JPH01210565A - Handrail and manufacture thereof - Google Patents

Handrail and manufacture thereof

Info

Publication number
JPH01210565A
JPH01210565A JP3293788A JP3293788A JPH01210565A JP H01210565 A JPH01210565 A JP H01210565A JP 3293788 A JP3293788 A JP 3293788A JP 3293788 A JP3293788 A JP 3293788A JP H01210565 A JPH01210565 A JP H01210565A
Authority
JP
Japan
Prior art keywords
mandrel
handrail
frame
hole
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP3293788A
Other languages
Japanese (ja)
Other versions
JP2588566B2 (en
Inventor
Susumu Konishi
小西 進
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tateyama Aluminum Industry Co Ltd
Original Assignee
Tateyama Aluminum Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tateyama Aluminum Industry Co Ltd filed Critical Tateyama Aluminum Industry Co Ltd
Priority to JP63032937A priority Critical patent/JP2588566B2/en
Publication of JPH01210565A publication Critical patent/JPH01210565A/en
Application granted granted Critical
Publication of JP2588566B2 publication Critical patent/JP2588566B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

PURPOSE:To facilitate the work of a framework, by inserting core rods fixed saliently on to structure framework into the struts of a handrail main-body, and by fixing both ones with the injection of a hardener. CONSTITUTION:In holes bored through a structure framework 6, core rods 7 are saliently fixed by an adhesives. A handrail main-body 1 has cylindrical struts 2, a head frame 3, a bottom frame 4, and rail members 5, and the struts 2 are externally fitted on the core rods 7. Then, by injecting the hardener through the slots 12 of the head frame 3 of the upper section of the struts 2, the core rods 7 and the struts 2 are firmly fitted on each other. After that, by fitting a coping on the head frame 3, the slots 12 are covered with the coping.

Description

【発明の詳細な説明】 (産業上の利用分野) この発明は、後付は工法で構築される手摺に関する。[Detailed description of the invention] (Industrial application field) The present invention relates to a handrail constructed using a retrofit construction method.

(従来の技術) 従来、建物躯体に手摺を取付けるには、第6図ないし第
9図に示すように、建物躯体のコンクリート打設に先た
ち型枠31を設け、所定部位にアンカー32を配設して
、該アンカー上部に囲い33を設け、しかる後コンクリ
ート34を打設する(第6図)。これにより建物躯体3
5がアンカー32を埋設して形成され、該アンカーの上
方にはコンクリートの存在しない空間部36が形成され
る(第7図)。この空間部36において、アンカー32
の上面に支柱補強材37を支持金具38を介して溶接し
、該支柱補強材37に支柱39を外嵌しく第8図)、爾
後、空間部36に樹脂モルタル40を充填して仕上げる
(第9図)。これにより、支柱39は、支柱補強材37
と樹脂モルタル40とによって補強支持される。
(Prior Art) Conventionally, in order to attach a handrail to a building frame, as shown in Figs. 6 to 9, a formwork 31 is provided before concrete is poured into the building frame, and anchors 32 are placed at predetermined locations. A fence 33 is provided above the anchor, and then concrete 34 is poured (FIG. 6). As a result, building frame 3
5 is formed by burying an anchor 32, and a space 36 without concrete is formed above the anchor (FIG. 7). In this space 36, the anchor 32
A column reinforcing material 37 is welded to the upper surface via a support metal fitting 38, and a column 39 is fitted onto the column reinforcing material 37 (Fig. 8). After that, the space 36 is filled with resin mortar 40 to finish it (Fig. 8). Figure 9). As a result, the pillar 39 is connected to the pillar reinforcement member 37.
and resin mortar 40 for reinforcement and support.

(発明が解決しようとする課題) 上記従来の手摺取付は工法は、建物躯体を打設するとき
に予め手摺の取付けを予定しているものであり、爾後時
に手摺を取付けるには、第5図に示すような工法によっ
てなされていた。
(Problems to be Solved by the Invention) The conventional method of installing handrails mentioned above is one in which the handrails are planned to be installed in advance when the building frame is poured. It was constructed using the construction method shown below.

この工法は、すなわち、建物躯体21に取付金具22を
ボルト・ナツト23で固定し、該取付金具22(ζ手摺
本体24の支柱25の下部をボルト25、ナツト26で
固定していた。したがって、上記の後付は工法では、取
付金具22と2種類のボルト・ナツト23及び25.2
6を必要とし、取付けの信頼性が欠如するとともに、組
付は作業も面倒なものであった。
In this construction method, the mounting bracket 22 is fixed to the building frame 21 with bolts and nuts 23, and the lower part of the support 25 of the mounting bracket 22 (ζ handrail body 24) is fixed with bolts 25 and nuts 26. The above retrofitting method uses the mounting bracket 22 and two types of bolts and nuts 23 and 25.2.
6, the reliability of the installation was lacking, and the assembly was troublesome.

本発明は、上記問題点を解決する手摺及びその製造方法
を提供すべくなされたものである。
The present invention has been made to provide a handrail and a method for manufacturing the same that solves the above problems.

(課題を解決するための手段) 本発明は、上記問題点を解決するために、まず第1の発
明では、建物躯体に突出固定される心棒と、該心棒に取
付けられ且つ、一対の筒状支柱、上下枠、該上梓に冠着
される笠木、及び棧材を具備した手摺本体とからなり、
前記支柱は、下部に前記心棒が内挿されるとともに固着
剤を介して該心棒に固着され、前記上枠は、前記支柱の
上端が当接する部位に固着剤注入用の孔を備えている手
摺を提案し、さらに第2の発明として、建物躯体に穴を
穿設し、鎖式に心棒を挿入した後、接着剤によって該心
棒を建物躯体に突出固定する一方、予め一対の筒状支柱
、該支柱の上端が当接する部位に固着剤注入用の孔を備
えている上枠、前記支柱間に配される下枠、及び棧材を
具備した手摺本体を形成しておき、該手摺本体の前記支
柱を前記心棒に外嵌し、前記上枠の前記孔から固着剤を
注入した後、前記上枠に笠木を冠着した手摺の製造方法
を提供せんとするものである。
(Means for Solving the Problems) In order to solve the above-mentioned problems, the present invention provides a first invention comprising: a mandrel protrudingly fixed to a building frame; a pair of cylindrical pipes attached to the mandrel; It consists of a pillar, a top and bottom frame, a cap that is attached to the upper azusa, and a handrail body equipped with a sash wood.
The pillar has the mandrel inserted in its lower part and is fixed to the mandrel through a fixing agent, and the upper frame has a handrail having a hole for injecting the adhesive at a portion where the upper end of the pillar abuts. In addition, as a second invention, a hole is bored in a building frame, a mandrel is inserted in a chain type, and then the mandrel is protruded and fixed to the building frame with an adhesive. A handrail main body is formed which includes an upper frame having a hole for injecting a fixing agent at a portion where the upper end of the support comes into contact, a lower frame disposed between the support supports, and a slat material. It is an object of the present invention to provide a method for manufacturing a handrail in which a support post is fitted onto the mandrel, a fixing agent is injected through the hole in the upper frame, and then a cape is attached to the upper frame.

(作 用) 建物躯体に穴を穿設して鎖式に接着剤を注入するととも
に、鎖式に心棒を挿入するので、該心棒は接着剤によっ
て建物躯体に突出固定される。−方、手摺本体は、その
支柱が筒状であるため、該支柱を前記心棒に単に外嵌す
るのみで装着がなされる。支柱の上端が当接する部位の
上梓には孔が設けであるので、鎖孔から固着剤を注入す
れば、該固着剤は前記心棒の外嵌部位に流れ込み、この
固着剤によって心棒と支柱との固着がなされる。
(Function) A hole is drilled in the building frame, adhesive is injected in a chain style, and a mandrel is inserted in a chain style, so that the mandrel protrudes and is fixed to the building body by the adhesive. - On the other hand, since the support of the handrail body is cylindrical, it can be attached by simply fitting the support onto the mandrel. Since a hole is provided in the upper part of the part where the upper end of the strut comes into contact, if the adhesive is injected through the chain hole, the adhesive will flow into the external fitting part of the mandrel, and this adhesive will cause the mandrel and the strut to be connected. Fixation is made.

しかる後、前記上枠に笠木を冠着すれば、前記孔は笠木
によって隠蔽され、見栄えが良くしかも取付は強度の大
きい手摺が得られる。さらに、本発明では、螺子止め作
業が全く不要となり、また、建物躯体に応じた取付金具
を用意する必要もない。
After that, by attaching a cap to the upper frame, the hole is hidden by the cap, and a handrail with a good appearance and strong mounting strength is obtained. Furthermore, in the present invention, there is no need for screwing work at all, and there is no need to prepare mounting fittings depending on the building frame.

(実施例) 以下、本発明を第1図〜第4図の一実施例図に基いて説
明する。
(Example) Hereinafter, the present invention will be explained based on one example diagram of FIGS. 1 to 4.

第1図は全体斜視図、第2図は心棒の固定形態を示す斜
視図、第3図は笠木を除き手摺の構築状態を一部破断し
て示す斜視図、第4図は笠木と上枠との結合を解いた状
態の斜視図である。
Figure 1 is an overall perspective view, Figure 2 is a perspective view showing how the mandrel is fixed, Figure 3 is a partially cutaway perspective view showing how the handrail is constructed, excluding the cap, and Figure 4 is the cap and upper frame. FIG.

図において、1は手摺本体を示し、該手摺本体1は左右
一対の支柱2,2と上下枠3,4と該上下枠3,4間に
固着された複数本の棧材5とで構成されている。
In the figure, reference numeral 1 indicates a handrail main body, and the handrail main body 1 is composed of a pair of left and right supports 2, 2, upper and lower frames 3, 4, and a plurality of beams 5 fixed between the upper and lower frames 3, 4. ing.

6は建物躯体、7は建物躯体6に突出固定された心棒を
示す。具体的には、上記心棒7は、建物躯体6に六8を
穿設しておいて、該穴8に接着剤9を注入すると共に同
大8に心棒7を突きさし、該心棒7を建物躯体6から突
出状として同建物躯体6に固定するのである。
Reference numeral 6 indicates a building frame, and 7 indicates a shaft protrudingly fixed to the building frame 6. Specifically, the mandrel 7 is made by drilling a hole 68 in the building frame 6, injecting adhesive 9 into the hole 8, and inserting the mandrel 7 into the hole 8 of the same size. It is fixed to the building frame 6 as a protrusion from the building frame 6.

そして上記手摺本体1は、上述の心棒7と後述の樹脂モ
ルタル等固着剤11を介して、建物躯体6に取付けられ
る。
The handrail main body 1 is attached to the building frame 6 via the above-mentioned mandrel 7 and a fixing agent 11 such as resin mortar, which will be described later.

すなわち、上記手摺本体1の支柱2.2として中空部1
0を有する筒状体が用いられ、該支柱2.2の下部それ
ぞれに心棒7,7を内挿させ、この状態下に支柱2,2
内に樹脂モルタル等固着剤11を注入し、心棒7、固着
剤11を介して手摺本体1を建物躯体6に取付けている
That is, the hollow part 1 serves as the support 2.2 of the handrail main body 1.
0 is used, the mandrels 7, 7 are inserted into the lower parts of the struts 2.2, respectively, and under this condition the struts 2, 2 are inserted.
A fixing agent 11 such as resin mortar is injected into the inside, and the handrail body 1 is attached to the building frame 6 via the mandrel 7 and the fixing agent 11.

12は固着剤注入孔であって、該固着剤注入孔12は、
上記固着剤11を支柱2.2内に注入すべく上枠3に貫
設される。18はカバーで、支柱2.2の上端固着部に
形成されている。
12 is a fixing agent injection hole, and the fixing agent injection hole 12 is
It is inserted through the upper frame 3 in order to inject the adhesive 11 into the column 2.2. Reference numeral 18 denotes a cover, which is formed at the upper end fixed portion of the support column 2.2.

したがって、上記実施例にあっては、上枠3に固着剤注
入孔12が形成されていて固着剤11の注入が容易であ
る反面、不体裁であるという問題点がある。そこでこの
問題点を解消するため、笠木13が上枠3に嵌着使用さ
れている。そして図示の実施例では、上枠3に対する笠
木13の冠着を容易とするため、上枠3と笠木13の冠
着構造に工夫が凝らされている。
Therefore, in the above-mentioned embodiment, although the fixing agent injection hole 12 is formed in the upper frame 3 and the fixing agent 11 can be easily injected, there is a problem that it is unsightly. In order to solve this problem, a cap 13 is fitted onto the upper frame 3. In the illustrated embodiment, in order to facilitate the attachment of the cap 13 to the upper frame 3, the cap attachment structure of the upper frame 3 and the cap 13 is devised.

具体的には、上枠3の上面に、外方に向った係止部14
を有する楔条15を突設し、他方、笠木13の内側に、
内側に向った係止部16を有する可撓性湾曲系17を形
成している。そして、上記笠木13は、手摺本体1の取
付は後、上枠3に上方から押圧して嵌着される。
Specifically, a locking portion 14 facing outward is provided on the upper surface of the upper frame 3.
A wedge strip 15 is provided protrudingly having
A flexible curved system 17 is formed with inwardly directed locking portions 16. After the handrail body 1 is attached, the cap 13 is fitted onto the upper frame 3 by pressing it from above.

なお、固着剤注入孔12は、支柱2.2の側壁に貫設し
ても良く、この場合は笠木13は必ずしも必要ではない
Note that the adhesive injection hole 12 may be provided through the side wall of the support column 2.2, and in this case, the cap 13 is not necessarily required.

(発明の効果) 以上説明したように、本発明に依れば、取付金具を必要
とせず、螺子止め作業を行わなくてよい。そして、取付
金具に代って用いられる心棒は、支柱との関係において
その長さ及び径が定まるものであって、建物躯体には関
係なく手摺本体に合わせて一種類のみを用意すればよい
という利点があり、また、接着剤や固着剤の注入作業は
、螺子止め作業よりも楽である。さらに、固着剤注入孔
が笠木によって隠されることになり、体裁及び見栄えの
良い手摺を得ることができる。
(Effects of the Invention) As explained above, according to the present invention, there is no need for mounting fittings and there is no need to perform screwing work. The length and diameter of the mandrel used in place of the mounting bracket is determined by its relationship with the support column, and only one type needs to be prepared to match the handrail itself, regardless of the building frame. Advantages include: Injecting adhesives and fixing agents is easier than using screws. Furthermore, the adhesive injection hole is hidden by the cap, making it possible to obtain a handrail with good appearance and appearance.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図から第4図は本発明の一実施例図であって、第1
図は全体斜視図、第2図は心棒の固定形態を示す斜視図
、第3図は笠木を除き手摺の構築状態を一部破断して示
す斜視図、第4図は笠木と上梓との結合を解いた状態の
斜視図、第5図は後付は工法例を示す斜視図、第6図な
いし第9図は従来の手摺取付は工法例を示す斜視図であ
る。 1・・・手摺本体  2・・・支柱  3・・・上枠4
・・・下枠    5・・・枝材  6・・・建物躯体
7・・・心棒    8・・・穴   9・・・接着剤
10・・・中空部  11・・・固着剤12・・・固着
剤注入孔     13・・・笠木特許出願人   立
山アルミニウム工業株式会社代 理 人   弁理士 
 森    正  澄第5図 第6図 第8図 第7図
FIG. 1 to FIG. 4 are diagrams showing an embodiment of the present invention, and FIG.
The figure is an overall perspective view, Figure 2 is a perspective view showing how the mandrel is fixed, Figure 3 is a partially cutaway perspective view of the handrail construction excluding the cap, and Figure 4 is the combination of the cap and upper Azusa. FIG. 5 is a perspective view showing an example of a construction method for installing a handrail, and FIGS. 6 to 9 are perspective views showing examples of a construction method for installing a conventional handrail. 1...Handrail body 2...Post 3...Upper frame 4
... Lower frame 5 ... Branch material 6 ... Building frame 7 ... Mandrel 8 ... Hole 9 ... Adhesive 10 ... Hollow part 11 ... Adhesive agent 12 ... Fixing Agent injection hole 13... Kasagi patent applicant Tateyama Aluminum Industry Co., Ltd. Representative Patent attorney
Masaaki MoriFigure 5Figure 6Figure 8Figure 7

Claims (2)

【特許請求の範囲】[Claims] (1)建物躯体に突出固定される心棒と、該心棒に取付
けられ且つ、一対の筒状支柱、上下枠、該上枠に冠着さ
れる笠木、及び棧材を具備した手摺本体とからなり、前
記支柱は、下部に前記心棒が内挿されるとともに固着剤
を介して該心棒に固着され、前記上枠は、前記支柱の上
端が当接する部位に固着剤注入用の孔を備えていること
を特徴とする手摺。
(1) Consists of a mandrel that protrudes and is fixed to the building frame, and a handrail body that is attached to the mandrel and includes a pair of cylindrical supports, an upper and lower frame, a cap that is attached to the upper frame, and a sill. The pillar has the mandrel inserted in its lower part and is fixed to the mandrel via a binding agent, and the upper frame is provided with a hole for injecting the binding agent at a portion where the upper end of the pillar comes into contact. A handrail featuring
(2)建物躯体に穴を穿設し、該穴に心棒を挿入した後
、接着剤によって該心棒を建物躯体に突出固定する一方
、予め一対の筒状支柱、該支柱の上端が当接する部位に
固着剤注入用の孔を備えている上枠、前記支柱間に配さ
れる下枠、及び棧材を具備した手摺本体を形成しておき
、該手摺本体の前記支柱を前記心棒に外嵌し、前記上枠
の前記孔から固着剤を注入した後、前記上枠に笠木を冠
着したことを特徴とする手摺の製造方法。
(2) After drilling a hole in the building frame and inserting the mandrel into the hole, the mandrel is protruded and fixed to the building frame with adhesive, while a pair of cylindrical supports are placed in advance, and the part where the upper end of the support comes into contact A handrail body including an upper frame having a hole for injecting a fixing agent, a lower frame disposed between the pillars, and a piece of wood is formed, and the pillars of the handrail body are externally fitted onto the mandrel. A method for manufacturing a handrail, comprising: injecting a fixing agent through the hole of the upper frame, and then capping the upper frame with a capstone.
JP63032937A 1988-02-17 1988-02-17 Handrail manufacturing method Expired - Lifetime JP2588566B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP63032937A JP2588566B2 (en) 1988-02-17 1988-02-17 Handrail manufacturing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP63032937A JP2588566B2 (en) 1988-02-17 1988-02-17 Handrail manufacturing method

Publications (2)

Publication Number Publication Date
JPH01210565A true JPH01210565A (en) 1989-08-24
JP2588566B2 JP2588566B2 (en) 1997-03-05

Family

ID=12372856

Family Applications (1)

Application Number Title Priority Date Filing Date
JP63032937A Expired - Lifetime JP2588566B2 (en) 1988-02-17 1988-02-17 Handrail manufacturing method

Country Status (1)

Country Link
JP (1) JP2588566B2 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59190826U (en) * 1983-06-04 1984-12-18 株式会社 長谷川工務店 Handrail support installation device
JPS6190927U (en) * 1984-11-16 1986-06-13

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59190826U (en) * 1983-06-04 1984-12-18 株式会社 長谷川工務店 Handrail support installation device
JPS6190927U (en) * 1984-11-16 1986-06-13

Also Published As

Publication number Publication date
JP2588566B2 (en) 1997-03-05

Similar Documents

Publication Publication Date Title
JPH01210565A (en) Handrail and manufacture thereof
JP2004011203A (en) Precast SRC column joint structure
JPH09100576A (en) Method for joining end section of column for wooden framework technique
JP3002859B2 (en) Handrail mounting method
JPH11270092A (en) Attaching method for handrail
JP4086993B2 (en) Joint structure of vertical precast concrete members
JPH1162264A (en) A seismatic reinforcement structure of crust frame
JPH10238132A (en) Seismic reinforcement method
JP2008057257A (en) Pillar tying tool, decorative cover covering it, and pillar tying structure using them
JPH10219954A (en) Handrail support, its manufacture and method for executing handrail support
JPS6217550Y2 (en)
JP2889840B2 (en) Construction method of underground outer peripheral wall
JPS5847137Y2 (en) handrail
JP3729926B2 (en) Standing device for handrail column
JP3361295B2 (en) Handrail and its construction method
JP2001271424A (en) Joining tool and joining structure of structural member using it and joining method of structural member
JPH0412918Y2 (en)
JPH0925694A (en) Post fixing construction for balustrade
KR20040061891A (en) Connected Window Frame Setting Up Structure
JPH0224821Y2 (en)
JPH0543121Y2 (en)
JPH10183923A (en) Assembled structure of handrail
JPH059584B2 (en)
JP3241606B2 (en) Reinforcement structure of existing wooden building and anchor used for it
JPH0433316Y2 (en)