ES2224076T5 - Módulo de potencia de turbina eólica alojado en la base de la torre - Google Patents
Módulo de potencia de turbina eólica alojado en la base de la torre Download PDFInfo
- Publication number
- ES2224076T5 ES2224076T5 ES02777070T ES02777070T ES2224076T5 ES 2224076 T5 ES2224076 T5 ES 2224076T5 ES 02777070 T ES02777070 T ES 02777070T ES 02777070 T ES02777070 T ES 02777070T ES 2224076 T5 ES2224076 T5 ES 2224076T5
- Authority
- ES
- Spain
- Prior art keywords
- base
- installation
- tower
- power module
- power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000009434 installation Methods 0.000 claims description 47
- 238000010276 construction Methods 0.000 claims description 23
- 238000010616 electrical installation Methods 0.000 claims description 4
- 238000000034 method Methods 0.000 claims description 4
- 238000009826 distribution Methods 0.000 description 6
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 239000004020 conductor Substances 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D1/00—Wind motors with rotation axis substantially parallel to the air flow entering the rotor
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D13/00—Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
- F03D13/20—Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
- F03D13/22—Foundations specially adapted for wind motors
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D13/00—Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
- F03D13/10—Assembly of wind motors; Arrangements for erecting wind motors
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D13/00—Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
- F03D13/20—Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D80/00—Details, components or accessories not provided for in groups F03D1/00 - F03D17/00
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D80/00—Details, components or accessories not provided for in groups F03D1/00 - F03D17/00
- F03D80/80—Arrangement of components within nacelles or towers
- F03D80/82—Arrangement of components within nacelles or towers of electrical components
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D80/00—Details, components or accessories not provided for in groups F03D1/00 - F03D17/00
- F03D80/80—Arrangement of components within nacelles or towers
- F03D80/82—Arrangement of components within nacelles or towers of electrical components
- F03D80/85—Cabling
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D9/00—Adaptations of wind motors for special use; Combinations of wind motors with apparatus driven thereby; Wind motors specially adapted for installation in particular locations
- F03D9/20—Wind motors characterised by the driven apparatus
- F03D9/25—Wind motors characterised by the driven apparatus the apparatus being an electrical generator
- F03D9/255—Wind motors characterised by the driven apparatus the apparatus being an electrical generator connected to electrical distribution networks; Arrangements therefor
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- F05B2230/00—Manufacture
- F05B2230/50—Building or constructing in particular ways
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- F05B2230/00—Manufacture
- F05B2230/60—Assembly methods
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/728—Onshore wind turbines
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P70/00—Climate change mitigation technologies in the production process for final industrial or consumer products
- Y02P70/50—Manufacturing or production processes characterised by the final manufactured product
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10—TECHNICAL SUBJECTS COVERED BY FORMER USPC
- Y10T—TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
- Y10T29/00—Metal working
- Y10T29/49—Method of mechanical manufacture
- Y10T29/49826—Assembling or joining
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Sustainable Development (AREA)
- Sustainable Energy (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Wind Motors (AREA)
- Control Of Eletrric Generators (AREA)
- Foundations (AREA)
Description
DESCRIPCIÓN
Módulo de potencia de turbina eólica alojado en la base de la torre
La invención se refiere a un procedimiento para la construcción de una instalación de energía eólica, así como al diseño de la propia instalación de energía eólica.
Hasta ahora en la construcción de instalaciones de energía eólica se construye, en primer lugar, una base, luego se edifica la torre de la instalación de energía eólica y, por último, se equipa la sala de máquinas y se coloca el rotor con las alas de rotor. Posteriormente, se instalan los módulos eléctricos de potencia, como el transformador, los armarios de distribución y, dado el caso, ondulador, instalación de tensión media, distribución de baja tensión, etc. Esto sucede casi siempre en una pequeña construcción independiente fuera de la instalación de energía eólica. En el documento DE 198164831 ya se propone, también, alojar el transformador en el interior de la torre, de forma que ya no se requiere la construcción de una caseta de transformador independiente con base propia.
El objetivo de la invención es desarrollar ahora un procedimiento mediante el cual la construcción de instalaciones de energía eólica pueda llevarse a cabo de forma más ventajosa pero, sobre todo también, de forma más rápida. El objetivo de la invención se alcanza con un procedimiento según las características de la reivindicación 1 y con una instalación de energía eólica según las características de la reivindicación 2. Configuraciones adicionales ventajosas se describen en las reivindicaciones subordinadas.
Según la invención se propone, desviándose de la construcción de instalaciones de energía eólica existentes hasta ahora, una vez construida la base de la instalación eólica, colocar los módulos de potencia esenciales, es decir, transformador, armarios de distribución, etc. en la base y luego construir la torre, de forma que todos los módulos de potencia tras la construcción de la torre estén protegidos en la zona de la base de la torre, o en la parte inferior de la torre y descansen de forma segura en la base de la torre.
Los módulos de potencia están ya prefabricados en la medida de lo posible y montados sobre soportes, de forma que los módulos de potencia pueden colocarse en la base de la torre mediante una grúa, que se requiere, de todos modos, para la construcción de una instalación de energía eólica y toda la fabricación de funcionamiento, particularmente, el tendido de cables, así como toda la preparación de funcionamiento de la instalación de energía eólica puede tener lugar en un espacio protegido mediante el ajuste de módulos de control individuales, equipamiento de los armarios de distribución etc., y estas actividades pueden iniciarse una vez construida la torre. Los soportes de los módulos de potencia presenten pies de apoyo, que a su vez descansan sobre placas posicionadas previamente en la base de la torre. Estas placas se colocan ya en la construcción de la base en determinadas posiciones y se fijan con la base, de forma que pueden colocarse posteriormente también de forma muy sencilla.
Finalmente, también, resulta ventajoso si para los cables que salen, es decir, particularmente, los cables de transmisión de corriente, cables de control, etc. se prevén travesaños de conductos para cables en la base de la instalación de energía eólica y estos travesaños de conductos para cables están fijados en posiciones predeterminadas. Para ello, los travesaños se sujetan mediante brazos de sujeción, que por su parte están fijados a su vez en partes de la base o en la sección inferior de una torre. Mediante estos travesaños de conductos para cables puede predeterminarse de forma exacta la zona de conducción de cables y, sobre todo, puede diseñarse de forma que los cables que llegan desde el módulo de potencia a la base dispongan del recorrido de cables más corto y óptimo.
Las medidas según la invención facilitan, por tanto también, toda la instalación eléctrica de la instalación de energía eólica mediante una prefabricación de módulos individuales, como los travesaños de conductos para cables, los soportes del módulo de potencia, etc. ya en la construcción de la base.
Con las medidas según la invención puede reducirse claramente el tiempo total de construcción de la instalación de energía eólica. Así mismo, con la invención también pueden reducirse los costes para toda la construcción de la instalación de energía eólica, sin que deban tenerse en cuenta posibles desventajas técnicas.
La invención se explica en detalle, a continuación, mediante un ejemplo realizado en el plano.
La figura 1 muestra una vista en planta de una base prefabricada (sin relleno de hormigón) con un armazón de acero 1 y 2 junto a un conducto para cables 3, que se sostiene mediante un puntal 4 con una sección de la torre inferior que limita con el armazón. Así mismo, se aprecian placas de soporte 5, que se colocan para los brazos de sujeción 6 en la sección inferior de la torre (que posteriormente ya no son visibles tras la construcción de la instalación de energía eólica).
El conducto para cables 3 sirve después para el alojamiento de cables, por ejemplo, de los cables de corriente mediante los cuales se suministra toda la energía eléctrica de la instalación de energía eólica a la red a través del cable de tierra. Para ello, a menudo, se prevén no sólo un único conducto, sino varios conductos.
La figura 2 muestra la sección de la base tras el relleno de hormigón. Al mismo tiempo, se ve que los conductos para cables permanecen en su posición prefijada y las placas de soporte, también, están hormigonadas, con lo cual, al aplicar hormigón debe tenerse en cuenta que las placas de soporte asienten bien sobre el hormigón de la construcción y garanticen así una nivelación plana de la carga. El hormigón llega hasta el borde superior de las placas de soporte y se coloca cuidadosamente en el borde la placa.
Tras endurecerse el hormigón pueden desmontarse los brazos de sujeción para sujetar las placas de soporte, así como los travesaños para fijar los conductos para cables y usarse de nuevo para la construcción de otras instalaciones.
Una vez endurecido el hormigón, para la posterior construcción de la instalación de energía eólica, no se coloca la torre en la base inferior para la sección de la torre - como hasta ahora- sino que se coloca, en primer lugar, un módulo de potencia 7 sobre las placas de soporte 5 (figuras, 2, 3 y 4).
Un módulo de potencia 7 de este tipo se muestra en la figura 3 en una realización de dos partes, con lo cual el módulo de potencia también puede componerse de otras dos partes.
Ambas partes del módulo de potencia 7 están colocadas una sobre otra en el ejemplo representado y todo el módulo de potencia se compone de dos soportes 8 colocados uno sobre otro que, a su vez, alojan partes esenciales de los módulos de potencia como, por ejemplo, el transformador, ondulador, armarios de distribución, instalación de tensión media, etc.
Los soportes 8 colocados uno sobre otro están estructurados en forma de marco y se ajustan exactamente uno sobre otro, de forma que se garantiza una fijación fiable entre sí.
Los soportes individuales presentan entre otras cosas cuatro puntales orientados de forma vertical -tensando un rectángulo- que están unidos entre sí. Estos puntales están atornillados entre sí en su lado inferior y superior.
Tras la colocación del módulo de potencia en la base, se construye la torre 9 (figura 4) y, para ello, se amolda sobre el módulo de potencia. A tal efecto, las dimensiones exteriores del módulo de potencia respecto a anchura y longitud son menores que el diámetro interior de la torre en la zona inferior de la torre/ zona de la base.
Tras la construcción de la torre, se equipa la instalación de energía eólica como habitualmente con la sala de máquinas, se monta el rotor y para la puesta en funcionamiento se producen las uniones eléctricas correspondientes entre el generador y el módulo de potencia 7 y, tiene lugar, también, la conexión del módulo de potencia (salida del transformador) a la red de suministro de corriente.
Si los conductos para cables descritos anteriormente para la realización del cableado de las construcciones previstas están prefijados en una determinada posición descrita anteriormente, puede realizarse, también, la unión entre el módulo de potencia y la red de forma mucho más rápida y ventajosa, con lo cual, las longitudes de cable son mínimas en total, porque los conductos para cables están posicionados allí donde llegan exactamente a la instalación con las partes correspondientes del módulo de potencia.
En la instalación de energía eólica según la invención resulta, también, ventajoso que el acceso a la instalación de energía eólica ya no tiene lugar obligatoriamente en la zona fija de la base a través de una puerta habitual, sino a través de una puerta (acceso) que está posicionada de forma que abre hacia la zona por encima de las partes del módulo de potencia que conducen alta y media tensión. Para ello, puede preverse en el lado exterior de la torre un conductor o escalera correspondiente. Este posicionamiento de la puerta de acceso tiene la ventaja de que la persona, que debe acceder a la instalación a menudo, no tiene que pasar constantemente junto a las partes del módulo de potencia que conducen alta y media tensión mientras la instalación está en funcionamiento. De este
modo, se garantiza que de forma imprevista o por despiste durante el funcionamiento de la instalación de energía eólica alguien pueda encontrarse cerca del módulo de potencia y entre en contacto con las partes que conducen corriente o tensión, lo que podría ocasionar un grave accidente.
En la zona de la puerta de acceso de la torre se prevé una plataforma intermedia correspondiente, que el personal que accede a la torre, puede pisar para poder subir desde el interior de la torre a la instalación de energía eólica o llevar a cabo ajustes en distintas instalaciones de control o leer, también, los datos de medición.
En una instalación de energía eólica del tipo según la invención se trata de una instalación que proporciona regularmente más de 100kW de potencia nominal, preferiblemente, presenta una potencia nominal en la franja de 500 kW, 1 MW, 1 MW o claramente más. Preferentemente, la plataforma intermedia está provista de una placa que puede cerrarse, a través de la cual el personal puede acceder a la zona inferior del módulo de potencia. Con el cierre de la tapa, se garantiza una mayor seguridad de la parte inferior del módulo de potencia frente a un acceso indebido.
El diámetro interior de la torre en la zona de base puede ascender, para ello, a varios metros, de forma que la superficie total allí asciende, por ejemplo, a 100 m2 o más y, por tanto, también, facilita una gran superficie suficiente para alojar los módulos de potencia. En tanto en esta comunicación se usa el concepto “módulo de potencia”, se indica con ello la parte de la instalación de energía eólica que conduce la tensión media o alta. Estos son, particularmente, los agregados como el transformador u ondulador, o el interruptor de emergencia, así como el armario de distribución de tensión media o, también, el distribuidor de baja tensión.
Claims (5)
1. Procedimiento para la construcción de una instalación de energía eólica con una torre (9), que se asienta sobre una base, así como al menos un módulo de potencia eléctrica (7), que se compone, básicamente, de un transformador y, si es necesario, un ondulador y/u otra instalación eléctrica para el control de la instalación de energía eólica y para la conducción de la potencia eléctrica proporcionada por el generador a la instalación de energía eólica y suministrada a una red, en la que el módulo de potencia eléctrica (7) se coloca antes de la construcción de la torre en la base de la torre, en la que el módulo de potencia presenta un soporte que aloja las instalaciones eléctricas del módulo de potencia y el módulo de potencia se coloca en la base de la torre mediante una grúa que se utiliza para la construcción de una instalación de energía eólica instalación de energía eólica y el soporte del módulo de potencia presenta pies de apoyo, que a su vez descansan sobre placas posicionadas previamente en la base de la torre y que ya en la construcción de la base se colocan en determinadas posiciones y se fijan con la base y la anchura y/o longitud del módulo de potencia es menor que el diámetro de la torre de la instalación de energía eólica en la zona de la base.
2. Instalación de energía eólica que se compone de una torre, que se asienta sobre una base, y de un módulo de potencia, en la que el módulo de potencia presenta un transformador, mediante el cual la energía eléctrica que se proporciona por el generador de la instalación de energía eólica, se transforma en tensión media o y/o alta y el módulo de potencia contiene una instalación, mediante la cual la energía eléctrica que proporciona el generador de la instalación de energía eólica se controla y conduce, en la que el módulo de potencia presenta un soporte, que se coloca en la base de la instalación de energía eólica y el soporte aloja las instalaciones eléctricas del módulo de potencia y la anchura y/o longitud del módulo de potencia es menor que el diámetro de la torre de la instalación de energía eólica en la zona de la base, caracterizada porque la torre de la instalación de energía eólica presenta un acceso en forma de puerta posicionada de forma que abre hacia la zona por encima de las partes del módulo de potencia que conducen alta y media tensión y el soporte del módulo de potencia presenta pies de apoyo, que a su vez descansan sobre placas posicionadas previamente en la base de la torre y colocadas ya en la construcción de la base en determinadas posiciones y se fijan con la base y porque en la zona de la puerta de acceso de la torre se prevé una plataforma intermedia.
3. Instalación de energía eólica según la reivindicación 2, caracterizada porque el módulo de potencia está configurado de dos partes, en la que ambas partes están colocadas una sobre otra y los soportes en la zona intermedia entre la primera y segunda parte están configurados de forma que se ajustan entre sí y se fijan uno a otro.
4. Instalación de energía eólica según una de las reivindicaciones 2 o 3, caracterizada porque el módulo de potencia se compone de un transformador y un ondulador y, al menos, un armario de distribución para el alojamiento de instalaciones de control eléctricas de las instalaciones de energía eólica.
5. Instalación de energía eólica según una de las reivindicaciones precedentes, caracterizada porque en la base de la instalación de energía eólica están dispuestos conductos para cables (3) para el alojamiento de cables y los conductos para cables están fijados con los travesaños antes de fijar la base.
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE10145414 | 2001-09-14 | ||
| DE10145414A DE10145414B4 (de) | 2001-09-14 | 2001-09-14 | Verfahren zur Errichtung einer Windenergieanlage, Windenergieanlage |
| PCT/EP2002/010212 WO2003025392A1 (de) | 2001-09-14 | 2002-09-12 | Windturbineleistungsmodul auf dem turmfundament gelagert |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| ES2224076T3 ES2224076T3 (es) | 2005-03-01 |
| ES2224076T5 true ES2224076T5 (es) | 2019-02-04 |
Family
ID=7699081
Family Applications (4)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| ES07120659.3T Expired - Lifetime ES2609911T3 (es) | 2001-09-14 | 2002-09-12 | Procedimiento para la construcción de una instalación de energía eólica, instalación de energía eólica |
| ES02777070T Expired - Lifetime ES2224076T5 (es) | 2001-09-14 | 2002-09-12 | Módulo de potencia de turbina eólica alojado en la base de la torre |
| ES16164605T Expired - Lifetime ES2710308T3 (es) | 2001-09-14 | 2002-09-12 | Procedimiento para la construcción de una instalación de energía eólica, instalación de energía eólica |
| ES04016488.1T Expired - Lifetime ES2576553T3 (es) | 2001-09-14 | 2002-09-12 | Instalación de energía eólica y procedimiento para la construcción de una instalación de energía eólica |
Family Applications Before (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| ES07120659.3T Expired - Lifetime ES2609911T3 (es) | 2001-09-14 | 2002-09-12 | Procedimiento para la construcción de una instalación de energía eólica, instalación de energía eólica |
Family Applications After (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| ES16164605T Expired - Lifetime ES2710308T3 (es) | 2001-09-14 | 2002-09-12 | Procedimiento para la construcción de una instalación de energía eólica, instalación de energía eólica |
| ES04016488.1T Expired - Lifetime ES2576553T3 (es) | 2001-09-14 | 2002-09-12 | Instalación de energía eólica y procedimiento para la construcción de una instalación de energía eólica |
Country Status (22)
| Country | Link |
|---|---|
| US (3) | US7365446B2 (es) |
| EP (4) | EP1882851B1 (es) |
| JP (2) | JP4284178B2 (es) |
| KR (1) | KR100776535B1 (es) |
| CN (1) | CN1292168C (es) |
| AR (1) | AR036515A1 (es) |
| AT (1) | ATE271189T1 (es) |
| AU (3) | AU2002338668B2 (es) |
| BR (1) | BR0212479B1 (es) |
| CA (1) | CA2458581C (es) |
| CY (2) | CY1117680T1 (es) |
| DE (2) | DE10145414B4 (es) |
| DK (4) | DK1477668T3 (es) |
| ES (4) | ES2609911T3 (es) |
| MX (1) | MXPA04002347A (es) |
| NO (1) | NO341007B1 (es) |
| NZ (1) | NZ531660A (es) |
| PL (1) | PL207793B1 (es) |
| PT (4) | PT1381775E (es) |
| TR (1) | TR200400490T4 (es) |
| WO (1) | WO2003025392A1 (es) |
| ZA (1) | ZA200401865B (es) |
Families Citing this family (40)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7612999B2 (en) * | 1998-09-18 | 2009-11-03 | Flo Healthcare Solutions, Llc | Mobile clinical workstation |
| DE10145414B4 (de) | 2001-09-14 | 2013-09-12 | Aloys Wobben | Verfahren zur Errichtung einer Windenergieanlage, Windenergieanlage |
| DE10152557C1 (de) * | 2001-10-24 | 2003-06-18 | Aloys Wobben | Windenergieanlage mit Stromschienen |
| WO2004067959A1 (de) | 2003-02-01 | 2004-08-12 | Aloys Wobben | Verfahren zur errichtung einer windenergieanlage sowie windenergieanlage |
| DE10310036A1 (de) * | 2003-02-01 | 2004-08-12 | Aloys Wobben | Verfahren zur Errichtung einer Windenergieanlage, Windenergieanlage |
| CA2591536A1 (en) * | 2004-11-23 | 2006-06-01 | Vestas Wind Systems A/S | A wind turbine, a method for assembling and handling the wind turbine and uses hereof |
| AT500843B8 (de) * | 2005-03-18 | 2007-02-15 | Hehenberger Gerald Dipl Ing | Verfahren und vorrichtung zum abbremsen des rotors einer windkraftanlage |
| US7298055B2 (en) * | 2005-07-15 | 2007-11-20 | Abb Technology Ag | Auxiliary power supply for a wind turbine |
| US7762037B2 (en) * | 2005-11-18 | 2010-07-27 | General Electric Company | Segment for a tower of a wind energy turbine and method for arranging operating components of a wind energy turbine in a tower thereof |
| CN101384818B (zh) * | 2006-03-25 | 2012-08-01 | 剪式风能公司 | 用于风轮机的热管理系统 |
| US8482146B2 (en) * | 2007-12-10 | 2013-07-09 | V Squared Wind, Inc. | Efficient systems and methods for construction and operation of accelerating machines |
| US8937399B2 (en) | 2007-12-10 | 2015-01-20 | V Squared Wind, Inc. | Efficient systems and methods for construction and operation of mobile wind power platforms |
| WO2009076479A2 (en) | 2007-12-10 | 2009-06-18 | V Squared Wind, Inc. | Modular array fluid flow energy conversion facility |
| DE102008018790A1 (de) * | 2008-04-15 | 2009-10-22 | Wobben, Aloys | Windenergieanlage mit Stromschienen |
| US8646219B2 (en) * | 2008-05-30 | 2014-02-11 | General Electric Company | Fixture for locating wind turbine equipment on foundation prior to tower installation |
| US20100024311A1 (en) * | 2008-07-30 | 2010-02-04 | Dustin Jon Wambeke | Wind turbine assembly with tower mount |
| US20100095617A1 (en) * | 2008-10-16 | 2010-04-22 | General Electric Wind Energy Gmbh | Wind turbine tower foundation containing power and control equipment |
| DE102008058129A1 (de) * | 2008-11-16 | 2010-05-20 | Siemens Aktiengesellschaft | Vorrichtung mit starren Verbindungsschienen zur stromführenden Verbindung von ersten mit zweiten Stromschienen |
| CA2746648A1 (en) * | 2008-12-10 | 2010-06-17 | V Squared Wind, Inc. | Efficient systems and methods for construction and operation of accelerating machines |
| DE602008002602D1 (de) * | 2008-12-19 | 2010-10-28 | Openhydro Ip Ltd | Verfahren zum Installieren eines hydroelektrischen Turbinengenerators |
| US8482147B2 (en) * | 2009-07-21 | 2013-07-09 | George Moser | Wind turbine with powered synchronization system |
| US8201378B2 (en) | 2009-07-29 | 2012-06-19 | General Electric Company | Guide system for power modules |
| US20110027100A1 (en) * | 2009-07-30 | 2011-02-03 | Daniel Francis Cummane | Mobile wind power station |
| DE102009051518B3 (de) * | 2009-10-31 | 2011-05-12 | Semikron Elektronik Gmbh & Co. Kg | Modular aufgebaute Stromrichteranordnung |
| DE102010007136B4 (de) * | 2010-02-05 | 2012-04-05 | Abb Technology Ag | Schaltanlage, insbesondere Schaltanlage für eine Offshore-Windenergieanlage |
| JP4852158B2 (ja) * | 2010-02-19 | 2012-01-11 | 株式会社東芝 | 電子機器、および収納ケース |
| DE102010012408A1 (de) * | 2010-03-23 | 2011-09-29 | Powerwind Gmbh | Trägeranordnung für eine Windenergieanlage, Windenergieanlage mit einer Trägeranordnung und Verfahren zum Errichten einer Windenergieanlage |
| DE102010020587A1 (de) | 2010-05-14 | 2011-11-17 | Powerwind Gmbh | Trafo-Tausch |
| JP5667822B2 (ja) * | 2010-09-21 | 2015-02-12 | 株式会社日立製作所 | 風車タワー内の部品搭載構造 |
| ITVI20110013U1 (it) * | 2011-02-23 | 2012-08-24 | Itaco S R L | Generatore elettrico |
| DE102011001906A1 (de) | 2011-04-08 | 2012-10-11 | Schuler Pressen Gmbh & Co. Kg | Lastverteilelement für eine Ankeranordnung für ein Fundament einer Windkraftanlage und Verfahren zur Herstellung eines Fundaments |
| US8245458B2 (en) | 2011-05-17 | 2012-08-21 | General Electric Company | Wind turbine with tower support system and associated method of construction |
| US20120139256A1 (en) * | 2011-10-06 | 2012-06-07 | General Electric Company | Wind turbine installation with a self-contained power production component enclosure |
| US8677700B2 (en) | 2012-03-01 | 2014-03-25 | Thomas & Betts International, Inc. | Foundation system for electrical utility structures |
| DE102012221498A1 (de) * | 2012-11-23 | 2014-05-28 | Wobben Properties Gmbh | Übergabestation zur Einspeisung elektrischer Energie, sowie Windenergieanlagenpark mit solcher Übergabestation |
| ES2753358T3 (es) * | 2014-03-28 | 2020-04-08 | Vestas Wind Sys As | Un método para la instalación de un módulo de control de potencia en una torre de unidad de energía eólica y un componente agregado |
| CN103971884B (zh) * | 2014-05-14 | 2016-04-27 | 国家电网公司 | 一种角钢塔式台架配电变压器 |
| WO2015175923A1 (en) * | 2014-05-16 | 2015-11-19 | HST Solar Farms, Inc. | Systems & methods for solar photovoltaic array engineering |
| JP2017089447A (ja) * | 2015-11-06 | 2017-05-25 | 株式会社日立製作所 | 洋上風車の建設方法、洋上風車及び洋上風力発電設備 |
| JP6967537B2 (ja) * | 2016-06-29 | 2021-11-17 | ヴェスタス ウィンド システムズ エー/エス | アセンブリ、設備パッケージ、及び風力タービンタワーにおける設備ユニットの設置に用いる方法 |
Family Cites Families (141)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US702324A (en) * | 1902-04-14 | 1902-06-10 | William Mcilvrid | Air-lock for caissons. |
| US1415545A (en) * | 1921-05-05 | 1922-05-09 | George Spiro | Rail splice |
| US1415645A (en) * | 1921-08-01 | 1922-05-09 | Holterud Samuel | Wind wheel |
| US1523977A (en) * | 1923-08-02 | 1925-01-20 | Seeley L Pillar | Pole foundation |
| US1544863A (en) * | 1924-04-28 | 1925-07-07 | Ross Alfred | Reenforced-concrete pole base |
| US1578829A (en) * | 1924-05-03 | 1926-03-30 | John E Jennings | Mast for high-tension electric transmission |
| US1633460A (en) * | 1926-07-26 | 1927-06-21 | Giuseppe Nobile | Wind-power-generating device |
| US2105557A (en) * | 1935-03-19 | 1938-01-18 | John A Slack | Visualizing camera |
| US2106557A (en) * | 1935-06-22 | 1938-01-25 | Palmer C Putnam | Aero-electric generation system |
| US2417022A (en) * | 1945-05-23 | 1947-03-04 | Stagg Allen | Windmill |
| AT191530B (de) | 1954-06-15 | 1957-08-26 | Western Electric Co | Gekapselte elektrische Einrichtung |
| US3289369A (en) * | 1964-08-11 | 1966-12-06 | Spring City Foundry Company | Light standard base hold down |
| DE1509511C3 (de) | 1965-07-30 | 1979-08-09 | Interatom Internationale Atomreaktorbau Gmbh, 5060 Bensberg | Personenschleuse für Druck- oder Sicherheitsräume |
| US3891899A (en) | 1971-07-19 | 1975-06-24 | Donald F Sparling | Concrete utility post with meter, gas line and water line |
| FR2225591B1 (es) | 1973-04-12 | 1980-04-18 | Pennecot Jean | |
| US3942026A (en) * | 1974-06-11 | 1976-03-02 | Carter Frank H | Wind turbine with governor |
| US3944839A (en) * | 1974-07-18 | 1976-03-16 | Carter Frank H | Multi-windmill wheel power generator |
| US4017698A (en) | 1975-04-02 | 1977-04-12 | Westinghouse Electric Corporation | Draw-out type circuit interrupter with modular construction |
| US4012163A (en) * | 1975-09-08 | 1977-03-15 | Franklin W. Baumgartner | Wind driven power generator |
| US4068131A (en) * | 1975-10-20 | 1978-01-10 | Jacobs Marcellus L | Wind electric plant |
| US4066911A (en) * | 1976-10-04 | 1978-01-03 | Sarchet Douglas P | Wind-driven prime mover |
| US4228363A (en) * | 1979-04-03 | 1980-10-14 | Jacobs Marcellus L | Modular wind electric power plant |
| US4272929A (en) * | 1979-08-23 | 1981-06-16 | Hanson Bror H | Tower and method of construction |
| US4291233A (en) * | 1980-01-29 | 1981-09-22 | Westinghouse Electric Corp. | Wind turbine-generator |
| DE3007442C2 (de) * | 1980-02-28 | 1983-02-10 | Messerschmitt-Bölkow-Blohm GmbH, 8000 München | Vorrichtung zum Verankern von freitragenden hohen, dynamisch beanspruchten Strukturen |
| US4340822A (en) * | 1980-08-18 | 1982-07-20 | Gregg Hendrick J | Wind power generating system |
| US4449053A (en) * | 1981-07-27 | 1984-05-15 | Aluminum Company Of America | Vertical axis wind turbine |
| US4565929A (en) * | 1983-09-29 | 1986-01-21 | The Boeing Company | Wind powered system for generating electricity |
| US4551631A (en) | 1984-07-06 | 1985-11-05 | Trigilio Gaetano T | Wind and solar electric generating plant |
| AU572675B2 (en) * | 1984-07-23 | 1988-05-12 | Hitchins, W.G. | Foundation with bolting means |
| US4609827A (en) * | 1984-10-09 | 1986-09-02 | Nepple Richard E | Synchro-vane vertical axis wind powered generator |
| JPS61112780A (ja) * | 1984-10-25 | 1986-05-30 | Naomi Kikuchi | 風力発電機 |
| JPS61105768A (ja) | 1984-10-27 | 1986-05-23 | Mitsubishi Electric Corp | ビデオカセツトレコ−ダ |
| JPS6220678A (ja) | 1985-07-19 | 1987-01-29 | Matsushita Seiko Co Ltd | 風力暖房装置 |
| US4772999A (en) | 1986-12-16 | 1988-09-20 | Merlin Gerin | Static converter, especially for an uninterruptible electrical power supply system |
| DE3732670A1 (de) * | 1987-09-28 | 1989-04-13 | Siemens Ag | Anordnung eines transformators und eines mastes in einem freileitungsnetz zur elektrizitaetsuebertragung |
| US4976087A (en) * | 1987-12-07 | 1990-12-11 | Edward Pizzino | Method of forming footing and laying first course of block |
| US4873028A (en) | 1988-02-22 | 1989-10-10 | Baltimore Aircoil Company, Inc. | Low silhouette cooling tower with trapezoidal fill and method of air flow therethrough |
| US5050356A (en) * | 1988-07-19 | 1991-09-24 | Houston Industries Incorporated | Immured foundation |
| US4999966A (en) * | 1988-07-19 | 1991-03-19 | Houston Industries Incorporated | Method of forming an-before "immured" |
| US4987719A (en) * | 1988-12-29 | 1991-01-29 | Goodson Jr Albert A | Reinforced concrete building construction and method of forming same |
| US5075564A (en) * | 1989-12-19 | 1991-12-24 | Hickey John J | Combined solar and wind powered generator with spiral surface pattern |
| US5140856A (en) * | 1990-12-03 | 1992-08-25 | Dynamic Rotor Balancing, Inc. | In situ balancing of wind turbines |
| JP2575960B2 (ja) | 1991-03-01 | 1997-01-29 | 株式会社トプコン | 自動レンズ研削装置 |
| US5254876A (en) | 1992-05-28 | 1993-10-19 | Hickey John J | Combined solar and wind powered generator with spiral blades |
| US5437519A (en) * | 1992-08-26 | 1995-08-01 | Roger Bullivant Of Texas, Inc. | Piles and pile forming methods |
| US5285112A (en) | 1992-09-21 | 1994-02-08 | Star Energy Company, L.L.C. | Fluid energy collection system |
| DE4241952C2 (de) | 1992-12-12 | 1996-03-07 | Licentia Gmbh | Schaltanlagen-Container |
| US5499482A (en) * | 1993-08-06 | 1996-03-19 | Ptmw, Incorporated | Structure and method for encapsulating an existing building |
| JPH07122438A (ja) * | 1993-10-22 | 1995-05-12 | Tohoku Denki Seizo Kk | 電柱一体形変圧器 |
| US5487849A (en) | 1993-12-03 | 1996-01-30 | Tower Tech, Inc. | Pultruded cooling tower construction |
| SE503948C2 (sv) * | 1993-12-15 | 1996-10-07 | Mafi Ab | Mast |
| NL9400506A (nl) * | 1994-03-30 | 1995-11-01 | Samenwerkingen Energiebedrijf | Betonnen transformatorhuis. |
| DE9417738U1 (de) | 1994-10-27 | 1994-12-22 | Rudersdorf, Friedemann, Dipl.-Ing., 50968 Köln | Windkraftmast mit Trafostation |
| US5586417A (en) * | 1994-11-23 | 1996-12-24 | Henderson; Allan P. | Tensionless pier foundation |
| JP3002107B2 (ja) * | 1994-12-19 | 2000-01-24 | 勤伍 内藤 | 柱脚構造及び柱脚工法 |
| JPH0993729A (ja) | 1995-09-25 | 1997-04-04 | Tokyo Electric Power Co Inc:The | 電気機器収容箱の扉錠 |
| DE29518899U1 (de) * | 1995-12-01 | 1997-01-09 | G. Mokinski & Sohn KG, 33442 Herzebrock-Clarholz | Sohlenelement für ein Transformatoren-Häuschen o.dgl. |
| US5806262A (en) * | 1995-12-05 | 1998-09-15 | Schuylkill Products, Inc. | Post and method of emplacing a post |
| JPH1041042A (ja) * | 1996-07-23 | 1998-02-13 | Fujikura Ltd | フレキシブルフラットケーブルとプリント配線板との接続方法及びフレキシブルフラットケーブル |
| KR100269764B1 (ko) * | 1996-11-30 | 2000-10-16 | 심현진 | 풍력 발전 장치 |
| DE59811213D1 (de) | 1997-05-14 | 2004-05-27 | Betonbau Gmbh | Elektrische Umspannstation |
| DK9700453U3 (da) * | 1997-12-01 | 1998-03-13 | Ove Mejlholm | Transformatormodul til placering i vindmølle |
| EP1038103A1 (de) * | 1997-12-08 | 2000-09-27 | Siemens Aktiengesellschaft | Windkraftanlage und verfahren zur kühlung eines generators einer windkraftanlage |
| US6097104A (en) * | 1999-01-19 | 2000-08-01 | Russell; Thomas H. | Hybrid energy recovery system |
| DE19816483C2 (de) * | 1998-04-14 | 2003-12-11 | Aloys Wobben | Windenergieanlage |
| DE19853790A1 (de) | 1998-11-21 | 2000-05-31 | Wilhelm Groppel | Windkraftanlage |
| US6448669B1 (en) * | 1998-12-01 | 2002-09-10 | Dillyn M. Elder | Water power generation system |
| US6191496B1 (en) * | 1998-12-01 | 2001-02-20 | Dillyn M. Elder | Wind turbine system |
| EP1149449A2 (en) * | 1998-12-17 | 2001-10-31 | Dan-Control Engineering A/S | Wind mill with a suspension for cables and the like, such suspension for cables and the like and a holder for such suspension |
| DE19859628C1 (de) | 1998-12-23 | 2000-03-23 | Aerodyn Eng Gmbh | Vorrichtung zur Vermeidung des Eindringens von korrosiv wirkenden Salzpartikeln |
| DE19860211C1 (de) | 1998-12-24 | 2000-11-23 | Aerodyn Energiesysteme Gmbh | Verfahren zum Verlegen von elektrischen Kabeln von einer ersten Offshore-Windenergieanlage zu einer zweiten Offshore-Windenergieanlage |
| JP2000213451A (ja) | 1999-01-22 | 2000-08-02 | Hitachi Zosen Corp | 風力発電装置 |
| JP2000265938A (ja) * | 1999-03-17 | 2000-09-26 | Hitachi Ltd | 風力発電の雷保護システム |
| IL146286A (en) * | 1999-05-20 | 2004-08-31 | Wobben Aloys | Armor ring for a wind turbine tower |
| US6272810B1 (en) * | 1999-05-24 | 2001-08-14 | Jack L. Ingram | Method and system for providing foundation and perimeter stem walls for mobile homes |
| ES2204573T5 (es) | 1999-07-14 | 2012-05-31 | Aloys Wobben | Aerogenerador con circuito de refrigeración cerrado |
| US6530553B1 (en) * | 1999-09-20 | 2003-03-11 | Philip A. Diorio | Method and apparatus for making concrete buildings |
| ES2160078B1 (es) * | 1999-11-23 | 2002-05-01 | Marrero O Shanahan Pedro M | Torre eolica con aceleracion de flujo. |
| DE19962453C1 (de) | 1999-12-22 | 2001-07-12 | Aerodyn Eng Gmbh | Offshore-Windenergieanlage mit Subsysteme aufnehmenden austauschbaren Containern |
| US6452708B1 (en) * | 2000-01-11 | 2002-09-17 | Aurora Networks, Inc. | Reverse digitized communications architecture |
| IL134724A0 (en) * | 2000-02-24 | 2001-04-30 | Giltek Telecomm Ltd | Foundation for a tower and a method for its deployment on site |
| US6665990B1 (en) * | 2000-03-06 | 2003-12-23 | Barr Engineering Co. | High-tension high-compression foundation for tower structures |
| DK200000086U3 (da) * | 2000-03-09 | 2000-05-12 | Villy Bruun A S Elautomatik | Fleksibel og justerbar indbygningsmodul til vindmøller |
| DE10013442C1 (de) | 2000-03-17 | 2001-10-31 | Tacke Windenergie Gmbh | Windkraftanlage |
| JP2001345162A (ja) * | 2000-03-30 | 2001-12-14 | Denso Corp | 内燃機関用スパークプラグ |
| DK174156B1 (da) * | 2000-04-03 | 2002-07-29 | Henrik Frans Christensen | Vind- og bølgeenergianlæg |
| JP2002016125A (ja) * | 2000-06-29 | 2002-01-18 | Ebara Corp | 基板回転装置 |
| PE20020090A1 (es) | 2000-07-11 | 2002-02-10 | Pacheco Pedro Saavedra | Generador electrico eolico marino |
| KR200216125Y1 (ko) * | 2000-09-08 | 2001-03-15 | 강자승 | 풍력발전기의 주축조정장치 |
| WO2002027105A1 (en) * | 2000-09-27 | 2002-04-04 | Allan P Henderson | Perimeter weighted foundation for wind turbines and the like |
| US6470645B1 (en) | 2000-11-09 | 2002-10-29 | Beaird Industries, Inc. | Method for making and erecting a wind tower |
| US6530614B1 (en) * | 2000-11-14 | 2003-03-11 | Tactical & Rescue Equipment Llc | Collapsible grappling hook |
| GB0029498D0 (en) * | 2000-12-02 | 2001-01-17 | Oceans Engineering Ltd | A method of making a foundation |
| US6782667B2 (en) * | 2000-12-05 | 2004-08-31 | Z-Tek, Llc | Tilt-up and telescopic support tower for large structures |
| US6782887B2 (en) * | 2001-01-12 | 2004-08-31 | Becton, Dickinson And Company | Medicament respiratory delivery device and cartridge |
| DE20102051U1 (de) | 2001-01-31 | 2001-05-03 | Sulz, Adolf, 16775 Gransee | Windkraftanlage mit frontal angeströmten Vertikalrotoren |
| DE10119429A1 (de) | 2001-04-20 | 2002-10-24 | Enron Wind Gmbh | Windkraftanlage mit verschiebbarem Behälter |
| US6734578B2 (en) * | 2001-05-29 | 2004-05-11 | Honda Giken Kogyo Kabushiki Kaisha | Vehicular remote control lock apparatus |
| US6661113B1 (en) * | 2001-08-31 | 2003-12-09 | Walter E. Bonin | Power generator |
| DE10145414B4 (de) * | 2001-09-14 | 2013-09-12 | Aloys Wobben | Verfahren zur Errichtung einer Windenergieanlage, Windenergieanlage |
| DE10226996B4 (de) * | 2001-10-09 | 2014-07-03 | Aloys Wobben | Verfahren zur Erstellung eines Fundaments, insbesondere für einen Turm einer Windenergieanlage |
| DE10160306B4 (de) * | 2001-12-07 | 2004-01-15 | Wobben, Aloys, Dipl.-Ing. | Turm einer Windenergieanlage |
| EP1336704B1 (en) * | 2002-02-15 | 2013-02-13 | NTT Infrastructure Network Corporation | Concrete electric pole and method for reinforcing the same |
| US6688842B2 (en) * | 2002-06-24 | 2004-02-10 | Bruce E. Boatner | Vertical axis wind engine |
| US7137225B2 (en) * | 2002-06-25 | 2006-11-21 | David Zuppan | Foundation wall system |
| DE10233947A1 (de) * | 2002-07-25 | 2004-02-12 | Siemens Ag | Windkraftanlage |
| DE10237908A1 (de) | 2002-08-14 | 2004-05-13 | Abb Patent Gmbh | Verfahren und Vorrichtung zum Versorgen und Warten von baulichen Einrichtungen auf dem Meer |
| US6815936B2 (en) | 2002-08-21 | 2004-11-09 | Intersil Americas Inc. | Closed loop diode emulator for DC-DC converter |
| DE10245078B4 (de) * | 2002-09-27 | 2005-08-11 | Aloys Wobben | Windenergieanlage |
| JP4355949B2 (ja) * | 2002-10-01 | 2009-11-04 | ゼネラル・エレクトリック・カンパニイ | 風力タービンタワー用のモジュラーキット |
| US6841894B2 (en) * | 2003-01-02 | 2005-01-11 | Josep Lluis Gomez Gomar | Wind power generator having wind channeling body with progressively reduced section |
| DE10310036A1 (de) * | 2003-02-01 | 2004-08-12 | Aloys Wobben | Verfahren zur Errichtung einer Windenergieanlage, Windenergieanlage |
| WO2004067959A1 (de) * | 2003-02-01 | 2004-08-12 | Aloys Wobben | Verfahren zur errichtung einer windenergieanlage sowie windenergieanlage |
| US6872023B2 (en) * | 2003-03-17 | 2005-03-29 | Tsun-Chi Liao | Structure of steplessly adjusting angle for a cymbal |
| JP4102278B2 (ja) * | 2003-03-19 | 2008-06-18 | 三菱電機株式会社 | 風力発電システム |
| US7171787B2 (en) * | 2003-06-24 | 2007-02-06 | Ch2M Hill Inc. | Rectangular tilt-up concrete tank construction |
| US6798082B1 (en) | 2003-09-29 | 2004-09-28 | Chen Chin-Yih | Turbine wind energy generator structure for the same |
| US7185467B2 (en) * | 2003-10-06 | 2007-03-06 | Oscar Marty | Modular system of permanent forms for casting reinforced concrete buildings on site |
| US7618217B2 (en) * | 2003-12-15 | 2009-11-17 | Henderson Allan P | Post-tension pile anchor foundation and method therefor |
| ES2309478T3 (es) * | 2004-02-10 | 2008-12-16 | GAMESA INNOVATION & TECHNOLOGY, S.L. UNIPERSONAL | Banco de ensayo para generadores eolicos. |
| KR20050088522A (ko) * | 2004-03-02 | 2005-09-07 | 김영민 | 싱글 로터 방식의 수평-수직축 통합형 풍력 발전기 시스템 |
| CA2591536A1 (en) * | 2004-11-23 | 2006-06-01 | Vestas Wind Systems A/S | A wind turbine, a method for assembling and handling the wind turbine and uses hereof |
| US20060169868A1 (en) * | 2005-01-31 | 2006-08-03 | Precast Concepts, Llc | Precast concrete meter pit and method and apparatus for making same |
| US8282869B2 (en) * | 2005-01-31 | 2012-10-09 | Precast Concepts, Llc | Method for making precast concrete meter pit |
| JP4700980B2 (ja) | 2005-03-01 | 2011-06-15 | 株式会社リバーコーポレーション | ギャングウエイタワーのリプレース方法 |
| US8261502B2 (en) * | 2005-03-16 | 2012-09-11 | Illinois Tool Works, Inc. | Tower foundation system |
| DE102005044989B3 (de) * | 2005-09-21 | 2006-12-14 | Nordex Energy Gmbh | Verfahren zur Gründung eines Fundamentkörpers für eine Windenenergieanlage |
| US7762037B2 (en) * | 2005-11-18 | 2010-07-27 | General Electric Company | Segment for a tower of a wind energy turbine and method for arranging operating components of a wind energy turbine in a tower thereof |
| KR100747661B1 (ko) * | 2005-12-07 | 2007-08-08 | (주)엠씨에스공법 | 거푸집-콘크리트 복합보 및 이를 이용한 건축물 시공 방법 |
| US7178298B1 (en) * | 2006-04-17 | 2007-02-20 | Ebeling Sr Albert | Building construction system and method |
| US7530780B2 (en) * | 2006-05-22 | 2009-05-12 | General Electric Company | Method and apparatus for wind power foundation |
| CN101484643B (zh) * | 2006-07-05 | 2011-02-02 | 维斯塔斯风力系统有限公司 | 塔架建筑 |
| EP2064393B1 (en) * | 2006-09-21 | 2012-07-04 | Ahmed Phuly Engineering & Consulting, Inc. | Partially prefabricated modular foundation system |
| US8056299B2 (en) * | 2007-03-12 | 2011-11-15 | Mack Industries, Inc. | Foundation construction for superstructures |
| US7921616B2 (en) * | 2008-01-16 | 2011-04-12 | Willy Reyneveld | Method and apparatus for setting support columns within a foundation |
| US7805893B2 (en) * | 2008-02-21 | 2010-10-05 | General Electric Company | Preassembled tower section of a wind power plant |
| US20090223139A1 (en) * | 2008-03-05 | 2009-09-10 | Karl-Heinz Meiners | Method and system for assembling components in a tower of a wind energy turbine |
| ES2347742A1 (es) * | 2008-03-18 | 2010-11-03 | GAMESA INNOVATION & TECHNOLOGY S.L. | Cimentacion de aerogenerador. |
| DE102008022654A1 (de) * | 2008-05-07 | 2009-11-12 | Berg, Mario, Dr. | Verfahren und Vorrichtung zur Montage eines modulartigen Bauwerks, wie einer Windenergieanlage |
| US8646219B2 (en) * | 2008-05-30 | 2014-02-11 | General Electric Company | Fixture for locating wind turbine equipment on foundation prior to tower installation |
-
2001
- 2001-09-14 DE DE10145414A patent/DE10145414B4/de not_active Expired - Lifetime
-
2002
- 2002-09-12 EP EP07120659.3A patent/EP1882851B1/de not_active Expired - Lifetime
- 2002-09-12 WO PCT/EP2002/010212 patent/WO2003025392A1/de not_active Ceased
- 2002-09-12 PT PT02777070T patent/PT1381775E/pt unknown
- 2002-09-12 PT PT71206593T patent/PT1882851T/pt unknown
- 2002-09-12 JP JP2003528991A patent/JP4284178B2/ja not_active Expired - Fee Related
- 2002-09-12 US US10/477,299 patent/US7365446B2/en not_active Expired - Lifetime
- 2002-09-12 PL PL367357A patent/PL207793B1/pl unknown
- 2002-09-12 KR KR1020047003467A patent/KR100776535B1/ko not_active Expired - Fee Related
- 2002-09-12 ES ES07120659.3T patent/ES2609911T3/es not_active Expired - Lifetime
- 2002-09-12 ES ES02777070T patent/ES2224076T5/es not_active Expired - Lifetime
- 2002-09-12 PT PT16164605T patent/PT3104002T/pt unknown
- 2002-09-12 PT PT40164881T patent/PT1477668T/pt unknown
- 2002-09-12 ES ES16164605T patent/ES2710308T3/es not_active Expired - Lifetime
- 2002-09-12 EP EP16164605.4A patent/EP3104002B1/de not_active Expired - Lifetime
- 2002-09-12 BR BRPI0212479-3A patent/BR0212479B1/pt not_active IP Right Cessation
- 2002-09-12 DK DK04016488.1T patent/DK1477668T3/en active
- 2002-09-12 AT AT02777070T patent/ATE271189T1/de active
- 2002-09-12 AU AU2002338668A patent/AU2002338668B2/en not_active Ceased
- 2002-09-12 ES ES04016488.1T patent/ES2576553T3/es not_active Expired - Lifetime
- 2002-09-12 CN CNB028178211A patent/CN1292168C/zh not_active Expired - Lifetime
- 2002-09-12 TR TR2004/00490T patent/TR200400490T4/xx unknown
- 2002-09-12 DK DK16164605.4T patent/DK3104002T3/en active
- 2002-09-12 DK DK07120659.3T patent/DK1882851T3/en active
- 2002-09-12 EP EP04016488.1A patent/EP1477668B1/de not_active Expired - Lifetime
- 2002-09-12 NZ NZ531660A patent/NZ531660A/en not_active IP Right Cessation
- 2002-09-12 DE DE50200637T patent/DE50200637D1/de not_active Expired - Lifetime
- 2002-09-12 MX MXPA04002347A patent/MXPA04002347A/es active IP Right Grant
- 2002-09-12 DK DK02777070.0T patent/DK1381775T4/da active
- 2002-09-12 EP EP02777070.0A patent/EP1381775B2/de not_active Expired - Lifetime
- 2002-09-12 CA CA002458581A patent/CA2458581C/en not_active Expired - Fee Related
- 2002-09-13 AR ARP020103466A patent/AR036515A1/es not_active Application Discontinuation
-
2004
- 2004-03-08 ZA ZA200401865A patent/ZA200401865B/xx unknown
- 2004-04-07 NO NO20041456A patent/NO341007B1/no not_active IP Right Cessation
-
2005
- 2005-07-07 AU AU2005202963A patent/AU2005202963A1/en not_active Abandoned
-
2008
- 2008-02-25 US US12/072,235 patent/US7663263B2/en not_active Expired - Lifetime
- 2008-08-15 JP JP2008209241A patent/JP2008303884A/ja not_active Abandoned
-
2009
- 2009-09-30 US US12/569,975 patent/US7786612B2/en not_active Expired - Fee Related
-
2010
- 2010-07-22 AU AU2010203130A patent/AU2010203130B2/en not_active Ceased
-
2016
- 2016-06-24 CY CY20161100568T patent/CY1117680T1/el unknown
-
2017
- 2017-01-10 CY CY20171100022T patent/CY1118444T1/el unknown
Also Published As
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| ES2224076T3 (es) | Modulo de potencia de turbina eolica alojado en la base de la torre. | |
| JP4282667B2 (ja) | 風力発電設備の構築方法および風力発電設備 | |
| ES2462665T3 (es) | Instalación de energía eólica | |
| NZ586660A (en) | A wind energy plant where an entrance lock is used to keep water, salt or humid air out of the interior | |
| ES2391890T3 (es) | Instalación de energía eólica con carriles conductores | |
| AU2013216627B2 (en) | Wind turbine power module mounted on the tower foundation | |
| AU2008201590B2 (en) | Method for the erection of a wind energy plant and wind energy plant |