Construction work of underground spaceInfo
- Publication number
- JPH01210598A JPH01210598A JP63036781A JP3678188A JPH01210598A JP H01210598 A JPH01210598 A JP H01210598A JP 63036781 A JP63036781 A JP 63036781A JP 3678188 A JP3678188 A JP 3678188A JP H01210598 A JPH01210598 A JP H01210598A
- Authority
- JP
- Japan
- Prior art keywords
- underground
- excavated
- underground space
- tunnel
- pilot
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 16
- 238000000034 method Methods 0.000 claims abstract description 14
- 230000002093 peripheral effect Effects 0.000 abstract description 2
- 239000010410 layer Substances 0.000 description 3
- 238000009412 basement excavation Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- NMFHJNAPXOMSRX-PUPDPRJKSA-N [(1r)-3-(3,4-dimethoxyphenyl)-1-[3-(2-morpholin-4-ylethoxy)phenyl]propyl] (2s)-1-[(2s)-2-(3,4,5-trimethoxyphenyl)butanoyl]piperidine-2-carboxylate Chemical compound C([C@@H](OC(=O)[C@@H]1CCCCN1C(=O)[C@@H](CC)C=1C=C(OC)C(OC)=C(OC)C=1)C=1C=C(OCCN2CCOCC2)C=CC=1)CC1=CC=C(OC)C(OC)=C1 NMFHJNAPXOMSRX-PUPDPRJKSA-N 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 239000002356 single layer Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D13/00—Large underground chambers; Methods or apparatus for making them
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
Description
【発明の詳細な説明】 (産業上の利用分野) この発明は、地下空間の構築工法に関するものである。[Detailed description of the invention] (Industrial application field) The present invention relates to a construction method for underground space.
さらに詳しくは、この発明は、地上の既設構築物の有無
にかかわらず、地中に各種の形状の空間を形成すること
のできる地下空間構築のための深部施工法に関するもの
である。More specifically, the present invention relates to a deep construction method for constructing underground spaces that can form spaces of various shapes underground, regardless of the presence or absence of existing structures above ground.
(従来の技術)
土地利用の進展と、地上の構築物の過密化にとちなって
、地下空間の利用が注目されている。(Prior Art) With the development of land use and the increasing density of above-ground structures, the use of underground space is attracting attention.
しかしながら、従来は、地下の空間を構築するにあたっ
ては、地上より連続壁を地中に打設し、次いで、その内
側を掘削することにより行っているために、所定の場所
にすでに施設したビル、家屋、工場などが存在する場合
にはこれらの構築物を移転するか、仮撤去、もしくはそ
れらを解体した後にしか地下空間の構築はできなかった
。特にこのことは、都市部における大規模な地下空間の
利用にとっての大きな障害となっていた。However, conventionally, when constructing an underground space, a continuous wall is placed underground from the ground level, and then the inside of the wall is excavated. If houses, factories, etc. existed, underground space could only be constructed after these structures had been relocated, temporarily removed, or demolished. In particular, this has been a major obstacle to the use of large-scale underground spaces in urban areas.
このような従来の地下空間構築のための制限は、地下の
深部における地山崩壊防止(山留め)のための地中壁の
施工技術が実現されていないことに技術的な理由かあっ
た。These conventional restrictions on constructing underground spaces may be due to technical reasons, such as the fact that construction technology for underground walls to prevent rock collapse deep underground has not yet been realized.
(発明の目的と問題点を解決するための手段)この発明
は、以上の通りの事情に区みてなされたものであり、従
来の地下空間の構築技術の欠点を改善し、地上の既設構
築物の有無にかかわりなく、各種形状の地下空間を容易
に構築することのできる新しい地下空間の構築工法を提
供することを目的としている。(Objective of the Invention and Means for Solving the Problems) This invention was made in view of the above-mentioned circumstances, and it improves the shortcomings of the conventional underground space construction technology and improves the existing structure above ground. The purpose of this invention is to provide a new underground space construction method that can easily construct underground spaces of various shapes, regardless of the presence or absence of underground spaces.
この発明は、上記の目的を実現するために、構築する地
下空間の空洞周縁部に、進入路トンネルに連結するパイ
ロットトンネルを掘削し、このパイロットトンネルの上
部および/または下部に地中壁を設け、次いで空洞部の
内側を掘削することを特徴とする地下空間の構築工法を
提供する。゛また、この発明は、上記の地下空間構築の
ための地中壁の施工法と、パイロットトンネル掘削のた
めのシールド工法を提供する。In order to achieve the above object, this invention excavates a pilot tunnel connected to the approach tunnel at the periphery of the cavity of the underground space to be constructed, and provides an underground wall above and/or below the pilot tunnel. The present invention provides a method for constructing an underground space, which is characterized by excavating the inside of the cavity. Furthermore, the present invention provides a method for constructing an underground wall for constructing the above-mentioned underground space, and a shield method for excavating a pilot tunnel.
(作 用)
この発明の工法においては、公園等の地上空間を確保す
ることのできる場所を抗日とする、単一または複数の立
坑、斜坑、水平坑などの進入路トンネルを掘削し、次い
で構築する地下空間の面頂に対応する空洞周縁をシール
ド工法等によって掘削した後に、このパイロットトンネ
ルの地盤に地中壁を構築することからなるため、パイロ
ットトンネルからの方缶工によって地中壁の構築は容易
で、しかも地山の地盤強化改良を行うこともできる。(Function) In the construction method of the present invention, an approach tunnel such as a single or multiple vertical shafts, inclined shafts, horizontal shafts, etc. is excavated in a place where ground space can be secured, such as a park, and then constructed. After excavating the periphery of the cavity corresponding to the top of the underground space using the shield method etc., an underground wall is constructed on the ground of this pilot tunnel. It is easy to do, and it is also possible to improve the ground strength of the ground.
パイロットトンネルの上下の多層の組合せにより、地中
深く地中壁を連続的に施工でき、安定した地山の状態で
、これら地中壁の内側を掘削して地下空間とすることが
できる。By combining the upper and lower layers of the pilot tunnel, underground walls can be constructed continuously deep underground, and while the ground is in a stable state, the inside of these underground walls can be excavated to create an underground space.
(実施例)
次に添付した図面に沿って、この発明の地下空間の構築
法の実施例を説明する。もちろん、この発明は、以下の
実施例によって限定されるものではない。(Example) Next, an example of the underground space construction method of the present invention will be described with reference to the attached drawings. Of course, the invention is not limited to the following examples.
第1図は、この発明の一実施例を示した地中断面図であ
る。地上に既設の構築’tllJ(A)が存在する場合
の例を示している。FIG. 1 is a sectional view showing an embodiment of the present invention. An example is shown in which there is an existing construction 'tllJ(A) on the ground.
公園(B)等の地上の利用できる空間に坑口を設けた立
坑(1)および水平坑(2)からなる進入路1〜ンネル
を掘削し、水平坑(2)に連結する− 作業用のパイロ
ットトンネル(3)を掘削する。Excavate an approach tunnel consisting of a vertical shaft (1) and a horizontal shaft (2) with a shaft entrance in an available above-ground space such as a park (B) and connect it to the horizontal shaft (2) - Pilot for work Excavate the tunnel (3).
この例においては、所要の地下空間の大きさに相当する
空洞周縁部に上下に螺旋状にパイロ・ントトンネル(3
)を1屈削している。In this example, a pyrotechnic tunnel (3
) has been reduced by one.
これらの掘削は、シールド掘進機によって、あるいはそ
の池の適宜な手段によって行うことができるが、地下深
部へと掘進していくことや、hlli工性の面からみて
、シールド1法は特に好ましいものである。These excavations can be carried out by a shield excavator or by any suitable means, but the shield 1 method is particularly preferable from the viewpoint of digging deep underground and ease of construction. It is.
このパイロットトンネルの大きさ、螺旋掘削のピッチ、
および周縁部の大きさは、地下空間の大きさ、地山の状
態、作業性等を考慮して適宜なものとすることができる
。また、水平坑(2)は、パイロットトンネル(3)の
ピッチ毎に第2段水平坑(2−2> 、第n段水平坑(
2−n)として複数設けることもできる。The size of this pilot tunnel, the pitch of spiral excavation,
The size of the periphery can be determined appropriately taking into consideration the size of the underground space, the condition of the ground, workability, etc. In addition, the horizontal shaft (2) has a second stage horizontal shaft (2-2>), an nth stage horizontal shaft (
A plurality of them can be provided as 2-n).
パイロットトンネル(3)の掘削後、上下のパイロット
トンネル(3)の位置を連結するように地中壁(4)を
連続的に設ける。この地中壁(4)の施工は、パイロッ
トトンネル(3)の内で行うことができる0次いで、こ
の地中壁(4)の内側部(C)を掘削し、地下空間を形
成する。After excavating the pilot tunnel (3), an underground wall (4) is continuously provided so as to connect the positions of the upper and lower pilot tunnels (3). Construction of this underground wall (4) can be carried out within the pilot tunnel (3). Next, the inner part (C) of this underground wall (4) is excavated to form an underground space.
この内側部(C)の掘削は、たとえは、天盤を補強した
後に、上部より下方へと掘り進むことにより行うことが
できる。This inner part (C) can be excavated by, for example, reinforcing the ceiling plate and then digging downward from the upper part.
パイロットトンネル(3)の平面形状としては、様々な
ものとすることができる。たとえば、第2図に示したよ
うに、(a)円形、(b)長方形、(C)小判形、(d
)正方形、(e)三角形、あるいは(f)多角形のよう
に種々のものとすることができる。 第3図は、別の実
施例を示したもので、この例の場合には、パイロットト
ンネル(3)を水平に一つだけ掘削し、次いで連続地中
壁(4)を施工する、いわゆる単層坑道方式による地下
空間の構築法を示している。The pilot tunnel (3) can have various planar shapes. For example, as shown in Figure 2, (a) circular, (b) rectangular, (C) oval, (d
) square, (e) triangular, or (f) polygonal. Figure 3 shows another example, in which only one pilot tunnel (3) is excavated horizontally and then a continuous underground wall (4) is constructed, a so-called simple method. This shows how to construct an underground space using the layer tunnel method.
第4図はさらに別の実施例を示している。この例におい
ては、立坑に連結する上下複数の水平坑(2)を設け、
各々の水平坑に対応して水平のパイロットトンネル(3
)を複数、多層に掘削する。FIG. 4 shows yet another embodiment. In this example, a plurality of upper and lower horizontal shafts (2) connected to the vertical shaft are provided,
Horizontal pilot tunnels (3
) is excavated in multiple layers.
多層平行坑道式のパイロットトンネル(3)を掘削する
ものである。A multi-layer parallel tunnel type pilot tunnel (3) will be excavated.
各々のパイロットトンネル(3)から連続地中壁(4)
を施工し、この地中壁(4)に囲まれた内側を掘削する
。Continuous underground wall (4) from each pilot tunnel (3)
and excavate the inside surrounded by this underground wall (4).
たとえば以上の第1図および第4図に示した上下に連続
する、または複数のパイロットトンネル(3)を掘削し
た後に地中壁(4)を施工した状態を拡大して示したも
のが第5図である。たとええばシールド工法によって掘
削した直径4〜5m程度までのパイロットトンネル(3
)の相互の間を鉄筋コンクリート連続地中壁(4)によ
って連結している。For example, Figure 5 is an enlarged view of the condition in which the underground wall (4) is constructed after excavating the vertically continuous or multiple pilot tunnels (3) shown in Figures 1 and 4 above. It is a diagram. For example, a pilot tunnel with a diameter of about 4 to 5 m excavated using the shield method (3
) are connected to each other by a reinforced concrete continuous underground wall (4).
また、パイロットトンネル(3)の地山側の近務域は止
水工法等によって地盤改良して地盤強化区域(5)とし
ている、地中壁(4)の内側は、掘削して地下空間空洞
になっている。この空洞の径は、たとえば200m、も
しくはそれ以上の大きさにすることもでき、またその深
さも、50m以上の、超深部大規模な空洞とすることも
できる。In addition, the area adjacent to the ground side of the pilot tunnel (3) has been improved by water-stopping methods, etc., and has been made into a ground reinforcement area (5).The inside of the underground wall (4) has been excavated to create an underground space cavity. It has become. The diameter of this cavity can be, for example, 200 m or more, and the depth can also be a very deep and large-scale cavity of 50 m or more.
(発明の効果)
この発明により、既設構築物の移転、解体を前提としな
くとも、その下方の地下に、進入路トンネルに連結して
シールド工法等によって作業用のパイロットトンネルを
単層、または多層に掘削し、地中壁を施工することで、
効率的に、かつ地山の崩壊を防止しつつ地下空間を構築
することができる。(Effect of the invention) With this invention, even without relocating or dismantling the existing structure, a pilot tunnel for work can be built in a single layer or in multiple layers underground by connecting it to the approach tunnel and using the shield method etc. By excavating and constructing underground walls,
An underground space can be constructed efficiently and while preventing the collapse of the ground.
利用しようとする地区の地慇条件により、また使用目的
に合せて種々の平面形状と深さを持つ地下空間を構築で
きるため、都市空間の高度利用に大きな効果が得られる
。Since it is possible to construct underground spaces with various planar shapes and depths depending on the local conditions of the area to be used and the purpose of use, a great effect can be obtained in the advanced use of urban space.
第1図は、この発明の一実施例を示した地中断面図であ
る。第2図(aHb)(c)(d)(e) (f)は、
パイロットトンネルの平面形状を各々例示した平面図で
ある。
第3図および第4図は、各々、さらに別の実施例を示し
た断面図である。
第5図は、多層パイロットトンネル掘削により構築した
地下空間の周縁部を示した部分断面図である。
1・・・立坑 2・・・水平坑3・・
・パイロットトンネル 4・・・地中壁5・・・地盤
強化区域
代理人 弁理士 西 澤 利 夫
第1図
第2図
(a)
第 3 図
第4図
第5図FIG. 1 is a sectional view showing an embodiment of the present invention. Figure 2 (aHb) (c) (d) (e) (f) is
FIG. 3 is a plan view illustrating the planar shape of each pilot tunnel. FIGS. 3 and 4 are sectional views each showing still another embodiment. FIG. 5 is a partial sectional view showing the peripheral part of the underground space constructed by excavating a multilayer pilot tunnel. 1...Vertical shaft 2...Horizontal shaft 3...
・Pilot tunnel 4...Underground wall 5...Ground reinforcement area agent Toshio Nishizawa, patent attorney Figure 1 Figure 2 (a) Figure 3 Figure 4 Figure 5
Claims (6)
ルに連結するパイロットトンネルを掘削し、このパイロ
ットトンネルの上部および/または下部に地中壁を設け
、次いで空洞部の内側を掘削することを特徴とする地中
空間の構築工法。(1) Excavating a pilot tunnel connected to the approach tunnel at the periphery of the cavity of the underground space to be constructed, installing an underground wall above and/or below this pilot tunnel, and then excavating the inside of the cavity. An underground space construction method characterized by:
のパイロットトンネルを地中壁にて連結する請求項第(
1)項記載の地下空間の構築工法。(2) A plurality of pilot tunnels are excavated vertically, and the upper and lower pilot tunnels are connected by an underground wall.
1) Construction method of underground space described in section 1).
削し、このパイロットトンネルを地中壁にて連結する請
求項第(1)項記載の地下空間の構築工法。(3) The method for constructing an underground space according to claim (1), wherein a vertically continuous spiral pilot tunnel is excavated and the pilot tunnels are connected by an underground wall.
請求項第(1)項、第(2)項または第(3)項記載の
地下空間の構築工法。(4) The underground space construction method according to claim (1), (2) or (3), wherein the pilot tunnel is excavated by a shield method.
ルを掘削し、既設地上構築物の下方に超深度地下空間を
形成する請求項第(1)項記載の地下空間の構築工法。(5) The method for constructing an underground space according to claim (1), wherein a pilot tunnel is excavated underground below the existing above-ground structure to form an ultra-deep underground space below the existing above-ground structure.
トトンネルを掘削する地下空間構築のためのシールド工
法。(6) Shield construction method for constructing underground space by excavating multiple or continuous spiral pilot tunnels above and below.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP63036781A JP2680323B2 (en) | 1988-02-19 | 1988-02-19 | Construction method of underground space |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP63036781A JP2680323B2 (en) | 1988-02-19 | 1988-02-19 | Construction method of underground space |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH01210598A true JPH01210598A (en) | 1989-08-24 |
| JP2680323B2 JP2680323B2 (en) | 1997-11-19 |
Family
ID=12479317
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP63036781A Expired - Fee Related JP2680323B2 (en) | 1988-02-19 | 1988-02-19 | Construction method of underground space |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2680323B2 (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111560979A (en) * | 2020-01-21 | 2020-08-21 | 中国电建集团华东勘测设计研究院有限公司 | An underground parking garage and urban tunnel joint construction structure |
| CN113622922A (en) * | 2021-06-28 | 2021-11-09 | 中铁十六局集团有限公司 | Early-stage excavation method for deep ground space |
| CN113863934A (en) * | 2021-06-28 | 2021-12-31 | 中铁十六局集团有限公司 | Spiral tunnel for deep ground space construction |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS49103446A (en) * | 1973-02-05 | 1974-09-30 | ||
| JPS6443699A (en) * | 1987-08-07 | 1989-02-15 | Taisei Corp | Method of executing underground cavity |
-
1988
- 1988-02-19 JP JP63036781A patent/JP2680323B2/en not_active Expired - Fee Related
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS49103446A (en) * | 1973-02-05 | 1974-09-30 | ||
| JPS6443699A (en) * | 1987-08-07 | 1989-02-15 | Taisei Corp | Method of executing underground cavity |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111560979A (en) * | 2020-01-21 | 2020-08-21 | 中国电建集团华东勘测设计研究院有限公司 | An underground parking garage and urban tunnel joint construction structure |
| CN113622922A (en) * | 2021-06-28 | 2021-11-09 | 中铁十六局集团有限公司 | Early-stage excavation method for deep ground space |
| CN113863934A (en) * | 2021-06-28 | 2021-12-31 | 中铁十六局集团有限公司 | Spiral tunnel for deep ground space construction |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2680323B2 (en) | 1997-11-19 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103775110A (en) | Underground excavation construction method for multilayer underground space of soft soil area | |
| JP4022687B2 (en) | Construction method for underground structures | |
| CN105804085B (en) | Multiple-unit well shaft type underground three-dimensional garage subregion construction method | |
| JP2680323B2 (en) | Construction method of underground space | |
| JPS62288269A (en) | Method for extending underground stair of building | |
| JPH02108798A (en) | Underground large scale space structure and building method thereof | |
| JPH02300422A (en) | Construction of underground structure | |
| JP3091859B2 (en) | Piling method for shafts with openings at the top | |
| JPH03122400A (en) | Method for constructing architectural big space in great depth underground | |
| JP4031284B2 (en) | Construction method for underground structures | |
| JPH0819824B2 (en) | Construction method of underground space | |
| CN113882429B (en) | Construction method and construction structure of underground structure | |
| JP2000104482A (en) | Shaft construction method and earth retaining plate | |
| JP2733542B2 (en) | How to build underground structures | |
| JP3646698B2 (en) | Construction method for underground structures | |
| JP3027685B2 (en) | Earth retaining wall and construction method | |
| JPH02248521A (en) | Open shield method | |
| JP2667350B2 (en) | Underground structures and construction methods | |
| JPS62129423A (en) | Construction method for foundation | |
| JP2001323485A (en) | Method of constructing underground structure | |
| JPH03147926A (en) | construction method for basement | |
| JPS5985022A (en) | Underground continuous wall constructing work | |
| JP2004250859A (en) | Sole plate construction method of open caisson | |
| CN116335188A (en) | Continuous open caisson type subway station construction method and structure | |
| JPH03103600A (en) | Construction of large space of building in extremely deep underground |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313111 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| LAPS | Cancellation because of no payment of annual fees |