JP2012214830A - 高炉装入物の落下軌跡測定方法および測定棒 - Google Patents
高炉装入物の落下軌跡測定方法および測定棒 Download PDFInfo
- Publication number
- JP2012214830A JP2012214830A JP2011079653A JP2011079653A JP2012214830A JP 2012214830 A JP2012214830 A JP 2012214830A JP 2011079653 A JP2011079653 A JP 2011079653A JP 2011079653 A JP2011079653 A JP 2011079653A JP 2012214830 A JP2012214830 A JP 2012214830A
- Authority
- JP
- Japan
- Prior art keywords
- blast furnace
- charge
- measuring
- pressure
- film
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Blast Furnaces (AREA)
- Force Measurement Appropriate To Specific Purposes (AREA)
- Manufacture Of Iron (AREA)
Abstract
【解決手段】 高炉内に装入物を装入するときの装入物落下軌跡を測定する高炉装入物の落下軌跡測定方法であって、高炉の装入物装入装置と炉内の装入物表面の間に、圧力測定フィルム2を巻きつけた測定棒1を挿入する工程と、前記測定棒に装入物3を落下させて、前記圧力測定フィルム2に圧痕を発色させる工程と、測定した前記圧力測定フィルム上に記録された圧痕から、該圧痕の個数と個々の圧痕の圧力を求める工程、を有する高炉装入物の落下軌跡測定方法。
【選択図】図1
Description
この発明によれば、バーを固定することで、高炉休風とは無関係に常時の測定が可能であるが、バーの磨耗が激しくメンテナンスが困難であるという問題がある。
この方法によれば、高炉半径方向における装入物の衝突位置の検知はできるが、高炉炉頂の粉塵が多い環境では、プローブの気体供給配管がつまりやすく、測定精度が悪いという問題がある。
高炉の装入物装入装置と炉内の装入物表面の間に、圧力測定フィルムを巻きつけた測定棒を挿入する工程と、
前記測定棒に装入物を落下させて、前記圧力測定フィルムに圧痕を発色させる工程と、
測定した前記圧力測定フィルム上に記録された圧痕から、該圧痕の個数と個々の圧痕の圧力を求める工程、を有する高炉装入物の落下軌跡測定方法。
(2)前記圧力測定フィルムが感知する圧力により、装入物の粒度毎の落下軌跡を測定する工程を有する前記(1)に記載の高炉装入物の落下軌跡測定方法。
(3)芯棒と、該芯棒の上面の一部を覆う圧力測定フィルムと、該圧力測定フィルムの上面全体を覆う該圧力測定フィルムの測定時の破損を防止する機能を有する保護皮膜とからなる高炉装入物の落下軌跡の測定棒。
芯棒の表面には、圧力測定フィルム2が置かれる。巻きつける範囲は、炉半径方向(芯棒長手方向)では装入物が落下する範囲をすべて含む必要があるが、炉円周方向(芯棒幅方向)では適宜定めてよい。測定精度の観点からは、図3に示すように、圧痕数が最も多く得られる上面全体とするのが最も好ましい。ここに、圧力測定フィルムとは、圧力を受けた部分がその圧力に応じて濃淡を発する機能を有するフィルムであって、市販品を測定対象に応じて選択する。一般的に、例えば、ロールの接触圧、各種機械の締結部の締め付け圧力、紙等の巻き取り圧等の圧力測定で利用されている。しかし、固体の粒体流れを、圧力測定フィルムに衝突させることにより、固体の流れを測定する事例はなく、高炉の装入物落下軌跡の特性を測定する事例もない。
圧力測定フィルムを取り囲むように保護皮膜1bを設ける。高炉においては、1回当たりの鉱石装入量は、50トン〜100トンにもなるので、測定棒1の表面の圧力測定フィルム2は、鉱石の落下衝撃で破損されてしまう。圧力測定フィルムの破損を防止するために、フィルムを保護する皮膜が必要である。しかし、保護皮膜が強固過ぎると鉱石落下の衝撃力を圧力測定フィルムが検出できない。本発明者は、圧力測定フィルムを保護する皮膜として、クラフト粘着テープ、布粘着テープ、各種フィルムテープを検討した結果、布粘着テープが、適正な強度があり、かつ、取り外しも簡易であり、測定後圧力の解析に最適であることを見出した。
装入物装入装置が、旋回シュートである高炉の休風時において、本発明を実施した。旋回シュート4の下端と炉内装入物表面5の間に炉外から直径90mmの測定棒1を挿入した(図1)。測定棒1の表面に、圧力測定フィルム2(富士フイルム製、品番MW)を置き、さらにその上を布粘着テープで被覆した。
2…圧力測定フィルム、3…装入物、4…旋回シュート、5…装入物表面
Claims (3)
- 高炉内に装入物を装入するときの装入物落下軌跡を測定する高炉装入物の落下軌跡測定方法であって、
高炉の装入物装入装置と炉内の装入物表面の間に、圧力測定フィルムを巻きつけた測定棒を挿入する工程と、
前記測定棒に装入物を落下させて、前記圧力測定フィルムに圧痕を発色させる工程と、
測定した前記圧力測定フィルム上に記録された圧痕から、該圧痕の個数と個々の圧痕の圧力を求める工程、を有する高炉装入物の落下軌跡測定方法。 - 前記圧力測定フィルムが感知する圧力により、装入物の粒度毎の落下軌跡を測定する工程を有する請求項1に記載の高炉装入物の落下軌跡測定方法。
- 芯棒と、該芯棒の上面の一部を覆う圧力測定フィルムと、該圧力測定フィルムの上面全体を覆う該圧力測定フィルムの測定時の破損を防止する機能を有する保護皮膜とからなる高炉装入物の落下軌跡の測定棒。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2011079653A JP5561228B2 (ja) | 2011-03-31 | 2011-03-31 | 高炉装入物の落下軌跡測定方法および測定棒 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2011079653A JP5561228B2 (ja) | 2011-03-31 | 2011-03-31 | 高炉装入物の落下軌跡測定方法および測定棒 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2012214830A true JP2012214830A (ja) | 2012-11-08 |
| JP5561228B2 JP5561228B2 (ja) | 2014-07-30 |
Family
ID=47267871
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2011079653A Active JP5561228B2 (ja) | 2011-03-31 | 2011-03-31 | 高炉装入物の落下軌跡測定方法および測定棒 |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP5561228B2 (ja) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110684874A (zh) * | 2019-09-25 | 2020-01-14 | 包头钢铁(集团)有限责任公司 | 一种高炉布料方法 |
| JP2020015935A (ja) * | 2018-07-24 | 2020-01-30 | 日本製鉄株式会社 | 高炉装入物の落下位置測定方法、高炉装入物の装入方法、および高炉装入物の装入システム |
| CN116751906A (zh) * | 2023-05-04 | 2023-09-15 | 衡阳华菱钢管有限公司 | 一种炼铁厂高炉炉顶料面测量方法及测量装置 |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS563606A (en) * | 1979-06-21 | 1981-01-14 | Kobe Steel Ltd | Charge descending condition grasping method of blast furnace raw material |
| JPS6293353U (ja) * | 1985-11-29 | 1987-06-15 | ||
| JPH0421549U (ja) * | 1990-06-08 | 1992-02-24 | ||
| JPH11315309A (ja) * | 1998-03-05 | 1999-11-16 | Kobe Steel Ltd | 粒粉体の落下状況把握方法、落下物測定装置及び高炉用落下物測定装置 |
| US6261513B1 (en) * | 1997-01-29 | 2001-07-17 | Paul Wurth, S.A. | Device for directly monitoring the charging process on the inside of a shaft furnace |
-
2011
- 2011-03-31 JP JP2011079653A patent/JP5561228B2/ja active Active
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS563606A (en) * | 1979-06-21 | 1981-01-14 | Kobe Steel Ltd | Charge descending condition grasping method of blast furnace raw material |
| JPS6293353U (ja) * | 1985-11-29 | 1987-06-15 | ||
| JPH0421549U (ja) * | 1990-06-08 | 1992-02-24 | ||
| US6261513B1 (en) * | 1997-01-29 | 2001-07-17 | Paul Wurth, S.A. | Device for directly monitoring the charging process on the inside of a shaft furnace |
| JPH11315309A (ja) * | 1998-03-05 | 1999-11-16 | Kobe Steel Ltd | 粒粉体の落下状況把握方法、落下物測定装置及び高炉用落下物測定装置 |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2020015935A (ja) * | 2018-07-24 | 2020-01-30 | 日本製鉄株式会社 | 高炉装入物の落下位置測定方法、高炉装入物の装入方法、および高炉装入物の装入システム |
| JP7127404B2 (ja) | 2018-07-24 | 2022-08-30 | 日本製鉄株式会社 | 高炉装入物の落下位置測定方法、高炉装入物の装入方法、および高炉装入物の装入システム |
| CN110684874A (zh) * | 2019-09-25 | 2020-01-14 | 包头钢铁(集团)有限责任公司 | 一种高炉布料方法 |
| CN116751906A (zh) * | 2023-05-04 | 2023-09-15 | 衡阳华菱钢管有限公司 | 一种炼铁厂高炉炉顶料面测量方法及测量装置 |
Also Published As
| Publication number | Publication date |
|---|---|
| JP5561228B2 (ja) | 2014-07-30 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP5561228B2 (ja) | 高炉装入物の落下軌跡測定方法および測定棒 | |
| KR101031079B1 (ko) | 고로 장입물 레벨 측정 장치 | |
| JP6311482B2 (ja) | 高炉塊状帯のガス流速および還元負荷の推定方法 | |
| JP7307341B2 (ja) | 炉内ガス圧力の変動検知方法 | |
| JP6575467B2 (ja) | 高炉操業方法 | |
| JP6409490B2 (ja) | 落下軌跡推定方法、落下軌跡の推定式の補正方法及び装入量分布推定方法 | |
| JP2019183261A (ja) | 高炉炉況状態判定装置、高炉の操業方法、及び、高炉炉況状態判定方法 | |
| JP6547474B2 (ja) | 高炉、及び、高炉装入物の高さレベルを測定する測定方法 | |
| KR101277883B1 (ko) | 고로의 선회 슈트 장치 | |
| JPH0586446B2 (ja) | ||
| JP7694748B1 (ja) | 高炉炉内の溶融物レベルの計測方法、高炉炉内の溶融物レベルの計測装置、及び高炉の操業方法 | |
| JP2015120964A (ja) | 高炉装入物の落下軌跡測定方法 | |
| JP7127404B2 (ja) | 高炉装入物の落下位置測定方法、高炉装入物の装入方法、および高炉装入物の装入システム | |
| CA2383538A1 (en) | Method for determining the trajectory of materials when charging a shaft kiln | |
| JP7740490B2 (ja) | 高炉炉内の溶融物レベルの計測方法、高炉炉内の溶融物レベルの計測装置、及び高炉の操業方法 | |
| Schmidt et al. | Process Insights with Advanced Blast Furnace Probes | |
| JP2521838Y2 (ja) | 高炉装入物の落下位置測定用ゾンデ | |
| JP2008223121A (ja) | 高炉シャフト上部炉壁面の補修方法 | |
| JP6870694B2 (ja) | 高炉炉況状態判定装置、高炉の操業方法、及び、高炉炉況状態判定方法 | |
| KR101134620B1 (ko) | 고로의 용탕 탐지 장치 | |
| JP2931502B2 (ja) | 高炉操業法 | |
| JPS62192511A (ja) | 回転シユ−ト式高炉の装入原料落下位置推定方法 | |
| KR101330975B1 (ko) | 토페도 래들카의 슬래그양 측정장치 | |
| JPS63195205A (ja) | ベル式高炉における原料装入方法 | |
| JPS5832207B2 (ja) | 装入物堆積層厚検知ゾンデ |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20130212 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20140513 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20140526 |
|
| R151 | Written notification of patent or utility model registration |
Ref document number: 5561228 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R151 |
|
| S533 | Written request for registration of change of name |
Free format text: JAPANESE INTERMEDIATE CODE: R313533 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |