EP3310973A1 - Konstruktion vom typ einer fertigsäule und eines fertigbalkens - Google Patents

Konstruktion vom typ einer fertigsäule und eines fertigbalkens

Info

Publication number
EP3310973A1
EP3310973A1 EP16728392.8A EP16728392A EP3310973A1 EP 3310973 A1 EP3310973 A1 EP 3310973A1 EP 16728392 A EP16728392 A EP 16728392A EP 3310973 A1 EP3310973 A1 EP 3310973A1
Authority
EP
European Patent Office
Prior art keywords
beams
construction
prefabricated
posts
junction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP16728392.8A
Other languages
English (en)
French (fr)
Other versions
EP3310973B1 (de
Inventor
Libère Nitunga
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of EP3310973A1 publication Critical patent/EP3310973A1/de
Application granted granted Critical
Publication of EP3310973B1 publication Critical patent/EP3310973B1/de
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/26Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of wood
    • E04B1/2604Connections specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G25/00Shores or struts; Chocks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H9/00Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
    • E04H9/02Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground
    • E04H9/021Bearing, supporting or connecting constructions specially adapted for such buildings
    • E04H9/0237Structural braces with damping devices
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H9/00Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
    • E04H9/02Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground
    • E04H9/024Structures with steel columns and beams
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2406Connection nodes
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2418Details of bolting
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2451Connections between closed section profiles
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B2001/2496Shear bracing therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/26Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of wood
    • E04B2001/2696Shear bracing

Definitions

  • the present invention relates to the construction of buildings type posts and prefabricated beams, whether wood, reinforced concrete or any other material.
  • the present invention relates to a construction technique of wood, reinforced concrete or any other material, which consists of using prefabricated columns and beams in the factory, and to carry out their connection on construction site, on the one hand by a system of vertical and horizontal bracing, and on the other hand by a reinforced concrete junction at their intersection.
  • a central role is played by the bracings that securely hold the posts and beams in their final position as soon as their installation is complete. They make a link that we call here device, as opposed to the central link made at the intersection of said posts and beams.
  • Threaded rods are the most appropriate means of joining braces to studs and beams.
  • the central junction can itself be cast on site; we are talking about partial or prefabricated prefabrication, and we are talking about total prefabrication.
  • the contact surface between a brace and a post or beam can be simple without any particular provision.
  • the bracing will play its role in opposing it.
  • the assembly rod will be stressed in shear and should therefore be of large section.
  • it is expected roughness on said surfaces a notch in the post or beam, a notch into which enters a shim provided at the end of the brace, etc..
  • the outer notch prevents closure of said angle
  • the inner notch prevents its opening.
  • the inner notch is longer than the outer notch, and may even form an acute angle with the axis of the pole or beam.
  • bracing pieces There is no limitation in the number or inclination of bracing pieces, nor in the number or type of their attachment to posts or beams: bolts, dowels, rivets, nails, etc. It is the same for the connection between the terminal blocks and the ends of the columns and beams described below.
  • the beams are prefabricated at the factory, with bars or irons waiting to enter the junctions.
  • Posts and beams are securely held in their final position by horizontal and vertical bracing.
  • the ends of said posts and beams form a formwork lost at the time of pouring concrete in the junction.
  • the reinforcement of the junction is prefabricated, either completely or partially. It can take the form of a metal frame, preferably welded.
  • the columns and beams whose reinforcement entering the junction is prefabricated are provided with small pieces of iron waiting on which will be welded the prefabricated reinforcement of the junction.
  • a complete junction block with as many branches as there are poles and beams in this node.
  • the branches of said terminal block will be connected to the ends of the posts and beams that enter the node.
  • the assembly area of a branch of the block with a post or a beam can be cut along an oblique line, ie bevelled, along a straight line, along a broken line, that is to say a staircase, etc. .
  • junction blocks as well as the ends of the posts and beams that form the junction are manufactured to ensure high mechanical strength: dense reinforcement and maximum concrete dosage.
  • the contact surfaces have deep grooves or other forms of asperities intended to prevent the relative movement of the elements to be connected.
  • Threaded rods are the means of assembling poles and beams to the most suitable terminal blocks.
  • the ends of the columns and beams that enter this node then take the form of a T to match the dimensions of the terminal block thus formed.
  • the thickness of the different parts of the terminal block must take into account the thickness of the ends of the columns and beams to which it will be connected, so that the total thickness does not differ too much from the thickness of the columns and beams, for example. example 20 cm.
  • the central portion of the terminal block which is not contiguous to any post or beam end, retains the thickness of the posts and beams, 20 cm in our example.
  • the areas of the terminal block to which are joined a single end of post or beam have a thickness of about 10 cm in our example, half the thickness of the structure of the construction. It is the same, mutatis mutandis, areas of the terminal block which are crossed by two ends.
  • the thickness of one end of a post or beam must in turn take into account the thickness of the other ends and the branch of the terminal block with which they are going to be in contact. the knot, to make a total thickness of 20 cm in our example.
  • the assembly of posts and beams is usually done using various hardware. But in the context of the present invention, the junction is reinforced concrete. It is then a question of securely fixing the steel bars at the ends of the posts and the beams, so that they present waiting irons which will participate in the realization of said junction.
  • the present invention also takes advantage of cross-nailing for good attachment of wood bracing, poles and beams also wood.
  • the areas that are likely to crack or burst as a result of intensive nailing are surrounded by compression fittings, which at the same time increases the pressure exerted on the nails used and improves the connection achieved.
  • Figure 1/20 shows the sectional view of the foundation and the lower chaining (2) of the building under construction.
  • Figure 2/20 shows a sectional view of the installation of a post in the case of partial prefabrication.
  • the prefabricated zone is distinguished from the post to be laid (4), the standoff bars in the area of the post-concreting post (5).
  • Figure 3/20 shows the pole at the time of its installation on the lower chaining.
  • Figure 4/20 shows a pole whose junction with the lower chaining is already concreted: the connection is complete.
  • Figure 5/20 shows the installation of the beams that will form the upper chaining of the stage.
  • a beam (8) is distinguished, as well as the reinforcement of the junction (9) constituted by the waiting bars of the left beam, those of the right beam and those of the upper end of the pole.
  • Figure 6/20 shows the same elements as the previous figure, but after concreting the junction: the completion of the junction is complete.
  • Figure 7/20 shows a sectional view of all the links in a node of the construction, highlighting the concreted parts on site.
  • Figure 8/20 shows a prefabricated terminal block for the connection of the various posts and beams that enter the node, in case of total prefabrication.
  • Figure 9/20 shows a terminal block that is already attached to the pole. There is an assembly rod (1 1), and two beams (1 2) pending fixation on the block.
  • Figure 10/20 shows an enlarged terminal block. Areas of the enlarged terminal block are distinguished at the corners of the walls and adjacent floors (13).
  • Figure 1 1/20 shows an enlarged terminal block which is already attached to the post. There are three assembly rods (1 1), and two beams (12) pending fixation on the block.
  • Figure 12/20 shows the diagram of an assembly of a beam with bracing. No special provision has been made for the contact area. In case of force tending to open or close the angle formed by the post and the beam, the bracing will oppose it. The connecting rod will be stressed in shear and must be dimensioned.
  • FIG. 13/20 shows the diagram of the same beam-bracing assembly in which a notch in which a wedge fits in the beam is provided. provided on the bracing, to prevent sliding of the brace against the beam, and shear forces that would result for the connecting rod.
  • Figure 14/20 shows the schematic of the same beam-bracing assembly in which the internal bracing blockage notch is deeper than the outer notch.
  • Figure 15/20 shows the diagram of the same beam-bracing assembly in which the notch provided in the post or the beam is less than 90 °.
  • Figure 16/20 shows a sectional view of a typical junction of the construction. We distinguish the pole (4), a beam (8), a bracing (6), and the reinforcement of the junction (9).
  • Figure 17/20 shows a sectional view of a reinforcement of the prefabricated junction. We distinguish the reinforcement of the prefabricated junction (14).
  • Figure 18/20 shows a sectional view of a typical construction node, prior to the installation of prefabricated reinforcement.
  • Figure 19/20 shows in detail the end of a beam when using a prefabricated reinforcement.
  • Figure 20/20 shows the assembly of prefabricated reinforcement on the beams.
  • Prefabricated reinforcements are welded to the standpipes of columns and beams (Fig. 20/20).
  • the formwork is then made where it is necessary, that is to say in the nodes which comprise two or three beams, keeping in mind that the ends of the columns and beams constitute a lost formwork, then the concrete is poured. in the junction.
  • step 3 ° is repeated for the continuation of the construction of the next stage.
  • the primary object of the invention is as much prefabrication as possible of the structure of buildings of the type of columns and beams, prefabrication which allows industrialization of this type of construction.
  • the main development that achieves this goal under the same technical conditions, or better than in the conventional system, is the massive use of bracing both vertically and horizontally. They constitute a peripheral and solid junction which connects the posts and the beams on the one hand and the beams between them on the other hand.
  • the central junction which takes place at the intersection of posts and beams can be done on site or prefabricated, and therefore industrialized, or at least highly standardized.
  • this modular lattice structure is lighter than a conventional structure.
  • the main constraint of the system is that the braces occupy the axis of the walls for greater efficiency, which prevents or reduces the use of the usual materials in the construction of walls such as bricks and blocks of all kinds. But this will push manufacturers to adopt more often the walls and walls adapted to this type of structure, for example the panels currently used in the construction of wood.
  • Such a construction system is of special interest for regions with high seismic risk, because the building is light, consisting of a set of structurally self-sufficient units, strongly triangulated and therefore very little deformable, all at a relatively modest cost .

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Electromagnetism (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)
  • Tents Or Canopies (AREA)
EP16728392.8A 2015-05-28 2016-05-25 Konstruktion vom typ einer fertigsäule und eines fertigbalkens Active EP3310973B1 (de)

Applications Claiming Priority (5)

Application Number Priority Date Filing Date Title
BI32115 2015-05-28
BI32515 2015-07-23
BI32915 2015-09-10
BI33316 2016-05-19
PCT/IB2016/053064 WO2016189476A1 (fr) 2015-05-28 2016-05-25 Construction type poteaux et poutres préfabriqués

Publications (2)

Publication Number Publication Date
EP3310973A1 true EP3310973A1 (de) 2018-04-25
EP3310973B1 EP3310973B1 (de) 2020-03-25

Family

ID=56117907

Family Applications (1)

Application Number Title Priority Date Filing Date
EP16728392.8A Active EP3310973B1 (de) 2015-05-28 2016-05-25 Konstruktion vom typ einer fertigsäule und eines fertigbalkens

Country Status (13)

Country Link
US (1) US10494807B2 (de)
EP (1) EP3310973B1 (de)
JP (1) JP2018520285A (de)
KR (1) KR20180012809A (de)
CN (1) CN108138481B (de)
AU (1) AU2016268484A1 (de)
BR (1) BR112017025348A2 (de)
EA (1) EA034805B1 (de)
MX (1) MX2017014935A (de)
PE (1) PE20171773A1 (de)
TN (1) TN2017000477A1 (de)
WO (1) WO2016189476A1 (de)
ZA (1) ZA201800002B (de)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110145029A (zh) * 2019-06-18 2019-08-20 国网河北省电力有限公司经济技术研究院 非牛顿液体填充的抗冲击节点、抗冲击建筑物及构筑方法
CN111794373A (zh) * 2020-06-18 2020-10-20 华南理工大学 高强钢柱-普通钢梁-低屈服点钢腋撑可复位结构
CN111927090B (zh) * 2020-08-10 2021-10-22 湖南省第六工程有限公司 高层建筑梁式转换层钢管支撑施工结构及其施工方法
CN112832575B (zh) * 2020-12-28 2022-07-12 浙江天然建筑设计有限公司 一种预制装配式混凝土建筑及其设计方法
CN113374245B (zh) * 2021-06-29 2022-11-25 中冶建工集团有限公司 梁板后浇带临时支撑的施工方法
CN113374082A (zh) * 2021-07-27 2021-09-10 江西恒信检测集团有限公司 一种可拆卸连杆连接耗能摩擦型梁柱节点
CN114382170B (zh) * 2021-12-21 2024-01-30 曹大燕 一种上层预制竖向构件施工方法
CN114382169A (zh) * 2021-12-21 2022-04-22 曹大燕 基于斜支撑体系的建筑上层施工方法
CN117966960B (zh) * 2024-02-01 2024-10-18 上海建工四建集团有限公司 一种悬挂结构吊杆及其使用方法

Family Cites Families (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1872813A (en) * 1930-06-30 1932-08-23 Frank D Reiland Adjustable shelf-angle support for building construction
FR941058A (fr) * 1947-01-17 1948-12-31 Procédé et dispositifs pour l'assemblage et le montage des éléments de construction
US3097730A (en) * 1960-11-14 1963-07-16 Roger J Halle Connection of structural elements in the art of building
DE1559023A1 (de) * 1964-05-13 1969-09-04 Mario Landi Vorgefertigte Bauelemente,wie Pfosten,Bodenbelagplatten aus Zement od.dgl.,und Bauverfahren zur Verwendung dieser Elemente
US3977801A (en) * 1974-11-22 1976-08-31 Thomas Philip Murphy Connector for structural members
US4091594A (en) * 1976-10-04 1978-05-30 Yujiro Yamashita Structure for convecting paralled spaced vertical supports
US4237797A (en) * 1977-03-02 1980-12-09 Zapara Gerald A Laminated wood warehouse support structure
CA1303379C (en) * 1987-04-07 1992-06-16 Bjorn O. Thoresen Building construction
JP2766770B2 (ja) * 1993-12-08 1998-06-18 五洋建設株式会社 鉄筋の継手方法及びプレキャスト鉄筋コンクリート梁と柱の接合方法
JPH08105114A (ja) * 1994-10-04 1996-04-23 Kumagai Gumi Co Ltd 柱と梁の接合方法
JP3101163B2 (ja) * 1994-10-04 2000-10-23 株式会社熊谷組 柱と梁の接合方法
CN2339648Y (zh) * 1998-09-23 1999-09-22 高文利 工业化施工钢筋混凝土建筑结构框架的梁、柱连接器
EP1478812A1 (de) * 2002-02-18 2004-11-24 Timberfix Limited Konstruktionssystem
US6802169B2 (en) * 2002-03-18 2004-10-12 Robert J. Simmons Building frame structure
US20060165482A1 (en) * 2005-01-11 2006-07-27 Olberding David J Novel enhanced apparatus and method connecting structural members
KR100926140B1 (ko) * 2007-08-21 2009-11-10 이완영 Pc부재를 이용한 건축 구조물 및 그의 시공방법
US8365476B2 (en) * 2007-12-28 2013-02-05 Seismic Structural Design Associates, Inc. Braced frame force distribution connection
US8209924B2 (en) * 2009-11-12 2012-07-03 The Foley Group, LLC Connector system for securing an end portion of a steel structural member to a vertical cast concrete member
CN101787733A (zh) * 2010-03-03 2010-07-28 管乃彦 一种预制立式构件
CN202012136U (zh) * 2011-03-15 2011-10-19 东南大学 装配剪力墙结构水平缝u型闭合筋连接构造
US20140083042A1 (en) * 2012-09-27 2014-03-27 Best Nature Co., Ltd. Junction structure between structures and beam junction method
CN103074941B (zh) * 2012-12-24 2015-11-04 北京工业大学 一种端部含有钢筋桁架梁的装配式再生混凝土节点及作法
CN103850350A (zh) * 2014-03-14 2014-06-11 南京工业大学 一种预制装配整体式异形柱结构及其拼接施工方法

Also Published As

Publication number Publication date
AU2016268484A1 (en) 2018-01-25
BR112017025348A2 (pt) 2018-07-31
TN2017000477A1 (en) 2019-04-12
ZA201800002B (en) 2018-12-19
EP3310973B1 (de) 2020-03-25
MX2017014935A (es) 2018-11-09
JP2018520285A (ja) 2018-07-26
WO2016189476A1 (fr) 2016-12-01
US10494807B2 (en) 2019-12-03
EA034805B1 (ru) 2020-03-24
PE20171773A1 (es) 2017-12-21
KR20180012809A (ko) 2018-02-06
EA201700596A1 (ru) 2018-05-31
CN108138481B (zh) 2021-02-05
CN108138481A (zh) 2018-06-08
US20180163389A1 (en) 2018-06-14

Similar Documents

Publication Publication Date Title
EP3310973B1 (de) Konstruktion vom typ einer fertigsäule und eines fertigbalkens
CA2496704A1 (fr) Module de coffrage metallique prefabrique pour beton
WO1998054418A1 (fr) Ossature de batiment
OA18497A (fr) Construction type poteaux et poutres préfabriqués.
FR2950910A1 (fr) Panneau pour la realisation d'une construction et procede d'assemblage d'au moins deux panneaux
FR2939817A1 (fr) Bloc elementaire prefabrique pour la construction d'un mur a isolation exterieure
BE1010092A6 (fr) Procede de fabrication et d'assemblage d'un element de contruction en beton.
EP2243891B9 (de) Holzbetonverbundplatte
FR3057289B1 (fr) Element de construction pour poutre mixe acier-beton arme, ensemble de construction et kits de construction
BE1030172B1 (fr) Une paroi préfabriquée en béton armé à utiliser dans un coffrage pour la construction d'un mur en béton
BE1031238B1 (fr) Voile préfabriqué en béton armé destiné à être utilisé dans un coffrage pour construire un mur en béton
FR2878877A1 (fr) Bloc de coffrage
FR2885624A1 (fr) Procede de construction d'un batiment prefabrique et element constitutif de ce batiment
FR2639388A1 (fr) Structure porteuse en beton arme, procede pour sa realisation ainsi qu'element prefabrique en beton arme, bati de coffrage et procede pour la fabrication d'elements prefabriques en beton arme et elements prefabriques en forme de caissons comportant des plaques jumelees
FR2757889A1 (fr) Planchers realises a partir de dalles prefabriquees permettant de transmettre des efforts horizontaux sans dalle de compression rapportee sur chantier
FR3058428B1 (fr) Element de construction a planelle integree
FR3014464A1 (fr) Ecarteur pour la construction d'un mur d'un edifice
BE457752A (de)
FR2732990A1 (fr) Systeme de construction de mur
FR2473589A1 (fr) Procede pour la realisation d'ossature porteuse de batiment a partir d'elements metalliques prefabriques et elements pour la mise en oeuvre du procede
BE641315A (de)
CH97377A (fr) Construction.
BE458180A (de)
BE478184A (de)
BE445777A (de)

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20180102

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20190808

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1248713

Country of ref document: AT

Kind code of ref document: T

Effective date: 20200415

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: FRENCH

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602016032512

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200325

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200625

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200325

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20200601

Year of fee payment: 6

Ref country code: DE

Payment date: 20200601

Year of fee payment: 5

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200626

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200625

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200325

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200325

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200325

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20200601

Year of fee payment: 5

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20200325

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200325

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200725

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200325

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200325

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200325

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200818

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200325

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200325

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200325

VS25 Lapsed in a validation state [announced via postgrant information from nat. office to epo]

Ref country code: MD

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200325

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1248713

Country of ref document: AT

Kind code of ref document: T

Effective date: 20200325

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602016032512

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200325

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200325

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200325

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200325

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200531

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200325

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200531

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200325

26N No opposition filed

Effective date: 20210112

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20200531

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200525

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200525

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200531

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200325

VS25 Lapsed in a validation state [announced via postgrant information from nat. office to epo]

Ref country code: MA

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200325

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602016032512

Country of ref document: DE

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20210525

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210525

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20211201

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200325

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200325

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200325

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200325

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200325

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220531