JPH0120763B2 - - Google Patents

Info

Publication number
JPH0120763B2
JPH0120763B2 JP57193338A JP19333882A JPH0120763B2 JP H0120763 B2 JPH0120763 B2 JP H0120763B2 JP 57193338 A JP57193338 A JP 57193338A JP 19333882 A JP19333882 A JP 19333882A JP H0120763 B2 JPH0120763 B2 JP H0120763B2
Authority
JP
Japan
Prior art keywords
power generation
load
plant
generation unit
change rate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP57193338A
Other languages
Japanese (ja)
Other versions
JPS5983204A (en
Inventor
Akimoto Kamya
Shuntaro Tanaka
Hiroshi Takaoka
Hiroshi Fukuda
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Tokyo Electric Power Co Holdings Inc
Original Assignee
Toshiba Corp
Tokyo Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp, Tokyo Electric Power Co Inc filed Critical Toshiba Corp
Priority to JP57193338A priority Critical patent/JPS5983204A/en
Publication of JPS5983204A publication Critical patent/JPS5983204A/en
Publication of JPH0120763B2 publication Critical patent/JPH0120763B2/ja
Granted legal-status Critical Current

Links

Classifications

    • H—ELECTRICITY
    • H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00—Circuit arrangements for AC mains or AC distribution networks
    • H02J3/38—Arrangements for feeding a single network from two or more generators or sources in parallel; Arrangements for feeding already energised networks from additional generators or sources in parallel
    • H02J3/46—Controlling the sharing of generated power between the generators, sources or networks
    • H02J3/466—Scheduling or selectively controlling the operation of the generators or sources, e.g. connecting or disconnecting generators to meet a demand

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Feedback Control In General (AREA)

Description

【発明の詳細な説明】 〔発明の技術分野〕 本発明は複数台の発電ユニツトで構成される発
電プラントの運転制御装置に関する。
DETAILED DESCRIPTION OF THE INVENTION [Technical Field of the Invention] The present invention relates to an operation control device for a power generation plant composed of a plurality of power generation units.

〔発明の技術的背景〕[Technical background of the invention]

最近、発電効率の向上を目的として複数サイク
ル発電ユニツトが開発された。この発電ユニツト
はガスタービンと蒸気タービンを結合し、ガスタ
ービンを駆動し終えた排ガスを利用して蒸気ター
ビンを駆動することにより、熱エネルギーの有効
利用を図るようにしたものである。しかし、この
発電ユニツトは単機容量が小さいため、系統運用
上は複数台で一つの発電プラントを構成する必要
がある。また、この発電プラントは開発されて間
もないため、その運転制御方式は完全には確立さ
れていないが、従来のものとはかなり異なつた制
御形態をとることが予測される。例えば、個々の
発電ユニツトは起動、停止が簡単となることか
ら、この発電プラントが負荷調整幅の大きい運転
制御に使われることもその一つである。
Recently, multi-cycle power generation units have been developed with the aim of improving power generation efficiency. This power generation unit combines a gas turbine and a steam turbine, and uses the exhaust gas that has driven the gas turbine to drive the steam turbine, thereby making effective use of thermal energy. However, since this power generation unit has a small single unit capacity, it is necessary to configure a single power generation plant with multiple units for system operation. Furthermore, since this power generation plant has only recently been developed, its operation control system has not been completely established, but it is expected that it will take a control form that is quite different from conventional ones. For example, since individual power generation units can be started and stopped easily, this power generation plant is used for operational control with a wide range of load adjustment.

ところで、一般に発電プラントを系統運用する
場合には、電力系統の安定化のため、中央給電指
令に対する追従性を良くすることが必要となる。
前記複数発電ユニツトから成る発電プラントの運
転制御方式は上述したように未だ開発段階にある
が、中央給電指令に対する追従性を良くするに
は、各発電ユニツトを取り得る最大負荷変化率即
ち発電ユニツトの構成機器の特性に依存する出力
負荷を増減できる変化量の最大値で運転制御する
ことが考えられる。
By the way, when a power generation plant is operated in a system, it is generally necessary to improve the ability to follow a central power supply command in order to stabilize the power system.
As mentioned above, the operation control system for a power generation plant consisting of multiple power generation units is still in the development stage, but in order to improve followability to the central power supply command, it is necessary to increase the maximum load change rate that each power generation unit can take. It is conceivable to control operation using the maximum amount of change that can increase or decrease the output load, which depends on the characteristics of the component equipment.

例えば、今、この発電プラントの定格負荷を
100%、この発電プラントにおける各発電ユニツ
トの最大負荷変化率を定格負荷換算で1%/分、
各発電ユニツトが運転継続可能な最低負荷を同じ
く定格負荷換算で14%、、現在の定格負荷運転中
の発電ユニツト運転台数を5台、目標の発電プラ
ント負荷を50%とし、これを3台の発電ユニツト
にて運転するものとする。この条件の下に、第1
図の曲線Aで示すように、5台の発電ユニツトを
同時に最大変化率で定格負荷100%(時刻t1)か
ら70%負荷(時刻t2)まで降下させる。各発電ユ
ニツトの最低負荷は14%であるから発電プラント
が70%負荷まで降下したのちは、同図曲線Bに示
すように3台の発電ユニツトを14%負荷運転し、
同図曲線Cで示すように残り2台の発電ユニツト
を最大負荷変化率で負荷降下させる。その2台の
発電ユニツトが各4%負荷に達したとき(時刻
t3)、発電プラント負荷が50%となる。以後は、
停止予定となる2台の発電ユニツトをそれぞれ0
%まで負荷降下させ、残り3台の発電ユニツトは
16.7%まで上昇させる。このようにすれば、発電
プラント負荷を定格の100%から50%へと最大負
荷率で降下させることができるようになる。尚、
第1図中、曲線Bは停止しない発電ユニツト1台
分の負荷変化状態、曲線Cは停止する発電ユニツ
ト1台分の負荷変化状態を表わしている。
For example, now the rated load of this power plant is
100%, the maximum load change rate of each power generation unit in this power generation plant is 1%/min in terms of rated load,
The minimum load at which each power generation unit can continue operating is also 14% in terms of rated load, the current number of power generation units operating at rated load is 5, and the target power plant load is 50%, and this is set as 3 units. It shall be operated by a power generation unit. Under this condition, the first
As shown by curve A in the figure, five power generating units are simultaneously lowered from 100% rated load (time t 1 ) to 70% load (time t 2 ) at the maximum rate of change. Since the minimum load of each power generation unit is 14%, after the power generation plant has dropped to 70% load, the three power generation units are operated at 14% load as shown in curve B in the figure.
As shown by curve C in the figure, the load of the remaining two power generation units is lowered at the maximum load change rate. When the two power generating units each reach 4% load (time
t 3 ), the power plant load becomes 50%. From then on,
The two power generation units that are scheduled to be shut down are each set to zero.
%, and the remaining three power generation units
Increase to 16.7%. In this way, it becomes possible to reduce the power plant load from 100% of the rated value to 50% at the maximum load rate. still,
In FIG. 1, curve B represents a load change state for one power generation unit that does not stop, and curve C represents a load change state for one power generation unit that stops.

〔背景技術の問題点〕[Problems with background technology]

しかしながら上記方法によると、第1図の時刻
t2前後における発電プラントの負荷変化率が一定
でなくなり、系統運用に支障を及ぼす問題点が生
じる。即ち、中央給電指令所では予め各発電プラ
ントの負荷変化率を知り、これに基づき各発電プ
ラントに負荷増減指令を出し、系統における需給
のバランスを保つようにしている。従つて、発電
プラントが負荷を増減する途中でその負荷変化率
が変化すると、需結のバランスがくずれ、系統の
安定運転が保てなくなる問題点が生じる。
However, according to the above method, the time shown in Figure 1
The rate of change in the power plant's load around t 2 is no longer constant, creating a problem that hinders system operation. That is, the central power dispatch center knows the load change rate of each power generation plant in advance and issues load increase/decrease commands to each power generation plant based on this information to maintain the balance of supply and demand in the system. Therefore, if the load change rate changes while the power generation plant increases or decreases the load, the balance between demand and connection will be disrupted, causing a problem in which stable operation of the system cannot be maintained.

〔発明の目的〕[Purpose of the invention]

本発明は負荷変化率を一定に保つた上、複数台
の発電ユニツトから成る発電プラントが最大変化
率で負荷を増減運転できる発電プラントの運転制
御装置を提供することを目的とする。
SUMMARY OF THE INVENTION It is an object of the present invention to provide an operation control device for a power generation plant that allows a power generation plant consisting of a plurality of power generation units to increase or decrease the load at the maximum rate of change while keeping the rate of load change constant.

〔発明の概要〕[Summary of the invention]

このため本発明は起動、停止すべき発電ユニツ
トは最大負荷変化率で起動、停止させる一方、残
りの運転中の発電ユニツトは、発電プラントの最
大負荷変化率RM(%/分)(これは複数発電ユニ
ツトからなる発電プラントが総合出力負荷として
増減できる負荷変化量の最大値のことで、そのと
きどきの運転状態や条件に応じて変化する)が、
下式を満足するような変化率で負荷調整運転させ
るようにしたことを特徴とする。
Therefore, in the present invention, the power generation units to be started and stopped are started and stopped at the maximum load change rate, while the remaining operating power generation units are started and stopped at the maximum load change rate R M (%/min) of the power generation plant. This is the maximum amount of load change that a power generation plant consisting of multiple power generation units can increase or decrease as a total output load, and it changes depending on the operating status and conditions at the time.
The present invention is characterized in that the load adjustment operation is performed at a rate of change that satisfies the following formula.

RM=LI−LF/li−lfrn(%/分) 但し、 LI:負荷変化開始時発電プラント負荷(%) LF:目標発電プラント負荷(%) li:負荷変化開始時発電ユニツト負荷(%) lf:目標発電プラント負荷到達時の最低発電ユニ
ツト負荷(%) rn:発電ユニツトの最大発電ユニツト負荷変化率
(%/分) 〔発明の実施例〕 第2図は本発明の一実施例に係る発電プラント
の運転制御装置の構成図を示したもので、1は目
標負荷発電ユニツト目標値設定器、2は負荷変化
率制御装置、3は負荷制御装置、4は発電プラン
トである。
R M =L I −L F /l i −l f r n (%/min) However, L I : Power plant load at the start of load change (%) L F : Target power plant load (%) l i : Load Power generation unit load at the start of change (%) l f : Minimum power generation unit load when the target power generation plant load is reached (%) r n : Maximum power generation unit load change rate of the power generation unit (%/min) [Embodiments of the invention] No. Figure 2 shows a configuration diagram of an operation control device for a power generation plant according to an embodiment of the present invention, in which 1 is a target load power generation unit target value setter, 2 is a load change rate control device, and 3 is a load control device. , 4 is a power generation plant.

負荷変化率制御装置2は入力処理部21、最大
負荷変化率計算部22、パラメータ記憶部23お
よび出力処理部24より構成される。入力処理部
21へは、目標負荷発電ユニツト目標値設定器1
より発電ユニツト目標運転台数を表わすデータd
1、発電プラントの目標負荷を表わすデータd2
および発電ユニツト起動、停止指定データd3
が、また、負荷制御装置3からは発電プラント現
在負荷データd4が、更に、制御対象とする発電
プラント4からは発電ユニツト現在運転台数を表
わすデータd5が入力される。最大負荷変化率計
算部22へは、入力処理部21より発電プラント
の目標負荷データd2、発電ユニツト目標運転台
数データd1、発電プラント現在負荷データd4
および発電ユニツト現在運転台数データd5が伝
送され、パラメータ記憶部23より発電ユニツト
最大負荷変化率データd6および発電ユニツト最
大、最小負荷制限値データd7が伝達される。こ
れにより、最大負荷変化率計算部22は出力処理
部24へ発電プラントの目標負荷データd2、発
電ユニツト目標運転台数データd1、発電プラン
ト現在負荷データd4、発電ユニツト現在運転台
数データd5、発電ユニツト最大負荷変化率デー
タd6および発電プラント最大負荷変化率データ
d8を伝送する。出力処理部24は、負荷制御装
置3の目標負荷設定器31へ発電プラント目標負
荷設定データd9および発電プラント負荷変化率
設定データd10を出力すると共に、発電ユニツ
ト増減負荷制御切替器33へ発電ユニツト増減負
荷指令d11および発電ユニツト増減負荷制御切
替指令d12を出力する。このとき、発電ユニツ
ト起動、停止指定データd3が入力処理部21か
ら出力処理部24へ伝送される。
The load change rate control device 2 includes an input processing section 21, a maximum load change rate calculation section 22, a parameter storage section 23, and an output processing section 24. The target load power generation unit target value setting device 1 is input to the input processing section 21.
Data d representing the target number of power generation units in operation
1. Data d2 representing the target load of the power generation plant
and power generation unit start/stop specification data d3
However, power generation plant current load data d4 is inputted from the load control device 3, and furthermore, data d5 representing the number of power generation units currently in operation is inputted from the power generation plant 4 to be controlled. The maximum load change rate calculation unit 22 receives power generation plant target load data d2, power generation unit target operating number data d1, and power generation plant current load data d4 from the input processing unit 21.
Data d5 on the number of currently operating power generating units are transmitted, and power generating unit maximum load change rate data d6 and power generating unit maximum and minimum load limit value data d7 are transmitted from the parameter storage section 23. As a result, the maximum load change rate calculation section 22 sends the output processing section 24 the target load data d2 of the power generation plant, the target number of power generation units in operation d1, the current load data of the power generation plant d4, the data d5 of the number of power generation units currently in operation, and the maximum number of power generation units in operation. Load change rate data d6 and power plant maximum load change rate data d8 are transmitted. The output processing unit 24 outputs power generation plant target load setting data d9 and power generation plant load change rate setting data d10 to the target load setter 31 of the load control device 3, and outputs power generation unit increase/decrease setting data d10 to the power generation unit increase/decrease load control switch 33. It outputs a load command d11 and a power generation unit increase/decrease load control switching command d12. At this time, power generation unit start/stop designation data d3 is transmitted from the input processing section 21 to the output processing section 24.

負荷制御装置3は目標負荷設定器31、比例積
分器32、複数の発電ユニツト増減負荷制御切替
器33および2つの加算器34,35より構成さ
れ、目標負荷発電ユニツト目標値設定器1より与
えられる発電プラント目標負荷設定データd9お
よび負荷変化率設定データd10の通りに、発電
プラント4の出力である現在負荷を制御するよう
に構成されている。即ち、目標負荷設定器31は
与えられる発電プラント目標負荷設定データd9
および負荷変化率設定データd10から発電プラ
ント負荷指令d13を生成する。発電プラント現
在負荷データd4を発電プラント負荷指令d13
に等しくするため、加算器34において差演算が
行なわれ、発電プラント制御偏差データd14を
発生する。この偏差データd14は、比例積分器
32において積分され、発電ユニツト制御指令d
15を生成し、この発電ユニツト制御指令d15
により複数の発電ユニツト41の出力d16を制
御し、発電ユニツト負荷データd16の加算器3
5により加算された発電プラント出力即ち発電プ
ラント現在負荷データd4を前記の目標負荷設定
器31の出力である発電プラント負荷指令d13
に追従させる。発電ユニツト増減負荷制御切替器
33は、発電ユニツト増減負荷指令d11側に切
替えられた場合、対応する発電ユニツト41の出
力負荷d16は、発電ユニツト増減負荷指令d1
1により制御される。
The load control device 3 is composed of a target load setter 31, a proportional integrator 32, a plurality of power generation unit increase/decrease load control switchers 33, and two adders 34, 35. It is configured to control the current load, which is the output of the power generation plant 4, according to the power generation plant target load setting data d9 and the load change rate setting data d10. That is, the target load setter 31 uses the given power plant target load setting data d9.
A power generation plant load command d13 is generated from the load change rate setting data d10. Power generation plant current load data d4 is converted into power generation plant load command d13
To make it equal to , a difference calculation is performed in the adder 34 to generate power plant control deviation data d14. This deviation data d14 is integrated in the proportional integrator 32, and the power generation unit control command d
This generation unit control command d15 is generated.
The output d16 of the plurality of power generation units 41 is controlled by the adder 3 of the power generation unit load data d16.
The power generation plant output added by 5, that is, the power generation plant current load data d4, is converted into the power generation plant load command d13, which is the output of the target load setter 31.
to follow. When the power generation unit increase/decrease load control switch 33 is switched to the power generation unit increase/decrease load command d11 side, the output load d16 of the corresponding power generation unit 41 is set to the power generation unit increase/decrease load command d1.
1.

以上の構成で、目標値設定器1の発電プラント
目標負荷データd2は、中央給電指令所の指令に
よつて自動または手動で設定される。発電ユニツ
ト目標運転台数データd1は一般に発電プラント
の総合効率が最大となるように、発電プラントの
部分負荷効率曲線、発電ユニツト起動、停止損
失、発電プラントの負荷曲線によつて決定され
る。
With the above configuration, the power generation plant target load data d2 of the target value setting device 1 is automatically or manually set by a command from the central power dispatch center. The target number of operating power generation units data d1 is generally determined based on the partial load efficiency curve of the power generation plant, the power generation unit start-up and stop losses, and the load curve of the power generation plant so that the overall efficiency of the power generation plant is maximized.

第3図は複数台発電ユニツト構成発電プラント
の部分負荷効率曲線を示す。同一の発電ユニツト
が複数台ある場合、最小運転発電ユニツト数で均
等負荷分配とした場合が最高効率になることは知
られている。同図は、発電プラントが5台の発電
ユニツトより構成されるとした。
FIG. 3 shows a partial load efficiency curve for a power plant with multiple generating units. It is known that when there are multiple identical power generating units, the highest efficiency is achieved when the minimum number of operating power generating units is used and the load is distributed evenly. The figure assumes that the power generation plant is composed of five power generation units.

第4図は発電プラント負荷曲線の一例を示す。
同図は時刻t1からt2まで負荷は100%から70%に
変化し、また時刻t3からt4まで負荷は70%から再
び100%に変化すると仮定した。この場合、100%
運転の最大効率の発電ユニツトの運転台数が5台
で、70%運転の最大効率の発電ユニツトの運転台
数が4台としよう。100%から70%までの負荷降
下(t1→t2)をするとき、 (1) 発電ユニツト;5→4台(発電ユニツト1台
停止) (2) 発電ユニツト;5→5台(発電ユニツト1台
停止しない) 上記のどれかのケースを選択するかは、70%に
おいてケース(1)とケース(2)の効率の比較、t2→t3
の時間および発電ユニツトの起動、停止損失によ
る。1台発電ユニツトを停止することによつて、
t2→t3の運転効率向上による利得が発電プラント
の起動、停止損失を超えたときケース(1)を選択す
る方がよく、逆の場合ではケース(2)を選択する方
がよい。このようにして、発電プラント出力負荷
変化に伴う発電ユニツトの目標台数が算出され
る。
FIG. 4 shows an example of a power plant load curve.
The figure assumes that the load changes from 100% to 70% from time t 1 to t 2 , and from 70% to 100% again from time t 3 to t 4 . In this case 100%
Let us assume that the number of power generation units operating at maximum efficiency is 5, and the number of power generation units operating at maximum efficiency of 70% is 4. When lowering the load from 100% to 70% (t 1 → t 2 ), (1) Power generation units: 5 → 4 (one power generation unit stops) (2) Power generation units: 5 → 5 (power generation units stop) 1 unit does not stop) Which of the above cases should be selected is determined by comparing the efficiency of case (1) and case (2) at 70%, t 2 → t 3
time and start-up and stop losses of the power generation unit. By stopping one power generation unit,
It is better to select case (1) when the gain from improved operating efficiency from t 2 → t 3 exceeds the start-up and shutdown losses of the power plant, and in the opposite case, it is better to select case (2). In this way, the target number of power generation units is calculated as the output load of the power generation plant changes.

発電ユニツト起動、停止指定データd3は、発
電プラント増(減)負荷時において発電ユニツト
現在運転台数が目標運転台数より少ない(多い)
場合、即ち発電ユニツトの起動(停止)が必要と
する場合、どの発電ユニツトを起動(停止)する
かを指定するものである。どの発電ユニツトの起
動(停止)を選択するかは、発電ユニツトの運転
積算時間、保守点検作業中、起動停止回数などに
よつて決まる。
The power generation unit start/stop designation data d3 indicates that the number of power generation units currently in operation is less (more) than the target number of power generation units when the power generation plant is increasing (decreasing) load.
In other words, when starting (stopping) a power generating unit is required, which power generating unit is to be started (stopped) is specified. Which power generation unit is selected to be started (stopped) is determined by the cumulative operating time of the power generation unit, maintenance and inspection work, the number of times the power generation unit is started and stopped, and so on.

発電プラントの目標負荷データd2、発電ユニ
ツト目標運転台数データd1、発電プラント現在
負荷データd4および発電ユニツト現在運転台数
データd5は最大負荷変化率計算部22において
処理されやすいように、入力処理部21において
信号処理された後、前記の計算部22へ伝送され
る。また、発電ユニツト起動、停止指定データd
3は出力処理部24において処理されやすいよう
に、入力処理部21において信号処理された後、
前記の出力処理部24へ伝送される。
The target load data d2 of the power generation plant, the target number of power generation units in operation d1, the current power generation plant load data d4, and the data d5 of the number of power generation units currently in operation are stored in the input processing unit 21 so that they can be easily processed in the maximum load change rate calculation unit 22. After signal processing, the signal is transmitted to the calculation section 22 described above. In addition, power generation unit start/stop designation data d
3 is subjected to signal processing in the input processing unit 21 so that it is easily processed in the output processing unit 24, and then
It is transmitted to the output processing section 24 mentioned above.

パラメータ記憶部23の発電ユニツト最大変化
率データd6は発電ユニツト41の最大負荷変化
率運転によつて決まる。発電ユニツトはこの変化
率以内に運転される。また、この記憶部23の発
電ユニツト最大、最小負荷制御値データd7は、
発電ユニツトの容量、運転効率、安全運転によつ
て決定される。発電ユニツトの定常負荷運転は、
この負荷制限値データd7範囲において行なわれ
る。
The power generation unit maximum rate of change data d6 in the parameter storage section 23 is determined by the maximum load change rate operation of the power generation unit 41. The generating unit is operated within this rate of change. Moreover, the power generation unit maximum and minimum load control value data d7 in this storage section 23 are as follows:
Determined by power generation unit capacity, operational efficiency, and safe operation. Steady load operation of the power generation unit is
This is carried out within the range of this load limit value data d7.

最大負荷変化率計算部22は入力処理部21か
ら入力される発電ユニツト目標運転台数d1、発
電プラントの目標負荷データd2、発電プラント
現在負荷データd4、発電ユニツト現在運転台数
データd5およびパラメータ記憶部23から入力
される発電ユニツト最大負荷変化率データd6、
発電ユニツト最大、最小負荷制御値データd7を
基に下記(1)式で与えられる発電プラント最大負荷
変化率RMを計算する。
The maximum load change rate calculation section 22 receives the target operating number of power generation units d1, power generation plant target load data d2, power generation plant current load data d4, current power generation unit operation number data d5, and the parameter storage section 23, which are input from the input processing section 21. Power generation unit maximum load change rate data d6 input from
Based on the power generation unit maximum and minimum load control value data d7, the power generation plant maximum load change rate R M given by the following equation (1) is calculated.

RM=LI−LF/li−lfrn(%/分) …(1) 但し、 LI:負荷変化開始時発電プラント負荷(%) LF:目標発電プラント負荷(%) li:負荷変化開始時発電ユニツト負荷(%) lf:目標発電プラント負荷到達時の最低発電ユニ
ツト負荷(%) rn:発電ユニツト最大負荷変化率(%/分) ここで、LI、LF、li、lF、rnについての計算方
法について説明する。
R M =L I −L F /l i −l f r n (%/min) …(1) However, L I : Power plant load at the start of load change (%) L F : Target power plant load (%) l i : Generating unit load at the start of load change (%) l f : Minimum generating unit load when the target power generating plant load is reached (%) r n : Maximum generating unit load change rate (%/min) where, L I , The calculation method for L F , l i , l F , and r n will be explained.

(i) LI:負荷変化開始時発電プラント負荷(%) LIは即ち第2図の発電プラント現在負荷デー
タd4であり、同図の入力処理部21を介して
負荷制御装置3から入力される。
(i) L I : Power plant load at the start of load change (%) L I is the power plant current load data d4 in Figure 2, which is input from the load control device 3 via the input processing section 21 in the figure. Ru.

(ii) LF:目標発電プラント負荷(%) LFは即ち第2図の発電プラントの目標負荷
データd2であり、同図の入力処理部21を介
して目標負荷、発電ユニツト目標値設定器1か
ら入力される。
(ii) L F : Target power generation plant load (%) L F is target load data d2 of the power generation plant shown in Fig. 2, and the target load and power generation unit target value setter are inputted via the input processing section 21 shown in the figure. It is input from 1.

(iii) li:負荷変化開始時発電ユニツト負荷(%) li=LI/NI 但し、 LI:負荷変化開始時発電プラント負荷(%) NI:負荷変化開始時発電ユニツト運転台数 NIは即ち第2図の発電ユニツト現在運転台
数データd5であり、同図の入力処理部21を
介して発電プラント4から入力される。
(iii) l i : Generation unit load at the start of load change (%) l i = L I /N I However, L I : Power generation plant load at the start of load change (%) N I : Number of operating power generation units at the start of load change N I is data d5 on the number of power generation units currently in operation shown in FIG. 2, which is input from the power generation plant 4 via the input processing section 21 shown in the figure.

(iv) lf:目標発電プラント負荷到達時の最低発電
ユニツト負荷(%) (イ) lnio≦LF/NI≦lnaxの場合 lf=LF/NI …(2) 但し、 LF:目標発電プラント負荷(%) NI:負荷変化開始時発電ユニツト運転台数 lnio(lnax):発電ユニツト最小(最大)負荷制
限値(%) lnio(lnax)は即ち第2図の発電ユニツト最
大、最小負荷制限値データd7であり、パラ
メータ記憶部23に保存されている。
(iv) l f : Minimum power generation unit load (%) when the target power generation plant load is reached (a) When l nio ≦L F /N I ≦l nax , l f =L F /N I …(2) However, L F : Target power generation plant load (%) N I : Number of operating power generation units at the start of load change l nio (l nax ): Minimum (maximum) load limit value of power generation units (%) l nio (l nax ) is the second This is the power generation unit maximum and minimum load limit value data d7 shown in the figure, and is stored in the parameter storage section 23.

(ロ) LF/NI<lnio又はLF/NI>lnaxの場合 lf=LF−NF×lnio(lnax)/NI−NF …(3) 但し、 LF:目標発電プラント負荷(%) lnio(lnax):発電ユニツト最小(最大)負荷制
限値 NI:負荷変化開始時発電ユニツト運転台数 NF:発電ユニツト目標運転台数 NFは即ち第2図の発電ユニツト目標運転
台数データd1であり、同図の入力処理部2
1を介して目標負荷、発電ユニツト目標値設
定器1から入力される。
(b) In the case of L F /N I <l nio or L F /N I >l nax , l f = L F −N F ×l nio (l nax )/N I −N F …(3) However, L F : Target power generation plant load (%) l nio (l nax ): Minimum (maximum) load limit value for power generation units N I : Number of power generation units in operation at the start of load change N F : Target number of power generation units in operation N F is the second This is data d1 for the target number of power generation units in operation in the figure, and is input processing unit 2 in the figure.
The target load and power generation unit target value setter 1 are inputted via the power generation unit 1.

また、発電プラント減(増)負荷におい
て、LF/NI<lnio又はLF/NI>lnaxという条
件が成立すれば、必ず発電ユニツトを1台以
上停止(起動)する必要があるので、NI−
NF≠0となる。
In addition, if the conditions of L F /N I <l nio or L F /N I >l nax are satisfied when the load is reduced (increased) at the power generation plant, it is necessary to stop (start) one or more power generation units. Therefore, N I −
N F ≠0.

(v) rn:発電ユニツトの最大発電ユニツト負荷変
化率(%/min) rnは即ち第2図の発電ユニツト最大負荷変化
率データd6であり、同図のパラメータ記憶部
23に記憶されている。
(v) r n : Maximum power generation unit load change rate of the power generation unit (%/min) r n is the power generation unit maximum load change rate data d6 in Fig. 2, and is stored in the parameter storage section 23 in the same figure. There is.

以上(i)〜(v)によりLI、LF、li、lfおよびrnが求
まり、前記(1)式が算出される。第5図はこのとき
の処理をフローチヤートにまとめたものである。
Through (i) to (v) above, L I , L F , l i , l f and r n are determined, and the above equation (1) is calculated. FIG. 5 is a flowchart summarizing the processing at this time.

次に、出力処理部24は最大負荷変化率計算部
22からの発電プラントの目標負荷データd2お
よび発電プラント最大負荷変化率データd8によ
り、発電プラント目標負荷設定データd9および
発電プラント負荷変化率設定データd10を負荷
制御装置3の目標負荷設定器31へ出力し、発電
プラントの出力負荷を最大負荷変化率で変化させ
る。また、入力処理部21からの発電ユニツト起
動、停止指定データd3により、起動、停止とな
る発電ユニツト41に対応した発電ユニツト増減
負荷制御切替器33を発電ユニツト増減負荷指令
データd11側へ切替えるように、出力処理部2
4から前記の発電ユニツト増減負荷制御切替器3
3へ発電ユニツト増減負荷制御切替指令データd
12を出力する。次いで、出力処理部24は発電
ユニツト起動、停止指定データd3に対応した発
電ユニツト41に対して発電ユニツト増減負荷指
令データd11を出力し、発電ユニツト41を発
電ユニツト最大負荷変化率データd6に従つて起
動、停止する。
Next, the output processing section 24 uses the power generation plant target load data d2 and the power generation plant maximum load change rate data d8 from the maximum load change rate calculation section 22 to generate the power generation plant target load setting data d9 and the power generation plant load change rate setting data. d10 is output to the target load setter 31 of the load control device 3, and the output load of the power generation plant is changed at the maximum load change rate. Further, the power generation unit increase/decrease load control switch 33 corresponding to the power generation unit 41 to be started or stopped is switched to the power generation unit increase/decrease load command data d11 side based on the power generation unit start/stop designation data d3 from the input processing section 21. , output processing section 2
4 to the power generation unit increase/decrease load control switch 3
To 3, power generation unit increase/decrease load control switching command data d
Outputs 12. Next, the output processing section 24 outputs the power generation unit increase/decrease load command data d11 to the power generation unit 41 corresponding to the power generation unit start/stop designation data d3, and controls the power generation unit 41 according to the power generation unit maximum load change rate data d6. Start, stop.

例えば、前記第1図で説明したのと同じ条件で
発電プラント4を運転制御する場合について説明
すると、負荷変化率制御装置2には、目標負荷発
電ユニツト目標値設定器1から発電ユニツト目標
運転台数データd1として3台、発電プラントの
目標負荷データd2として50%、発電ユニツト起
動、停止指令データd3として2台の発電ユニツ
ト41を停止指定すべきデータが与えられる。同
時に発電プラント4からは発電ユニツト現在台数
データd5として5台、更に、負荷制御装置3か
ら発電プラント現在負荷データd4として100%
が与えられる。
For example, to explain the case where the operation of the power generation plant 4 is controlled under the same conditions as explained in FIG. Data for specifying the stop of three power generating units 41 is given as data d1, 50% as target load data d2 of the power generating plant, and data for specifying the stop of two power generating units 41 as power generating unit start/stop command data d3. At the same time, from the power generation plant 4, the current number of power generation units data d5 is 5 units, and furthermore, from the load control device 3, the power generation plant current load data d4 is 100%.
is given.

負荷変化率制御装置2はこれらのデータd1〜
d5およびパラメータ記憶部23に予め記憶され
ている発電ユニツト最大負荷変化率データd6と
して1%/分、発電ユニツト最大、最小負荷制限
値データd7として14%最小負荷制御値から、先
ず、前記(1)式に基づき発電プラント最大負荷変化
率RMを算出し、これを発電プラント負荷変化率
データd10として目標負荷設定器31に出力す
る。
The load change rate control device 2 uses these data d1~
d5 and the power generation unit maximum load change rate data d6 stored in advance in the parameter storage unit 23 is 1%/min, and the power generation unit maximum and minimum load limit value data d7 is 14%. The power generation plant maximum load change rate R M is calculated based on the equation ) and outputted to the target load setter 31 as the power generation plant load change rate data d10.

即ち、発電プラントの出力負荷を最大負荷変化
率RMで目標負荷まで下げるには、先ず、現在運
転中の全ての発電ユニツトを同時に一斉に発電ユ
ニツト最大負荷変化率rnで目標負荷まで下げる。
次いで、その後、停止すべき発電ユニツトは、そ
のまま発電ユニツト最大負荷変化率RMで出力負
荷を下げて停止させる。一方、残り運転継続すべ
き発電ユニツトは、停止する発電ユニツトの出力
負荷分を分担して出力負荷を下げ、以後目標負荷
を維持するように運転することが考えられる。
That is, in order to reduce the output load of the power generation plant to the target load at the maximum load change rate RM , first all the power generation units currently in operation are simultaneously lowered to the target load at the maximum load change rate RN .
Next, the power generation unit to be stopped thereafter is stopped by lowering its output load at the maximum load change rate R M of the power generation unit. On the other hand, it is conceivable that the power generation unit that is to continue operating for the rest of the time will reduce its output load by sharing the output load of the power generation unit that is to be stopped, and thereafter operate so as to maintain the target load.

しかし、運転継続すべき発電ユニツトには最小
負荷制御値lnioが決められていて、それを下まわ
ることは許されない。
However, a minimum load control value l nio is determined for the power generation unit that must continue to operate, and it is not allowed to go below this value.

このため、LF/NI=50/5=10<lnio=14の場
合、第6図に示すように、発電プラントの出力負
荷を途中変化率を変えることなく曲線αで示すよ
うに最も早く目標負荷まで下げるためには、停止
すべき2台の発電ユニツトは曲線γで示すように
発電ユニツト最大負荷変化率rnで出力負荷を下げ
る一方、残り運転継続すべき発電ユニツトは目標
負荷到達時にそれぞれの出力負荷が発電ユニツト
最小負荷制限値lnio=14%に達するように曲線β
で示す如くリニアに変化させれば良い。
Therefore, when L F /N I = 50/5 = 10 < l nio = 14, as shown in Fig. 6, the output load of the power plant is adjusted to the maximum value as shown by curve α without changing the rate of change during the process. In order to quickly reduce the load to the target load, the output load of the two power generation units that should be stopped is reduced at the maximum load change rate r n as shown by the curve γ, while the remaining power generation units that should continue operation are forced to reach the target load. curve β so that each output load reaches the generating unit minimum load limit l nio = 14%.
It is sufficient to change it linearly as shown in .

この場合、発電ユニツトが目標負荷50%到着時
には、運転継続すべき3台の発電ユニツトはそれ
ぞれ14%負荷を取ることになるから、運転停止す
べき2台の発電ユニツトはそれぞれ負荷4%に達
していることが判る。即ち、前記(iv)の(ロ)の(3)式よ
り、発電プラントが目標負荷到達時の発電ユニツ
ト最低負荷lfは、 lf=LF−NF×lnio/NI−NF=50−3×14/5−3=4
% と求まる。
In this case, when the power generation units reach 50% of the target load, the three power generation units that should continue to operate will each have a load of 14%, so the two power generation units that should stop operating will each reach a load of 4%. It can be seen that That is, from equation (3) in (b) of (iv) above, the minimum load l f of the power generation unit when the power generation plant reaches the target load is l f =L F −N F ×l nio /N I −N F =50-3×14/5-3=4
It is calculated as %.

lf=4%が求まると、このときの発電ユニツト
最大負荷変化率はrn=1(%/分)と予め設定さ
れていることから、負荷変化開始時点t1から目標
負荷到達時t3までの負荷変化時間がT=(t3−t1)
=(li−lf)/rn=(20−4)/1=16分と求まる。
When l f = 4% is determined, the maximum load change rate of the power generation unit at this time is set in advance as r n = 1 (%/min), so from the load change start time t 1 to the time the target load is reached t 3 The load change time until T = (t 3 − t 1 )
= (l i -l f )/r n = (20-4)/1 = 16 minutes.

負荷変化時間Tが求まれば、このときの発電プ
ラントの最大負荷変化率RMは RM=Li−Lf/T=Li−Lf/li−lf・rn =100−50/20−4・1=50/16=3.125 と求まり、負荷変化率制御装置2は、この発電プ
ラント最大負荷変化率RM=3.125(%/分)を発
電プラント負荷変化率設定d10として目標設定
器31に出力する。
If the load change time T is found, the maximum load change rate R M of the power generation plant at this time is R M =L i −L f /T=L i −L f /l i −l f・r n =100− 50/20-4・1=50/16=3.125 is determined, and the load change rate control device 2 sets this power plant maximum load change rate R M =3.125 (%/min) as the target power plant load change rate setting d10. Output to the setting device 31.

目標負荷設定器31はこの発電プラント負荷変
化率データd10を積分することにより発電プラ
ント負荷指令データd13を出力し、発電プラン
ト4からフイードバツクされる発電プラント現在
負荷データd4との偏差を比例積分器32でPI
演算した発電ユニツト制御指令d15データを、
d15側に切替わつている発電ユニツト増減負荷
制御切替器33を介して3台の発電ユニツト41
に加える。同時に、発電ユニツト起動、停止指令
d3に基づき発電ユニツト増減負荷制御切替指令
d12を出力して現在運転中の5台の発電ユニツ
ト41のうち、停止すべき2台の発電ユニツト増
減負荷制御切替器33をd11側に切替え、発電
ユニツト増減負荷指令d11として発電ユニツト
最大負荷変化率データd6即ち1%/分を出力し
て所定の2台の発電ユニツト41を停止させる。
The target load setter 31 outputs the power plant load command data d13 by integrating the power plant load change rate data d10, and calculates the deviation from the power plant current load data d4 fed back from the power plant 4 to the proportional integrator 32. DePI
The calculated power generation unit control command d15 data is
The three power generation units 41 are connected via the power generation unit increase/decrease load control switch 33 which has been switched to the d15 side.
Add to. At the same time, a power generation unit increase/decrease load control switching command d12 is outputted based on the power generation unit start/stop command d3 to select two power generation units increase/decrease load control switch 33 to be stopped among the five power generation units 41 currently in operation. is switched to the d11 side, and the power generation unit maximum load change rate data d6, that is, 1%/min, is outputted as the power generation unit increase/decrease load command d11, and the two predetermined power generation units 41 are stopped.

この結果、発電プラント4の負荷曲線は第6図
のαで示すように、リニアに100%負荷から50%
負荷に向つて最大負荷変化率で減少する。即ち、
2台の発電ユニツト41はそれぞれ同図の曲線γ
で示すように時刻t1から最大負荷変化率1%/分
で下降する。一方、残り3台の発電ユニツト41
は、発電プラント4出力d4が前記(1)式で計算さ
れる最大負荷変化率RMで降下するように曲線β
に沿つて降下する。
As a result, the load curve of power plant 4 changes linearly from 100% load to 50% load, as shown by α in Figure 6.
The load decreases at the maximum load change rate towards the load. That is,
The two power generation units 41 each follow the curve γ in the same figure.
As shown, the load decreases at a maximum load change rate of 1%/min from time t1 . On the other hand, the remaining three power generation units 41
is a curve β such that the power plant 4 output d4 drops at the maximum load change rate R M calculated by the above equation (1).
descend along the

次いで、発電プラント4の出力d4が50%負荷
に達したとき、負荷変化率制御装置2の出力処理
部24から出力される発電プラント目標負荷設定
データd9に基づき負荷制御装置3は発電プラン
ト現在負荷データd4が発電プラント4がこの50
%負荷を維持するように3台の発電ユニツト41
を負荷制御する。
Next, when the output d4 of the power generation plant 4 reaches 50% load, the load control device 3 adjusts the current load of the power generation plant based on the power generation plant target load setting data d9 output from the output processing unit 24 of the load change rate control device 2. Data d4 indicates that power plant 4 is this 50
3 power generation units 41 to maintain the % load.
control the load.

この結果、3台の各発電ユニツト41はそれぞ
れ第6図の曲線βで示すように時刻t3で14%に達
したのちは、停止すべき2台の各発電ユニツト4
1がそれぞれ曲線γに沿つて4%(時刻t3)から
0%(時刻t4)に下降するのに伴つて、16.7%ま
で上昇する。
As a result, after each of the three power generation units 41 reaches 14% at time t3 , as shown by the curve β in FIG.
1 decreases along the curve γ from 4% (time t 3 ) to 0% (time t 4 ), and increases to 16.7%.

このようにして、発電プラント4の負荷を第1
図の場合と同様、時刻t1からt3までの間に最大負
荷変化率で100%から50%まで減少させることが
できると共に、その間リニアに減少させることが
できるため、複数発電ユニツトから成る発電プラ
ントの系統運用を円滑かつ安定して行なうことが
できるようになる。
In this way, the load of the power generation plant 4 is reduced to the first
As in the case shown in the figure, the maximum load change rate can be reduced from 100% to 50% from time t 1 to t 3 , and it can be reduced linearly during that time, so the power generation consisting of multiple power generation units This enables smooth and stable plant system operation.

即ち、これを第1図で説明した従来例の場合と
比較すると、発電プラントの負荷を100%から50
%に降下させる時間は、共に、t3−t1=16分で変
らないが、従来の場合はt2時点前後で負荷変化
RMが変るのに対し、本発明による場合は負荷変
化率RMが一定となり、系統運用の円滑かつ安定
化に寄与する。
In other words, if we compare this with the conventional example explained in Figure 1, we can reduce the power plant load from 100% to 50%.
% remains unchanged at t 3 − t 1 = 16 minutes, but in the conventional case, the load changes around time t 2 .
Whereas R M varies, in the case of the present invention, the load change rate R M is constant, contributing to smooth and stable system operation.

尚、負荷変化率制御装置2のパラメータ記憶部
23に記憶する発電ユニツト最大負荷変化率デー
タd6を外部から変更できるようにすることによ
り、発電ユニツト41のガスタービンおよび蒸気
タービンの熱応力管理を容易にすることができ
る。即ち、一般にガスタービン、蒸気タービンの
寿命は、発電ユニツト負荷変動に伴つて発生され
る熱応力の積算値によつて管理される。発電ユニ
ツト負荷変化率が大きければ大きいほど、負荷変
化に伴う発生される熱応力が大きくなる。従つ
て、発電ユニツト最大負荷変化率を可変にするこ
とにより、ガスタービン、蒸気タービン熱応力管
理が容易にできる効果が得られる。
By making it possible to change the power generation unit maximum load change rate data d6 stored in the parameter storage section 23 of the load change rate control device 2 from the outside, thermal stress management of the gas turbine and steam turbine of the power generation unit 41 is facilitated. It can be done. That is, the lifespan of gas turbines and steam turbines is generally managed by the integrated value of thermal stress generated as a result of load fluctuations in the power generation unit. The greater the rate of change in power generation unit load, the greater the thermal stress generated due to the load change. Therefore, by making the maximum load change rate of the power generation unit variable, it is possible to easily manage the thermal stress of the gas turbine and steam turbine.

〔発明の効果〕〔Effect of the invention〕

以上のように本発明によれば、複数発電ユニツ
トから成る発電プラントの出力負荷をリニアにし
てしかも最大負荷変化率で制御できるようにな
る。この結果、中央給電指令所からの負荷変化指
令に対する追従性が良くなり、電力系統の安定化
に有用な負荷調整能力の高い発電プラントが得ら
れるようになる。
As described above, according to the present invention, the output load of a power generation plant consisting of a plurality of power generation units can be made linear and controlled at the maximum load change rate. As a result, the ability to follow load change commands from the central power dispatch center is improved, and a power generation plant with high load adjustment ability useful for stabilizing the power system can be obtained.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は複数発電ユニツトから成る発電プラン
トの負荷曲線図、第2図は本発明の一実施例に係
る発電プラントの運転制御装置のブロツク構成
図、第3図は複数発電ユニツトから成る発電プラ
ントの部分負荷効率曲線図、第4図は発電プラン
ト負荷曲線図、第5図は第2図の負荷変化率制御
装置における処理のフローチヤート、第6図は第
2図における最大負荷変化率制御の一例を説明す
るための負荷曲線図である。 1……目標負荷発電ユニツト目標値設定器、2
……負荷変化率制御装置、3……負荷制御装置、
4……発電プラント、21……入力処理部、22
……最大負荷変化率計算部、23……パラメータ
記憶部、24……出力処理部、31……目標負荷
設定器、32……比例積分器、33……発電ユニ
ツト増減負荷制御切替器、34,35……加算
器、41……発電ユニツト。
Figure 1 is a load curve diagram of a power generation plant consisting of multiple power generation units, Figure 2 is a block configuration diagram of an operation control device for a power generation plant according to an embodiment of the present invention, and Figure 3 is a diagram of a power generation plant consisting of multiple power generation units. Fig. 4 is a partial load efficiency curve diagram, Fig. 4 is a power generation plant load curve diagram, Fig. 5 is a flowchart of processing in the load change rate control device in Fig. 2, and Fig. 6 is a diagram of maximum load change rate control in Fig. 2. It is a load curve diagram for explaining an example. 1...Target load power generation unit target value setting device, 2
...Load change rate control device, 3...Load control device,
4...Power plant, 21...Input processing section, 22
... Maximum load change rate calculation section, 23 ... Parameter storage section, 24 ... Output processing section, 31 ... Target load setter, 32 ... Proportional integrator, 33 ... Power generation unit increase/decrease load control switch, 34 , 35... adder, 41... power generation unit.

Claims (1)

【特許請求の範囲】 1 複数台の発電ユニツトからなる発電プラント
の運転制御装置において、発電ユニツト最大、最
小負荷制限値および発電ユニツト最大負荷変化率
を記憶しているパラメータ記憶部、発電プラント
の目標負荷、発電ユニツト目標運転台数、発電プ
ラント現在負荷および発電ユニツト現在運転台数
を入力する入力処理部、前記パラメータ記憶部、
入力処理部からのデータに基づき発電プラント最
大負荷変化率RMを RM=LI−LF/li−lfrn(%/分) 但し、 LI:発電プラント現在負荷(%) LF:発電プラントの目標負荷(%) li:発電プラント負荷変化開始時の発電ユニツト
負荷(%) lf:発電プラント目標負荷到達時の最低発電ユニ
ツト負荷(%) rn:発電ユニツト最大負荷変化率(%/分) として算出する最大負荷変化率計算部、前記発電
プラント最大負荷変化率、発電プラント目標負
荷、発電ユニツト最大負荷変化率および発電ユニ
ツト増減負荷制御切換指令を出力する出力処理部
の各部から成る負荷変化率制御装置と、前記増減
負荷制御切換指令に基づき起動、停止すべき発電
ユニツトを切替えて前記発電ユニツト最大負荷変
化率で起動、停止させると同時に、前記発電プラ
ント最大負荷変化率および発電プラント目標負荷
に応じて残り運転中の発電ユニツトを制御する負
荷制御装置とから成ることを特徴とする発電プラ
ント運転制御装置。
[Scope of Claims] 1. In an operation control device for a power generation plant consisting of a plurality of power generation units, a parameter storage unit that stores maximum and minimum load limit values of the power generation unit and maximum load change rate of the power generation unit, and a target of the power generation plant. an input processing unit for inputting the load, the target number of power generation units in operation, the current load of the power generation plant, and the number of power generation units currently in operation; the parameter storage unit;
Based on the data from the input processing section, calculate the maximum load change rate R M of the power plant R M =L I −L F /l i −l f r n (%/min) where, L I : Current load of the power plant (%) L F : Target load of power generation plant (%) l i : Power generation unit load at the start of power generation plant load change (%) l f : Minimum power generation unit load (%) when power generation plant target load is reached r n : Maximum power generation unit A maximum load change rate calculation unit that calculates the load change rate (%/min), an output process that outputs the power generation plant maximum load change rate, power generation plant target load, power generation unit maximum load change rate, and power generation unit increase/decrease load control switching command. A load change rate control device consisting of each part of the unit and the power generation unit to be started or stopped based on the increase/decrease load control switching command are started or stopped at the maximum load change rate of the power generation unit, and at the same time, the power generation unit is started or stopped at the maximum load change rate of the power generation plant. A power generation plant operation control device comprising: a load control device that controls a power generation unit remaining in operation according to a rate of change and a target load of the power generation plant.
JP57193338A 1982-11-05 1982-11-05 Controller for operation of power plant Granted JPS5983204A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP57193338A JPS5983204A (en) 1982-11-05 1982-11-05 Controller for operation of power plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP57193338A JPS5983204A (en) 1982-11-05 1982-11-05 Controller for operation of power plant

Publications (2)

Publication Number Publication Date
JPS5983204A JPS5983204A (en) 1984-05-14
JPH0120763B2 true JPH0120763B2 (en) 1989-04-18

Family

ID=16306227

Family Applications (1)

Application Number Title Priority Date Filing Date
JP57193338A Granted JPS5983204A (en) 1982-11-05 1982-11-05 Controller for operation of power plant

Country Status (1)

Country Link
JP (1) JPS5983204A (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0738125B2 (en) * 1985-09-30 1995-04-26 株式会社東芝 Integrated load control device
JP2645000B2 (en) * 1987-01-05 1997-08-25 株式会社東芝 Hydroelectric power plant load regulator

Also Published As

Publication number Publication date
JPS5983204A (en) 1984-05-14

Similar Documents

Publication Publication Date Title
CN102654751A (en) Coordination control method based on nonlinear control and fuzzy control
JPS6032036B2 (en) Power plant control equipment
JP2001123852A (en) Gas turbine power generation control device
CN113595085A (en) Load regulation and control method for pumped storage power station unit under group control mode
JPH05195711A (en) Method of improving operating efficiency of steam turbine plant
JPS6239919B2 (en)
JP2001295607A (en) Load control method and apparatus for thermal power plant
CN112947609A (en) Main steam pressure setting control strategy and system for sliding pressure operation unit
JPH0811922B2 (en) Method for improving heat consumption rate of partial circumference steam turbine
JPS5983204A (en) Controller for operation of power plant
CN111535885A (en) Method and device for power distribution of gas-steam combined cycle unit
JP3792853B2 (en) Combined cycle control device and gas turbine control device
JPS5926842B2 (en) Boiler feed water flow rate control method
CN113756963B (en) Gas turbine load control device and method
CN112736989B (en) A frequency modulation method, system, device and readable storage medium involving battery energy storage
JP2878872B2 (en) Load control device for multi-shaft combined cycle plant
JP2642999B2 (en) Load control device for combined cycle plant
JPH0811923B2 (en) Method for improving operating efficiency of steam turbine power plant
JPS6082033A (en) Reactive power controller of composite generator plant
JPS585414A (en) Controller for combined plant
JPS6070929A (en) Reactive power controller of composite generator plant
JPS6346387A (en) Condenser cooling water supplier
JPS59201102A (en) Output controller of compound power plant
JPS59201638A (en) Output controller of composite generating plant
JPH0244107A (en) Automatic switching device for water feeding pump