JP2000230204A - Elevated track construction method and equipment - Google Patents

Elevated track construction method and equipment

Info

Publication number
JP2000230204A
JP2000230204A JP11032051A JP3205199A JP2000230204A JP 2000230204 A JP2000230204 A JP 2000230204A JP 11032051 A JP11032051 A JP 11032051A JP 3205199 A JP3205199 A JP 3205199A JP 2000230204 A JP2000230204 A JP 2000230204A
Authority
JP
Japan
Prior art keywords
unit
track
girder
existing track
new
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP11032051A
Other languages
Japanese (ja)
Inventor
Shigenori Nakahara
繁則 中原
Yoshiyuki Obara
由幸 小原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Shimizu Corp
JR East Consultants Co
Original Assignee
Shimizu Construction Co Ltd
Shimizu Corp
JR East Consultants Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd, Shimizu Corp, JR East Consultants Co filed Critical Shimizu Construction Co Ltd
Priority to JP11032051A priority Critical patent/JP2000230204A/en
Publication of JP2000230204A publication Critical patent/JP2000230204A/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

(57)【要約】 【課題】 新交通システム等の高架軌道を効率的に施工
する。 【解決手段】 高架軌道1を施工するに際し、施工済み
の既設軌道の前方に新たな柱2を立設するとともに該柱
と既設軌道との間に新たな桁3を架設することで軌道を
前方に延長していく。柱材2aと桁材3aとをピン7に
より相対回転可能に連結したユニット4を製作し、該ユ
ニットを既設軌道を走行する施工装置5に積載して既設
軌道の先端部まで搬送し、既設軌道の先端部上からユニ
ットを既設軌道の前方に設置する。桁材の基端を既設軌
道の先端に転回可能に連結し、そこを支点としてユニッ
トを前方に転回させる。施工装置はユニットを積載して
既設軌道を走行する台車12上に、ユニットを保持する
とともに前方へ転回させる揚重機材13を搭載する。台
車を前部台車12aと後部台車12bとにより構成す
る。
(57) [Summary] [Problem] To efficiently construct an elevated track such as a new transportation system. SOLUTION: When an elevated track 1 is constructed, a new pillar 2 is erected in front of the constructed existing track and a new girder 3 is erected between the pillar and the existing track to move the track forward. To be extended. A unit 4 in which the column member 2a and the girder member 3a are connected to each other by a pin 7 so as to be rotatable relative to each other is manufactured, the unit is loaded on a construction device 5 running on an existing track, and is transported to the tip of the existing track. The unit will be installed in front of the existing track from above the tip. The base end of the girder is turnably connected to the tip of the existing track, and the unit is turned forward using this as a fulcrum. The construction apparatus mounts a lifting equipment 13 that holds the unit and turns it forward on a trolley 12 on which the units are loaded and travels on an existing track. The truck is constituted by a front truck 12a and a rear truck 12b.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、たとえば新交通シ
ステムにおける高架軌道を施工する際に適用して好適な
施工方法とそのための施工装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a construction method and a construction apparatus suitable for use when constructing an elevated track in a new transportation system, for example.

【0002】[0002]

【従来の技術】近年、都市域の道路は激しい交通渋滞が
慢性化しているため、その緩和、解消を目的として、十
名程度の定員の小型車両をガイドレールにより案内して
完全自動運転する形式の比較的簡便な公共交通機関、い
わゆる新交通システムが各地で計画されつつある。
2. Description of the Related Art In recent years, intense traffic congestion has become chronic on roads in urban areas. For the purpose of alleviating or eliminating such traffic congestion, small vehicles with a capacity of about 10 people are guided by guide rails and fully automatically driven. The relatively simple public transportation system, so-called new transportation system, is being planned in various places.

【0003】[0003]

【発明が解決しようとする課題】ところで、新交通シス
テムを計画するに際しては、その軌道であるガイドレー
ルの敷設用地を新たに確保することは困難であることが
多いため、ガイドレールを既存の道路上の空間たとえば
中央分離帯の上方空間を利用してそこに高架軌道として
設けることが一般的である。しかし、既存道路上に高架
軌道を設ける工事を行うためには道路上からのクレーン
による作業が中心となるため、道路交通規制を行うこと
が不可欠であり、しかも大都市の幹線道路等においては
十分に交通規制を行うことが困難な場合も多い。そのた
め交通規制をできるだけ必要とせずに高架軌道を施工し
得る有効な方策の開発が急務であるとされていた。
When planning a new transportation system, it is often difficult to secure a new site for laying the guide rail, which is the track of the new transportation system. It is common to utilize an upper space, for example, a space above a median strip, and to provide an elevated track there. However, in order to construct an elevated track on an existing road, work with a crane from the road is the center, so it is essential to regulate road traffic, and it is not sufficient for arterial roads in large cities. In many cases, it is difficult to regulate traffic. Therefore, it was urgently necessary to develop an effective measure for constructing an elevated track with as little traffic regulation as possible.

【0004】[0004]

【課題を解決するための手段】上記事情に鑑み、請求項
1の発明の施工方法は、柱を所定間隔で立設してそれら
柱の上端相互間に桁を架設してなる高架軌道を施工する
に際して、施工済みの既設軌道の前方に新たな柱を立設
するとともに該柱と既設軌道との間に新たな桁を架設す
ることで施工するべき高架軌道を順次前方に延長してい
くこととし、新たな柱の立設と新たな桁の架設を行うに
当たっては、柱材の上端と桁材の先端とをピンにより相
対回転可能に連結してなるユニットを製作し、該ユニッ
トを既設軌道を走行する施工装置に積載して既設軌道の
先端部まで搬送し、既設軌道の先端部上から前記ユニッ
トを既設軌道の前方に設置して柱材を新たな柱として立
設するとともに該柱と既設軌道との間に前記桁材を新た
な桁として架設するようにしたものである。
SUMMARY OF THE INVENTION In view of the above circumstances, the construction method according to the first aspect of the present invention is to construct an elevated track in which columns are erected at predetermined intervals and a girder is erected between the upper ends of the columns. Erecting an elevated track to be constructed sequentially by erecting a new pillar in front of the installed existing track and installing a new girder between the pillar and the existing track. When erecting a new pillar and erection of a new girder, a unit was manufactured by connecting the upper end of the pillar material and the tip of the girder material so as to be relatively rotatable with a pin, and the unit was mounted on the existing track. And transported to the tip of the existing track, transporting it to the tip of the existing track, installing the unit in front of the existing track from the tip of the existing track, and standing up the pillar as a new pillar and The girder material is erected as a new girder between the existing track. It is obtained by way.

【0005】請求項2の発明の施工方法は、請求項1の
発明において、前記ユニットにおける桁材の基端側を前
方に向けかつ該桁材の上方に前記柱材を添わせた状態で
該ユニットを前記施工装置に横置きして積載し、該ユニ
ットを既設軌道の前方に設置するに当たっては、前記桁
材の基端を既設軌道の先端に対して転回可能に連結し、
該連結点を支点として前記ユニットを前方に転回させる
ことで前記桁材を略水平姿勢として既設軌道の前方に位
置せしめるとともに、前記柱材を前記ピンを支点として
前記桁材に対して相対回転せしめて鉛直姿勢とするよう
にしたものである。
According to a second aspect of the present invention, there is provided the construction method according to the first aspect of the present invention, wherein the base end of the girder of the unit is directed forward and the column is attached above the girder. The unit is placed horizontally on the construction device and loaded, and when installing the unit in front of the existing track, the base end of the girder is connected to the tip of the existing track so as to be able to turn,
By turning the unit forward with the connection point as a fulcrum, the girder is positioned in front of the existing track with a substantially horizontal posture, and the column is rotated relative to the girder with the pin as a fulcrum. In a vertical position.

【0006】請求項3の発明の施工装置は、請求項2の
発明の施工方法を実施する際に使用するものであって、
前記ユニットを積載して既設軌道を走行する台車上に、
前記ユニットを保持するとともに該ユニットを前方へ転
回させる揚重機材を搭載してなるものである。
A construction apparatus according to a third aspect of the present invention is used when performing the construction method according to the second aspect of the invention.
On a truck carrying the unit and traveling on the existing track,
A hoisting device for holding the unit and turning the unit forward is mounted.

【0007】請求項4の発明の施工装置は、請求項3の
発明において、前記台車を前記ユニットにおける桁材の
基端部を保持する前部台車と、該桁材の先端部を保持す
るとともに前記揚重機材が搭載されている後部台車とに
より構成したものである。
According to a fourth aspect of the present invention, in the construction apparatus according to the third aspect, the bogie includes a front bogie for holding a base end of a girder in the unit, and a front bogie for holding a front end of the girder. And a rear bogie on which the lifting equipment is mounted.

【0008】[0008]

【発明の実施の形態】図1〜図3は本発明の実施形態を
示すものである。本実施形態の施工対象である高架軌道
1は新交通システムのガイドレールとなるもので、一定
間隔で立設された柱2と、それら柱2の上端間に架設さ
れた桁3とにより構成され、桁3自体をガイドレールと
してそこを車両が走行するものである。
1 to 3 show an embodiment of the present invention. The elevated track 1 to be constructed according to the present embodiment serves as a guide rail of a new transportation system, and includes columns 2 erected at regular intervals and a girder 3 erected between upper ends of the columns 2. , And the vehicle travels on the girder 3 itself as a guide rail.

【0009】本実施形態の施工方法は、施工済みの既設
軌道の前方に新たな柱2を立設するとともにその柱2と
既設軌道との間に新たな桁3を架設することで高架軌道
1を順次前方に延長していくことを基本とする。そし
て、既設軌道の前方に新たな柱2の立設と新たな桁3の
架設を行うに当たっては、柱2となる柱材2aと桁3と
なる桁材3aとを連結したユニット4を用い、そのユニ
ット4を既設軌道を走行する施工装置5に積載して既設
軌道の先端部まで搬送し、既設軌道上からの作業により
その設置を行う。
The construction method according to the present embodiment is characterized in that a new pillar 2 is erected in front of the constructed existing track and a new girder 3 is erected between the pillar 2 and the existing track. Is basically extended forward. Then, in erection of a new pillar 2 and erection of a new girder 3 in front of the existing track, a unit 4 in which a pillar 2a to be a pillar 2 and a girder 3a to be a girder 3 are used, The unit 4 is loaded on a construction device 5 running on an existing track, transported to the tip of the existing track, and installed by work from the existing track.

【0010】上記のユニット4は、柱材2aの上端と桁
材3aの先端とがブラケット6を介してピン7により相
対回転可能に連結されたものであり、このユニット4は
図1に示すように桁材3aの基端側を前方に向けかつそ
の桁材3aの上方に柱材2aを添わせた状態として固定
金物8により仮固定され、その状態で施工装置5に横置
きされて積載されるものである。このユニット4は桁材
3aの基端にブラケット9が取り付けられ、後述するよ
うにそのブラケット9が既設軌道の先端に取り付けられ
た同様のブラケット10に重ね合わせられてピン11
(図2および図3参照)により連結されることで、その
ユニット4は既設軌道に対してピン11を中心として前
方に転回可能に連結されるようになっている。なお、ユ
ニット4の寸法は施工するべき高架軌道1の柱2および
梁3の寸法に応じて自ずと決まるが、柱材2aの長さは
5〜8m程度、桁材3aの長さは10〜15m程度、重
量は5t程度未満とすることが現実的である。
In the unit 4, the upper end of the pillar 2a and the tip of the beam 3a are connected to each other via a bracket 6 via a pin 7 so as to be relatively rotatable. This unit 4 is shown in FIG. The beam 3a is temporarily fixed by the fixing hardware 8 in a state where the base end side of the beam 3a is directed forward and the column 2a is attached above the beam 3a. Things. In this unit 4, a bracket 9 is attached to the base end of the girder member 3a. As will be described later, the bracket 9 is superimposed on a similar bracket 10 attached to the tip of an existing track, and a pin 11
(See FIGS. 2 and 3), the unit 4 is connected to the existing track so as to be able to turn forward with the pin 11 as a center. The dimensions of the unit 4 are naturally determined according to the dimensions of the columns 2 and the beams 3 of the elevated track 1 to be constructed, but the length of the column 2a is about 5 to 8 m, and the length of the girder 3a is 10 to 15 m. It is practical that the weight is less than about 5t.

【0011】上記施工装置5は、既設軌道を自走する台
車12上に、上記ユニット4を保持するとともにそのユ
ニット4を前方へ転回させる揚重機材13を搭載してな
るものである。本例の施工装置5における台車12は、
ユニット4の桁材3aの基端部を保持する前部台車12
aと、桁材3aの先端部を保持するとともに揚重機材1
3が搭載されている後部台車12bとがロッド14によ
り連結された構成のものが採用されている。前部台車1
2aは後部台車12bに対して離接可能とされ、必要に
応じて既設軌道上から撤去できるものとされている。上
記の揚重機材13はユニット4を把持する油圧ジャッキ
13aと、その油圧ジャッキ13aを起倒させる油圧ジ
ャッキ13bを有し、それら油圧ジャッキ13a,13
bの操作によりユニット4を前方に転回させることが可
能なものである。
The construction apparatus 5 is provided with a lifting machine 13 for holding the unit 4 and turning the unit 4 forward on a carriage 12 which runs on an existing track. The trolley 12 in the construction apparatus 5 of this example is
Front bogie 12 holding the base end of beam 3a of unit 4
a and the leading end of the girder 3a and the lifting equipment 1
3 is connected to a rear bogie 12b on which rods 3 are mounted by rods 14. Front trolley 1
2a is configured to be detachable from the rear bogie 12b and can be removed from the existing track as needed. The lifting equipment 13 has a hydraulic jack 13a for gripping the unit 4 and a hydraulic jack 13b for raising and lowering the hydraulic jack 13a.
The unit 4 can be turned forward by the operation b.

【0012】上記のユニット4および施工装置5を用い
て既設軌道を前方に延長する作業を行うには、先行施工
した駅舎を作業基地としてそこでユニット4を施工装置
5に積載し、施工装置5を発進させて図1に示すように
既設軌道の先端部に導く。この際、ユニット4の荷重は
前部台車12aと後部台車12bとに分散されるので、
ユニット4および施工装置5の全荷重が既設の桁3に集
中してかかることがない。なお、新たな柱2を立設する
ための基礎15は先行施工しておく。
In order to extend the existing track forward by using the unit 4 and the construction apparatus 5, the unit 4 is loaded on the construction apparatus 5 using the previously constructed station building as a work base. It is started and guided to the tip of the existing track as shown in FIG. At this time, since the load of the unit 4 is distributed to the front bogie 12a and the rear bogie 12b,
The entire load of the unit 4 and the construction device 5 does not concentrate on the existing girder 3. The foundation 15 for erecting a new pillar 2 is pre-constructed.

【0013】施工装置5が既設軌道の先端部に達した
ら、そこで揚重機材13を操作するとともに必要に応じ
て台車12の位置を前後に調整して、桁材3aの基端部
に取り付けておいたブラケット9を既設軌道の先端に取
り付けておいたブラケット10に重ね合わせるように位
置決めを行い、それらブラケット9,10にピン11を
挿通することでユニット4を既設軌道に対して転回可能
に連結する。その連結作業は前部台車12a上から、あ
るいはそれに設置した足場に作業員が乗って行えば良
い。
When the construction device 5 reaches the tip of the existing track, the lifting equipment 13 is operated there, and the position of the truck 12 is adjusted back and forth as necessary, and attached to the base end of the girder 3a. The unit 9 is positioned so as to overlap the bracket 9 attached to the tip of the existing track so as to overlap with the bracket 10 attached to the tip of the existing track, and the unit 4 is rotatably connected to the existing track by inserting pins 11 into the brackets 9 and 10. I do. The connecting operation may be performed by the operator from the front carriage 12a or a scaffold installed on the front carriage 12a.

【0014】そして、固定金物8を取り外した後、図2
に示すように揚重機材13を操作してユニット4をピン
11を支点として転回させて起立させ、さらに図3に示
すようにユニット4をそのまま前方に倒していく。この
際、前部台車12aが邪魔になる場合にはそれを適宜退
避させれば良い。図示例では前部台車12aを後部台車
12bから切り離して既設軌道上から降ろしてある。ま
た、ユニット4の荷重により後部台車12bが前方に転
倒する恐れがあるような場合には後部台車12bを既設
軌道に対して適宜固定すれば良い。
After removing the fixing hardware 8, FIG.
As shown in FIG. 3, the lifting device 13 is operated to turn the unit 4 around the pin 11 as a fulcrum to stand up, and then, as shown in FIG. At this time, if the front carriage 12a is in the way, it may be retracted appropriately. In the illustrated example, the front bogie 12a is separated from the rear bogie 12b and lowered from the existing track. If there is a possibility that the rear truck 12b may fall forward due to the load of the unit 4, the rear truck 12b may be appropriately fixed to the existing track.

【0015】以上の操作により、図3に示されるように
柱材2aは自重によりピン7を支点として桁材3aに対
して自ずと相対回転して鉛直姿勢となって降下してい
き、その柱材2aの下端が基礎15に達すれば桁材3a
は自ずと水平姿勢となって既設軌道に連続する。以降
は、柱材2aを基礎15に対して定着することのみで新
たな柱2が立設され、桁材3aの両端をその柱2と既設
軌道に対して連結するのみで新たな桁3が架設される。
By the above operation, as shown in FIG. 3, the column member 2a naturally rotates relative to the girder member 3a with the pin 7 as a fulcrum by its own weight and descends in a vertical posture. When the lower end of 2a reaches the foundation 15, the beam 3a
Automatically becomes a horizontal attitude and continues to the existing track. Thereafter, a new column 2 is erected only by fixing the column member 2a to the foundation 15, and a new column 3 is formed only by connecting both ends of the beam member 3a to the column 2 and the existing track. It will be erected.

【0016】上記施工方法によれば、新たな柱2の立設
と新たな梁3の架設に係わる作業の大半を既設軌道上か
ら行うことができ、かつ、ユニット4の搬送も既設軌道
を利用して施工装置5により行うので、従来のようにク
レーンを用いての地上からの作業を大幅に軽減あるいは
殆ど無くすことができ、したがって高架軌道1を道路上
に設ける場合にも交通規制を最小限度に軽減することが
可能である。また、柱材2aと桁材3aとを予め連結し
てユニット4としておき、それを既設軌道に対して連結
して揚重機材13により前方に転回させるようにしてい
ることから、地上からの作業が不要であることに加え
て、柱2の立設と桁3の架設とを同時にしかも安全に行
い得るので施工性に優れ、工期短縮と工費削減を図るこ
とができる。
According to the above construction method, most of the work related to the erecting of the new pillar 2 and the erection of the new beam 3 can be performed from the existing track, and the transfer of the unit 4 also uses the existing track. Work by the construction apparatus 5 can greatly reduce or almost eliminate the work from the ground using a crane as in the prior art. Therefore, even when the elevated track 1 is provided on a road, traffic regulation is minimized. It is possible to reduce it. Further, since the column member 2a and the beam member 3a are connected in advance to form a unit 4, which is connected to the existing track and turned forward by the lifting equipment 13, work from the ground is performed. In addition to the fact that it is unnecessary, the erecting of the column 2 and the erection of the girder 3 can be performed simultaneously and safely, so that the workability is excellent, and the construction period and the cost can be reduced.

【0017】なお、本発明は、施工対象の高架軌道1の
構造が比較的簡便である新交通システムに適用すること
が最適であるが、同様の構造の高架軌道であれば新交通
システムに限ることなく他にも適用することが可能であ
る。また、ユニット4としてはたとえば図4に示すよう
に1本の柱材2aに2本の桁材3aをピン7により連結
した複線用のユニット4も適用可能である。ただし、い
ずれにしても本発明は既設軌道を利用してユニット4の
搬送とその架設を行うため、ユニット4を積載した施工
装置5の総重量は施工対象の高架軌道1の設計荷重を越
えない範囲に設定すべきであり、そうでない場合には既
設軌道に対する補強が必要となる。
The present invention is optimally applied to a new transportation system in which the structure of the elevated track 1 to be constructed is relatively simple, but is limited to the new transportation system if the elevated track 1 has the same structure. It is possible to apply other without. As the unit 4, for example, a unit 4 for a double track in which two column members 3 a are connected to one column member 2 a by pins 7 as shown in FIG. 4 is also applicable. However, in any case, since the present invention uses the existing track to transport the unit 4 and install it, the total weight of the construction apparatus 5 loaded with the unit 4 does not exceed the design load of the elevated track 1 to be constructed. It should be set within the range, otherwise reinforcement for the existing track is required.

【0018】また、本発明においては上記実施形態のよ
うに駅舎を先行施工してそれを作業基地とすることが合
理的であるが、駅舎間の距離が1Km程度を越えて搬送
効率が良くないような場合には、駅舎間に仮設の作業基
地を設けて資材搬送の効率化を図れば良い。
Further, in the present invention, it is reasonable to construct the station building in advance and use it as a work base as in the above embodiment, but the distance between the station buildings exceeds about 1 km and the transport efficiency is not good. In such a case, a temporary work base may be provided between the station buildings to improve the efficiency of material transportation.

【0019】さらに、本発明の施工装置の構成はユニッ
トの寸法や形態に応じて適宜の変更を行えば良く、たと
えば必ずしも上記実施形態のように前部台車12aと後
部台車12bとにより構成することに限るものではない
し、揚重機材13も油圧ジャッキ13a,13bによる
ものに限らず他の形式のものも採用可能である。また、
図4に示したような複線用のユニット4を用いる場合に
は揚重機材13を2本の桁材3aを操作可能なものとす
るか、もしくは施工装置5に2台の揚重機材13を搭載
しておけば良い。さらに、施工装置は走行駆動源を備え
て自走するものが好ましいが、牽引等により走行するも
のであっても差し支えない。
Further, the construction of the construction apparatus of the present invention may be appropriately changed according to the size and form of the unit. For example, the construction apparatus may be constituted by the front bogie 12a and the rear bogie 12b as in the above embodiment. However, the lifting equipment 13 is not limited to the hydraulic jacks 13a and 13b, and other types can be used. Also,
When the unit 4 for a double track as shown in FIG. 4 is used, the lifting equipment 13 is made to be capable of operating two girder members 3a, or the construction equipment 5 is provided with two lifting equipment 13 It should be installed. Further, it is preferable that the construction device be self-propelled with a traveling drive source, but may be one that travels by traction or the like.

【0020】[0020]

【発明の効果】請求項1の発明の施工方法は、柱材と桁
材とを連結したユニットを既設軌道を走行する施工装置
に積載して既設軌道の先端部まで搬送し、そこからユニ
ットを既設軌道の前方に設置するので、新たな柱の立設
と新たな梁の架設に係わる作業の大半を既設軌道上から
行うことができ、かつ、ユニットの搬送も既設軌道を利
用して行うので、従来のようにクレーンを用いての地上
からの作業を大幅に軽減あるいは殆ど無くすことがで
き、したがって高架軌道を道路上に設ける場合にも交通
規制を最小限度に軽減することが可能であり、新交通シ
ステム等における比較的簡便な高架軌道を施工する際に
最適である。
According to the construction method of the first aspect of the present invention, a unit in which a column member and a girder member are connected is loaded on a construction device traveling on an existing track, transported to the tip of the existing track, and the unit is transferred from there. Since it is installed in front of the existing track, most of the work related to erecting new columns and erection of new beams can be performed from the existing track, and units are also transported using the existing track. Therefore, it is possible to greatly reduce or almost eliminate the work from the ground using a crane as in the past, and therefore it is possible to minimize traffic regulations even when an elevated track is provided on a road, It is optimal when constructing relatively simple elevated tracks in new transportation systems.

【0021】請求項2の発明の施工方法は、桁材の基端
を既設軌道の先端に対して転回可能に連結し、その連結
点を支点としてユニットを前方に転回させるようにした
ので、基礎工事を除いて既設軌道上からの作業のみで柱
の立設と桁の架設とを同時にしかも安全に行い得るの
で、施工性に優れ、工期短縮、工費削減を図ることがで
きる。
According to the construction method of the second aspect of the present invention, the base end of the girder material is rotatably connected to the tip of the existing track, and the unit is turned forward using the connection point as a fulcrum. Except for the construction work, the erecting of the pillars and the erection of the girder can be performed simultaneously and safely only by working from the existing track, so that the workability is excellent, the construction period is shortened, and the construction cost is reduced.

【0022】請求項3の発明の施工装置は、ユニットを
積載して既設軌道を走行する台車上に、ユニットを保持
するとともにそれを前方へ転回させる揚重機材を搭載し
てなるものであるから、ユニットの搬送と前方への転回
作業を効率的に行うことができ、上記方法を実施する際
に使用して好適なものである。。
According to the construction apparatus of the third aspect of the present invention, a lifting device for holding the unit and turning it forward is mounted on a bogie on which the unit is loaded and travels on the existing track. Since the unit can be transported and turned forward, it is suitable for use in carrying out the above method. .

【0023】請求項4の発明の施工装置は、台車を前部
台車と後部台車とにより構成したので、ユニット搬送時
の荷重を分散することができ、既設軌道に対して過大な
集中荷重がかかることを防止できる。
In the construction apparatus according to the fourth aspect of the present invention, since the bogie is constituted by the front bogie and the rear bogie, the load during unit transport can be dispersed, and an excessive concentrated load is applied to the existing track. Can be prevented.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 本発明の実施形態を説明する図であって、ユ
ニットを既設軌道の先端部に搬送した状態を示す図であ
る。
FIG. 1 is a diagram illustrating an embodiment of the present invention, and is a diagram illustrating a state in which a unit has been transported to a tip end of an existing track.

【図2】 同、ユニットを前方に転回せしめて起立させ
た状態を示す図である。
FIG. 2 is a diagram showing a state in which the unit is turned upright by standing forward.

【図3】 同、ユニットをさらに前方に転回せしめて既
設軌道の前方位置に設置する状態を示す図である。
FIG. 3 is a diagram showing a state in which the unit is further turned forward and installed at a position in front of an existing track.

【図4】 本発明において用いるユニットの他の例を示
す図である。
FIG. 4 is a diagram showing another example of a unit used in the present invention.

【符号の説明】[Explanation of symbols]

1 高架軌道 2 柱 2a 柱材 3 桁 3a 桁材 4 ユニット 5 施工装置 7 ピン 12 台車 12a 前部台車 12b 後部台車 13 揚重機材 13a、13b 油圧ジャッキ DESCRIPTION OF SYMBOLS 1 elevated track 2 pillar 2a pillar material 3 girder 3a girder material 4 unit 5 construction equipment 7 pin 12 trolley 12a front trolley 12b rear trolley 13 lifting equipment 13a, 13b hydraulic jack

───────────────────────────────────────────────────── フロントページの続き (72)発明者 小原 由幸 東京都港区芝浦一丁目2番3号 清水建設 株式会社内 Fターム(参考) 2D057 CC02 2D059 AA05 BB37 CC07 DD03 DD04 ────────────────────────────────────────────────── ─── Continued on the front page (72) Inventor Yoshiyuki Ohara 1-3-2 Shibaura, Minato-ku, Tokyo Shimizu Corporation F-term (reference) 2D057 CC02 2D059 AA05 BB37 CC07 DD03 DD04

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 柱を所定間隔で立設してそれら柱の上端
相互間に桁を架設してなる高架軌道を施工するに際し
て、施工済みの既設軌道の前方に新たな柱を立設すると
ともに該柱と既設軌道との間に新たな桁を架設すること
で施工するべき高架軌道を順次前方に延長していくこと
とし、 新たな柱の立設と新たな桁の架設を行うに当たっては、
柱材の上端と桁材の先端とをピンにより相対回転可能に
連結してなるユニットを製作し、該ユニットを既設軌道
を走行する施工装置に積載して既設軌道の先端部まで搬
送し、既設軌道の先端部上から前記ユニットを既設軌道
の前方に設置して前記柱材を新たな柱として立設すると
ともに該柱と既設軌道との間に前記桁材を新たな桁とし
て架設することを特徴とする高架軌道施工方法。
When constructing an elevated track having pillars erected at predetermined intervals and a girder between the upper ends of the pillars, a new pillar is erected in front of the already-constructed existing track. An elevated track to be constructed is to be extended sequentially by constructing a new girder between the pillar and the existing track, and in erection of a new pillar and construction of a new girder,
Manufacture a unit that connects the upper end of the column material and the tip of the girder material so that they can rotate relative to each other with pins, load the unit on the construction equipment running on the existing track, transport it to the tip of the existing track, and It is required that the unit is installed in front of the existing track from the top of the track and the pillar is erected as a new pillar, and that the beam is erected as a new beam between the pillar and the existing track. Elevated track construction method is a feature.
【請求項2】 請求項1記載の高架軌道施工方法であっ
て、 前記ユニットにおける桁材の基端側を前方に向けかつ該
桁材の上方に前記柱材を添わせた状態で該ユニットを前
記施工装置に横置きして積載し、該ユニットを既設軌道
の前方に設置するに当たっては、前記桁材の基端を既設
軌道の先端に対して転回可能に連結し、該連結点を支点
として前記ユニットを前方に転回させることで前記桁材
を略水平姿勢として既設軌道の前方に位置せしめるとと
もに、前記柱材を前記ピンを支点として前記桁材に対し
て相対回転せしめて鉛直姿勢とすることを特徴とする高
架軌道施工方法。
2. The method for constructing an elevated track according to claim 1, wherein the unit is mounted in a state where a base end side of a girder member in the unit faces forward and the column member is attached above the girder member. When the unit is placed laterally on the construction device and the unit is installed in front of the existing track, the base end of the girder is connected rotatably to the tip of the existing track, and the connection point is used as a fulcrum. By turning the unit forward, the girder is positioned in front of the existing track in a substantially horizontal posture, and the column is relatively rotated with respect to the girder using the pin as a fulcrum, thereby obtaining a vertical posture. An elevated track construction method characterized by the following.
【請求項3】 請求項2記載の高架軌道施工方法におい
て使用する施工装置であって、前記ユニットを積載して
既設軌道を走行する台車上に、前記ユニットを保持する
とともに該ユニットを前方へ転回させる揚重機材を搭載
してなることを特徴とする高架軌道施工装置。
3. A construction apparatus used in the method of constructing an elevated track according to claim 2, wherein the unit is held on a truck carrying the unit and traveling on an existing track, and the unit is turned forward. An elevated track construction device, which is equipped with lifting equipment to be lifted.
【請求項4】 請求項3記載の施工装置であって、前記
台車を前記ユニットにおける桁材の基端部を保持する前
部台車と、該桁材の先端部を保持するとともに前記揚重
機材が搭載されている後部台車とにより構成してなるこ
とを特徴とする高架軌道施工装置。
4. The construction apparatus according to claim 3, wherein the bogie includes a front bogie for holding a base end of a girder in the unit, and a crane for holding a front end of the girder. An elevated track construction apparatus characterized by comprising a rear bogie on which is mounted.
JP11032051A 1999-02-09 1999-02-09 Elevated track construction method and equipment Withdrawn JP2000230204A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11032051A JP2000230204A (en) 1999-02-09 1999-02-09 Elevated track construction method and equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11032051A JP2000230204A (en) 1999-02-09 1999-02-09 Elevated track construction method and equipment

Publications (1)

Publication Number Publication Date
JP2000230204A true JP2000230204A (en) 2000-08-22

Family

ID=12348076

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11032051A Withdrawn JP2000230204A (en) 1999-02-09 1999-02-09 Elevated track construction method and equipment

Country Status (1)

Country Link
JP (1) JP2000230204A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003025091A (en) * 2001-04-26 2003-01-28 Honda Canada Inc Article transfer device
JP2007077656A (en) * 2005-09-14 2007-03-29 Yokogawa Bridge Corp Construction method of bridge girder, and bridge girder
JP2007205014A (en) * 2006-02-01 2007-08-16 Yokogawa Bridge Corp Bridge erection method and apparatus
JP2008144472A (en) * 2006-12-11 2008-06-26 Yokogawa Bridge Holdings Corp Position adjustment method and apparatus for bridge girder connection

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003025091A (en) * 2001-04-26 2003-01-28 Honda Canada Inc Article transfer device
JP2007077656A (en) * 2005-09-14 2007-03-29 Yokogawa Bridge Corp Construction method of bridge girder, and bridge girder
JP2007205014A (en) * 2006-02-01 2007-08-16 Yokogawa Bridge Corp Bridge erection method and apparatus
JP2008144472A (en) * 2006-12-11 2008-06-26 Yokogawa Bridge Holdings Corp Position adjustment method and apparatus for bridge girder connection

Similar Documents

Publication Publication Date Title
CN112962459B (en) Integrated bridge girder erection machine for piling, pier mounting and girder erection and bridge construction method
CN211848975U (en) Block mounting device for ultra-wide steel box girder of cable-stayed bridge
JP2009191458A (en) Bridge erection device, floor slab erection method, and bridge erection method
CN111038940A (en) Rail mounted is used for hoist and mount traction system of transportation
CN112160773A (en) Tunnel lining reinforcing steel bar trolley and lining reinforcing steel bar binding construction method
JP2006028881A (en) Self-propelled PC slab erection machine and PC slab erection method
JP2000230205A (en) Elevated track construction method and equipment
JP4489872B2 (en) Bridge erection method and apparatus
JP2971042B2 (en) Girder transporter and girder transport method
JP5187969B2 (en) Overhead viaduct construction equipment and construction method
JP4143442B2 (en) PC floor slab erection device and PC floor slab erection method using the device
CN114481834B (en) Pile-beam erection integrated machine and erection method
JP2000230204A (en) Elevated track construction method and equipment
JP2006336392A (en) Bridge removal method
JP3892196B2 (en) Slope-equipment carrying work device and construction method of this device
JP2000230206A (en) Elevated track construction method and equipment
CN109295855B (en) Hollow frame machine for suspending hollow iron cantilever
JP2006045913A (en) How to build a bridge
CN209652767U (en) A device for synchronously erecting the girder and deck
CN109295818B (en) Construction method for hanging empty iron
JP3318133B2 (en) How to build artificial ground
JPH0791814B2 (en) Arch-type shelter construction equipment
JP2004051335A (en) Vehicle for high lift work
JP3247181U (en) Rail assembly equipment
JPS6365761B2 (en)

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20060509