occurrence of a fault, e.g. fault tolerance
    • G06F11/0703Error or fault processing not based on redundancy, i.e. by taking additional measures to deal with the error or fault not making use of redundancy in operation, in hardware, or in data representation
    • G06F11/0766Error or fault reporting or storing
    • G06F11/0772Means for error signaling, e.g. using interrupts, exception flags, dedicated error registers
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L12/00Data switching networks
    • H04L12/28Data switching networks characterised by path configuration, e.g. LAN [Local Area Networks] or WAN [Wide Area Networks]
    • H04L12/46Interconnection of networks
    • H04L12/4633Interconnection of networks using encapsulation techniques, e.g. tunneling
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L12/00Data switching networks
    • H04L12/64Hybrid switching systems
    • H04L12/6418Hybrid transport
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/06Management of faults, events, alarms or notifications
    • H04L41/0654Management of faults, events, alarms or notifications using network fault recovery
    • H04L41/0668Management of faults, events, alarms or notifications using network fault recovery by dynamic selection of recovery network elements, e.g. replacement by the most appropriate element after failure
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/06Management of faults, events, alarms or notifications
    • H04L41/0677Localisation of faults
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks
    • H04L43/08Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
    • H04L43/0823Errors, e.g. transmission errors
    • H04L43/0847Transmission error
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W76/00Connection management
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W76/00Connection management
    • H04W76/10Connection setup
    • H04W76/12Setup of transport tunnels
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L2212/00Encapsulation of packets
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W28/00Network traffic management; Network resource management
    • H04W28/02Traffic management, e.g. flow control or congestion control
    • H04W28/04Error control
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W76/00Connection management
    • H04W76/10Connection setup
    • H04W76/18Management of setup rejection or failure

Definitions

  • the present invention relates to the field of communications network technologies, and in particular, to a tunnel management method, a tunnel management apparatus, and a communications system in a communications network.
  • a forwarding path In an existing packet-switched communications network, a forwarding path must be set up between network nodes to forward service packets.
  • a forwarding path is implemented through a tunnel management procedure, and is created or updated between network elements through a tunnel management request.
  • the tunnel management request fails for certain reasons. For example, an error occurs in the request message or resources of an associated network node are exhausted.
  • a cause value is generally used to indicate the processing result of the tunnel management request. The cause value indicates whether the processing of the tunnel management request succeeds or fails and indicates the reason of failure when the tunnel management request fails.
  • EPS evolved packet system
  • MME mobility management entity
  • PDN-GW packet data network gateway
  • S-GW serving gateway
  • a mobile terminal initiates a mobility management or session management procedure that includes a tunnel management request, such as an E PS attach, routing area update, tracking area update, handover, or external PDN connectivity procedure
  • the MME sends a tunnel management request and the S-GW and PDN-GW cooperate to process the tunnel management request.
  • the S-GW will send a response which includes a cause value to the MME, indicating the processing result to the M M E .
  • the node that initiates the tunnel management request receives a response but cannot determine the error of which node has caused the tunnel management request failure according to the response. As a result, the node that initiates the tunnel management request cannot perform processing accordi ng to the tunnel management failure caused by different nodes.
  • the present invention provides a tunnel management method, a tunnel management apparatus, and a communications system, which enable a node that initiates a tunnel management request to correctly determine the node that has caused the tunnel management request failure and perform processing accordingly.
  • a tunnel management method includes:
  • a tunnel management apparatus includes:
  • a tunnel management apparatus includes:
  • a communications system includes:
  • the initiating node because the response message received by the initiating node includes node information and the initiating node can find the node that causes failure of a tunnel management request according to the node information, even if the tunnel management node further sends the tunnel management request to a remote node, the initiating node is able to distinguish whether the tunnel management request failure is caused by the tunnel management node or the remote node according to the node information. Thus, the initiating node can process the tunnel management request failure more conveniently, more efficiently, and more quickly.
  • the present invention solves the problem in the prior art that an initiating node in a conventional communications system is unable to determine which node has caused the error and therefore fails to perform effective processing.
  • FIG. 1 shows an evolved packet system (E PS) network according to an embodiment of the present invention.
  • the EPS network includes a mobile terminal, a radio access network, a serving gateway (S-GW), a mobility management element, a packet data network gateway (PDN-GW or P-GW), and a policy control entity.
  • the mobility management element is a mobility management entity (MME)
  • MME mobility management entity
  • the signaling exchanged between the MME and the PDN-GW must cross the S-GW.
  • the mobility management element is a serving GPRS support node (SGSN)
  • the SGSN may also send a tunnel management request to the S-GW and cooperate with the S-GW to process a tunnel management request initiated by the PDN-GW.
  • SGSN serving GPRS support node
  • the first embodiment relates to a tunnel management method. As shown in FIG. 2 , the method includes the following steps:
  • the embodiment provides another tunnel management method. As shown in FIG. 3 , the method includes the following steps:
  • the embodiment of the present invention provides a tunnel management apparatus.
  • the apparatus includes a receiving unit 41 and a sending unit 42.
  • the receiving unit 41 is configured to receive the tunnel management request from the initiating node.
  • the sending unit 42 is configured to send a response that includes node information to the initiating node.
  • the node information is information of the node that causes the tunnel management request failure so that the initiating node can find the node that causes the tunnel management request failure accordi ng to the node i nformati on.
  • the embodiment of the present invention provides a tunnel management apparatus.
  • the apparatus includes a sending unit 51, a receiving unit 52, and a searchi ng unit 53.
  • the sending unit 51 is configured to send a tunnel management request to a tunnel management node, which returns a response that includes node information to the apparatus after processing the tunnel management request.
  • the receiving unit 52 is configured to receive the response that includes node information returned by the tunnel management node.
  • the searchi ng node 53 is configured to fi nd the node that causes the tunnel management request failure accordi ng to the node i nformati on.
  • the embodiment also provides a communications system.
  • the communications system includes an initiating node 61 and a tunnel management node 62.
  • the initiating node 61 when it is necessary to manage a user plane forwarding path, the initiating node 61 is configured to send a tunnel management request; the tunnel management node 62 is configured to receive the tunnel management request from the initiating node 61 and return a response that includes node information to the initiating node 61; the initiating node 61 is further configured to find the node that causes the tunnel management request failure according to the node information and perform processing accordingly afterwards, for example, select an effective error check direction or select a new node.
  • the error check is: checking whether the error is caused by the local equipment implementation when the error cause included in the received response is an information element (IE) related error with the value such as "IE missing" or "IE decodes error” and checking the equipment implementation of the error node indicated in the response message when the local equipment implementation is correct. This helps the node to locate the error cause quickly and thus assures the correct proceeding of the subsequent procedure.
  • IE information element
  • the embodiment of the present invention determines whether the failure of a tunnel management request is caused by the tunnel management node or a remote node according to the node information so that the initiating node can process the tunnel management request failure more conveniently, more efficiently and more quickly.
  • FIG. 7 shows the processing of the network in a attach procedure in EPS network, especially when a tunnel management request fails.
  • the method includes the following steps:
  • steps 702 and 703 are optional.
  • the response returned in the step may further include additional location information to identify the reason of the Create Default Bearer Request failure.
  • the interface protocol between S-GW and P-GW in the embodiment communicate is the GPRS Tunneling Protocol (GTP).
  • GTP GPRS Tunneling Protocol
  • the S-GW and P-GW may communicate over the Proxy Mobile IP Protocol (PMIP), in which case step 712 and step 713 above are modified as follows:
  • the MME can know the node that causes the Create Default Bearer Request failure.
  • the MME can adjust the node that causes the failure i n ti me so that the subsequent procedure is performed correctly.
  • the embodiment is applicable to a tracking area update procedure.
  • the processing on the network side includes the following steps:
  • the response returned in the step may further include additional location information to identify the reason of the Update Bearer Request failure.
  • the processing is similar to that shown in FIG. 9 and the only difference is that the functions completed by the old S-GW are completed by the new S-GW, as shown by the broken lines.
  • the step where the new MME obtains a context is the same as steps 901 and 902.
  • the new MME decides whether to select a new S-GW. If a new S-GW is selected, the new MME sends a Create Bearer Request to the new S-GW. If the new S-GW processes the Create Bearer Request correctly, the new S-GW sends an Update Bearer Request to the P-GW; otherwise, the new S-GW returns to the new MME a Create Bearer Response, which includes node information of the new S-GW, indicating that the bearer update failure is caused by the new S-GW. After processing the Update Bearer Request, the P-GW returns an Update Bearer Response to the new S-GW.
  • the P-GW fails to process the Update Bearer Request, the P-GW returns to the new S-GW an Update Bearer Response that includes an error cause.
  • the new S-GW also sends a Create Bearer Response to the new MME.
  • the response message received from the P-GW indicates processing failure, the response returned to the new MME includes node information of the P-GW, indicating that the bearer update failure is caused by the P-GW.
  • routing area update scenarios with respect to a routing area update request from a UE, the following two cases may exist:
  • the UE sends a Routing Area Update Request to the new SGSN.
  • the new SGSN obtai ns a context from the old SGS N and afterwards sends a Create Bearer Request to the new S-GW. If the new S-GW processes the Create Bearer Request correctly, the new S-GW sends an Update Bearer Request to the P-GW; otherwise, the new S-GW sends to the new SGSN a Create Bearer Response which includes node information of the new S-GW, indicating that the bearer creation failure is caused by the new S-GW. After processing the Update Bearer Request, the P-GW returns to the new S-GW an Update Bearer Response which indicates processing success or failure with a cause value.
  • the P-GW fails to process the Update Bearer Request, the P-GW returns to the new S-GW an Update Bearer Response that indicates failure.
  • the new S-GW also sends a Create Bearer Response to the new SGSN and when the message returned by the P-GW indicates processing failure, the message returned to the new SGSN includes node information of the P-GW, indicating that the bearer creation failure is caused by the P-GW.
  • the S-GW does not change.
  • the old SGSN acts as the initiating node of the Routing Area Update Request
  • the old S-GW acts as the tunnel management node of the Routing Area Update Request
  • the P-GW acts as the remote node. The procedure is shown by the broken lines in FIG. 10 .
  • the UE sends a Routing Area Update Request to the old SGSN.
  • the old SGSN sends an Update Bearer Request to the old S-GW. If the old S-GW processes the Update Bearer Request correctly, the old S-GW sends an Update Bearer Request to the P-GW; otherwise, the old S-GW returns to the old SGSN an Update Bearer Response, which includes node information of the old S-GW, indicating that the bearer update failure is caused by the old S-GW. After processing the Update Bearer Request, the P-GW returns to the old S-GW an Update Bearer Response which indicates processing success or failure with a cause value. If the P-GW fails to process the Update Bearer Request, the P-GW returns to the old S-GW an Update Bearer Response that indicates failure.
  • the old S-GW also sends an Update Bearer Response to the old SGSN and when the message returned by the P-GW indicates processing failure, the message returned to the old SGSN includes node i nformati on of the P-GW, i ndi cati ng that the bearer update failure is caused by the P-GW.
  • the method in the embodiment can indicate the node that causes failure of tracking area update or routing area update in a tracking area update or routing area update procedure so that the node causing the tracking area update or routing area update failure is adjusted in time and that the subsequent procedure proceeds correctly.
  • the scenario of the fourth embodiment is the handover from an evolved UMTS territorial radio access network (E-UTRAN) to a UMTS territorial radio access network (UTRAN).
  • E-UTRAN evolved UMTS territorial radio access network
  • UTRAN UMTS territorial radio access network
  • the response returned in the step may further include additional location information to identify the specific reason of the Update Bearer Requestfailure.
  • the method in the embodiment of the present invention indicates whether the node that causes a bearer update failure is the target S-GW or P-GW during the handover from an E-UTRAN to a UTRAN, so that the target SGSN can adjust the node causing the bearer update failure in time and that the subsequent procedure will proceed correctly.
  • the scenario of the fifth embodiment is a PDN connectivity procedure. As shown in FIG. 12 , when the procedure fails, the method includes the following steps:
  • the node information may be indicated by a field in the cause of failure of the tunnel management request, or an IE in the response message.
  • the response returned in steps 1208 and 1209 may further include additional location information to identify the reason of the Create Default Bearer Request failure.
  • the additional location information may be indicated by a field in the cause of the failure of the tunnel management request, or an IE in the response message.
  • the node i nformati on may be i ndi cated by a f i el d i n the cause of the failure of the tunnel management request, or an IE in the response message.
  • the response returned in the step may further include additional location information to identify the specific reason of the Create Default Bearer Request failure.
  • the additional location information may be the additional location information included in the response received by the S-GW.
  • the additional location information may also be indicated by a field in the cause of the failure of the tunnel management request, or an IE in the response message.
  • the method in the embodi ment of the present invention can indicate whether the node causing the PDN connectivity failure is the S-GW, P-GW, or PCRF, so that the MME can adjust the node causing the PDN connectivity failure and that the subsequent procedure can proceed correctly.
  • the scenario of the sixth embodiment is the bearer creation initiated by the P-GW.
  • the method for indicating the bearer creation failure includes the following steps:
  • the response returned in the step may further include additional location information to identify the reason of the Create Dedicated Bearer Request failure.
  • the additional location information may also be indicated by a field in the cause of the failure of the tunnel management request, or an IE in the response message.
  • the method in the embodiment of the present invention can indicate whether the node causing the dedicated bearer creation failure is the S-GW, MME, or eNodeB, so that the P-GW can adjust the node causing the dedicated bearer creation failure and that the subsequent procedure can proceed correctly.
  • the embodiment of the present invention provides a tunnel management apparatus. As shown in FIG. 14 , the apparatus includes a receiving unit 141 and a sending unit 142.
  • the receiving unit 141 is configured to receive a tunnel management request from an initiating node; when the tunnel management request of the initiating node is processed unsuccessfully, the sending unit 142 is configured to send to the initiating node a response, which includes node information of the node that causes the tunnel management request failure.
  • the node that causes the tunnel management request failure may be the local node or a remote node.
  • the sending unit 142 includes a determining module 1421 and a sending module 1422.
  • the determining module 1421 is configured to determine whether the local node is able to complete the tunnel management request.
  • the sending module 1422 is configured to send to the initiating node a response message which includes a cause value of failure of the tunnel management request and local node information when the determining module 1421 determines that the local node is unable to complete the tunnel management request, where the local node information is the node information of the node that causes the tunnel management request failure.
  • the response received by the receiving unit 141 in the embodiment may also include additional location information, identifying the specific reason of the tunnel management request failure.
  • the additional location information may indicate which IE is missing or incorrectly decoded and which mandatory IE is missing.
  • the response sent by the sending unit 142 in the embodiment to the initiating node may also include the additional location information so that the initiating node can find the correct failure cause.
  • the tunnel management apparatus in the embodiment of the present invention may be configured in many network devices, such as the S-GW, P-GW, MME, and SGSN.
  • the embodiment of the present invention provides another tunnel management apparatus.
  • the apparatus includes a sending unit 151, a receiving unit 152, and a searching unit 153.
  • the sending unit 151 is configured to send a tunnel management request to the tunnel management node. After the tunnel management node processes the tunnel management request, the tunnel management node returns a tunnel management response to the apparatus. If the processing is unsuccessful, the response returned to the apparatus includes node information and additional location information.
  • the node information identifies the node that causes the tunnel management request failure.
  • the additional location information identifies the specific reason of the tunnel management request failure.
  • the receiving unit 152 is configured to receive the response that includes node information returned by the tunnel management node.
  • the searching unit 153 is configured to find the node that causes the tunnel management request failure according to the node information and find the specific reason of the tunnel management request failure accordi ng to the additional location information to facilitate the error checking.
  • the tunnel management apparatus further includes a processing unit 154.
  • the processing unit 154 is configured to select a new node to replace the node that causes the tunnel management request failure when the cause of the tunnel management request failure is resource insufficiency or equipment failure; or the processing unit 154 is configured to check for errors of the local node or instruct the node that causes the tunnel management request failure to check for errors when the cause of the tunnel management request failure is IE missing or IE decoded error.
  • the function of the tunnel management apparatus shown in FIG. 14 to determi ne whether the local device is able to process the request can be configured on the intermediate node or the remote node; the function of sending or transparently transmitting the error node indication to the initiating node after receiving the response from the remote node can only be implemented on the intermediate node.
  • the tunnel management apparatus shown in FIG. 15 is only configured on the initiating node.
  • the initiating node may be an MME, or a P-GW, or an SGSN.
  • the response returned by the intermediate node to the initiating node includes node information to enable the initiating node to find the node that causes the tunnel management request failure and make node adjustment accordingly, so that the subsequent procedure proceeds correctly.
  • the eighth embodiment provides a communications system.
  • the communications system includes an initiating node 161 and a tunnel management node 162.
  • the initiating node 161 is configured to send a tunnel management request to the tunnel management node 162.
  • the tunnel management node 162 is configured to receive the tunnel management request from the initiating node 161 and determine whether the tunnel management node is able to complete the tunnel management request.
  • the tunnel management node 162 If the tunnel management node 162 is unable to complete the tunnel management request, the tunnel management node 162 sends to the initiating node 161 a response which includes the cause value of the tunnel management request failure and information of the tunnel management node, i ndicati ng that the tunnel management node is the node that causes the tunnel management request failure.
  • the initiating node 161 is further configured to find the node that causes the tunnel management request failure according to the node information in the response returned by the tunnel management node and perform related error checking.
  • the above communications system generally relates to the communication between two network devices, for example, between MME and S-GW and between S-GW and P-GW.
  • the communications system in the embodiment further includes a remote node 163.
  • the tunnel management node 162 When the tunnel management node 162 is able to process the tunnel management request correctly, the tunnel management node 162 sends the tunnel management request to the remote node 163, which causes failure of the tunnel management request due to a certain reason, such as a local node error.
  • the remote node 163 is then configured to return to the tunnel management node 162 a response which includes the cause value of the tunnel management request failure.
  • the tunnel management node 162 is further configured to send to the initiating node 161 a response that includes the cause value of the tunnel management request failure and information of the remote node, indicating that the remote node is the node causing the tunnel management request failure.
  • the processing of the communications system is as follows:
  • the embodiment is applicable to a communications system with respect to various possible failure causes during the management of a user plane forwarding path and indicates the cause to the initiating node so that the initiating node performs appropriate processing.
  • the initiating node Because the response received by the initiating node includes node information and the initiating node can find the node causing the tunnel management request failure according to the node information, the initiating node will be able to distinguish whether the tunnel management request failure is caused by the tunnel management node or the remote node, even if the tunnel management node further sends the tunnel management request to the remote node. Thus, the initiating node can process the tunnel management request failure more conveniently, more efficiently, and more quickly.
  • the present invention may be implemented by hardware only or by software and a necessary universal hardware platform. However, in most cases, using software and a necessary universal hardware platform are preferred. Based on such understandings, all or part of the technical solution under the present invention that makes contributions to the prior art may be essentially embodied in the form of a software product.
  • the software product may be stored in a computer readable storage medium, such as a hard disk, a compact disk read-only memory (CD-ROM), and a floppy disk.
  • the software product includes a number of instructions that enable a computer device (personal computer, server, or network device) to execute the methods provided in the embodiments of the present invention.

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Theoretical Computer Science (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Mobile Radio Communication Systems (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)
EP15192231.7A 2008-07-16 2009-05-26 Tunnelverwaltungsverfahren, tunnelverwaltungsvorrichtung und kommunikationssystem Not-in-force EP3010186B1 (de)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN2008101324214A CN101631344B (zh) 2008-07-16 2008-07-16 隧道管理方法、装置及通信系统
EP09797378.8A EP2293502B9 (de) 2008-07-16 2009-05-26 Verfahren, gerät und kommunikationssystem für tunnelverwaltung
EP12182102.9A EP2533481B1 (de) 2008-07-16 2009-05-26 Verfahren, Gerät und Kommunikationssystem für Tunnelverwaltung

Related Parent Applications (3)

Application Number Title Priority Date Filing Date
EP09797378.8A Division EP2293502B9 (de) 2008-07-16 2009-05-26 Verfahren, gerät und kommunikationssystem für tunnelverwaltung
EP12182102.9A Division-Into EP2533481B1 (de) 2008-07-16 2009-05-26 Verfahren, Gerät und Kommunikationssystem für Tunnelverwaltung
EP12182102.9A Division EP2533481B1 (de) 2008-07-16 2009-05-26 Verfahren, Gerät und Kommunikationssystem für Tunnelverwaltung

Publications (2)

Publication Number Publication Date
EP3010186A1 true EP3010186A1 (de) 2016-04-20
EP3010186B1 EP3010186B1 (de) 2018-05-23

Family

ID=41550013

Family Applications (3)

Application Number Title Priority Date Filing Date
EP15192231.7A Not-in-force EP3010186B1 (de) 2008-07-16 2009-05-26 Tunnelverwaltungsverfahren, tunnelverwaltungsvorrichtung und kommunikationssystem
EP09797378.8A Not-in-force EP2293502B9 (de) 2008-07-16 2009-05-26 Verfahren, gerät und kommunikationssystem für tunnelverwaltung
EP12182102.9A Active EP2533481B1 (de) 2008-07-16 2009-05-26 Verfahren, Gerät und Kommunikationssystem für Tunnelverwaltung

Family Applications After (2)

Application Number Title Priority Date Filing Date
EP09797378.8A Not-in-force EP2293502B9 (de) 2008-07-16 2009-05-26 Verfahren, gerät und kommunikationssystem für tunnelverwaltung
EP12182102.9A Active EP2533481B1 (de) 2008-07-16 2009-05-26 Verfahren, Gerät und Kommunikationssystem für Tunnelverwaltung

Country Status (7)

Country Link
US (4) US8938640B2 (de)
EP (3) EP3010186B1 (de)
JP (4) JP5101734B2 (de)
CN (2) CN102355686B (de)
ES (1) ES2401758T3 (de)
PL (1) PL2293502T3 (de)
WO (1) WO2010006531A1 (de)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102355686B (zh) 2008-07-16 2015-08-05 华为技术有限公司 隧道管理方法、装置及通信系统
FR2968155A1 (fr) * 2010-11-30 2012-06-01 France Telecom Technique de communication entre un equipement utilisateur et un reseau de donnees dans un reseau de communication
FR2968156A1 (fr) 2010-11-30 2012-06-01 France Telecom Technique de communication entre un equipement utilisateur et un reseau de donnees dans un reseau de communication
JP2014199980A (ja) * 2013-03-29 2014-10-23 株式会社Nttドコモ Pdnゲートウェイ装置及び移動通信方法
WO2014186935A1 (zh) * 2013-05-20 2014-11-27 华为技术有限公司 数据传输方法、装置及系统
RU2640573C1 (ru) * 2013-12-30 2018-01-10 Хуавей Текнолоджиз Ко., Лтд. Способ устранения отказа, сеть пакетной передачи данных, узел управления мобильностью и сетевая система
EP3018941B1 (de) * 2014-11-10 2021-08-18 Vodafone GmbH Aufbau eines Trägerdienstes in einem Telekommunikationsnetz
US10237795B2 (en) 2015-10-11 2019-03-19 Qualcomm Incorporated Evolved packet data gateway (EPDG) reselection
CN106604295A (zh) * 2015-10-14 2017-04-26 大唐移动通信设备有限公司 一种用户服务请求方法及移动性管理实体装置
EP3403429B1 (de) * 2016-01-14 2020-04-22 Telefonaktiebolaget LM Ericsson (PUBL) Verfahren und knoten zur durchführung eines verfahrens zur tracking-bereichsaktualisierung (tau) / routing-bereichsaktualisierung (rau) in einer zustandslosen architektur
US10616854B2 (en) * 2016-03-31 2020-04-07 Ntt Docomo, Inc. Communication control method and communication system for changing a tracking area when a control plane and user plane are separated
CN112020100B (zh) * 2019-05-31 2022-04-22 华为技术有限公司 分组流描述信息的管理方法、设备及系统

Family Cites Families (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2397966C (en) 2000-11-21 2007-01-09 Samsung Electronics Co., Ltd. Regional tunnel management method in a mobile communication system using mobile ip
US20030117948A1 (en) * 2001-12-26 2003-06-26 Ton Bobby That Dao Method and gateway GPRS support node (GGSN) for control plane redundancy
US7191136B2 (en) 2002-10-01 2007-03-13 Ibiquity Digital Corporation Efficient coding of high frequency signal information in a signal using a linear/non-linear prediction model based on a low pass baseband
US7599283B1 (en) * 2003-06-30 2009-10-06 Packeteer, Inc. Network traffic synchronization and data compression in redundant network topologies
EP1654821B1 (de) 2003-07-17 2011-08-24 Interdigital Technology Corporation Zeichengabeverfahren für die wlan-netzwerksteuerung
CN1581744A (zh) * 2003-07-31 2005-02-16 北京三星通信技术研究有限公司 为mbms业务提供多种qos的方法
CN1283055C (zh) * 2003-08-15 2006-11-01 华为技术有限公司 一种对创建分组数据协议上下文请求的处理方法
GB0324597D0 (en) * 2003-10-21 2003-11-26 Nokia Corp A communication system
CN1277393C (zh) * 2003-12-12 2006-09-27 华为技术有限公司 一种无线局域网用户终端选择分组数据关口的方法
CN100337444C (zh) 2003-12-24 2007-09-12 华为技术有限公司 一种无线局域网中重定向分组数据关口的方法
US7414997B2 (en) * 2004-03-12 2008-08-19 Lucent Technologies Inc. GPRS tunneling protocol path integrity protocol
JP2006121246A (ja) * 2004-10-20 2006-05-11 Nec Commun Syst Ltd 移動体パケット通信システム、ノード装置及びそれらに用いるpdpコンテキスト継続方法
US7630298B2 (en) * 2004-10-27 2009-12-08 Cisco Technology, Inc. Method and apparatus for forwarding data in a data communications network
JP4558454B2 (ja) * 2004-11-12 2010-10-06 パナソニック株式会社 通信システム
CN100355247C (zh) 2005-03-16 2007-12-12 华为技术有限公司 一种分组域智能业务的中断提示方法
CN100395994C (zh) * 2005-06-23 2008-06-18 华为技术有限公司 自动交换光网络中通道故障的处理方法
US8068460B2 (en) * 2005-07-14 2011-11-29 Toshiba America Research, Inc. Dynamic packet buffering system for mobile handoff
JP4545658B2 (ja) 2005-08-11 2010-09-15 富士通株式会社 コネクション型ネットワークノード
JP4747197B2 (ja) * 2005-10-28 2011-08-17 パナソニック株式会社 トンネリングループ検出制御装置
WO2007103369A2 (en) * 2006-03-07 2007-09-13 Interdigital Technology Corporation Method and apparatus for supporting handoff in an lte gtp based wireless communication system
US8565216B2 (en) * 2006-06-07 2013-10-22 Qualcomm Incorporated Methods and apparatus for supporting tunneling related to wireless uplink signaling flows
EP1879404A1 (de) * 2006-07-12 2008-01-16 Alcatel Lucent Verfahren und Vorrichtungen für die Kopplung eines Zugriffsnetzwerks für Mobil-Festnetz-Konvergenz mit dem paketvermittelten Bereich eines mobilen Kernnetzwerks
CN101094152B (zh) * 2006-11-07 2010-08-18 中兴通讯股份有限公司 一种分组域单隧道无线网络控制器错误的处理方法
JP4830889B2 (ja) * 2007-02-15 2011-12-07 ブラザー工業株式会社 情報配信システム、情報配信方法及びノード装置等
FI20075297A0 (fi) 2007-04-27 2007-04-27 Nokia Siemens Networks Oy Menetelmä, radiojärjestelmä ja tukiasema
CN102355686B (zh) 2008-07-16 2015-08-05 华为技术有限公司 隧道管理方法、装置及通信系统
JP2010178209A (ja) * 2009-01-30 2010-08-12 Toshiba Corp 移動無線端末装置

Non-Patent Citations (8)

* Cited by examiner, † Cited by third party
Title
"3rd Generation Partnership Project; Technical Specification Group Core Network and Terminals; General Packet Radio Service (GPRS); GPRS Tunnelling Protocol (GTP) across the Gn and Gp interface (Release 8)", 3GPP STANDARD; 3GPP TS 29.060, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, no. V8.4.0, 1 June 2008 (2008-06-01), pages 1 - 145, XP050371101 *
"3rd Generation Partnership Project; Technical Specification Group Core Network and Terminals; Mobile radio interface Layer 3 specification; Core network protocols; Stage 3 (Release 8)", 3GPP STANDARD; 3GPP TS 24.008, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, no. V8.1.0, 1 March 2008 (2008-03-01), pages 1 - 551, XP050364468 *
"3rd Generation Partnership Project;Technical Specification Group Core Network and Terminals; 3GPP Evolved Packet System;Evolved GPRS Tunnelling Protocol for EPS (GTPv2); Stage 3(Release 8)", 3GPP DRAFT; 29274-110_CL, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. CT WG4, no. Zagreb; 20080708, 8 July 2008 (2008-07-08), XP050040177 *
"3rd Generation Partnership Project;Technical Specification Group Core Network and Terminals;Non-Access-Stratum (NAS) protocol for Evolved Packet System (EPS); Stage 3(Release 8)", 3GPP DRAFT; 24301-030, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. CT WG1, no. Zagreb, Croatia; 20080615, 15 June 2008 (2008-06-15), XP050029403 *
HUAWEI: "Cause IE", 3GPP DRAFT; C4-090262_DISCUSSION CAUSE IE R2, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, no. San Antonio; 20090223, 23 February 2009 (2009-02-23), XP050315317 *
HUAWEI: "Cause IE", 3GPP DRAFT; C4-090263_CR ON CAUSE IE, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, no. San Antonio; 20090223, 23 February 2009 (2009-02-23), XP050315318 *
MOTOROLA ET AL: "IE Type ordering", 3GPP DRAFT; C4-090798_29274_CR-0044REV2_IE_TYPE_ORDERING, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, no. San Antonio; 20090223, 23 February 2009 (2009-02-23), XP050315764 *
MOTOROLA: "OI bit in Cause information element", 3GPP DRAFT; C4-091116_29274_CR-0130_OI_BIT_IN CAUSE_IE, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, no. Sophia; 20090410, 10 April 2009 (2009-04-10), XP050338206 *

Also Published As

Publication number Publication date
EP2533481B1 (de) 2016-02-24
EP2293502B1 (de) 2013-01-02
US20160099828A1 (en) 2016-04-07
US9235462B2 (en) 2016-01-12
JP5739508B2 (ja) 2015-06-24
JP2014039341A (ja) 2014-02-27
EP2293502A1 (de) 2011-03-09
WO2010006531A1 (zh) 2010-01-21
CN102355686A (zh) 2012-02-15
CN101631344A (zh) 2010-01-20
JP2015156712A (ja) 2015-08-27
CN102355686B (zh) 2015-08-05
JP2011528197A (ja) 2011-11-10
EP2293502A4 (de) 2011-08-10
JP5426741B2 (ja) 2014-02-26
US8938640B2 (en) 2015-01-20
EP2293502B9 (de) 2013-04-10
PL2293502T3 (pl) 2013-05-31
JP6065189B2 (ja) 2017-01-25
CN101631344B (zh) 2011-10-05
US20130117614A1 (en) 2013-05-09
US20140211611A1 (en) 2014-07-31
EP3010186B1 (de) 2018-05-23
JP2013038806A (ja) 2013-02-21
US8909975B2 (en) 2014-12-09
US20110113278A1 (en) 2011-05-12
ES2401758T3 (es) 2013-04-24
EP2533481A1 (de) 2012-12-12
JP5101734B2 (ja) 2012-12-19

Similar Documents

Publication Publication Date Title
EP3010186B1 (de) Tunnelverwaltungsverfahren, tunnelverwaltungsvorrichtung und kommunikationssystem
US9313094B2 (en) Node and method for signalling in a proxy mobile internet protocol based network
US8982836B2 (en) System and method for minimizing loss of IP context during IRAT handover
CN103517252A (zh) 分组网关标识信息的更新方法、aaa服务器和分组网关
US20140226606A1 (en) Communication system, communication method, and communication program
EP3300417A1 (de) Verfahren, vorrichtung und system zur erkennung einer anomalie einer endgerätevorrichtung
KR102897874B1 (ko) Gtp-u 엔티티 재시작에 대한 향상
US9692912B2 (en) Charging information processing method and gateway device
US9960950B2 (en) Apparatus, method, system and computer program product for server failure handling
EP3977812B1 (de) Verfahren, systeme und computerlesbare medien für verbesserte statusdetektion eines signalisierungsgateways (sgw) und auswahl für notrufe
WO2015168494A1 (en) Methods and apparatus for timing management

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AC Divisional application: reference to earlier application

Ref document number: 2293502

Country of ref document: EP

Kind code of ref document: P

Ref document number: 2533481

Country of ref document: EP

Kind code of ref document: P

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK TR

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20161020

RBV Designated contracting states (corrected)

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK TR

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

RIC1 Information provided on ipc code assigned before grant

Ipc: H04W 76/02 20090101ALI20171114BHEP

Ipc: H04L 12/66 20060101AFI20171114BHEP

Ipc: H04L 12/46 20060101ALI20171114BHEP

Ipc: H04L 12/64 20060101ALI20171114BHEP

Ipc: H04W 76/00 20090101ALI20171114BHEP

Ipc: H04L 12/24 20060101ALI20171114BHEP

INTG Intention to grant announced

Effective date: 20171211

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: NOKIA TECHNOLOGIES OY

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AC Divisional application: reference to earlier application

Ref document number: 2533481

Country of ref document: EP

Kind code of ref document: P

Ref document number: 2293502

Country of ref document: EP

Kind code of ref document: P

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602009052470

Country of ref document: DE

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1002412

Country of ref document: AT

Kind code of ref document: T

Effective date: 20180615

REG Reference to a national code

Ref country code: SE

Ref legal event code: TRGR

REG Reference to a national code

Ref country code: NL

Ref legal event code: FP

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180523

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180523

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180823

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180523

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180823

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180824

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180523

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180523

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1002412

Country of ref document: AT

Kind code of ref document: T

Effective date: 20180523

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20180531

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180523

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180523

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180523

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180523

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180523

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180523

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180523

RIC2 Information provided on ipc code assigned after grant

Ipc: H04W 76/00 20180101ALI20171114BHEP

Ipc: H04W 76/02 20090101ALI20171114BHEP

Ipc: H04L 12/66 20060101AFI20171114BHEP

Ipc: H04L 12/24 20060101ALI20171114BHEP

Ipc: H04L 12/46 20060101ALI20171114BHEP

Ipc: H04L 12/64 20060101ALI20171114BHEP

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602009052470

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180523

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180531

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180531

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180523

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180526

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180526

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180723

26N No opposition filed

Effective date: 20190226

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180523

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180531

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180526

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180523

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180523

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180523

Ref country code: MK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180523

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20090526

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180923

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20230417

Year of fee payment: 15

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20230331

Year of fee payment: 15

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 20230412

Year of fee payment: 15

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20230406

Year of fee payment: 15

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602009052470

Country of ref document: DE

REG Reference to a national code

Ref country code: SE

Ref legal event code: EUG

REG Reference to a national code

Ref country code: NL

Ref legal event code: MM

Effective date: 20240601

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20240526

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20240601

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20241203

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20240526

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20240527