JP2000314132A - Pile head treatment method of concrete pile - Google Patents
Pile head treatment method of concrete pileInfo
- Publication number
- JP2000314132A JP2000314132A JP11158459A JP15845999A JP2000314132A JP 2000314132 A JP2000314132 A JP 2000314132A JP 11158459 A JP11158459 A JP 11158459A JP 15845999 A JP15845999 A JP 15845999A JP 2000314132 A JP2000314132 A JP 2000314132A
- Authority
- JP
- Japan
- Prior art keywords
- pile
- concrete
- pile head
- liquid
- air
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 15
- 239000007788 liquid Substances 0.000 claims abstract description 13
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 8
- 238000002347 injection Methods 0.000 claims description 6
- 239000007924 injection Substances 0.000 claims description 6
- 239000002184 metal Substances 0.000 claims 1
- 229920003023 plastic Polymers 0.000 claims 1
- 125000000391 vinyl group Chemical group [H]C([*])=C([H])[H] 0.000 claims 1
- 229920002554 vinyl polymer Polymers 0.000 claims 1
- 238000000926 separation method Methods 0.000 abstract description 10
- 238000010276 construction Methods 0.000 description 4
- 239000000428 dust Substances 0.000 description 4
- 238000004064 recycling Methods 0.000 description 3
- 125000006850 spacer group Chemical group 0.000 description 3
- 239000002699 waste material Substances 0.000 description 3
- 238000013461 design Methods 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 1
- 229910000278 bentonite Inorganic materials 0.000 description 1
- 239000000440 bentonite Substances 0.000 description 1
- SVPXDRXYRYOSEX-UHFFFAOYSA-N bentoquatam Chemical compound O.O=[Si]=O.O=[Al]O[Al]=O SVPXDRXYRYOSEX-UHFFFAOYSA-N 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000013505 freshwater Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 229920000642 polymer Polymers 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は場所打ちコンクリー
ト杭の杭頭処理方法(特開昭61−257532号公
報、特開昭62−117914号公報、特開昭64−6
413号公報、特開平5−67732号公報、特開平7
−207661号公報、特開平8−60653号公報な
ど参照)において、杭頭余盛り部を杭頂部より除去する
ために余盛り部と杭頂部との境界面を、容易に分離させ
るための装置を設置することの方法に関する。The present invention relates to a method of treating a pile head of a cast-in-place concrete pile (JP-A-61-257532, JP-A-62-117914, JP-A-64-6).
413, JP-A-5-67732, JP-A-5-67732.
Japanese Patent Application Laid-Open No. 207661/1996 and Japanese Patent Application Laid-Open No. Hei 8-60653) discloses an apparatus for easily separating a boundary surface between a pile top and a pile top in order to remove a pile top pile from the pile top. Related to the method of installation.
【0002】[0002]
【従来の技術】場所打コンクリート杭工法は、現場で組
み上げた鉄筋カゴを杭孔に挿入し、コンクリートを底部
より順次打設して基礎となる杭を造成するが、杭孔上部
に打ち上がってきたコンクリートには杭底や途中で発生
する泥土、泥水などを巻き込み低品質層やレイタンス層
が形成される。このために現在の建築工法では杭頭の強
度の安全を見込んで、設計杭長よりも予め50〜100
cm程余分にコンクリートを打設する(余盛り部とい
う)ことが必要とされている。2. Description of the Related Art In the cast-in-place concrete pile method, a reinforced cage assembled on site is inserted into a pile hole and concrete is sequentially driven from the bottom to form a foundation pile. The low-quality layer and the latence layer are formed in the concrete by entraining the muddy soil and muddy water generated at the bottom of the pile and on the way. For this reason, in the current construction method, the safety of the strength of the pile head is expected, and the design pile length is set to 50 to 100 in advance.
It is necessary to cast concrete about an extra centimeter (referred to as a surplus portion).
【0003】この余盛り部はコンクリート硬化後に設計
杭長および所定強度を確保するために除去されるが、こ
の除去作業はブレーカーやコールピックハンマーにより
行われるため、騒音と振動や粉塵の建築公害の発生は避
けられず、さらには作業の工期が長期化する傾向にあ
る。[0003] The extra pile is removed after the concrete is hardened in order to secure the design pile length and the predetermined strength. However, since this removal operation is performed by a breaker or a call pick hammer, noise, vibration, and construction pollution caused by dust are reduced. The occurrence is inevitable, and the work period tends to be longer.
【0004】このため、余盛り部のコンクリートを硬化
前に吸引除去したり、杭頭処理剤を用いてコンクリート
の硬化後の強度を低下させたり、または膨張材によりコ
ンクリートを静的破砕してしまうことで、騒音と振動や
粉塵を抑制する杭頭処理の方法が提案されていた(前述
公報参照)。[0004] For this reason, the excess concrete is suction-removed before hardening, the strength of the concrete after hardening is reduced by using a pile head treating agent, or the concrete is statically crushed by an expanding material. Accordingly, a method of treating a pile head that suppresses noise, vibration, and dust has been proposed (see the above-mentioned publication).
【0005】しかし、これらの方法では杭頂部の水平の
維持が困難であったり、コンクリートの強度低下にムラ
が生じやすく、最終的には従来どおりのハツリ除去作業
による補修に頼らざるをえなく、騒音や振動を抑制する
ことはできなかった。またこれらの作業には多大の人力
や装置が必要とされることもあり、目指していた効果と
作業の効率化を満足させるものではなかった。However, in these methods, it is difficult to maintain the level of the top of the pile, or the concrete is apt to deteriorate in strength. Noise and vibration could not be suppressed. In addition, these operations require a great deal of manpower and equipment, and do not satisfy the intended effects and efficiency of the operations.
【0006】最近では廃棄コンクリートを現場内で低騒
音で破砕できるクラツシャーの発達により、杭頭余盛り
コンクリートも大割りにしたままで現場内で破砕しリサ
イクルすることが可能となってきたため、杭頭処理の方
法も大割りする方法が取られるようになってきた。[0006] Recently, with the development of a crusher capable of crushing waste concrete at the site with low noise, it has become possible to crush and recycle the overfilled concrete at the site with a large amount of extra pile concrete. The method of processing is also largely divided.
【0007】そこで本発明は、余盛りコンクリートを大
割りにしたままで杭頭より除去する杭頭処理方法におい
て、余盛り部と杭頂部とをより簡便に短時間で騒音の発
生もなく、なおかつ経済的に分離することのできる杭頭
処理方法を提供するために創出されたものである。Accordingly, the present invention relates to a pile head treatment method for removing excess concrete from a pile head while dividing the excess concrete into large portions. It was created to provide a pile head treatment method that can be separated economically.
【0008】上述した目的を達成するために余盛りコン
クリートを分離する方法は、抗孔に挿入される鉄筋カゴ
の杭頂部になる所定位置に予め分離装置を設置し、コン
クリートの打設が終了後に地上部より接続されたチュー
ブから、空気および、または液体を装置中に加圧注入し
水平に膨張または伸張させて、抗頭の余盛り部と杭頂部
とを縁切りして分離することで、コンクリートの硬化後
に新たな力を加える事なく吊り上げて取り外すことがで
きるようにしたものである。In order to achieve the above-mentioned object, a method of separating the excess concrete is to set a separating device in advance at a predetermined position which is to be the top of a pile of a reinforcing bar inserted into a perforated hole, and after the concrete has been poured, From the tube connected from the ground, air and or liquid are injected under pressure into the device to expand or expand horizontally, and the extra head part of the anti-head and the pile top are cut off and separated, and concrete After being cured, it can be lifted and removed without applying new force.
【0009】コンクリートを分離させる装置は杭孔内の
鉄筋カゴの外側に設置され、鉄筋カゴの外側は装置の膨
張または伸張により、また内側は伸縮していた装置が空
気および、または液体を加圧注入することにより膨張し
て、杭の中心に向かって伸びて覆うことで縁切りをす
る。またその形状は中心に向かった櫛形のほかに扇形や
スライド型など空気および、または液体を加圧注入する
ことにより膨張または伸張して水平になり全体を覆いな
がら縁切りできるものであればよい。[0009] The device for separating concrete is installed outside the reinforcing bar in the pile hole, and the outside of the reinforcing bar is expanded or stretched by the device, and the device expanded and contracted inside pressurizes air and / or liquid. It expands by pouring and extends to the center of the pile to cover it. In addition, the shape may be a comb-like shape toward the center, or a fan-like shape or a slide-type shape, which can be expanded or expanded by injecting air and / or liquid under pressure to be horizontal, and can be trimmed while covering the whole.
【0010】[0010]
【発明の実施の形態】本発明の目的は、技術の向上によ
るコンクリートクラッシャーの出現により、従来のよう
に人力で騒音、振動、粉塵を発生させながらの杭頭処理
の方法から、大割り除去しクラッシャーで粉砕して場内
処理をすることにより、低騒音、無粉塵、建築廃材のリ
サイクルなどに寄与するためのコンクリートの余盛り部
の大割り方法を簡便に経済的に提供するものである。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The object of the present invention is to largely remove the conventional method of processing pile heads while generating noise, vibration and dust by human power, with the advent of concrete crushers due to the improvement of technology. The purpose of the present invention is to simply and economically provide a simple and economical method of dividing a surplus portion of concrete to contribute to low noise, no dust, recycling of construction waste material, etc. by crushing with a crusher and treating inside the plant.
【0011】空気および、または液体は、地上のコンプ
レッサーにチューブで接続し、所定位置にセットされた
分離装置に加圧注入されるが、加圧注入するチューブの
数は杭径などにより適宜決定する。The air and / or liquid is connected by a tube to a compressor on the ground, and is injected under pressure into a separation device set at a predetermined position. The number of tubes to be injected under pressure is appropriately determined according to the pile diameter and the like. .
【0012】分離装置は加圧注入された空気および、ま
たは液体により膨張または伸張する際にコンクリートの
抵抗を少なくするために、先端やその他から空気およ
び、または液体を噴射する噴射口を設ける。[0012] The separating device is provided with a jet port for jetting air and / or liquid from the tip or the other in order to reduce the resistance of the concrete when expanding or expanding with air and / or liquid injected under pressure.
【0013】また分離装置にはこのほかにスプリングや
棒状や紐状のものを用いて水平に膨張または伸張するよ
うにガイドを設けることもできる。In addition, the separating device may be provided with a guide so as to be horizontally expanded or expanded by using a spring, a rod-shaped or a string-shaped device.
【0014】分離装置に加圧注入する液体は清水のほか
に、コンクリート遅延剤やベントナイトまたは高分子ポ
リマー、アルミ粉末懸濁液などを利用してコンクリート
中に噴射し、分離層を化学的に確保する。The liquid to be injected under pressure into the separation device is sprayed into concrete using fresh water, concrete retarder, bentonite or high molecular polymer, aluminum powder suspension, etc. to chemically secure the separation layer. I do.
【0015】鉄筋カゴの外周については杭頂位置にスペ
ーサーを兼ねて円盤状のキャップを取り付けて、分離装
置を乗せて加圧注入により鉄筋内側に向けて膨張または
伸張させる方法もよい。A method may be used in which a disc-shaped cap is attached to the pile top position as a spacer also as a spacer on the outer periphery of the reinforcing bar cage, and a separating device is placed thereon to inflate or expand the reinforcing bar by pressure injection.
【0017】[0017]
【発明の効果】以上の如く本発明は、建築廃材の場外搬
出の抑制とリサイクルを目指し、クラッシャーによる二
次破砕を前提とした場所打ちコンクリート杭の余盛り部
を大割にする方法において、その大割り方法を極めて容
易にまた経済的に行うことができるものである。As described above, the present invention aims at suppressing the recycling of construction waste materials to the outside and recycling them, and aims to reduce the excess portion of cast-in-place concrete piles on the premise of secondary crushing by crushers. The method can be performed very easily and economically.
【図1】 分離装置の折り畳まれた状態の斜視図FIG. 1 is a perspective view of a separation device in a folded state.
【図2】 分離装置が膨張して広がった状態の斜視図FIG. 2 is a perspective view showing a state where a separation device is expanded and expanded.
【図3】 鉄筋外周部のスペーサーを兼ねる円盤状の
キャップ斜視図FIG. 3 is a perspective view of a disk-shaped cap which also serves as a spacer on the outer periphery of a reinforcing bar.
【図4】 分離装置を膨張させる際に空気及び、また
は液体を噴射する噴射口の配置の一例の斜視図FIG. 4 is a perspective view of an example of an arrangement of injection ports for injecting air and / or liquid when the separation device is expanded.
A 鉄筋カゴ B 分離装置の伸縮部分 C 加圧注入チューブ D 円盤状のキャップ E 噴射口 A Reinforced basket B Telescopic part of separation device C Pressurized injection tube D Disc-shaped cap E Injection port
Claims (3)
と杭頂部との境界部分に設置した装置へ、空気および、
または液体を加圧注入して、装置を膨張または伸張させ
ることによりコンクリートを上下に分離して、硬化後の
余盛り部の除去を容易にすることを特徴とする杭頭処理
方法。1. A device installed at a boundary between an extra pile head and a pile top of a cast-in-place concrete pile, air and
Alternatively, a pile head treatment method characterized in that concrete is separated into upper and lower parts by injecting a liquid under pressure to expand or expand the device, thereby facilitating removal of a hardened portion after hardening.
リートを分離する装置は、帆布、ビニール、プラスチッ
ク、金属などをもって伸縮または折り畳みができる袋ま
たは板状ものとし、コンクリート打設前に杭孔に挿入す
る鉄筋カゴの所定の位置に予め折り畳んでセットして、
空気および、または液体を加圧注入することで所定の長
さや広さに膨張または伸張させる。2. An apparatus for separating concrete between a pile head extra portion and a pile top is made of a bag or a plate which can be expanded or contracted with canvas, vinyl, plastic, metal, or the like. Fold it in a predetermined position of the reinforcing bar to be inserted into the pile hole and set it in advance.
The air and / or liquid is inflated or expanded to a predetermined length or width by pressure injection.
に、折り畳んだ装置にはコンクリート中に水平に膨張ま
たは伸張しやすくするために、空気および、または液体
を噴射する噴射口を設け、またはスプリングや棒状のレ
ールを設けることもある。3. When the pile head extra portion and the pile top are separated, the folded device is provided with an injection port for injecting air and / or liquid in order to easily expand or expand horizontally in the concrete. In some cases, a spring or a rod-shaped rail may be provided.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP11158459A JP2000314132A (en) | 1999-04-28 | 1999-04-28 | Pile head treatment method of concrete pile |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP11158459A JP2000314132A (en) | 1999-04-28 | 1999-04-28 | Pile head treatment method of concrete pile |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JP2000314132A true JP2000314132A (en) | 2000-11-14 |
Family
ID=15672214
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP11158459A Pending JP2000314132A (en) | 1999-04-28 | 1999-04-28 | Pile head treatment method of concrete pile |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2000314132A (en) |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2004070121A1 (en) * | 2003-02-07 | 2004-08-19 | Cementation Foundations Skanska Limited | Techniques for pile breaking |
| CN104234038A (en) * | 2014-03-03 | 2014-12-24 | 王磊 | Bored concrete pile construction technology without breaking of pile head |
| CN106400802A (en) * | 2016-08-24 | 2017-02-15 | 中交公局厦门工程有限公司 | Integral quick lifting method for pile head of drilled pile during pre-embedding and drilling-free ring-cutting |
| CN108560539A (en) * | 2018-05-24 | 2018-09-21 | 北京良乡蓝鑫水利工程设计有限公司 | A kind of filling pile head device for excising and its construction method |
| CN110847157A (en) * | 2019-12-20 | 2020-02-28 | 中铁四局集团第二工程有限公司 | Self-triggering partition device for pile head of concrete poured pile |
| CN112942315A (en) * | 2021-04-13 | 2021-06-11 | 中冶京诚工程技术有限公司 | Cast-in-place concrete pile head separating device |
| CN113250186A (en) * | 2021-04-14 | 2021-08-13 | 中冶京诚工程技术有限公司 | Cast-in-place concrete pile head separation device and pile head breaking method |
-
1999
- 1999-04-28 JP JP11158459A patent/JP2000314132A/en active Pending
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2004070121A1 (en) * | 2003-02-07 | 2004-08-19 | Cementation Foundations Skanska Limited | Techniques for pile breaking |
| CN104234038A (en) * | 2014-03-03 | 2014-12-24 | 王磊 | Bored concrete pile construction technology without breaking of pile head |
| CN106400802A (en) * | 2016-08-24 | 2017-02-15 | 中交公局厦门工程有限公司 | Integral quick lifting method for pile head of drilled pile during pre-embedding and drilling-free ring-cutting |
| CN108560539A (en) * | 2018-05-24 | 2018-09-21 | 北京良乡蓝鑫水利工程设计有限公司 | A kind of filling pile head device for excising and its construction method |
| CN110847157A (en) * | 2019-12-20 | 2020-02-28 | 中铁四局集团第二工程有限公司 | Self-triggering partition device for pile head of concrete poured pile |
| CN112942315A (en) * | 2021-04-13 | 2021-06-11 | 中冶京诚工程技术有限公司 | Cast-in-place concrete pile head separating device |
| CN113250186A (en) * | 2021-04-14 | 2021-08-13 | 中冶京诚工程技术有限公司 | Cast-in-place concrete pile head separation device and pile head breaking method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2000314132A (en) | Pile head treatment method of concrete pile | |
| CN102733399A (en) | Method for removing internal support concrete by static expansion | |
| JP2009250017A (en) | Pile head processing member which can reduce pile head processing | |
| JP2000314131A (en) | Pile head treatment method of concrete pile | |
| JP3450725B2 (en) | Ground improvement method | |
| JPH09268555A (en) | Pile pulling method and device | |
| Townsend et al. | Leachate recycle using horizontal injection | |
| JPH03107017A (en) | Pile head treatment method for cast-in-place concrete pile | |
| JPH10238296A (en) | Method and apparatus for damming concrete for primary lining of tunnel and airbag for damming concrete | |
| JPH1150451A (en) | Method and device for removing pile head extra-banking part concrete | |
| JP2931476B2 (en) | How to cut the head of an underground continuous wall | |
| JP2743055B2 (en) | Liquefaction prevention method for sand ground | |
| JP3752345B2 (en) | Casing construction method | |
| JPH04363410A (en) | Vibration compaction work method | |
| JP3979646B2 (en) | Concrete building repair method | |
| JPH04333718A (en) | Crushing of concrete pile head | |
| JP3438943B2 (en) | Soil liquefaction countermeasures and methods | |
| JP2886355B2 (en) | Vibration compaction method | |
| JPH0637061Y2 (en) | Crushed rock, vibration type ground improvement device | |
| JP3709420B2 (en) | Ground improvement device and method | |
| JPH08326068A (en) | Construction method of hollow deep foundation using air bag | |
| JP2003342951A (en) | Construction method for treatment of pile head of cast- in-place pile, and cushion material and concrete destroying device for use in the same | |
| KR102785502B1 (en) | Construction method for a retaining wall by moving acupressure plate | |
| JP2004019096A (en) | Pile head separating device and pile head separating method | |
| JPH0797811A (en) | Pile head treatment method for driven-in-place pile |