JP2000314794A - Suppression chamber dust collection and dehumidification method and apparatus - Google Patents

Suppression chamber dust collection and dehumidification method and apparatus

Info

Publication number
JP2000314794A
JP2000314794A JP11124074A JP12407499A JP2000314794A JP 2000314794 A JP2000314794 A JP 2000314794A JP 11124074 A JP11124074 A JP 11124074A JP 12407499 A JP12407499 A JP 12407499A JP 2000314794 A JP2000314794 A JP 2000314794A
Authority
JP
Japan
Prior art keywords
suppression chamber
air
dust
vent pipe
suppression
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP11124074A
Other languages
Japanese (ja)
Inventor
Susumu Tougasaki
将 東ヶ崎
Yoshimaru Niizawa
慶丸 新澤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IHI Corp
Ishikawajima Plant Construction Co Ltd
Original Assignee
Ishikawajima Plant Construction Co Ltd
Ishikawajima Harima Heavy Industries Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ishikawajima Plant Construction Co Ltd, Ishikawajima Harima Heavy Industries Co Ltd filed Critical Ishikawajima Plant Construction Co Ltd
Priority to JP11124074A priority Critical patent/JP2000314794A/en
Publication of JP2000314794A publication Critical patent/JP2000314794A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Landscapes

  • Structure Of Emergency Protection For Nuclear Reactors (AREA)

Abstract

(57)【要約】 【課題】 粉塵の外部への拡散を抑止しつつサプレッシ
ョンチェンバ内の湿度を低減させる。 【解決手段】 サプレッションチェンバ6内の空気を、
仮設ダクト18、集塵器17のフィルタ15及びファン
16、送気管19、除湿器20、仮設ダクト21を経て
サプレッションチェンバ6内へ送給されるような循環送
気経路を形成し、研掃作業時に生じる粉塵をサプレッシ
ョンチェンバ6外部のフィルタ15で捕捉し、また、サ
プレッションチェンバ6内の空気に含まれている水分
を、サプレッションチェンバ6外部の除湿器20で取り
除く。
(57) [Summary] [PROBLEMS] To reduce the humidity in a suppression chamber while suppressing the diffusion of dust to the outside. SOLUTION: The air in the suppression chamber 6 is
A circulating air supply path is formed so as to be supplied into the suppression chamber 6 through the temporary duct 18, the filter 15 and the fan 16 of the dust collector 17, the air supply pipe 19, the dehumidifier 20, and the temporary duct 21, and the cleaning operation is performed. Dust generated at the time is captured by a filter 15 outside the suppression chamber 6, and moisture contained in air in the suppression chamber 6 is removed by a dehumidifier 20 outside the suppression chamber 6.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は再塗装工事に用いる
サプレッションチェンバ集塵除湿方法及び装置に関する
ものである。
The present invention relates to a method and an apparatus for collecting and dehumidifying a suppression chamber used for repainting.

【0002】[0002]

【従来の技術】図2は原子炉設備の一例を、また、図3
は従来のサプレッションチェンバ研掃作業時の集塵手段
の一例を示すもので、この原子炉設備は、蒸気発生源で
ある原子炉圧力容器1と、上端が開口した格納容器本体
2及び該格納容器本体2の開口を閉止する上蓋3で構成
され且つ前記の原子炉圧力容器1を格納する原子炉格納
容器4と、該原子炉格納容器4の下部を周方向に取り囲
み且つ内部に水5を貯留するトーラス形状のサプレッシ
ョンチェンバ6とを備えている。
2. Description of the Related Art FIG. 2 shows an example of a nuclear reactor, and FIG.
FIG. 1 shows an example of a conventional dust collecting means at the time of a suppression chamber cleaning operation. This reactor equipment includes a reactor pressure vessel 1 as a steam generation source, a containment vessel body 2 having an open upper end, and a containment vessel. A reactor containment vessel 4 comprising an upper lid 3 for closing the opening of the main body 2 and containing the reactor pressure vessel 1, and a lower part of the reactor containment vessel 4 circumferentially surrounding and storing water 5 therein; And a torus-shaped suppression chamber 6.

【0003】サプレッションチェンバ6は、複数のセグ
メント7を無端状に接続したものであり、所定のセグメ
ント7の頂部には、着脱可能な閉止蓋8を有し且つ定期
検査工事を実施する際にサプレッションチェンバ6へ作
業者が出入りするためのマンホール9や、サプレッショ
ンチェンバ6に対する給排気系の配管(図示せず)が接
続される管台10が設けられている。
The suppression chamber 6 is formed by connecting a plurality of segments 7 endlessly, has a detachable closing lid 8 on the top of a predetermined segment 7, and suppresses the suppression when performing a periodic inspection. A manhole 9 for an operator to enter and leave the chamber 6 and a nozzle 10 to which a piping (not shown) of a supply / exhaust system to the suppression chamber 6 is provided.

【0004】このサプレッションチェンバ6内には、周
方向に延びるベントヘッダ11と、下端部が水5に没す
るようにベントヘッダ11に接続された多数のダウンカ
マ12とが設けられている。
In the suppression chamber 6, there are provided a vent header 11 extending in the circumferential direction, and a number of downcomers 12 connected to the vent header 11 such that the lower end is submerged in the water 5.

【0005】また、ベントヘッダ11の所定箇所には、
圧力差に応じてベントヘッダ11の外部から内部への空
気の流通を許容し得るバルブ13が取り付けられてい
る。
[0005] Also, at a predetermined location of the vent header 11,
A valve 13 capable of allowing air to flow from the outside to the inside of the vent header 11 according to the pressure difference is attached.

【0006】更に、ベントヘッダ11の内部空間は、サ
プレッションチェンバ6を貫通するベント管14を介し
て原子炉格納容器4の内部空間(ドライウエル)に連通
している。
Further, the internal space of the vent header 11 communicates with the internal space (dry well) of the containment vessel 4 via a vent pipe 14 penetrating through the suppression chamber 6.

【0007】サプレッションチェンバ6の内面、ベント
ヘッダ11の内面と外面、ダウンカマ12の内面と外
面、ベント管14の内面、ベント管14のサプレッショ
ンチェンバ6内に位置する部分の外面は、防錆効果が高
い無機ジンクリッチ系塗料、及び耐水性に優れたエポキ
シ樹脂系塗料により塗装されているが、塗膜の劣化に起
因するサプレッションチェンバ6、ベントヘッダ11、
ダウンカマ12、ベント管14の腐蝕を防止するため
に、これらの塗膜を更新する再塗装工事を原子炉設備の
定期検査時に実施している。
The inner surface of the suppression chamber 6, the inner surface and the outer surface of the vent header 11, the inner surface and the outer surface of the downcomer 12, the inner surface of the vent tube 14, and the outer surface of the portion of the vent tube 14 located inside the suppression chamber 6 have a rust-preventive effect. Although it is coated with a high inorganic zinc-rich paint and an epoxy resin paint having excellent water resistance, the suppression chamber 6, the vent header 11,
In order to prevent the downcomer 12 and the vent pipe 14 from being corroded, repainting work for updating these coatings is carried out at the time of periodic inspection of the reactor equipment.

【0008】再塗装工事は、サプレッションチェンバ6
内の水5を外部へ移送する水抜き作業、マンホール9か
らサプレッションチェンバ6内に足場用資材を搬入し且
つ作業足場を架設する足場組立作業、サプレッションチ
ェンバ6の内面、ベントヘッダ11の内面と外面、ダウ
ンカマ12の内面と外面、ベント管14の内面、ベント
管14のサプレッションチェンバ6内に位置する部分の
外面にそれぞれ形成されている既存の塗膜をサンドブラ
ストにより剥離させ且つ塗料を吹き付けて新しい塗膜を
形成する研掃塗装作業、作業足場を解体し且つ足場用資
材をマンホール9から搬出する足場取外作業を順に施工
する。
In the repainting work, the suppression chamber 6 is used.
Draining work for transferring the water 5 inside to the outside, scaffolding assembling work for carrying scaffolding materials into the suppression chamber 6 from the manhole 9 and erection of the work scaffolding, the inner surface of the suppression chamber 6, the inner surface and the outer surface of the vent header 11 The existing coating films formed on the inner surface and outer surface of the downcomer 12, the inner surface of the vent pipe 14, and the outer surface of the portion of the vent pipe 14 located in the suppression chamber 6 are respectively peeled off by sandblasting and sprayed with a new paint. The scouring work for forming a film and the scaffold removal work for dismantling the work scaffold and carrying out the scaffolding material from the manhole 9 are sequentially performed.

【0009】更に、新たに形成した塗膜が硬化するまで
の養生期間を経た後、サプレッションチェンバ6内へ水
5を戻している。
After a curing period until the newly formed coating film is cured, the water 5 is returned into the suppression chamber 6.

【0010】研掃塗装作業を行なう際には、サプレッシ
ョンチェンバ6の外部に設置され且つフィルタ15及び
ファン16を有する集塵器17の吸引口に、仮設ダクト
18の空気流通方向下流端を接続し、また、仮設ダクト
18の空気流通方向上流端寄り部分を、マンホール9か
らサプレッションチェンバ6内に挿通して、ファン16
を作動させる。
At the time of performing the abrasive coating operation, the downstream end of the temporary duct 18 in the air flow direction is connected to the suction port of the dust collector 17 which is provided outside the suppression chamber 6 and has the filter 15 and the fan 16. In addition, a portion of the temporary duct 18 near the upstream end in the air flow direction is inserted from the manhole 9 into the suppression chamber 6, and
Activate

【0011】これにより、塗膜の剥離に伴って生じる粉
塵などをフィルタ15で捕捉し、サプレッションチェン
バ6内における作業者の視界を確保している。
As a result, dust and the like generated due to the peeling of the coating film are captured by the filter 15, and the visibility of the worker in the suppression chamber 6 is secured.

【0012】[0012]

【発明が解決しようとする課題】しかしながら、従来の
研掃塗装作業では、サプレッションチェンバ6内の湿度
管理は考慮されておらず、このため、塗膜を剥離した研
掃面に対してできるだけ早く塗料を塗布して、研掃面の
発錆を回避している。
However, in the conventional blast coating operation, the humidity control in the suppression chamber 6 is not taken into consideration, and therefore, the polished surface from which the coating film has been peeled off must be coated as soon as possible. To avoid rusting on the polished surface.

【0013】また、サプレッションチェンバ6の外部に
除湿器を設け、該除湿器により水分を取り除いた空気
を、ファンによってサプレッションチェンバ6内へ送給
したりすることも考えられるが、このように外部から空
気を強制的に送給すると、サプレッションチェンバ6の
内圧が大気圧よりも高くなり、放射性を帯びた粉塵など
がサプレッションチェンバ6から外部へ拡散することが
懸念される。
It is also conceivable that a dehumidifier is provided outside the suppression chamber 6 and the air from which moisture has been removed by the dehumidifier is supplied into the suppression chamber 6 by a fan. When the air is forcibly supplied, the internal pressure of the suppression chamber 6 becomes higher than the atmospheric pressure, and there is a concern that radioactive dust and the like diffuse from the suppression chamber 6 to the outside.

【0014】本発明は上述した実情に鑑みてなしたもの
で、粉塵の外部への拡散を抑止しつつサプレッションチ
ェンバ内の湿度を低減させること目的としている。
The present invention has been made in view of the above circumstances, and has as its object to reduce the humidity in the suppression chamber while suppressing the diffusion of dust to the outside.

【0015】[0015]

【課題を解決するための手段】上記目的を達成するた
め、本発明の請求項1に記載のサプレッションチェンバ
集塵除湿方法では、サプレッションチェンバの内部、及
び該サプレッションチェンバと原子炉格納容器のドライ
ウエルとを連通するベント管の内部を研掃する際に、サ
プレッションチェンバ内及びベント管内の空気を吸引し
て該空気に随伴する粉塵を捕捉し、粉塵除去後の空気を
除湿してサプレッションチェンバ内へ送給する。
According to a first aspect of the present invention, there is provided a method for collecting and dehumidifying a suppression chamber according to the present invention, wherein the inside of the suppression chamber and the dry well of the suppression chamber and the reactor containment vessel are provided. When cleaning the inside of the vent pipe that communicates with the air, the air in the suppression chamber and the vent pipe is sucked to capture dust accompanying the air, and the air after dust removal is dehumidified into the suppression chamber. Send.

【0016】本発明の請求項2に記載のサプレッション
チェンバ集塵除湿方法では、本発明の請求項1に記載の
サプレッションチェンバ集塵除湿方法の構成に加えて、
サプレッションチェンバの内部、及び該サプレッション
チェンバと原子炉格納容器のドライウエルとを連通する
ベント管の内部を研掃する際に、原子炉圧力容器のドラ
イウエルに対するベント管の連通を遮断する。
According to a second aspect of the present invention, there is provided a dust collecting and dehumidifying method for a suppression chamber according to the first aspect of the present invention.
When the inside of the suppression chamber and the inside of the vent pipe communicating the suppression chamber with the dry well of the reactor containment vessel are cleaned, the communication of the vent pipe with the dry well of the reactor pressure vessel is cut off.

【0017】また、本発明の請求項3に記載のサプレッ
ションチェンバ集塵除湿装置では、サプレッションチェ
ンバ内及びベント管内から空気を吸引し且つ該空気に随
伴する粉塵を捕捉可能な集塵器と、該集塵器から送出さ
れる空気を除湿可能な除湿器と、該除湿器から送出され
る空気をサプレッションチェンバ内及びベント管内へ送
給する空気流路とを備えている。
According to a third aspect of the present invention, there is provided a dust collecting and dehumidifying device for a suction chamber, which sucks air from the inside of the suppression chamber and the inside of the vent pipe and captures dust accompanying the air. It has a dehumidifier capable of dehumidifying the air sent from the dust collector, and an air flow path for feeding the air sent from the dehumidifier into the suppression chamber and the vent pipe.

【0018】本発明の請求項4に記載のサプレッション
チェンバ集塵除湿装置では、本発明の請求項3に記載の
サプレッションチェンバ集塵除湿装置の構成に加えて、
サプレッションチェンバ内と原子炉格納容器のドライウ
エルとの連通を遮断可能な閉塞部材を備えている。
According to a fourth aspect of the present invention, there is provided a dust collecting and dehumidifying apparatus according to the third aspect of the present invention.
A closing member is provided that can shut off communication between the inside of the suppression chamber and the dry well of the containment vessel.

【0019】本発明の請求項1あるいは請求項2に記載
のサプレッションチェンバ集塵除湿方法のいずれにおい
ても、サプレッションチェンバ内と外部との間で空気を
循環させて、研掃作業時に生じる粉塵とサプレッション
チェンバ内の空気に含まれている水分とをサプレッショ
ンチェンバの外部へ移送し、サプレッションチェンバ内
の視野確保と湿度の低減を図り、サプレッションチェン
バ内を負圧管理する。
In any one of the first and second aspects of the present invention, air is circulated between the inside and the outside of the suppression chamber to reduce dust and suppression generated during the cleaning operation. Moisture contained in the air in the chamber is transferred to the outside of the suppression chamber to secure a visual field in the suppression chamber and reduce the humidity, and to control the negative pressure inside the suppression chamber.

【0020】本発明の請求項2に記載のサプレッション
チェンバ集塵除湿方法においては、サプレッションチェ
ンバ内と原子炉格納容器のドライウエルとの連通を遮断
し、研掃作業時に生じる粉塵が原子炉格納容器内へ飛散
することを抑止する。
In the dust collecting and dehumidifying method according to the second aspect of the present invention, the communication between the inside of the suppression chamber and the dry well of the containment vessel is cut off, and the dust generated during the cleaning operation is removed from the containment vessel. Deters flying inside.

【0021】本発明の請求項3あるいは請求項4に記載
のサプレッションチェンバ集塵除湿装置のいずれにおい
ても、サプレッションチェンバ内の空気を、集塵器、除
湿器を介してサプレッションチェンバ内へ循環させて、
研掃作業時に生じる粉塵とサプレッションチェンバ内の
空気に含まれている水分をサプレッションチェンバの外
部へ移送し、サプレッションチェンバ内の視野確保と湿
度の低減を図り、サプレッションチェンバ内を負圧管理
する。
In any of the suppression chamber dust collecting and dehumidifying devices according to the third and fourth aspects of the present invention, the air in the suppression chamber is circulated through the dust collector and the dehumidifier into the suppression chamber. ,
The dust generated during the cleaning operation and the water contained in the air in the suppression chamber are transferred to the outside of the suppression chamber to secure a visual field in the suppression chamber and reduce the humidity, and to control the negative pressure in the suppression chamber.

【0022】本発明の請求項4に記載のサプレッション
チェンバ集塵除湿装置においては、閉塞部材によって、
サプレッションチェンバ内と原子炉格納容器のドライウ
エルとの連通を遮断し、研掃作業時に生じる粉塵が原子
炉格納容器内へ飛散することを抑止する。
[0022] In the suppression chamber dust collecting and dehumidifying device according to the fourth aspect of the present invention, the closing member is provided with a closing member.
The communication between the suppression chamber and the dry well of the containment vessel is cut off, so that dust generated during the cleaning operation is prevented from scattering into the containment vessel.

【0023】[0023]

【発明の実施の形態】以下、本発明の実施の形態を図面
に基づいて説明する。
Embodiments of the present invention will be described below with reference to the drawings.

【0024】図1は本発明のサプレッションチェンバ集
塵除湿装置の実施の形態の一例であり、図中、図2及び
図3と同一の符号を付した部分は同一物を表している。
FIG. 1 shows an example of an embodiment of a suppression chamber dust collecting and dehumidifying apparatus according to the present invention. In the drawing, the portions denoted by the same reference numerals as in FIGS. 2 and 3 represent the same components.

【0025】このサプレッションチェンバ集塵除湿装置
は、フィルタ15及びファン16を有する集塵器17
と、該集塵器17の吸引口に空気流通方向下流端が接続
される仮設ダクト18と、吸気口が送気管19を介して
集塵器17の吐出口に接続される除湿器20と、該除湿
器20の吐出口に空気流通方向上流端が接続される仮設
ダクト21とを備えている。
This suppression chamber dust collecting and dehumidifying device comprises a dust collector 17 having a filter 15 and a fan 16.
A temporary duct 18 whose downstream end in the air flow direction is connected to a suction port of the dust collector 17, a dehumidifier 20 whose intake port is connected to a discharge port of the dust collector 17 via an air supply pipe 19, A temporary duct 21 is connected to the discharge port of the dehumidifier 20 at the upstream end in the air flow direction.

【0026】また、サプレッションチェンバ6内を集塵
し且つ除湿するのにあたっては、ベント管14の格納容
器本体2側の接続端開口部分を被覆可能な閉止カバー2
2を用いる。
When collecting and dehumidifying the inside of the suppression chamber 6, the closing cover 2 capable of covering the connection end opening portion of the vent pipe 14 on the side of the storage container body 2.
2 is used.

【0027】以下、図1に示すサプレッションチェンバ
集塵除湿装置の作動を説明する。
The operation of the suppression chamber dust collecting and dehumidifying apparatus shown in FIG. 1 will be described below.

【0028】サプレッションチェンバ6内の水5を外部
へ移送する水抜き作業、並びにマンホール9からサプレ
ッションチェンバ6内に足場用資材を搬入し且つ作業足
場を架設する足場組立作業が完了した後、研掃塗装作業
を施工する際には、管台10からサプレッションチェン
バ6に対する給排気系の配管(図示せず)を取り外し、
バルブ13を開放しておく。
After the draining operation for transferring the water 5 in the suppression chamber 6 to the outside and the scaffolding assembling work for transporting the scaffolding material from the manhole 9 into the suppression chamber 6 and erection of the working scaffold are completed, the polishing is performed. When performing the painting work, remove the piping (not shown) of the supply / exhaust system from the nozzle 10 to the suppression chamber 6,
The valve 13 is opened.

【0029】次いで、サプレッションチェンバ6の外部
に集塵器17及び除湿器20を配置し、集塵器17の吐
出口と除湿器20の吸気口との双方を送気管19によっ
て連通させる。
Next, the dust collector 17 and the dehumidifier 20 are arranged outside the suppression chamber 6, and both the discharge port of the dust collector 17 and the suction port of the dehumidifier 20 are communicated by the air supply pipe 19.

【0030】また、仮設ダクト18の空気流通方向下流
端を集塵器17の吸引口に接続し、マンホール9からサ
プレッションチェンバ6内へ仮設ダクト18の空気流通
方向上流端寄り部分を挿入する。
The downstream end of the temporary duct 18 in the air flow direction is connected to the suction port of the dust collector 17, and the portion of the temporary duct 18 near the upstream end in the air flow direction is inserted from the manhole 9 into the suppression chamber 6.

【0031】更に、仮設ダクト21の空気流通方向上流
端を除湿器20の吐出口に接続し、管台10からサプレ
ッションチェンバ6内へ仮設ダクト21の空気流通方向
下流端寄り部分を挿入する。
Further, the upstream end of the temporary duct 21 in the air flow direction is connected to the discharge port of the dehumidifier 20, and a portion of the temporary duct 21 near the downstream end in the air flow direction is inserted from the nozzle 10 into the suppression chamber 6.

【0032】これに加えて、閉止カバー22により各ベ
ント管14の格納容器本体2側の接続端開口部を被覆し
ておく。
In addition, the connection cover opening of each vent pipe 14 on the side of the containment vessel 2 is covered with a closing cover 22.

【0033】この状態でファン16を作動させたうえ、
サプレッションチェンバ6の内面、ベントヘッダ11の
内面と外面、ダウンカマ12の内面と外面、ベント管1
4の内面、ベント管14のサプレッションチェンバ6内
に位置する部分の外面にそれぞれ形成されている既存の
塗膜をサンドブラストにより剥離させると、サプレッシ
ョンチェンバ6内の空気が、仮設ダクト18を介して集
塵器17へ流入し、ベント管14内の空気が、ベントヘ
ッダ11、ダウンカマ12あるいは開放されているバル
ブ13のボディ、サプレッションチェンバ6内、仮設ダ
クト18を介して集塵器17へ流入し、塗膜の剥離によ
って生じる粉塵を集塵器17のフィルタ15が捕捉す
る。
After operating the fan 16 in this state,
The inner surface of the suppression chamber 6, the inner and outer surfaces of the vent header 11, the inner and outer surfaces of the downcomer 12, the vent pipe 1
When the existing coating films formed on the inner surface of the suppression pipe 4 and the outer surface of the portion of the vent pipe 14 located in the suppression chamber 6 are peeled off by sandblasting, the air in the suppression chamber 6 is collected through the temporary duct 18. The air in the vent pipe 14 flows into the dust collector 17 through the vent header 11, the downcomer 12 or the body of the open valve 13, the suppression chamber 6, and the temporary duct 18, The dust generated by the peeling of the coating film is captured by the filter 15 of the dust collector 17.

【0034】また、集塵器17のファン16から送出さ
れる空気が、送気管19を介して除湿器20へ流入し、
該除湿器20が空気に含まれている水分を取り除く。
The air sent from the fan 16 of the dust collector 17 flows into the dehumidifier 20 through the air supply pipe 19,
The dehumidifier 20 removes moisture contained in the air.

【0035】この空気は、仮設ダクト21を介してサプ
レッションチェンバ6内へ送給され、更に、ダウンカマ
12あるいは開放されているバルブ13のボディ、ベン
トヘッダ11を介してベント管14内へ送給され、サプ
レッションチェンバ6内及びベント管14内の湿度が低
減する。
This air is fed into the suppression chamber 6 through the temporary duct 21 and further into the vent pipe 14 through the downcomer 12 or the body of the valve 13 that is open and the vent header 11. Therefore, the humidity inside the suppression chamber 6 and the inside of the vent pipe 14 are reduced.

【0036】このようにして、サプレッションチェンバ
6の内面などの既存の塗膜を除去したならば、研掃面に
塗料を吹き付けて新しい塗膜を形成する。
After the existing coating film such as the inner surface of the suppression chamber 6 has been removed in this way, a new coating film is formed by spraying a paint on the polished surface.

【0037】更に、作業足場を解体し且つ足場用資材を
マンホール9から搬出する足場取外作業を施工し且つ前
記の閉止カバー22を回収したうえ、新たに形成した塗
膜が硬化するまでの養生期間を経た後に、サプレッショ
ンチェンバ6内へ水5を戻す。
Further, the work scaffold is dismantled, scaffold removal work for carrying out the scaffold material from the manhole 9 is carried out, the above-mentioned closing cover 22 is recovered, and curing until the newly formed coating film is cured. After a period, the water 5 is returned into the suppression chamber 6.

【0038】このように、図1に示すサプレッションチ
ェンバ集塵除湿装置では、研掃作業時に生じる粉塵をフ
ィルタ15により捕捉し、サプレッションチェンバ6内
及びベント管14内などの視野を確保することに加え
て、粉塵除去後の空気に含まれている水分を除湿器20
により取り除き、サプレッションチェンバ6内及びベン
ト管14内へ送給するので、塗料を吹き付ける前のサプ
レッションチェンバ6の内面などの発錆を効果的に抑制
することができる。
As described above, in the suppression chamber dust collecting and dehumidifying apparatus shown in FIG. 1, dust generated during the cleaning operation is captured by the filter 15, and in addition to securing a visual field in the suppression chamber 6 and the vent pipe 14, etc. The moisture contained in the air after dust removal is removed by the dehumidifier 20.
, And is fed into the suppression chamber 6 and the vent pipe 14, so that rusting on the inner surface of the suppression chamber 6 before spraying the paint can be effectively suppressed.

【0039】また、研掃作業時に、ベント管14の格納
容器本体2側の接続端開口部を閉止カバー22で被覆す
るので、原子炉格納容器4のドライウエルへの粉塵の飛
散を抑止することができる。
Also, during the cleaning operation, the connection end opening of the vent pipe 14 on the side of the containment vessel main body 2 is covered with the closing cover 22, so that scattering of dust to the dry well of the containment vessel 4 can be suppressed. Can be.

【0040】更に、サプレッションチェンバ6内やベン
ト管14内の空気が、仮設ダクト18、集塵器17のフ
ィルタ15及びファン16、送気管19、除湿器20、
仮設ダクト21を経てサプレッションチェンバ6内やベ
ント管14内へ送給されるような循環送気経路を形成し
ているので、当該循環送気系の流路抵抗などによってサ
プレッションチェンバ6の内圧が大気圧よりも低くな
り、よって、サプレッションチェンバ6の外部への粉塵
の拡散も抑止することができる。
Further, the air in the suppression chamber 6 and the vent pipe 14 is supplied to the temporary duct 18, the filter 15 of the dust collector 17, the fan 16, the air supply pipe 19, the dehumidifier 20,
Since the circulation air supply path is formed so as to be supplied into the suppression chamber 6 and the vent pipe 14 through the temporary duct 21, the internal pressure of the suppression chamber 6 is increased due to the flow path resistance of the circulation air supply system and the like. The pressure is lower than the atmospheric pressure, so that the diffusion of dust to the outside of the suppression chamber 6 can be suppressed.

【0041】なお、本発明のサプレッションチェンバ集
塵除湿方法及び装置は上述した実施の形態のみに限定さ
れるものではなく、本発明の要旨を逸脱しない範囲にお
いて変更を加え得ることは勿論である。
The method and the apparatus for collecting and dehumidifying the suppression chamber of the present invention are not limited to the above-described embodiment, but may be modified without departing from the scope of the present invention.

【0042】[0042]

【発明の効果】以上述べたように、本発明のサプレッシ
ョンチェンバ集塵除湿方法及び装置によれば、下記のよ
うな種々の優れた効果を奏し得る。
As described above, according to the method and the apparatus for collecting and dehumidifying the suppression chamber of the present invention, the following various excellent effects can be obtained.

【0043】(1)本発明の請求項1あるいは請求項2
に記載のサプレッションチェンバ集塵除湿方法のいずれ
においても、サプレッションチェンバ内と外部との間で
空気を循環させて、研掃作業時に生じる粉塵とサプレッ
ションチェンバ内及びベント管内の空気に含まれている
水分とをサプレッションチェンバの外部へ移送し、サプ
レッションチェンバ内及びベント管内の視野確保と湿度
の低減を図るので、塗膜を形成する前の研掃面の発錆、
並びにサプレッションチェンバ内などから外部への粉塵
の拡散を効果的に抑止することができる。
(1) Claim 1 or Claim 2 of the present invention
In any of the suppression chamber dust collection and dehumidification methods described in the above paragraph, air is circulated between the inside and the outside of the suppression chamber, so that dust generated during the cleaning operation and moisture contained in the air in the suppression chamber and the vent pipe are removed. Is transferred to the outside of the suppression chamber to secure the visual field in the suppression chamber and the vent pipe and reduce the humidity.
In addition, the diffusion of dust from inside the suppression chamber to the outside can be effectively suppressed.

【0044】(2)本発明の請求項2に記載のサプレッ
ションチェンバ集塵除湿方法においては、サプレッショ
ンチェンバ内と原子炉格納容器のドライウエルとの連通
を遮断するので、原子炉格納容器内への粉塵の飛散を抑
止することができる。
(2) In the dust collecting and dehumidifying method of the suppression chamber according to the second aspect of the present invention, the communication between the inside of the suppression chamber and the dry well of the containment vessel is cut off. Dust scattering can be suppressed.

【0045】(3)本発明の請求項3あるいは請求項4
に記載のサプレッションチェンバ集塵除湿装置のいずれ
においても、サプレッションチェンバ内及びベント管内
の空気を、集塵器、除湿器を介してサプレッションチェ
ンバ内へ循環させて、研掃作業時に生じる粉塵とサプレ
ッションチェンバ内及びベント管内の空気に含まれてい
る水分をサプレッションチェンバの外部へ移送し、サプ
レッションチェンバ内及びベント管内の視野確保と湿度
の低減を図るので、塗膜を形成する前の研掃面の発錆、
並びにサプレッションチェンバ内などから外部への粉塵
の拡散を効果的に抑止することができる。
(3) Claim 3 or Claim 4 of the present invention
In any of the suppression chamber dust collecting and dehumidifying devices described in (1), the air in the suppression chamber and the vent pipe is circulated through the dust collector and the dehumidifier into the suppression chamber, and the dust generated during the cleaning operation and the suppression chamber are removed. Moisture contained in the air inside the vent pipe and inside the vent pipe is transferred to the outside of the suppression chamber to secure the visual field inside the suppression chamber and the vent pipe and reduce the humidity. Rust,
In addition, the diffusion of dust from inside the suppression chamber to the outside can be effectively suppressed.

【0046】(4)本発明の請求項4に記載のサプレッ
ションチェンバ集塵除湿装置においては、閉塞部材によ
って、サプレッションチェンバ内と原子炉格納容器のド
ライウエルとの連通を遮断するので、原子炉格納容器内
への粉塵の飛散を抑止することができる。
(4) In the suppression chamber dust collecting and dehumidifying device according to the fourth aspect of the present invention, since the communication between the inside of the suppression chamber and the dry well of the reactor containment vessel is cut off by the closing member, the containment of the reactor is prevented. Dust scattering into the container can be suppressed.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明のサプレッションチェンバ集塵除湿装置
の実施の形態の一例を示す概念図である。
FIG. 1 is a conceptual diagram showing an example of an embodiment of a suppression chamber dust collecting and dehumidifying device of the present invention.

【図2】原子炉設備の一例を示す概念図である。FIG. 2 is a conceptual diagram showing an example of a nuclear reactor facility.

【図3】従来のサプレッションチェンバ研掃時の集塵手
段の一例を示す概念図である。
FIG. 3 is a conceptual diagram showing an example of a conventional dust collecting means at the time of suppression chamber polishing.

【符号の説明】[Explanation of symbols]

4 原子炉格納容器 6 サプレッションチェンバ 14 ベント管 15 フィルタ 17 集塵器 20 除湿器 21 仮設ダクト(空気流路) 22 閉止カバー(閉止部材) Reference Signs List 4 Reactor containment vessel 6 Suppression chamber 14 Vent pipe 15 Filter 17 Dust collector 20 Dehumidifier 21 Temporary duct (air flow path) 22 Closing cover (closing member)

───────────────────────────────────────────────────── フロントページの続き (72)発明者 新澤 慶丸 東京都中央区築地5丁目4番14号 住友築 地ビル 石川島プラント建設株式会社内 ────────────────────────────────────────────────── ─── Continued on the front page (72) Inventor Keimaru Niizawa 5-4-1-14 Tsukiji, Chuo-ku, Tokyo Sumitomo Tsukiji Building Ishikawajima Plant Construction Co., Ltd.

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 サプレッションチェンバの内部、及び該
サプレッションチェンバと原子炉格納容器のドライウエ
ルとを連通するベント管の内部を研掃する際に、サプレ
ッションチェンバ内及びベント管内の空気を吸引して該
空気に随伴する粉塵を捕捉し、粉塵除去後の空気を除湿
してサプレッションチェンバ内へ送給することを特徴と
するサプレッションチェンバ集塵除湿方法。
When cleaning the inside of a suppression chamber and the inside of a vent pipe that communicates the suppression chamber with a dry well of a reactor containment vessel, the air in the suppression chamber and the vent pipe is sucked to clean the inside of the suppression chamber. A method of collecting and dehumidifying a suppression chamber, comprising: capturing dust accompanying air, dehumidifying the air after removing the dust, and feeding the dehumidified air into a suppression chamber.
【請求項2】 サプレッションチェンバの内部、及び該
サプレッションチェンバと原子炉格納容器のドライウエ
ルとを連通するベント管の内部を研掃する際に、原子炉
圧力容器のドライウエルに対するベント管の連通を遮断
する請求項1に記載のサプレッションチェンバ集塵除湿
方法。
2. When the inside of the suppression chamber and the inside of the vent pipe communicating the suppression chamber with the dry well of the reactor containment vessel are cleaned, the vent pipe communicates with the dry well of the reactor pressure vessel. The method for collecting and dehumidifying a suppression chamber according to claim 1, wherein the dust is cut off.
【請求項3】 サプレッションチェンバ内及びベント管
内から空気を吸引し且つ該空気に随伴する粉塵を捕捉可
能な集塵器と、該集塵器から送出される空気を除湿可能
な除湿器と、該除湿器から送出される空気をサプレッシ
ョンチェンバ内及びベント管内へ送給する空気流路とを
備えてなることを特徴とするサプレッションチェンバ集
塵除湿装置。
3. A dust collector capable of sucking air from inside a suppression chamber and a vent pipe and capturing dust accompanying the air, a dehumidifier capable of dehumidifying air sent from the dust collector, A suppression chamber dust collecting and dehumidifying device, comprising: an air passage for supplying air sent from a dehumidifier into a suppression chamber and a vent pipe.
【請求項4】 サプレッションチェンバ内と原子炉格納
容器のドライウエルとの連通を遮断可能な閉塞部材を備
えた請求項3に記載のサプレッションチェンバ集塵除湿
装置。
4. The suppression chamber dust collecting and dehumidifying apparatus according to claim 3, further comprising a closing member capable of blocking communication between the inside of the suppression chamber and the dry well of the containment vessel.
JP11124074A 1999-04-30 1999-04-30 Suppression chamber dust collection and dehumidification method and apparatus Pending JP2000314794A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11124074A JP2000314794A (en) 1999-04-30 1999-04-30 Suppression chamber dust collection and dehumidification method and apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11124074A JP2000314794A (en) 1999-04-30 1999-04-30 Suppression chamber dust collection and dehumidification method and apparatus

Publications (1)

Publication Number Publication Date
JP2000314794A true JP2000314794A (en) 2000-11-14

Family

ID=14876300

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11124074A Pending JP2000314794A (en) 1999-04-30 1999-04-30 Suppression chamber dust collection and dehumidification method and apparatus

Country Status (1)

Country Link
JP (1) JP2000314794A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007268393A (en) * 2006-03-31 2007-10-18 Jfe Mechanical Co Ltd Dehumidification and organic solvent treatment system for painting room
JP2007268643A (en) * 2006-03-31 2007-10-18 Jfe Mechanical Co Ltd Dehumidification and dust removal system for blast rooms
JP2014185892A (en) * 2013-03-22 2014-10-02 Hitachi Ltd Dehumidification system in turbine condenser

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007268393A (en) * 2006-03-31 2007-10-18 Jfe Mechanical Co Ltd Dehumidification and organic solvent treatment system for painting room
JP2007268643A (en) * 2006-03-31 2007-10-18 Jfe Mechanical Co Ltd Dehumidification and dust removal system for blast rooms
JP2014185892A (en) * 2013-03-22 2014-10-02 Hitachi Ltd Dehumidification system in turbine condenser

Similar Documents

Publication Publication Date Title
JP5401206B2 (en) Blast room
JP2010274204A (en) Coating material collecting system
KR101394545B1 (en) Apparatus for eliminating paint dust
JP2000314794A (en) Suppression chamber dust collection and dehumidification method and apparatus
JPH07171531A (en) Piping maintenance robot
JPH06213593A (en) Method for cleaning boiler and dust removing device used in this method
JPH1043700A (en) Dry ice blasting equipment
JP2009091081A (en) Deposit treatment device and deposit treatment method
JP4426734B2 (en) Suppression chamber repainting method
CN106984480B (en) Paint spray booth and exhaust duct
JP3975028B2 (en) Suppression chamber repainting method
JP3975027B2 (en) Suppression chamber ventilation method
JPH01121799A (en) Method for stripping surface of concrete structure
JPH11248876A (en) How to repaint the suppression chamber
JP2001029852A (en) Coating device
JP4147237B2 (en) Removal method of sprayed rock wool containing sprayed asbestos or asbestos
JP3215352U (en) Peeling device that does not scatter building exterior materials containing asbestos into the atmosphere
JP7138302B1 (en) Exterior wall asbestos removal strong suction sander construction method
JP4720972B2 (en) Blasting method for pipe member and bag covering the pipe member
CN108043823A (en) A kind of intermetallic composite coating cleaning device
JP2005271174A (en) Structure ground treatment method
JP3996248B2 (en) Water tank wall painting equipment
JP2009090188A (en) Method and apparatus for removing attachment
CN207913407U (en) A kind of dust-extraction unit being used cooperatively with grain cleaner
JP6474306B2 (en) Steel bridge blasting method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060110

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070607

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070612

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20071106