JPH01202121A - Power system monitoring device - Google Patents
Power system monitoring deviceInfo
- Publication number
- JPH01202121A JPH01202121A JP63024897A JP2489788A JPH01202121A JP H01202121 A JPH01202121 A JP H01202121A JP 63024897 A JP63024897 A JP 63024897A JP 2489788 A JP2489788 A JP 2489788A JP H01202121 A JPH01202121 A JP H01202121A
- Authority
- JP
- Japan
- Prior art keywords
- power system
- information
- equipment
- displayed
- monitoring device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.
Description
【発明の詳細な説明】
[発明の目的]
(産業上の利用分野)
本発明は電力系統監視装置、特に電力系統の状態を常に
情報として入力しながら監視を行ない、電力系統に事故
が発生した場合に、その情報をアラームとして出力する
電力系統監視装置に関する。[Detailed Description of the Invention] [Object of the Invention] (Industrial Application Field) The present invention is a power system monitoring device, in particular, a power system monitoring device that monitors the power system status while constantly inputting information, and detects when an accident occurs in the power system. The present invention relates to a power system monitoring device that outputs that information as an alarm when the event occurs.
(従来の技術)
電力系統監視装置は電力系統に発生する多種多様のアラ
ーム情報をできるだけ正確に、かつ漏れなくオペレータ
に提示する役割を持っている。(Prior Art) A power system monitoring device has the role of presenting a wide variety of alarm information occurring in a power system to an operator as accurately and completely as possible.
第8図は従来の電力系統監視装置の一例図であり、これ
によって従来方式を説明する。第8図において、1は電
力系統を、2は電力系統のアラーム情報を送信するため
の送信局を、3は送信局からの情報を受信する受信局を
、4は受信局からの情報を受けとり、これをCRTやグ
リンタ(以後■―と称す)に出力する電子計算機を示す
。FIG. 8 is a diagram showing an example of a conventional power system monitoring device, and the conventional system will be explained using this diagram. In Fig. 8, 1 is the power system, 2 is a transmitting station for transmitting alarm information of the power system, 3 is a receiving station that receives information from the transmitting station, and 4 is a receiving station that receives information from the receiving station. , an electronic computer that outputs this to a CRT or a printer (hereinafter referred to as ■).
ス、5.6.7は電子計算機を構成する装置で、5は受
信局3から受けとった情報を保存するデータベースを、
6はデータベースに保存された情報を基にしてCRTに
電力系統図を表示し、そこに開閉器の入・切状態、発電
機の起動・停止状態を表示する電力系統図表示機構を、
7はデータベースに保存された情報を基に、予め定めら
れたメツセージを電子計算機に内蔵された時計の時刻を
つけてTWGこ印字するアラーム情報印字機構を示す。5.6.7 is a device constituting an electronic computer; 5 is a database for storing information received from the receiving station 3;
6 is a power system diagram display mechanism that displays a power system diagram on a CRT based on the information stored in the database, and displays there the on/off status of the switch and the start/stop status of the generator;
Reference numeral 7 indicates an alarm information printing mechanism that prints a predetermined message on the TWG with the time of a clock built into the computer based on information stored in the database.
第9図は電子計算機4の動作原理を説明するフローチャ
ートで、ステップ891〜S94からなる4つのステッ
プを有する。FIG. 9 is a flowchart illustrating the operating principle of the electronic computer 4, and has four steps consisting of steps 891 to S94.
ステップS91では、受信局から電力系統の情報を常に
入力する。ステップ892では、その情報の新旧を比較
し、変化があるとステップS93を実行する。ステップ
893では、変化の発生を検出した時刻を電子計算機内
蔵の時計から読取り、更に変化の発生した情報に対して
予め用意されているメツセージをデータベースから取出
して、これらの両者を対としてTlJ4こ出力する。In step S91, power system information is constantly input from the receiving station. In step 892, the new and old information is compared, and if there is a change, step S93 is executed. In step 893, the time at which the occurrence of the change was detected is read from the computer's built-in clock, and a message prepared in advance for the information on which the change occurred is retrieved from the database, and both are output as a pair to TlJ4. do.
ステップS94では電力系統図を表示し、そこに表示さ
れている開閉器の入・切状態と発電機の運転・停止状態
をシンボルの形と色により区別してCRTに表示する。In step S94, the power system diagram is displayed, and the on/off states of the switches and the running/stopping states of the generators displayed there are distinguished by symbol shapes and colors and displayed on the CRT.
第10図はCRTに表示される電力系統図の例で、A
S/S、 CS/S、 OS/S、 HS/Sは、大々
A変電所、C変電所、C変電所、H変電所を、B P/
S。Figure 10 is an example of a power system diagram displayed on a CRT.
S/S, CS/S, OS/S, HS/S are Odai A substation, C substation, C substation, H substation, B P/
S.
D P/S、 E P/S、 F P/Sは、大々B発
電所、D発電所、E発電所、F発電所を示している。D P/S, E P/S, and F P/S indicate Odai B Power Plant, D Power Plant, E Power Plant, and F Power Plant.
ス、AF−且、AF−2L、Ftl−且、FH−2L、
CE−Lは送電線を、CB1〜CB22はしゃ断器を
、■〜のは発電機を大々示し、しゃ断器と発電機の状態
は、下記のように区別して表示する。S, AF- and AF-2L, Ftl- and FH-2L,
CE-L indicates a power transmission line, CB1 to CB22 indicate a circuit breaker, and ■ to indicates a generator, and the states of the circuit breaker and generator are distinguished and displayed as shown below.
しゃ断器の入状態 赤色の 0
しゃ断器の切状態 白色の X
発電機の運転状態 赤色の 0
発電機の停止状態 白色の 0
第11図はT14に印字されるメツセージの例で、これ
らは以下に示すような意味を有している。Circuit breaker ON status Red 0 Circuit breaker OFF status White X Generator operating status Red 0 Generator stopped status White 0 Figure 11 is an example of the message printed on T14, and these are as follows. It has the meaning shown.
最初の列に示される数字15:35:11、・・・15
:43:44は、各アラーム情報が計算機システムに到
達して保存された時刻を、次の列に示されるF P/S
、G S/S、・・・B P/Sは発電所名或いは変電
所基を、更仁次の列に示されるOVG 、 C60、・
・・2号Gは第10図に示す各電気所の設備機器名を、
最後の列に示されるTR1P、解列、・・・停止は前掲
の設備機器の状態を示す。Numbers shown in the first column 15:35:11,...15
:43:44 indicates the time when each alarm information reached the computer system and was saved in the F P/S shown in the next column.
, G S/S,...B P/S is the power plant name or substation base, and the OVG, C60,...
...No. 2 G is the equipment name of each electrical station shown in Figure 10,
TR1P, disconnection, . . . stop shown in the last column indicate the status of the above-mentioned equipment.
なお、HREC,14REcは高速度再閉路成功、中速
度再閉路成功を、現地は現地装置にて実施しなことを夫
々意味している。Note that HREC and 14REc mean that high-speed reclosing success and medium-speed reclosing success were carried out on-site using local equipment, respectively.
つまり、0行に示された
15:35:11 F P/S OVGハ、15時
35分11秒にF発電所にて過電圧リレーが動作したこ
とを意味し、
■行に示された
15: 35: 13 B P/S C60TR
1Pは、15時35分13秒にB発電所にて、しゃ断器
3が切となったことを意味する。In other words, 15:35:11 F P/S OVG shown on line 0 means that the overvoltage relay was activated at power plant F at 15:35:11, and 15: shown on line ■ 35: 13B P/S C60TR
1P means that breaker 3 was turned off at power plant B at 15:35:13.
0行に示された
15:35:13 B P/S 1号G 解列は、
15時35分13秒にB発電所にて、1号発電機が電力
系統から切離されたことを、
0行に示された
15:35:13 F P/S CB12 H
RECは、15時35分13秒にF発電所にて、しゃ断
器12が高速度再開路されたことを、
0行に示された
15: 35: 17 CS/S C60TR1P
は、15時35分17秒にC変電所にて、しゃ断器7が
しゃ断されたことを、
0行に示された
15:36:13 B P/S C601N 現
地は、 −15時36分13秒にB発電所にて、し
+断器3が現地装置にて人となったことを、
0行の15: 36: 13 C、S/S C60
IN HRECは、15時36分13秒にC変電所に
て、しゃ断器7が中速度再閉路にて人となったことを、
0行の15:43:40 D P/S 3号G 停
止は、15時43分40秒にD発電所にて、3号発電機
が停止したことを意味する。The 15:35:13 B P/S No. 1 G sequence shown in row 0 is
15:35:13 F P/S CB12 H Line 0 indicates that the No. 1 generator was disconnected from the power grid at Power Plant B at 15:35:13.
REC indicated on line 0 that breaker 12 was recirculated at high speed at F power plant at 15:35:13.15:35:17 CS/S C60TR1P
Line 0 indicates that circuit breaker 7 was disconnected at 15:35:17 at substation C at 15:36:13. 15: 36: 13 C, S/S C60 on line 0 indicates that at power plant B at 15:36:13 C, S/S C60
IN HREC reported that at 15:36:13 at C substation, breaker 7 was disconnected due to medium speed reclosing. means that the No. 3 generator stopped at power plant D at 15:43:40.
ス、第10図と第11図に示した例は、送電、l A[
−■と八F−2[の2回線に落雷があり、A S/S、
Fp/Sは高遠度再開路が成功、B P/S、 CS
/Sでは高速度再閉路装置がないために解列し、発電機
が停止している様子を示している。The examples shown in Figures 10 and 11 are examples of power transmission, lA [
-■ and 8F-2[ were struck by lightning, A S/S,
Fp/S successfully rerouted at high altitude, B P/S, CS
/S shows that the generator is disconnected due to the lack of a high-speed reclosing device and the generator is stopped.
(発明が解決しようとする課M)
上記した小規模な系統の場合であっても:故障に際して
一度に多量のメツセージが出力され、この中から重要な
情報を選び出すことは難しいことがわかる。(Problem M to be solved by the invention) Even in the case of the above-mentioned small-scale system: When a failure occurs, a large number of messages are output at once, and it can be seen that it is difficult to select important information from among them.
更に、落雷のあった時刻は、OVGの動作している時刻
、15:35:11であるが、A S/S、 B P
/S。Furthermore, the time of the lightning strike was 15:35:11, the time when OVG was operating, but A S/S, B P
/S.
c S/S、 F P/Sの夫々のしゃ断器が動作した
時刻は、15:35:17.15:35:13.15:
35:13の如く、若干異なっている。The times when the respective circuit breakers for c S/S and F P/S operated were 15:35:17.15:35:13.15:
35:13, which is slightly different.
これには2つの原因がある。There are two reasons for this.
先ず第1に、夫々の情報が異なる伝送路を経由して計算
機システムに送られるため、計算機システムに到達する
時刻が異なることによるためである。First of all, since each piece of information is sent to the computer system via different transmission paths, the times at which the information reaches the computer system are different.
第2は到着する情報を計算機システムはシリアルに処理
するため、同時に多量の情報が到着すると、最初に処理
する時刻と、最後に処理する時刻とが異なり、■−へは
恰も異なった時刻に発生した情報であるかのように出力
されることによるものである。Second, computer systems process arriving information serially, so when a large amount of information arrives at the same time, the first and last processing times are different, and ■- occurs at different times. This is due to the fact that the information is output as if it were the actual information.
従って第11図では、例えば本来、6行目■に印字され
るべきメツセージ 15:35:14 HS/5Ov
Gは、10行1Oに印字されるといった現象が発生する
。Therefore, in Fig. 11, for example, the message that should originally be printed on the 6th line ■ 15:35:14 HS/5Ov
A phenomenon occurs in which G is printed in 10 rows 10.
ス、第10図に示した系統は一例として示した小規模系
統であるが、これが大規模系統になると、第11図の1
00倍にも及ぶメツセージが出力され、これらの中から
重要なメツセージを拾い出すことは極めて困難となる。The system shown in Figure 10 is a small-scale system shown as an example, but when it becomes a large-scale system, the system shown in Figure 11
00 times as many messages are output, and it is extremely difficult to pick out important messages from among them.
本発明は上記問題点を解決するためになされたものであ
り、伝送路の伝送時間差による印字順の乱れを防止し、
アラーム情報の物理的な意味を直感的にオペレータに感
じさせることの可能な電力系統監視装置を提供すること
を目的としている。The present invention has been made to solve the above problems, and prevents the printing order from being disturbed due to the transmission time difference of the transmission line.
It is an object of the present invention to provide a power system monitoring device that allows an operator to intuitively feel the physical meaning of alarm information.
[発明の構成]
(課題を解決するための手段)
本発明を実施例に対応する第1図を用いて説明すると、
電力系統監視装置において、保護リレーの動作と開閉器
の入・切を示す情報を入力し電力系統を構成する設備情
報と共に保存するデータベース105と、前記データベ
ース内の情報が状態変化した時、その変化時刻と変化後
の状態を検出して当該設備へのアラーム情報の対応づけ
を行なう手段107と、前記対応づけられた各アラーム
情報を電力系統図の該当する設備の近傍に表示するよう
調整する手段106と、調整後の電力系統図を表示する
手段8とから構成した。[Structure of the Invention] (Means for Solving the Problems) The present invention will be explained using FIG. 1 corresponding to an embodiment.
In a power system monitoring device, there is a database 105 into which information indicating the operation of protective relays and on/off of switches is input and stored together with equipment information that constitutes the power system, and when the information in the database changes state, the change means 107 for detecting the time and state after the change and associating alarm information with the relevant equipment; and means for adjusting so that each of the associated alarm information is displayed near the relevant equipment in the power system diagram. 106, and means 8 for displaying the adjusted power system diagram.
(作用)
電力系統からの保護リレーの動作、開閉器の状態情報及
び電力系統を構成する設備情報は、データベース105
に入力されて保存されている。(Function) Operation of protective relays, status information of switches, and information on equipment configuring the power system from the power system are stored in the database 105.
is entered and saved.
事故発生により電力系統で発生するアラーム情報は、ア
ラーム情報の関連設備への対応づけ手段107によって
、関連設備への振り分は処理がなされ、各振り分けられ
たアラーム情報は、電力系統図表示手段106によって
、電力系統図上の関連設備の近傍に時系列的に整理され
、表示手段8に表示される。Alarm information generated in the power system due to the occurrence of an accident is processed and distributed to related equipment by means 107 for associating alarm information with related equipment, and each distributed alarm information is processed by means 106 for associating alarm information with related equipment. Accordingly, the information is arranged in chronological order near the related equipment on the power system diagram and displayed on the display means 8.
(実施例) ′ 以下図面を参照して実施例を説明する。(Example) ' Examples will be described below with reference to the drawings.
第1図は本発明による電力系統監視装置の一実施例の機
能ブロック図であり、図中の符号は第8図に対応してい
る。FIG. 1 is a functional block diagram of an embodiment of a power system monitoring device according to the present invention, and the reference numerals in the figure correspond to those in FIG. 8.
第1図において、電子計算機104は電力系統1の状態
情報を含む電力系統設備データを蓄積するデータベース
105、電力系統1の状態情報の変化を検出してこれを
アラーム情報として促え、その状態変化の時刻と変化後
の状態を検出し、更に電力系統設備の中の関連する設備
に対応づけを行なうアラーム情報の関連設備への対応づ
け機構107、電力系統を構成する設備のシンボル、そ
の各設備間の接続状態・、設備の運転成いは入・切状態
及び前記した107によって設備と対応づけられたアラ
ーム情報を電力系統図として表示する電力系統図
□表示機構106とからなっている。In FIG. 1, a computer 104 has a database 105 that stores power system equipment data including state information of the power system 1, detects changes in the state information of the power system 1, prompts for this as alarm information, and detects changes in the state information of the power system 1. A mechanism 107 for associating alarm information with related equipment, which detects the time and state after the change, and further associates the alarm information with related equipment in the power system equipment, symbols of equipment constituting the power system, and each of the equipment. A power system diagram that displays the connection status between the equipment, the on/off status of the equipment, and the alarm information associated with the equipment by the above-mentioned 107 as a power system diagram.
□Display mechanism 106.
その他の構成は、従来例として示した第8図と同様であ
る。The other configuration is the same as that shown in FIG. 8 as a conventional example.
第2図は電子計算機の具体的な処理内容を示すフローチ
ャートである。第2図において、ステップS91.89
2及び894は、第9図に示したものと同様である。FIG. 2 is a flowchart showing specific processing contents of the computer. In FIG. 2, step S91.89
2 and 894 are similar to those shown in FIG.
先ず、ステップ392において、入力された新旧情報に
差異がなければ、ステップ891へ戻って差異が発生す
るのを待つ。ステップS92において、変化が認められ
ると、ステップS94以降の処理が行なわれる。First, in step 392, if there is no difference between the input new and old information, the process returns to step 891 and waits for a difference to occur. If a change is recognized in step S92, the processes from step S94 onwards are performed.
次に、ステップS92にて情報の新旧に変化が認められ
た場合について、2つの具体例を挙げて説明する。Next, a case where a change in the newness of the information is recognized in step S92 will be described using two specific examples.
なお、第3図は、第11図に示したアラーム情報をCR
Tへ表示した結果を示している。Note that FIG. 3 shows the alarm information shown in FIG.
The results displayed on T are shown.
第3図の表示例かられかるように、電力系統に事故が発
生した場合には、電力系統内に所属する各電気所毎に、
動作した設備名、動作内容が時間と共に表示されるよう
になっている。As can be seen from the display example in Figure 3, if an accident occurs in the power system, each electric station belonging to the power system will
The name of the equipment that operated and the details of the operation are displayed over time.
第3図の枠体内の記載が表示内容であり、これらが各電
気所近傍に明示される。The description inside the frame in FIG. 3 is the display content, and these are clearly displayed near each electric station.
以下に各側を第2図を参照しながら説明する。Each side will be explained below with reference to FIG.
■B P/S近傍に15 : 35 : 13 C
B3 TR1Pと表示される例、
この例は前記した通り、15時35分13秒にCB3の
切操作が行なわれて、電子計算機104へ入力されたケ
ースである。■B 15:35:13C near P/S
Example where B3 TR1P is displayed: As described above, this example is a case in which the CB3 was turned off at 15:35:13 and the information was input to the computer 104.
この場合は、ステップ894にて電力系統図上の設備シ
ンボルCB3を切を意味する形、例えば前記した通り、
Xに変えて表示する。In this case, in step 894, the equipment symbol CB3 on the power system diagram is changed to a shape that means off, for example, as described above.
Change it to an X and display it.
ステップ321では、電子計算機内部に設備されている
時計装置から、15時35分13秒という時刻を読取っ
て保存し、ステップS22では受信局3から与えられた
rCB3が現地装置により切操作された」という情報を
B P/Sに対応させて保存する。In step 321, the time 15:35:13 was read from the clock device installed inside the computer and saved, and in step S22, the rCB3 given from receiving station 3 was turned off by the local device. This information is stored in correspondence with the B P/S.
次にステップS23では、前記したステップS21.8
22で保存されたデータを電力系統図の該当電気所近傍
に表示する。Next, in step S23, the above-mentioned step S21.8
The data saved in step 22 is displayed near the relevant electric station on the power system diagram.
このようにして表示された一例が、第3図のB P/S
の近傍に表示されている「15二35:13CB3
TR1P」なるアラーム情報である。An example of this display is shown in Figure 3.
"15235:13CB3" displayed near the
The alarm information is "TR1P".
なお、ステップS22では、受信局3から与えられた情
報の中にCB3なる設備があり、その設備はB P/
Sに設置されていることを認識している。In addition, in step S22, there is a facility called CB3 in the information given from the receiving station 3, and that facility is BP/
I am aware that it is installed in S.
そして、この認識のためにデータベース105の中に、
CB3はB P/Sに設置されているという情報をもた
せている。For this recognition, in the database 105,
CB3 has information that it is installed in BP/S.
第4図にデータベース105の構成を示す。FIG. 4 shows the configuration of the database 105.
第4図において、例えば(A S/S CBI C
B2)は、
A S/SにCBIとCB2が設置されていることを示
し、
(B P/S CB3 CB4 CB5 CB
6 1号02号G)は、
B P/SにCB3、CB4 、CB5 、CB□、
1号012号Gが設置されていることを示している。In FIG. 4, for example (A S/S CBI C
B2) indicates that CBI and CB2 are installed in A S/S, (B P/S CB3 CB4 CB5 CB
6 No. 1 No. 02 G), B P/S has CB3, CB4, CB5, CB□,
This shows that No. 1 No. 012 G is installed.
@F P/S、 G S/S、 HS/Sの近傍に15
:35:110VG 、 15:35: ii OV
G 、 15:35:140VG ト表示される例
この例は3個所の発・変電所(F P/S、 G S/
S。@15 near F P/S, GS/S, HS/S
:35:110VG, 15:35:ii OV
G, 15:35:140VG This example shows three power generation/substations (F P/S, G S/
S.
HS/S)に設置された地絡過電圧リレーOVGが、1
5:35:11と15:35:14という異なる時刻に
作動したことを示す情報が電子計算機104に入力され
たケースである。これは実際のOVGが同時に動作して
も伝送路の遅れの違いにより、このような現象が発生す
ることは前に述べた通りである。The ground fault overvoltage relay OVG installed in
This is a case where information indicating that the actuation occurred at different times, 5:35:11 and 15:35:14, is input to the computer 104. As mentioned above, this phenomenon occurs due to differences in transmission path delays even if the actual OVGs operate simultaneously.
従ってこの種の入力を受けると、ステップS94では該
当する電力系統図シンボルが存在しないために何もせず
、次のステップ821の処理を実行する。Therefore, when this type of input is received, in step S94, since the corresponding power system diagram symbol does not exist, nothing is done, and the process of the next step 821 is executed.
ステップS21ではF P/Sについて15:35:1
1、G S/Sについて15:35:11、HS/Sに
ついて15:35:14を夫々保存する。In step S21, the F P/S is 15:35:1.
1, save 15:35:11 for GS/S and 15:35:14 for HS/S, respectively.
ステップS22 テはF P/S用ノOVG情報がF
P/Sに、G S/S用ノOVG情報がG S/3ニ、
XH8/S用の0■G情報がHS/Sに夫々対応づけら
れて保存する。Step S22 The OVG information for P/S is F.
The OVG information for G S/S is in P/S,
0■G information for XH8/S is stored in association with HS/S.
ステップS23では電力系統図に表示されたF P/S
、 G S/S、 HS/Sの近傍へ第3図に示すよう
に、15: 35: 11 0VG 、 15: 35
: 11 0VG 。In step S23, the F P/S displayed on the power system diagram
, GS/S, HS/S as shown in Figure 3, 15: 35: 11 0VG, 15: 35
: 11 0VG.
15: 35: 14 0VGというアラーム情報を表
示する。15: 35: 14 Displays alarm information of 0VG.
次に電力系統図の各設備の近傍にアラーム情報をいかに
表示するかについて説明する。Next, a description will be given of how alarm information is displayed near each facility in the power system diagram.
第5図はCRT画面であり、この場合はB P/Sの表
示例として説明する。図の枠体は、CRT画面の外枠で
あって、この内部にB P/Sを表示する場合は、a点
を原点として座標を定める。そして第6図に示されるよ
うに、B P/Sについては予めその座標が示されてい
る。FIG. 5 shows a CRT screen, and this case will be described as an example of a BP/S display. The frame in the figure is the outer frame of the CRT screen, and when displaying the BP/S inside this frame, the coordinates are determined with point a as the origin. As shown in FIG. 6, the coordinates of B P/S are shown in advance.
図において、(B P/S(X 80) (Y
25) )は、B P/SのX座標が原点を基準とし
て80であり、Ya標が同じ<25であることを示して
いる。In the figure, (B P/S (X 80) (Y
25)) indicates that the X coordinate of B P/S is 80 with respect to the origin, and the Ya mark is also <25.
従って、第5図に示されるように、原点(a)からの距
IX、Yの位置がB P/Sの位置として決定される。Therefore, as shown in FIG. 5, the position at distance IX, Y from the origin (a) is determined as the position of B P/S.
次に、メツセージを表示するためのウィンドウの座標で
あるが、これは第6図の2列目に示しである。これは第
5図の2点を基準としたもので、この7点はB P/S
の座標を基準として決められる。Next, the coordinates of the window for displaying the message are shown in the second column of FIG. This is based on the two points in Figure 5, and these seven points are B P/S.
It can be determined based on the coordinates of
(BP/Sウィンドウ(χ1−30> (V120
)(χ2 50) (V2 5xn))について、こ
のうちの(χ1−30)は2点のB P/S座標からの
X軸相対値を示し、(V、 20)は7点のB P/
S座標からのY軸相対値を示す。(BP/S window (χ1-30> (V120
)(χ2 50) (V2 5xn)), of which (χ1-30) indicates the X-axis relative value from the BP/S coordinates of the two points, and (V, 20) indicates the relative value of the X-axis from the BP/S coordinates of the 7 points.
The Y-axis relative value from the S coordinate is shown.
ス、(χ250)はウィンドウの横の長さを示し、(V
2 5x n)はウィンドウの縦の長さを示す。但し、
nはメツセージの個数に対応する値である。(χ250) indicates the horizontal length of the window, (V
2 5 x n) indicates the vertical length of the window. however,
n is a value corresponding to the number of messages.
第7図はメツセージ表示のための枠体を作成する処理内
容を示すフローチャートであり、電力系統図表示機構に
て行なわれる。FIG. 7 is a flowchart showing the process of creating a frame for message display, which is performed by the power system diagram display mechanism.
ステップS71では、第2図のステップS22にて保存
した変化の発生しな情報とそれに対応する投何名を入力
し、ステップ872において、その変化の発生した設備
が設置されている電気所(発・変電所)のCRT上の座
標を入力する。In step S71, the information on the occurrence of a change saved in step S22 in FIG.・Enter the coordinates on the CRT of the substation).
B P/Sの場合であれば、CIIT左上を原点とじて
X軸80、Y軸25であることを入力する。In the case of B P/S, enter that the origin is the upper left of CIIT, and the X axis is 80 and the Y axis is 25.
ステップ873では、アラーム情報を表示するウィンド
ウの左上端の座標を入力する。In step 873, the coordinates of the upper left corner of the window displaying alarm information are input.
B P/Sの場合であれば、ウィンドウの左上端2点の
座標を下記のように計算して求め、これを入力する。In the case of B P/S, calculate the coordinates of the two upper left points of the window as shown below and input them.
2点 X軸= 80−30= 50
2点 Y軸= 25+20= 45
ステツス874ではウィンドウの縦、横のサイズを決定
する。B P/Sの場合であればステップS71で入力
した情報の個数を10個とすれば、前記(V2 5xn
)を使って 5X10=50 にて縦のサイズが求ま
る。2 points X-axis = 80-30 = 50 2 points Y-axis = 25 + 20 = 45 In the status 874, the vertical and horizontal sizes of the window are determined. In the case of B P/S, if the number of pieces of information input in step S71 is 10, then the above (V2 5xn
) to find the vertical size using 5X10=50.
ス、横のサイズは、前記した(χ250)から50とい
う数値を入力する。ステップS75では保存した対応情
報を表示する。For the horizontal and vertical sizes, enter the value 50 from the above-mentioned (χ250). In step S75, the saved correspondence information is displayed.
以上によって電力系統の情報を、該当する設備の近傍に
時系列的に表示することができる。As described above, power system information can be displayed chronologically in the vicinity of the relevant equipment.
上記実施例によれば、アラーム情報は各設備の近傍に整
理されて表示され、オペレータにとって直感的に理解し
易い形に表示される。According to the above embodiment, the alarm information is organized and displayed near each piece of equipment, and is displayed in a form that is easy for the operator to intuitively understand.
更に、異なる地点で同時に発生したアラーム情報が伝送
路の遅れ具合によって、電子計算機には異なる時刻に入
力されるケースがあっても、これらは各設備毎に時系列
に整理され、横並びに見るコトがテキ、例えGfF P
/8ノ15:35:11 0VGと、HS/Sの15:
35: 14 0VGとは、オペレータにとって異な
る時刻と理解することはなく、事実上、問題を解消する
ことが出来る。Furthermore, even though alarm information that occurs simultaneously at different points may be input to the computer at different times depending on the degree of delay in the transmission path, this information is organized in chronological order for each piece of equipment, making it easy to view the information side-by-side. That's ideal, for example GfF P
/8 15:35:11 0VG and 15 of HS/S:
35: 14 0VG will not be understood by the operator as a different time, and the problem can be virtually eliminated.
[発明の効果コ
以上説明した如く、本発明によれば電力系統の情報を電
力系統を構成する各設備の近傍に時系列(。502表示
すうよう、:饗、)−C,、多数。7つ−よ、ッセージ
が整理され、運転員にとって直感的に理解し易い形に表
示され、監視操作が容易となる。[Effects of the Invention] As explained above, according to the present invention, power system information is displayed in chronological order (.502) in the vicinity of each piece of equipment constituting the power system. 7. Messages are organized and displayed in a format that is easy for operators to intuitively understand, making monitoring operations easier.
第1図は本発明による電力系統監視装置の一実施例の機
能ブロック図、第2図は電力系統の処哩内容を示すフロ
ーチャート、第3図はCRTにアラームメツセージと共
に表示される電力系統図、第4図はデータベースの構成
側図、第5図はアラームメツセージを表示するための枠
体をCRT上にてどのように形成するかを説明する図、
第6図はアラームメツセージ表示のための各電気所の枠
体の座標の構成側図、第7図は枠体を作成する場合の処
理内容を示すフローチャート、第8図は従来の電力系統
監視装置の構成を示す図、第9図は従来例における電子
計算機の処理内容を示すフローチャート、第10図はC
RTに表示される電力系統図、第11図はプリンタへの
メツセージの出力例図である。
■・・・電力系統 2・・・送信局3・・
・受信局 104・・・電子計算機10
5・・・データベース
106・・・電力系統図表示機構
107・・・アラーム情報の関連設備への対応づけ機構
8・・・CRT
第1図
第2図
■ (4% C3I CB、2 )■(DF/s
3号G)
■ (EP15 Ca1l 4号G)■ (FP/
)calz CE313 CaI2 CB+5 Cf
316CBI7CI31B第5図
(BP/s (X 80 ) (Y25 ) )BP1
5ウィンドウ(工、−30)(II+zo) (工2
50 )(LJ25Xル)第6図
第7図
■ +5:35:II FF/s 、’OVG■ +
5:35:+! GS/S ○VG■ 15:35
:13 8F/S C83TR1P■ 15:35
:+3 8 +15 C84TR1P■ +5:36
:+3 BI151号G 解列■ 15:35
:13 88’、 2うG M列■ 15:
35 :+3 F I/、 C812HRE
C■ 15:35°13 F P/s CB13
HREC■ 15:35:+3 EP/s 4号
GM列■ 15:35:14 )(S/s OVG
@ 15:3517 AS/5C81HREC@
)5:35:17 AS/; CB2
H尺EC@ 15:35:+7 DP15 3
% 解列@ 15 :35 : 17 Cs/s
C8’7 TR1P■ 15°35:17 CS/
5CB8 TRiρ■ 15:36 :+3
B F/s C83IN現地@ 15:36:+
3 BP/s 晶4 1NXIM■ 75:36
°13 C3/s C8’7 IN M
REC■ 16:43:40 0P’5 3
号G イ亭止■ 15:43:40 EP/s
4号Q イ与止@ 15:43:44
8P/S I号Q イ亭止@ +5:43
:44 8P/S 2’冶G イ亭止第11図FIG. 1 is a functional block diagram of an embodiment of the power system monitoring device according to the present invention, FIG. 2 is a flowchart showing the processing contents of the power system, and FIG. 3 is a power system diagram displayed on a CRT together with an alarm message. FIG. 4 is a side view of the database configuration, and FIG. 5 is a diagram explaining how to form a frame for displaying alarm messages on a CRT.
Figure 6 is a side view of the configuration of the coordinates of the frame of each electric station for displaying alarm messages, Figure 7 is a flowchart showing the processing content when creating the frame, and Figure 8 is a conventional power system monitoring device. 9 is a flowchart showing the processing contents of a conventional computer, and FIG. 10 is a diagram showing the configuration of C.
The power system diagram displayed on the RT, FIG. 11, is an example of outputting a message to the printer. ■... Power system 2... Transmitting station 3...
・Receiving station 104...electronic computer 10
5...Database 106...Power system diagram display mechanism 107...Mechanism for associating alarm information with related equipment 8...CRT Fig. 1 Fig. 2 ■ (4% C3I CB, 2) ■ ( DF/s
No. 3 G) ■ (EP15 Ca1l No. 4 G) ■ (FP/
) calz CE313 CaI2 CB+5 Cf
316CBI7CI31B Fig. 5 (BP/s (X 80 ) (Y25 ) ) BP1
5 window (Eng, -30) (II+zo) (Eng 2
50) (LJ25X) Fig. 6 Fig. 7■ +5:35:II FF/s, 'OVG■ +
5:35:+! GS/S ○VG■ 15:35
:13 8F/S C83TR1P ■ 15:35
:+3 8 +15 C84TR1P■ +5:36
:+3 BI No. 151 G disassembly ■ 15:35
:13 88', 2ug M row ■ 15:
35:+3 FI/, C812HRE
C■ 15:35°13 F P/s CB13
HREC ■ 15:35: +3 EP/s No. 4 GM column ■ 15:35:14 ) (S/s OVG
@15:3517 AS/5C81HREC@
)5:35:17 AS/; CB2
H-shaku EC @ 15:35:+7 DP15 3
% Separation @ 15:35: 17 Cs/s
C8'7 TR1P■ 15°35:17 CS/
5CB8 TRiρ■ 15:36:+3
B F/s C83IN local @ 15:36:+
3 BP/s Akira 4 1NXIM ■ 75:36
°13 C3/s C8'7 IN M
REC■ 16:43:40 0P'5 3
No. G I-tei-stop ■ 15:43:40 EP/s
No. 4 Q I Yodome @ 15:43:44
8P/S I-Q I-tei stop @ +5:43
:44 8P/S 2'YG I-stop Figure 11
Claims (1)
情報を基にして電力系統の事故設備を判定して表示する
電力系統監視装置において、保護リレーの動作と開閉器
の入・切を示す情報を入力し電力系統を構成する設備情
報と共に保存するデータベースと、前記データベース内
の情報が状態変化した時、その変化時刻と変化後の状態
を検出して当該設備へのアラーム情報の対応づけを行な
う手段と、前記対応づけられた各アラーム情報を電力系
統図の該当する設備の近傍に表示するよう調整する手段
と、前記調整後の電力系統図を表示する手段とからなる
ことを特徴とする電力系統監視装置。Information indicating the operation of protective relays and the on/off state of switches is used in power system monitoring equipment that constantly collects power system information through transmission lines and uses that information to determine and display faulty equipment in the power system. When the state of the information in the database changes, the time of the change and the state after the change are detected and the alarm information is associated with the equipment. a means for adjusting the associated alarm information to be displayed near the corresponding equipment on a power system diagram; and a means for displaying the adjusted power system diagram. Grid monitoring device.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP63024897A JPH01202121A (en) | 1988-02-04 | 1988-02-04 | Power system monitoring device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP63024897A JPH01202121A (en) | 1988-02-04 | 1988-02-04 | Power system monitoring device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH01202121A true JPH01202121A (en) | 1989-08-15 |
Family
ID=12150974
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP63024897A Pending JPH01202121A (en) | 1988-02-04 | 1988-02-04 | Power system monitoring device |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH01202121A (en) |
-
1988
- 1988-02-04 JP JP63024897A patent/JPH01202121A/en active Pending
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| GB9500973D0 (en) | Supervised hierarchy in a computer network | |
| JPH01202121A (en) | Power system monitoring device | |
| JP2010124548A (en) | Power plant monitoring controller | |
| JP5225166B2 (en) | Power system monitoring system and power system monitoring method | |
| JPH01238427A (en) | Electric power system supervisory device | |
| CN114400623B (en) | Low-voltage side fault removal protection system and method under direct current power loss of transformer substation | |
| JPH01202122A (en) | Power system monitoring device | |
| JPH01202123A (en) | Power system monitoring device | |
| JPH03270653A (en) | Monitoring equipment for electric power system | |
| CN207425067U (en) | A kind of terminal box alarm system of self-diagnostic function with ground | |
| KR20190003044A (en) | Apparatus and Method for recovering failure intalligentlly and automatically | |
| JP2602972B2 (en) | Failure monitoring display system | |
| JPS6338946B2 (en) | ||
| JP4236822B2 (en) | Test method for automatic accident recovery equipment | |
| CN112632779A (en) | Panoramic display method for running state of total station protection equipment based on primary equipment wiring diagram | |
| JPH01235496A (en) | Plant monitoring alarming device | |
| JP2002057667A (en) | Network maintenance device | |
| JP2009017625A (en) | System and method for monitoring electric power system | |
| JPH0636657B2 (en) | Split screen display method | |
| JP2724836B2 (en) | Fault section detection method in transmission line | |
| JP2510287B2 (en) | Data input method for power system supervisory control system | |
| Amelink et al. | Current trends in control centre design | |
| JP2016213921A (en) | Substation monitoring and control system | |
| CN119719186A (en) | Method, device, computer-readable storage medium and program product for displaying time sequence diagram of power equipment event information | |
| JPH03265432A (en) | Supervisory control device for power system |