JPH0153149B2 - - Google Patents
Info
- Publication number
- JPH0153149B2 JPH0153149B2 JP2222482A JP2222482A JPH0153149B2 JP H0153149 B2 JPH0153149 B2 JP H0153149B2 JP 2222482 A JP2222482 A JP 2222482A JP 2222482 A JP2222482 A JP 2222482A JP H0153149 B2 JPH0153149 B2 JP H0153149B2
- Authority
- JP
- Japan
- Prior art keywords
- hot water
- pouring
- melting furnace
- ladle
- casting machine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D46/00—Controlling, supervising, not restricted to casting covered by a single main group, e.g. for safety reasons
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Casting Support Devices, Ladles, And Melt Control Thereby (AREA)
Description
【発明の詳細な説明】
本発明は、溶解炉からの湯を複数台の鋳造機へ
選択的に注湯する自動給湯制御装置に関するもの
である。DETAILED DESCRIPTION OF THE INVENTION The present invention relates to an automatic hot water supply control device for selectively pouring hot water from a melting furnace into a plurality of casting machines.
従来の鋳造作業、特に重力鋳造機による鋳造作
業では、まず重力鋳造機の金型内に砂型をセツト
した後、その砂型内に最も湯を注湯しやすい角度
に金型を傾斜させる。ここで、作業者は、溶解炉
から杓で給湯してきた湯を金型に注湯した後、更
に金型を傾斜させ、その状態で金型内の湯がかた
まつたら金型の傾斜を戻して製品を取出す。この
後、再び金型内に新たな砂型をセツトして次の製
品の鋳造作業へと移る。 In conventional casting operations, particularly casting operations using a gravity casting machine, a sand mold is first set in a mold of the gravity casting machine, and then the mold is tilted at an angle that makes it easiest to pour hot water into the sand mold. Here, the worker pours hot water supplied from the melting furnace into the mold using a ladle, then tilts the mold further, and when the hot water in the mold hardens, the worker tilts the mold. Return it and take out the product. After this, a new sand mold is set in the mold again and the process moves on to casting the next product.
このように、従来の鋳造作業では、作業者が溶
解炉と鋳造機との間を往復しながら給湯するもの
であるため、作業に危険を伴うばかりでなく、鋳
造機1台にほとんど1人の作業者がつかなければ
ならない欠点があつた。 As described above, in conventional casting work, workers supply hot water while going back and forth between the melting furnace and the casting machine, which not only poses danger, but also requires approximately one worker per casting machine. There were shortcomings that the workers had to take care of.
そこで、例えば溶解炉からの湯を複数台の鋳造
機に自動的に注湯できるものがあれば、上記欠点
は解決できるはずである。具体的には、溶解炉と
複数台の鋳造機との間に搬送路を配設し、この搬
送路に給湯装置を移動自在に設け、この給湯装置
の動作を例えばリレーシーケンス等で制御するこ
とにより、溶解炉からの湯を各鋳造機へ順番に注
湯する方式が考えられる。 Therefore, if there was a device that could automatically pour hot water from a melting furnace into multiple casting machines, the above drawbacks could be solved. Specifically, a conveyance path is provided between a melting furnace and a plurality of casting machines, a water heater is movably provided on this conveyance path, and the operation of this water heater is controlled by, for example, a relay sequence. Therefore, a method can be considered in which hot water from the melting furnace is sequentially poured into each casting machine.
ところが、このように複数台の鋳造機へ湯を予
め定められた順番に注湯する方式であると、例え
ば複数台の鋳造機で互いに異なる製品を鋳造する
ような場合には適用できない問題が起る。それ
は、複数台の鋳造機で互いに異なる製品を鋳造す
る場合、湯を注いでからそれがかたまるまでの時
間が各鋳造機で異なるため、注湯順序を予め一律
的に規定できないからである。 However, this method of pouring hot water into multiple casting machines in a predetermined order poses a problem that cannot be applied, for example, when multiple casting machines are used to cast different products. Ru. This is because when different products are cast using multiple casting machines, the time from pouring the hot water until it hardens is different for each casting machine, so the pouring order cannot be uniformly prescribed in advance.
また、一般にこの種の鋳造機では、金型の内部
に砂型がセツトされると、金型が閉じられた後、
所定の角度に傾斜されるわけであるが、金型の内
部に砂型が正しくセツトされていない場合、金型
の閉じ動作によつて砂型が破損することがみられ
る。このほか、金型の傾斜が正しい角度に設定さ
れない場合も起り得る問題の1つである。そこ
で、例えば給湯装置が溶解炉から鋳造機まで移動
する時間を考慮して、金型の内部に砂型をセツト
した時点で起動信号を出力するような場合には、
金型が正しく注湯可能な状態でないまま注湯され
る場合がある。 Additionally, in general, in this type of casting machine, once the sand mold is set inside the mold, after the mold is closed,
Although the sand mold is tilted at a predetermined angle, if the sand mold is not properly set inside the mold, the sand mold may be damaged by the closing operation of the mold. Another problem that can occur is when the inclination of the mold is not set at the correct angle. Therefore, for example, if you want to take into account the time it takes for the water heater to move from the melting furnace to the casting machine, and output the start signal when the sand mold is set inside the mold,
Molten metal may be poured into the mold before it is properly poured.
本発明の目的は、各鋳造機のサイクルに応じて
注湯順序を決定でき、かつ効率よい注湯動作を確
実に実行できる。自動給湯制御装置を提供するこ
とにある。 An object of the present invention is to be able to determine the pouring order according to the cycle of each casting machine, and to reliably perform an efficient pouring operation. An object of the present invention is to provide an automatic hot water supply control device.
そのため、本発明では、溶解炉と複数台の鋳造
機との間に搬送路を配設し、この搬送路に前記溶
解炉から給湯した湯を複数台の鋳造機へ注湯する
給湯装置を移動自在に設け、更に前記各鋳造機に
おいて注湯準備が所定の段階まで完了したことを
条件として第1の起動信号を出力する第1の起動
信号発生手段と、前記各鋳造機において注湯準備
が全て完了したことを条件として第2の起動信号
を出力する第2の起動信号発生手段と、制御手段
とを設け、その制御手段を、前記第1の起動信号
発生手段からの第1の起動信号を順次記憶する記
憶部、この記憶部に記憶された第1の起動信号の
記憶順位に従つて指定される鋳造機へ溶解炉から
の湯を順番に注湯すべく前記給湯装置を制御する
とともに、その給湯装置が溶解炉から指定された
鋳造機へ移動する所定位置において前記第2の起
動信号発生手段からの第2の起動信号の有無を判
別し、その第2の起動信号があるときのみ指定さ
れた鋳造機への注湯動作を続行させる手段を含む
構成とすることにより、上記目的を達成しようと
するものである。つまり、記憶部に記憶された第
1の起動信号の記憶順位に従つて指定される鋳造
機へ溶解炉からの湯を順番に注湯すべく前記給湯
装置を制御することにより、注湯準備が完了した
鋳造機の順番に注湯させ、各鋳造機のサイクルに
応じて注湯順序を任意に決定できるようにする。
この際、第1の起動信号の出力時期を、各鋳造機
において金型内に砂型がセツトされ、後は金型を
閉じて傾斜させる動作を残すのみの状態など、注
湯準備が所定の段階まで完了した時点とすること
により、注湯順序を早めに決定して効率を高める
とともに、給湯装置が溶解炉から指定された鋳造
機へ移動する所定位置において前記第2の起動信
号発生手段からの第2の起動信号の有無を判別
し、その第2の起動信号があるときのみ指定され
た鋳造機への注湯動作を続行させることにより、
閉鎖および傾斜を含めた金型が注湯可能な状態に
設定されているなど、注湯準備が全て完了してい
ることを条件として注湯動作を確実に行うように
したものである。 Therefore, in the present invention, a conveyance path is provided between the melting furnace and the plurality of casting machines, and a hot water supply device that pours hot water supplied from the melting furnace to the plurality of casting machines is moved to this conveyance path. a first start signal generating means which is freely provided and further outputs a first start signal on condition that preparation for pouring has been completed to a predetermined stage in each of the casting machines; A second activation signal generation means that outputs a second activation signal on the condition that all the activation signals are completed, and a control means are provided, and the control means is configured to output a second activation signal from the first activation signal generation means. a storage unit for sequentially storing the first start signals stored in the storage unit, and controlling the water supply device to sequentially pour hot water from the melting furnace into the casting machine specified according to the storage order of the first start signal stored in the storage unit; , determining the presence or absence of a second start signal from the second start signal generating means at a predetermined position where the water heater moves from the melting furnace to the designated casting machine, and only when the second start signal is present. The above object is attempted to be achieved by having a configuration that includes means for continuing the pouring operation to a designated casting machine. That is, by controlling the water heater to sequentially pour hot water from the melting furnace into the casting machine designated according to the storage order of the first start signal stored in the storage section, preparation for pouring is performed. To pour molten metal in the order of completed casting machines, and to arbitrarily determine the pouring order according to the cycle of each casting machine.
At this time, the output timing of the first start signal is set at a predetermined stage when the preparation for pouring is in progress, such as when the sand mold is set in the mold in each casting machine, and all that remains is the operation of closing and tilting the mold. By determining the pouring order at an early stage and increasing efficiency, by setting the timing at which the melting process is completed, the pouring order is determined early, and the efficiency is increased. By determining the presence or absence of the second start signal and continuing the pouring operation to the specified casting machine only when the second start signal is present,
The pouring operation is performed reliably on the condition that all preparations for pouring have been completed, including that the mold, including the closed and tilted molds, is set in a pourable state.
以下、本発明の一実施例を図面について説明す
る。 An embodiment of the present invention will be described below with reference to the drawings.
第1図は本実施例の全体のシステムを示してい
る。同システムは、1台の電気溶解炉1と複複台
の重力鋳造機21〜2oとの間に、基台3が平行に
配設されている。前記溶解炉1には、その上方よ
り炉内の湯温を検出し、その湯温度データを制御
手段としてのコントローラ8へ与える湯温度検出
器9が設けられている。湯温度検出器9として
は、例えば光温度検出器が用いられている。ま
た、前記各鋳造機21〜2oは、金型の内部に砂型
がセツトされた状態で、注湯前および注湯後に所
定の傾斜角度に設定されるようになつている。一
方、各鋳造機21〜2oの近傍には操作部41〜4o
がそれぞれ設けられている。各操作部41〜4oに
は、注湯準備が所定の段階まで完了したこと、こ
こでは金型内に砂型がセツトされたことを条件と
して操作される第1の起動信号発生手段としての
第1の起動釦K11〜K1o、注湯準備が全て完了し
て金型が注湯可能な状態に設定されたこと、つま
り金型の内部に砂型がセツトされた状態で閉じら
れた後所定の角度に傾斜されたことを条件として
操作される第2の起動信号発生手段としての第2
の起動釦K21〜K2oおよび解除釦C1〜Coがそれぞ
れ設けられている。そして、前記第1の起動釦
K11〜K1oの操作に基づく第1の起動信号、前記
第2の起動釦K21〜K2oの操作に基づく第2の起
動信号および前記解除釦C1〜Coの操作に基づく
解除信号は、それぞれ前記コントローラ8へ与え
られている。更に、前記基台3の上面には、搬送
路としての案内レール5を介して給湯装置6が移
動自在に設けられているとともに、前記溶解炉1
と対向するホームポジシヨンP0の位置に前記給
湯装置6がきたことを検出しホームポジシヨン信
号を前記コントローラ8へ与えるホームポジシヨ
ン検出器7が設けられている。また、このホーム
ポジシヨンP0の位置には、前記給湯装置6が待
機状態において、その給湯装置6に設けられるラ
ドル29の内外表面温度を検出しその温度データ
を前記コントローラ8へ与えるラドル温度検出器
10が設けられている。前記コントローラ8は、
前記各操作部41〜4oにおける第1の起動釦K11
〜K1oの操作によつて与えられる第1の起動信号
を順次記憶するとともに、その記憶順位に従つて
指定される鋳造機21〜2oへ、前記溶解炉1で給
湯した湯を順番に注湯すべく前記給湯装置6の作
動を予め定められた手順に基づき制御するように
なつている。 FIG. 1 shows the entire system of this embodiment. In this system, a base 3 is arranged in parallel between one electric melting furnace 1 and multiple gravity casting machines 2 1 to 2 o . The melting furnace 1 is provided with a hot water temperature detector 9 that detects the hot water temperature in the furnace from above and provides the hot water temperature data to a controller 8 serving as a control means. As the hot water temperature detector 9, for example, an optical temperature detector is used. Each of the casting machines 2 1 to 2 o is set at a predetermined inclination angle before and after pouring the metal, with a sand mold set inside the mold. On the other hand, in the vicinity of each casting machine 2 1 to 2 o , there are operating units 4 1 to 4 o.
are provided for each. Each of the operation parts 41 to 4o has a first activation signal generating means that is operated on the condition that the pouring preparation has been completed to a predetermined stage, in this case that the sand mold has been set in the mold. The first start button K 11 to K 1o indicates that all pouring preparations have been completed and the mold is set to be ready for pouring, that is, after the mold is closed with the sand mold set inside it. A second activation signal generating means that is operated on the condition that it is tilted at a predetermined angle.
Activation buttons K 21 to K 2o and release buttons C 1 to C o are provided, respectively. and the first start button
A first activation signal based on the operation of K 11 to K 1o , a second activation signal based on the operation of the second activation buttons K 21 to K 2o , and a release signal based on the operation of the release buttons C 1 to C o . are respectively given to the controller 8. Further, a hot water supply device 6 is movably provided on the upper surface of the base 3 via a guide rail 5 serving as a conveyance path, and a hot water supply device 6 is movably provided on the upper surface of the base 3.
A home position detector 7 is provided for detecting that the water heater 6 has come to a home position P 0 opposite to the home position P 0 and providing a home position signal to the controller 8 . Further, at this home position P0 , when the water heater 6 is in a standby state, a ladle temperature sensor detects the temperature of the inner and outer surfaces of a ladle 29 provided in the water heater 6 and provides the temperature data to the controller 8. A container 10 is provided. The controller 8 includes:
The first activation button K 11 in each of the operation units 4 1 to 4 o
The first starting signals given by the operation of the melting furnace 1 are sequentially stored, and the hot water supplied in the melting furnace 1 is sequentially stored in the casting machines 2 1 to 2 o designated according to the order of storage. The operation of the hot water supply device 6 for pouring hot water is controlled based on a predetermined procedure.
第2図は前記給湯装置6の具体的な構造を示し
ている。同給湯装置6は、前記基台3の両側の案
内レール5に対してキヤリア11が摺動自在に装
着されている。キヤリア11には、その下部に前
記一方側の案内レール5に固着されたラツク12
に噛合するピニオン13と、そのピニオン13を
回転させることによりキヤリア11を案内レール
5に沿つて移動させる走行用モータ14とがそれ
ぞれ設けられているとともに、上部に支台15を
介して筐体16が取付けられている。筐体16に
は、その上部にラドル傾斜用モータ17によつて
回転する回転軸18が、中間部にリンク作動用モ
ータ19によつて回転する回転軸20がそれぞれ
回転自在に支持され、その両回転軸18,20間
にリンク機構21が設けられている。リンク機構
21は、一端が前記回転軸18にそれぞれ回転自
在に支持された第1および第2のアーム22,2
3と、一端が前記第1のアーム22の他端に回動
自在に連結された第3のアーム24と、一端が前
記第2のアーム23の他端に回動自在に連結され
かつ他端が前記第3のアーム24の一端寄りに回
動自在に連結された第4のアーム25と、一端が
前記回転軸20に固着されかつ他端が前記第4の
アーム25の一端寄りに回動自在に連結された第
5のアーム26とから構成され、前記リンク作動
用モータ19の駆動によつて第5のアーム26が
揺動すると、第3のアーム24の他端が図中鎖線
で示す軌跡を通つて変位するようになつている。
また、前記第3のアーム24には、その一側に例
えば一対の電極を並設した湯面検出センサ27が
設けられているとともに、一端に前記回転軸18
に図示しない連動機構を介して連結されその回転
軸18に同期して回転する支軸28を介してラド
ル29が取付けられている。ここで、湯面検出セ
ンサ27によつて溶解炉1の湯面が検出される
と、リンク作動用モータ19の駆動が停止された
後、ラドル傾斜用モータ17が駆動され、ラドル
29が傾斜されるようになつている。 FIG. 2 shows a specific structure of the water heater 6. As shown in FIG. In the water heater 6, carriers 11 are slidably mounted on guide rails 5 on both sides of the base 3. The carrier 11 has a rack 12 fixed to the guide rail 5 on one side at its lower part.
A pinion 13 that meshes with the pinion 13 and a travel motor 14 that moves the carrier 11 along the guide rail 5 by rotating the pinion 13 are provided, and the housing 16 is connected to the housing 16 via a support 15 on the upper part. is installed. The housing 16 rotatably supports a rotating shaft 18 rotated by a ladle tilting motor 17 at its upper portion, and a rotating shaft 20 rotated by a link actuating motor 19 at its middle portion. A link mechanism 21 is provided between the rotating shafts 18 and 20. The link mechanism 21 includes first and second arms 22, 2 each having one end rotatably supported by the rotating shaft 18.
3, a third arm 24 having one end rotatably connected to the other end of the first arm 22, and a third arm 24 having one end rotatably connected to the other end of the second arm 23 and the other end. is rotatably connected to one end of the third arm 24, and one end is fixed to the rotating shaft 20 and the other end is rotatable to one end of the fourth arm 25. When the fifth arm 26 is swung by the drive of the link operating motor 19, the other end of the third arm 24 is rotated as shown by the chain line in the figure. It is designed to be displaced through a trajectory.
Further, the third arm 24 is provided with a hot water level detection sensor 27 having, for example, a pair of electrodes arranged in parallel on one side thereof, and the rotating shaft 18 at one end thereof.
A ladle 29 is attached via a support shaft 28 which is connected to the rotary shaft 28 via an interlocking mechanism (not shown) and rotates in synchronization with the rotating shaft 18 . Here, when the melt level of the melting furnace 1 is detected by the melt level detection sensor 27, the drive of the link operation motor 19 is stopped, and then the ladle tilting motor 17 is driven, and the ladle 29 is tilted. It is becoming more and more common.
一方、前記回転軸18には回転レバー30が一
体に固着されているとともに、前記筐体16にそ
の回転レバー30に当接し前記ラドル傾斜用モー
タ17の駆動を停止させる湯量制御装置31が設
けられている。湯量制御装置31は、前記回動レ
バー30に当接されると前記ラドル傾斜用モータ
17を停止させるスイツチ32と、このスイツチ
32を前記回転レバー30に対して進退させその
回転レバー30の回動角度つまりラドル29の傾
斜角度を制御する湯量制御用モータ33とから構
成されている。ここで、ラドル29が湯量制御装
置31によつて設定された角度に傾斜すると、そ
の傾斜角度に応じた量の湯がラドル29内へ注が
れるようになつている。この後、ラドル29は、
その姿勢のままリンク機構21の作動によつて溶
解炉1の湯面より上昇された後、湯切りされ水平
状態に姿勢制御されるとともに、各鋳造機21〜
2oの位置において、支軸28を中心として上方
へ90度反転されるようになつている。 On the other hand, a rotary lever 30 is integrally fixed to the rotary shaft 18, and a hot water flow control device 31 is provided in the housing 16 to abut the rotary lever 30 and stop driving the ladle tilting motor 17. ing. The hot water flow control device 31 includes a switch 32 that stops the ladle tilting motor 17 when it comes into contact with the rotary lever 30, and a switch 32 that moves the switch 32 forward and backward relative to the rotary lever 30 to rotate the rotary lever 30. It is composed of a hot water amount control motor 33 that controls the angle, that is, the angle of inclination of the ladle 29. Here, when the ladle 29 is tilted at an angle set by the hot water amount control device 31, hot water is poured into the ladle 29 in an amount corresponding to the tilt angle. After this, Ladol 29,
After being raised from the melting surface of the melting furnace 1 in that position by the operation of the link mechanism 21, the hot water is drained and the position is controlled to a horizontal state, and each casting machine 2 1 -
At the 2o position, it is turned upward by 90 degrees about the support shaft 28.
第3図は前記コントローラ8の具体的回路構成
を示している。同図において、CPU(Central
Processing Unit)41には、アドレスバスやデ
ータバス42を介してI/Oニツト43,44、
ROM(Read Only Memory)45およびRAM
(Random Access Memoly)46がそれぞれ接
続されている。前記I/Oユニツト43には、前
記各操作部41〜4oからの各種信号、前記ホーム
ポジシヨン検出器7からのホームポジシヨン信
号、前記湯温度検出器9からの湯温度データQ、
前記ラドル温度検出器10からのラドル内外表面
温度データθ1,θ2および前記湯面検出センサ27
からの湯面検出信号がそれぞれ入力されていると
ともに、キーボード47が接続されている。キー
ボード47からは、各鋳造機21〜2oから溶解炉
1までの距離データL1〜Loおよび各鋳造機21〜
2oにおいて必要とされる湯量データG1〜Goがイ
ンプツトされる。また、前記I/Oユニツト44
には、前記走行用モータ14、リンク作動用モー
タ19、ラドル傾斜用モータ17および湯量制御
用モータ33のほかに、表示器48が接続されて
いる。表示器48は、例えば注湯動作を実行する
第1位から第3位までの鋳造機21〜2oに対応し
て、その機番が順に表示されるようになつてい
る。更に、前記ROM45には、前記起動信号等
の入力データに基づいて前記各種モータの駆動を
制御するシーケンスプログラムが予め記憶されて
いる。 FIG. 3 shows a specific circuit configuration of the controller 8. As shown in FIG. In the same figure, CPU (Central
The processing unit 41 is connected to I/O units 43, 44,
ROM (Read Only Memory) 45 and RAM
(Random Access Memories) 46 are connected to each. The I/O unit 43 receives various signals from the operating units 4 1 to 4 o , a home position signal from the home position detector 7, hot water temperature data Q from the hot water temperature detector 9,
Ladle inner and outer surface temperature data θ 1 , θ 2 from the ladle temperature detector 10 and the hot water level detection sensor 27
A keyboard 47 is also connected. From the keyboard 47, distance data L 1 -L o from each casting machine 2 1 - 2 o to the melting furnace 1 and each casting machine 2 1 -
At step 2 o , the required hot water amount data G 1 to G o are input. Further, the I/O unit 44
In addition to the traveling motor 14, the link actuating motor 19, the ladle tilting motor 17, and the hot water amount control motor 33, a display 48 is connected to the . The display 48 is configured to sequentially display machine numbers corresponding to, for example, the first to third casting machines 2 1 to 2 o that execute the pouring operation. Further, the ROM 45 stores in advance a sequence program for controlling the driving of the various motors based on input data such as the activation signal.
一方、前記RAM46には、距離レジスタ4
9、湯量レジスタ50、ラドル温度レジスタ5
1、湯温度レジスタ52、速度指令レジスタ5
3、第1および第2の起動信号レジスタ54A,
54B、解除信号レジスタ54C、第1および第
2のカウンタ55,56、タイマカウンタ57が
それぞれ設けられている。前記距離レジスタ49
には前記キーボード47から入力される距離デー
タL1〜Loが、前記湯量レジスタ50には前記キ
ーボード47から入力される湯量データG1〜Go
がそれぞれプリセツトされる。前記ラドル温度レ
ジスタ51および湯温度レジスタ52には、前記
給湯装置6がホームポジシヨンP0の位置にくる
毎に、前記ラドル温度検出器10で検出されたラ
ドル内外表面温度データθ1,θ2、湯温度検出器9
で検出された湯温度データQが新たに書込まれ
る。また、前記速度指令レジスタ53には、キヤ
リア11を指定された鋳造機21〜2oへ移動させ
る際、そのキヤリア11の移動速度を規定する複
数種の速度指令データVA〜VDが予め記憶されて
いる。また、前記第1の起動信号レジスタ54A
には各操作部41〜4oの第1の起動釦K11〜K1oの
操作によつて与えられる第1の起動信号が、前記
第2の起動信号レジスタ54Bには各操作部41
〜4oの第2の起動釦K21〜K2oの操作によつて与
えられる第2の起動信号が、前記解除信号レジス
タ54Cには各操作部41〜4oの解除釦C1〜Coの
操作によつて与えられる解除信号がそれぞれコー
ド化されて記憶される。更に、前記第1のカウン
タ55にはラドル29が溶解炉1で湯を汲み上げ
る通常の動作時間Tに対応するカウント数が予め
セツトされているとともに、前記第2のカウンタ
56には前記動作時間Tのカウント数と後述する
演算によつて求められるラドルの付加浸漬時間
ΔTに相当するカウント数の和がセツトされる。 On the other hand, the RAM 46 includes a distance register 4.
9, hot water flow register 50, ladle temperature register 5
1. Hot water temperature register 52, speed command register 5
3. First and second activation signal registers 54A,
54B, a release signal register 54C, first and second counters 55 and 56, and a timer counter 57, respectively. The distance register 49
The distance data L 1 to L o inputted from the keyboard 47 are entered into the hot water quantity register 50 , and the hot water quantity data G 1 to G o inputted from the keyboard 47 are entered into the hot water quantity register 50 .
are preset respectively. The ladle temperature register 51 and hot water temperature register 52 contain ladle inner and outer surface temperature data θ 1 , θ 2 detected by the ladle temperature detector 10 every time the water heater 6 comes to the home position P 0 . , hot water temperature detector 9
The hot water temperature data Q detected in is newly written. In addition, the speed command register 53 stores in advance a plurality of types of speed command data V A to V D that define the moving speed of the carrier 11 when the carrier 11 is moved to the specified casting machine 2 1 to 2 o . remembered. Further, the first activation signal register 54A
The first activation signal given by the operation of the first activation button K 11 to K 1o of each operation unit 4 1 to 4 o is sent to the second activation signal register 54B .
The second activation signal given by the operation of the second activation button K21 ~ K2o of ~ 4o is stored in the release signal register 54C of the release button C1 ~C of each operating section 41 ~ 4o . Each release signal given by the operation of o is encoded and stored. Further, the first counter 55 is preset with a count number corresponding to the normal operating time T during which the ladle 29 pumps up hot water in the melting furnace 1, and the second counter 56 is preset with a count number corresponding to the normal operating time T during which the ladle 29 pumps hot water in the melting furnace 1. The sum of the count number and the count number corresponding to the additional immersion time ΔT of the ladle obtained by the calculation described later is set.
次に、本実施例の作用を説明する。 Next, the operation of this embodiment will be explained.
まず、キーボード47において、各鋳造機21
〜2oから溶解炉1までの距離データL1〜Loを順
番に入力した後、各鋳造機21〜2oにおいて必要
とされる湯量データG1〜Goを順番に入力する。
すると、距離データL1〜Loは距離レジスタ49
に、湯量データG1〜Goは湯量レジスタ50にそ
れぞれストアされる。一方、給湯装置6がホーム
ポジシヨンP0に位置した待機状態において、湯
温度検出器9で検出された溶解炉1の湯温データ
Qは湯温度レジスタ52に、ラドル温度検出器1
0で検出された空のラドル29の内外表面温度デ
ータθ1,θ2はラドル温度レジスタ51にそれぞれ
書込まれる。ここで、各鋳造機21〜2oにおいて
注湯準備作業を行う。この注湯準備作業は、まず
金型内に砂型をセツトした後、第1の起動釦K11
〜K1oを押す。この後、金型を閉じ、最も湯を注
ぎやすい角度に傾斜させる。ここで、作業者は、
これらの作業が正常に行なわれたか否かを確認
し、正常である場合には第2の起動釦K21〜K2o
を押す。一方、第1の起動釦K11〜K1oを押した
後、金型閉じ動作や傾斜動作中、或いはその他の
点で事故が生じた場合には、解除釦C1〜Coを押
す。 First, on the keyboard 47, each casting machine 2 1
After inputting the distance data L 1 to Lo from ~2 o to the melting furnace 1 in order, the amount data G 1 to Go of the melt required for each casting machine 2 1 to 2 o is input in order.
Then, the distance data L 1 to L o are stored in the distance register 49.
Then, the hot water amount data G 1 to G o are respectively stored in the hot water amount register 50 . On the other hand, in the standby state where the hot water supply device 6 is located at the home position P 0 , the hot water temperature data Q of the melting furnace 1 detected by the hot water temperature detector 9 is stored in the hot water temperature register 52 and the ladle temperature detector 1
The inner and outer surface temperature data θ 1 and θ 2 of the empty ladle 29 detected at 0 are respectively written into the ladle temperature register 51. Here, pouring preparation work is performed in each of the casting machines 2 1 to 2 o . This pouring preparation work begins by setting the sand mold inside the mold, and then pressing the first start button K11.
~Press K 1o . After this, the mold is closed and tilted to the angle that makes it easiest to pour hot water into it. Here, the worker
Check whether these operations were performed normally, and if so, press the second start button K 21 ~ K 2o
Press. On the other hand, after pressing the first start buttons K 11 to K 1o , if an accident occurs during the mold closing operation, tilting operation, or any other point, the release buttons C 1 to C o are pressed.
一方、CPU41は、一定時間毎に第1の起動
釦K11〜K1oが押されたか否か、第2の起動釦K21
〜K2oが押されたか否か、解除釦C1〜Coが押され
たか否かを順に判断する処理を繰返し、第1の起
動釦K1〜Koが押されていた場合にはその第1の
起動信号を第1の起動信号レジスタ54Aに、第
2の起動釦K2〜Koが押されていた場合には第2
の起動信号を第2の起動信号レジスタ54Bに、
解除釦C1〜Coが押されていた場合にはその解除
信号を解除信号レジスタ54Cにそれぞれストア
する。 On the other hand, the CPU 41 determines whether or not the first startup buttons K 11 to K 1o have been pressed at regular intervals, and whether or not the second startup button K 21 is pressed.
The process of sequentially determining whether or not ~ K2o has been pressed and whether the release buttons C1 ~ Co have been pressed is repeated, and if the first activation button K1 ~ Ko has been pressed, the process is repeated. The first activation signal is input to the first activation signal register 54A, and if the second activation buttons K 2 to K o have been pressed, the second activation signal is input to the first activation signal register 54A.
the activation signal to the second activation signal register 54B,
If the release buttons C 1 to C o have been pressed, their release signals are stored in the release signal register 54C, respectively.
いま、例えば1番目に第1の起動釦K11が、2
番目に第1の起動釦K13が、3番目に第1の起動
釦K12が押され、それらの起動信号が第1の起動
信号レジスタ54Aに順番に記憶されたとする
と、CPU41は、まず第1の起動信号レジスタ
54Aに記憶された順位に対応する鋳造機21〜
2oの機番を表示器48に表示する。この後、第
1の起動信号レジスタ54Aに記憶された第1位
のデータを読み出し、それがどの鋳造機21〜2o
からのデータであるかを判別し、その判別結果に
基づきまずラドル29を溶解炉1の湯中へ浸して
おく浸漬時間を第4図のフローチヤートに従つて
演算した後、走行用モータ14、リンク作動用モ
ータ19、ラドル傾斜用モータ17および湯量制
御用モータ33を予め定められた順序に従つて制
御し、第1位の鋳造機21〜2oへ注湯させる。 Now, for example, the first activation button K 11 is
Assuming that the first activation button K13 is pressed first and the first activation button K12 is pressed third, and those activation signals are stored in the first activation signal register 54A in order, the CPU 41 first presses the first activation button K13. Casting machines 2 1 to 1 corresponding to the order stored in the starting signal register 54A of No. 1
2 Display the machine number o on the display 48. After that, the first data stored in the first starting signal register 54A is read out, and it is determined which casting machine 2 1 to 2 o
Based on the determination result, the immersion time for which the ladle 29 is immersed in the hot water of the melting furnace 1 is calculated according to the flowchart of FIG. The link actuating motor 19, the ladle tilting motor 17, and the molten metal volume control motor 33 are controlled in a predetermined order to pour molten metal into the first casting machines 21 to 2o .
ここでは、第1位のデータが鋳造機21からの
ものであるため、CPU41は、まず鋳造機21に
対応する距離データL1および湯量データG1を距
離レジスタ49、湯量レジスタ50からそれぞれ
読み出し、更にラドル内外表面温度データθ1,θ2
および湯温度データQをラドル温度レジスタ5
1、湯温度レジスタ52から読み出した後、これ
らのデータL1,G1,θ1,θ2,Qに基づいてキヤリ
ア11の移動速度Vxを速度指令レジスタ53か
ら選択する。続いて、その速度データVxおよび
前記データL1,G1,θ1,θ2,Qに基づいて、給湯
装置6が鋳造機21へ到着しその鋳造機21へラド
ル29内の湯を注湯するまでにラドル29内の湯
が温度降下する温度降下量ΔQを算出した後、そ
のΔQに対応するラドル29の付加浸漬時間ΔT
を求める。ちなみに、ラドルの付加浸漬時間ΔT
の演出に当つては、予めΔQとΔTとを対応させ
たテーブルをもつようにしてもよい。ここで、第
1のカウンタ55の値つまりラドル29が溶解炉
1で湯を汲み上げる通常の動作時間Tのカウント
数に、ΔTに相当するカウンタ数を加算し、その
合計値を第2のカウンタ56にセツトした後、予
め定められた手順に従つて各種モータに駆動指令
を与える。 Here, since the first data is from the casting machine 2 1 , the CPU 41 first obtains the distance data L 1 and the amount data G 1 corresponding to the casting machine 2 1 from the distance register 49 and the amount register 50, respectively. Read out and further ladle inner and outer surface temperature data θ 1 , θ 2
and hot water temperature data Q in ladle temperature register 5.
1. After reading out the hot water temperature register 52, the moving speed Vx of the carrier 11 is selected from the speed command register 53 based on these data L 1 , G 1 , θ 1 , θ 2 , and Q. Subsequently, based on the speed data Vx and the data L 1 , G 1 , θ 1 , θ 2 , Q, the water heater 6 arrives at the casting machine 2 1 and supplies the hot water in the ladle 29 to the casting machine 2 1 . After calculating the temperature drop ΔQ of the temperature of the hot water in the ladle 29 before pouring, calculate the additional immersion time ΔT of the ladle 29 corresponding to that ΔQ.
seek. By the way, the additional soaking time ΔT of the ladle
For this purpose, a table may be provided in which ΔQ and ΔT are made to correspond in advance. Here, the number of counters corresponding to ΔT is added to the value of the first counter 55, that is, the count number of the normal operating time T during which the ladle 29 pumps up hot water in the melting furnace 1, and the total value is added to the count number of the normal operation time T during which the ladle 29 pumps up hot water in the melting furnace 1, and the total value is calculated as the second counter 56. After setting, drive commands are given to various motors according to predetermined procedures.
まず、給湯装置6がホームポジシヨンP0つま
り溶解炉1に対向する位置に待期している状態に
おいて、リンク作動用モータ19に駆動指令を与
え、リンク機構21の作動を介してラドル29を
溶解炉1へ向つて下降させる。ラドル29が溶解
炉1へ向つて下降する途中で湯面検出センサ27
が湯面に達すると、その湯面検出センサ27から
の検出信号がCPU41へ与えられる。すると、
CPU41は、リンク作動用モータ19を停止つ
まりラドル29の下降を停止させた後、湯量レジ
スタ50から鋳造機21の湯量データG1を読み出
し、その湯量データG1に基づき湯量制御用モー
タ33を駆動させるとともに、ラドル傾斜用モー
タ17を駆動させ、ラドル29を所定の角度に傾
斜させる。一方、湯面検出センサ27からの検出
信号が与えられた後、CPU41は、一定時間毎
にタイマカウンタ57をカウントアツプし、その
タイマカウンタ57の値が第2のカウンタ56の
値に達したか否かを判断する。ここで、タイマカ
ウンタ57の値が第2のカウンタ56の値に達す
ると、つまりラドル29が湯につかつてからT+
ΔT時間経過すると、CPU41は、リンク作動用
モータ19に駆動指令を与え、ラドル29を第2
図の中央位置つまりキヤリア11の上方位置へ復
帰させる。従つて、溶解炉1から注湯する鋳造機
21までの距離L1、移送する湯量G1、ラドル内外
表面温度θ1,θ2、湯温Q等に基づいてラドル29
の浸漬時間が制御されるため、ラドル29が鋳造
機21へ到達するまでの温度降下量を少なくでき
る。なお、ラドル29は、溶解炉1から上昇する
際傾斜された姿勢のまま湯面より上昇された後、
水平状態に姿勢制御される。これにより、ラドル
29の傾斜角度に応じた湯量つまり鋳造機21に
必要な湯量がラドル29に給湯される。 First, while the hot water supply device 6 is waiting at the home position P0 , that is, the position facing the melting furnace 1, a drive command is given to the link actuation motor 19, and the ladle 29 is melted through the operation of the link mechanism 21. It is lowered towards the furnace 1. While the ladle 29 is descending toward the melting furnace 1, the hot water level detection sensor 27
When the water reaches the hot water level, a detection signal from the hot water level detection sensor 27 is given to the CPU 41. Then,
After stopping the link operation motor 19, that is, stopping the lowering of the ladle 29, the CPU 41 reads out the hot water amount data G1 of the casting machine 21 from the hot water amount register 50, and controls the hot water amount control motor 33 based on the hot water amount data G1 . At the same time, the ladle tilting motor 17 is driven to tilt the ladle 29 at a predetermined angle. On the other hand, after receiving the detection signal from the hot water level detection sensor 27, the CPU 41 counts up the timer counter 57 at regular intervals, and determines whether the value of the timer counter 57 reaches the value of the second counter 56 or not. Decide whether or not. Here, when the value of the timer counter 57 reaches the value of the second counter 56, that is, after the ladle 29 is immersed in hot water, T+
After the ΔT time has elapsed, the CPU 41 gives a drive command to the link actuation motor 19 to move the ladle 29 to the second position.
The carrier 11 is returned to the center position in the figure, that is, the upper position of the carrier 11. Therefore, the ladle 29 is determined based on the distance L 1 from the melting furnace 1 to the pouring casting machine 2 1 , the amount of molten metal transferred G 1 , the ladle inner and outer surface temperatures θ 1 , θ 2 , the hot water temperature Q, etc.
Since the immersion time is controlled, the amount of temperature drop until the ladle 29 reaches the casting machine 2 1 can be reduced. Incidentally, when the ladle 29 is raised from the melting furnace 1, after being raised from the melt level in an inclined position,
Attitude is controlled to horizontal state. As a result, the amount of hot water corresponding to the inclination angle of the ladle 29, that is, the amount of hot water required for the casting machine 21 is supplied to the ladle 29.
続いて、走行用モータ14に駆動指令を与え、
キヤリア11を前記速度指令レジスタ53から選
択した速度データVxに基づく速度でホームポジ
シヨンP0の位置から鋳造機21の位置P1へ移動さ
せて停止させる。キヤリア11がP1の位置に停
止した状態において、CPU41は、第5図のフ
ローチヤートに示す如くまず解除信号レジスタ5
4Cの中に鋳造機21からの解除信号があるか否
かを判断した後、第2の起動信号レジスタ54B
の中に鋳造機21からの第2の起動信号があるか
否かを判断する。ここで、解除信号がなく、かつ
第2の起動信号がある場合、つまり砂型のセツト
完了後金型が注湯可能な状態に設定されている場
合には、通常の処理が行なわれる。即ち、リンク
作動用モータ19に駆動指令を与え、リンク機構
21の作動を介してラドル29を鋳造機21へ向
つて前進させる。そして、ラドル29が鋳造機2
1へ達したとき、ラドル傾斜用モータ17に駆動
指令を与え、ラドル29を第2図中反時計方向へ
90度反転させ、そのラドル29内の湯を鋳造機2
1へ注湯させた後、ラドル29を水平状態へ復帰
させる。この後、ラドル29をキヤリア11の上
方位置へ復帰させた後、走行用モータ14に駆動
指令を与え、キヤリア11をホームポジシヨン
P0へ復帰させて鋳造機21への注湯を完了させる。 Next, a drive command is given to the traveling motor 14,
The carrier 11 is moved from the home position P 0 to the position P 1 of the casting machine 2 1 at a speed based on the speed data Vx selected from the speed command register 53 and stopped. When the carrier 11 is stopped at position P1 , the CPU 41 first registers the release signal register 5 as shown in the flowchart of FIG.
After determining whether there is a release signal from the casting machine 21 in 4C, the second starting signal register 54B
It is determined whether or not there is a second start signal from the casting machine 21 . Here, if there is no release signal and if there is a second activation signal, that is, if the mold is set to be ready for pouring after the sand mold has been set, normal processing is performed. That is, a drive command is given to the link actuating motor 19 to advance the ladle 29 toward the casting machine 2 1 through the actuation of the link mechanism 21 . Then, the ladle 29 is the casting machine 2.
1 , a drive command is given to the ladle tilting motor 17 to move the ladle 29 counterclockwise in FIG.
Turn it over 90 degrees and pour the hot water in the ladle 29 into the casting machine 2.
1 , the ladle 29 is returned to the horizontal state. After that, after returning the ladle 29 to the position above the carrier 11, a drive command is given to the travel motor 14 to move the carrier 11 to the home position.
Return to P 0 to complete pouring into the casting machine 2 1 .
また、解除信号および第2の起動信号のいずれ
もない場合には、つまり砂型のセツト完了後にお
いて、金型の閉動作や傾斜動作に支障があり、い
まだ注湯可能な状態に設定されていない場合に
は、タイマカウンタ57をカウントアツプし、そ
のタイマカウンタ57の値が予め設定された設定
値に達したか否かを判断した後、解除信号および
第2の起動信号の有無を判断するループを繰返
す。ここで、タイマカウンタ57の値が設定値に
達するまえに、第2の起動信号が与えられると、
つまりキヤリア11がP1の位置に到達した後一
定時間経過するまえに、金型の事故が修復され注
湯可能な状態に設定されると、通常の処理が行な
われる。 In addition, if there is no release signal or second start signal, that is, after the sand mold has been set, there is a problem with the closing or tilting operation of the mold, and the mold is not yet set to be ready for pouring. In this case, the timer counter 57 is counted up, and after determining whether or not the value of the timer counter 57 has reached a preset value, a loop is performed in which the presence or absence of the release signal and the second activation signal is determined. Repeat. Here, if the second activation signal is given before the value of the timer counter 57 reaches the set value,
That is, after the carrier 11 reaches the position P1 and before a certain period of time has elapsed, the mold accident is repaired and the mold is set in a ready state for pouring, and then normal processing is performed.
ところが解除信号および第2の起動信号がない
まま一定時間経過すると、復帰処理が行なわれ
る。この場合には、キヤリア11がP1の位置に
停止した状態において、走行用モータ14に駆動
指令を与え、キヤリア11をホームポジシヨン
P0の位置へ復帰させた後、リンク作動用モータ
19、ラドル傾斜用モータ17、湯量制御用モー
タ33を駆動し、ラドル29内の湯を溶解炉1へ
戻した後、待期状態に復帰させる。従つて、注湯
を行う鋳造機21〜2oが注湯可能な状態に設定さ
れていない場合には、ラドル29内に給湯された
湯が再び溶解炉1へ戻されることになる。 However, if a certain period of time elapses without the release signal and the second activation signal, the return process is performed. In this case, with the carrier 11 stopped at position P1 , a drive command is given to the travel motor 14 to move the carrier 11 to the home position.
After returning to the P 0 position, the link actuation motor 19, ladle tilt motor 17, and hot water amount control motor 33 are driven to return the hot water in the ladle 29 to the melting furnace 1, and then the standby state is restored. let Therefore, if the casting machines 2 1 to 2 o that perform pouring are not set to a pourable state, the hot water fed into the ladle 29 will be returned to the melting furnace 1 again.
更に、砂型のセツトが完了した後、金型の閉動
作や傾斜動作時の事故によつて解除釦C1が直ち
に押されたような場合には、キヤリア11がP1
の位置に到達した時点の判断において解除信号が
認識されるため、直ちに復帰処理が行なわれる。
また、タイマカウンタ57がカウントアツプする
まえに解除釦C1が押された場合には、その解除
信号が認識された時点で復帰処理が行なわれる。
従つて、第1の起動釦K11〜K1oを押した後、注
湯動作を取消したい場合には、解除釦C1〜Coを
押せばよい。 Furthermore, after the sand mold has been set, if the release button C1 is pressed immediately due to an accident during the closing or tilting operation of the mold, the carrier 11 will release P1.
Since the release signal is recognized at the time of reaching the position, the return process is immediately performed.
Further, if the release button C1 is pressed before the timer counter 57 counts up, the return process is performed when the release signal is recognized.
Therefore, if you want to cancel the pouring operation after pressing the first activation buttons K 11 to K 1o , you can press the release buttons C 1 to C o .
さて、上述した処理に基づき、キヤリア11が
ホームポジシヨンP0へ復帰し、ホームポジシヨ
ン検出器7からホームポジシヨン信号がCPU4
1に与えられると、CPU41は、処理が終了し
た鋳造機21からの解除信号および第2の起動信
号をクリアした後、第1の起動信号レジスタ54
Aのデータを順にシフトし、その最先のデータつ
まり2番目に入力されたデータを読み出し、それ
がどの鋳造機21〜2oからの注湯指令データであ
るかを判別する。この場合には、鋳造機23から
のデータであるため、CPU41は、まず鋳造機
23に基づくラドル29の浸漬時間を演算した後、
走行用モータ14、リンク作動用モータ19、ラ
ドル傾斜用モータ17および湯量制御用モータ3
3を制御するとともに、鋳造機23からの解除信
号および第2の起動信号に基づき溶解炉1からの
湯を鋳造機23へ注湯させる。このようにして、
第1の起動信号レジスタ54Aに記憶されたデー
タに従つて、各鋳造機21〜2oへ選択的に注湯が
行なわれる。 Now, based on the above-described processing, the carrier 11 returns to the home position P 0 , and the home position signal is sent from the home position detector 7 to the CPU 4.
1, the CPU 41 clears the release signal and the second start signal from the casting machine 21 that has finished processing, and then clears the first start signal register 54.
The data of A is shifted in order, the first data, that is, the second input data is read out, and it is determined which casting machine 2 1 to 2 o the pouring command data is from. In this case, since the data is from the casting machine 2 3 , the CPU 41 first calculates the immersion time of the ladle 29 based on the casting machine 2 3 , and then calculates the immersion time of the ladle 29 based on the casting machine 2 3.
Traveling motor 14, link actuation motor 19, ladle tilting motor 17, and hot water flow control motor 3
3 and pours hot water from the melting furnace 1 into the casting machine 2 3 based on a release signal and a second start signal from the casting machine 2 3 . In this way,
Molten metal is selectively poured into each of the casting machines 2 1 to 2 o according to the data stored in the first starting signal register 54A.
一方、各鋳造機21〜2oにおいて、注湯された
湯がかたまつて製品が完成すると、作業者は、そ
の製品を取出し、再び金型内に新たな砂型をセツ
トした後第1の起動釦K11〜K1oを押す。すると、
押された第1の起動釦K11〜K1oに対応するデー
タがRAM46の第1の起動信号レジスタ54A
に順に記憶され、その第1の起動信号レジスタ5
4Aに記憶されたデータの順位に従つて、各鋳造
機21〜2oへ選択的に注湯が行なわれる。 On the other hand, in each of the casting machines 21 to 2o , when the poured molten metal hardens and the product is completed, the worker takes out the product, sets a new sand mold in the mold again, and then returns to the first mold. Press the start buttons K 11 to K 1o . Then,
The data corresponding to the pressed first activation buttons K 11 to K 1o is stored in the first activation signal register 54A of the RAM 46.
are sequentially stored in the first activation signal register 5.
Molten metal is selectively poured into each of the casting machines 2 1 to 2 o according to the order of data stored in the casting machine 4A.
従つて、本実施例では、各鋳造機21〜2oにお
いて、注湯準備が完了したものから順番に注湯が
行なわれるため、例えば各鋳造機21〜2oがそれ
ぞれ異なる製品を鋳造するような場合でも、注湯
を効率的に行うことができるとともに、各鋳造機
21〜2oにおいて必要な湯量を注湯できる。ま
た、溶解炉1から注湯される各鋳造機21〜2oま
での距離、移送する湯量、ラドル内外表面温度、
湯温に基づきキヤリア11の移動速度が選択され
た後、その移動速度も含めてラドル29の浸漬時
間が決定されるため、溶解炉1から各鋳造機21
〜2oへの移送中におけるラドル29内の湯の温
度降下を少なくすることができる。 Therefore, in this embodiment, each of the casting machines 2 1 to 2 o pours molten metal in order from the one that is ready for pouring, so that, for example, each of the casting machines 2 1 to 2 o casts a different product. Even in such a case, the pouring can be carried out efficiently, and the required amount of hot metal can be poured in each of the casting machines 2 1 to 2 o . In addition, the distance from the melting furnace 1 to each casting machine 2 1 to 2 o into which melt is poured, the amount of melt to be transferred, the temperature of the inner and outer surfaces of the ladle,
After the moving speed of the carrier 11 is selected based on the hot water temperature, the immersion time of the ladle 29 is determined including the moving speed .
The drop in temperature of the hot water in the ladle 29 during transfer to ~2 o can be reduced.
また、給湯装置6が各鋳造機21〜2oの位置に
到達したとき、解除信号および第2の起動信号の
有無を判断し、その結果解除信号がなく、第2の
起動信号がある場合のみ、注湯動作を続行するよ
うにしたので、鋳造機21〜2oが注湯可能な状態
に設定されている場合のみ注湯動作を行なわせる
ことができる。一方、解除信号がある場合例えば
金型の閉動作や傾斜動作時に事故が起り注湯動作
が取消された場合、または所定時間内に第2の起
動信号がない場合例えば金型の事故が所定時間内
に修復できないような場合には、ラドル29内の
湯が再び溶解炉1へ戻されるため、注湯可能な状
態に設定されていない鋳造機21〜2oに対して注
湯されるのを未然に防止することができる。 Also, when the hot water supply device 6 reaches the position of each casting machine 2 1 to 2 o , it is determined whether there is a release signal and a second start signal, and as a result, if there is no release signal and there is a second start signal, Since the molten metal pouring operation is continued only when the casting machines 2 1 to 2 o are set in a state where molten metal can be poured, the molten metal pouring operation can be performed only when the casting machines 2 1 to 2 o are set in a state where molten metal can be poured. On the other hand, if there is a release signal, for example, if an accident occurs during the closing or tilting operation of the mold and the pouring operation is canceled, or if there is no second start signal within a predetermined time, for example, if a mold accident occurs for a predetermined time. If the hot water in the ladle 29 cannot be repaired within the melting furnace 1, the hot water in the ladle 29 will be returned to the melting furnace 1, so that it will not be poured into the casting machines 21 to 2o that are not set to be ready for pouring. can be prevented.
更に、溶解炉1から各鋳造機21〜2oへの注湯
作業を給湯装置6が自動的に行うため、作業の安
全をはかることができ、かつ省力化が期待でき
る。 Furthermore, since the hot water supply device 6 automatically performs the pouring work from the melting furnace 1 to each of the casting machines 2 1 to 2 o , work safety can be ensured and labor savings can be expected.
なお、上記実施例では、複数台の鋳造機21〜
2oを対象としたが、本発明は少なくとも2台以
上の鋳造機を対象とするものである。また、第1
の起動信号発生手段としては、上記実施例で述べ
た第1の起動釦K11〜K1oのほか、例えば各鋳造
機に砂型がセツトされるとそれを自動的に検出し
第1の起動信号を出力するものであつてもよい。
この際、第1の起動信号を出力する段階も、砂型
がセツトされた時点に限らず、砂型がセツトされ
て金型が閉じられ、後は金型を傾斜させるだけと
いう状態等でもよく、要するに注湯準備の所定の
段階まで完了して注湯動作に移つてもよい適宜な
段階を設定すればよい。 In addition, in the above embodiment, a plurality of casting machines 2 1 to
2 o , but the present invention is directed to at least two or more casting machines. Also, the first
In addition to the first starting buttons K 11 to K 1o described in the above embodiments, the starting signal generating means for the casting machine automatically detects when a sand mold is set in each casting machine and generates the first starting signal. It may also be something that outputs .
In this case, the step of outputting the first activation signal is not limited to the time when the sand mold is set, but may also be a state in which the sand mold is set, the mold is closed, and the only thing left to do is to tilt the mold. What is necessary is to set an appropriate stage in which the preparation for pouring the molten metal may be completed up to a predetermined stage and then the pouring operation can proceed.
さらに、第2の起動信号発生手段としては、上
記実施例で述べた第2の起動釦K21〜K2oのほか、
例えば内部に砂型がセツトされた状態で金型が閉
じられた後所定角度に傾斜されたことを検出し、
自動的に第2の起動信号を出力するもの、また傾
斜しない金型では金型が閉じられたことを検出
し、自動的に第2の起動信号を出力するものでも
よく、要するに注湯準備が全て完了して金型が注
湯可能な状態に設定されていることを確認して第
2の起動信号を出力するということである。 Furthermore, as the second activation signal generating means, in addition to the second activation buttons K 21 to K 2o described in the above embodiment,
For example, detecting that the mold is tilted at a predetermined angle after being closed with a sand mold set inside;
A device that automatically outputs the second start signal, or a device that detects that the mold is closed in the case of a non-tilting mold and automatically outputs the second start signal may be used. After confirming that everything is complete and the mold is ready for pouring, the second activation signal is output.
また、制御手段としては、上記実施例で述べた
回路に限定されるものではない。 Further, the control means is not limited to the circuit described in the above embodiment.
一方、第2の起動信号の有無を判断するに当つ
ては、上記実施例で述べた各鋳造機21〜2oの位
置に限らず、溶解炉1から各鋳造機21〜2oまで
の任意の位置でもよい。また、解除信号について
は、各鋳造機21〜2oの位置に限らず、給湯装置
6が溶解炉1から各鋳造機21〜2oへ移動する間
において、一定時間おきに判断するようにしても
よい。 On the other hand, in determining the presence or absence of the second start signal, it is not limited to the positions of the casting machines 2 1 - 2 o described in the above embodiment, but also from the melting furnace 1 to the casting machines 2 1 - 2 o. It can be at any position. Furthermore, the release signal is determined not only at the position of each casting machine 2 1 - 2 o but also at regular intervals while the water heater 6 moves from the melting furnace 1 to each casting machine 2 1 - 2 o . You may also do so.
以上述べた通り、本発明によれば、複数台の鋳
造機に湯を安全かつ効率的に注湯できるため、省
力化が期待でき、同時に各鋳造機のサイクルに応
じて注湯順序を決定することができるため、例え
ば各鋳造機がそれぞれ異なる製品を鋳造するよう
な場合でも適用でき、また金型が注湯可能な状態
に設定されている場合のみ注湯動作を行なわせる
ことができる。 As described above, according to the present invention, it is possible to safely and efficiently pour hot water into multiple casting machines, thereby saving labor, and at the same time, the order of pouring hot water can be determined according to the cycle of each casting machine. Therefore, it can be applied, for example, even when each casting machine casts a different product, and the pouring operation can be performed only when the mold is set to be ready for pouring.
図は本発明の一実施例を示すもので、第1図は
全体のシステムを示す説明図、第2図は給湯装置
を示す側面図、第3図はコントローラを示すブロ
ツク図、第4図はラドルの浸漬時間を求めるフロ
ーチヤート、第5図は注湯動作時のフローチヤー
トである。
1……溶解炉、21〜2o……鋳造機、5……搬
送路としての案内レール、6……給湯装置、8…
…制御手段としてのコントローラ、41……
CPU、54A……記憶部としての第1の起動信
号レジスタ、K11〜K1o……第1の起動信号発生
手段としての第1の起動釦、K21〜K2o……第2
の起動信号発生手段としての第2の起動釦。
The figures show one embodiment of the present invention, and Fig. 1 is an explanatory diagram showing the entire system, Fig. 2 is a side view showing the water heater, Fig. 3 is a block diagram showing the controller, and Fig. 4 is an explanatory diagram showing the entire system. The flowchart for determining the immersion time of the ladle, FIG. 5, is a flowchart during the pouring operation. DESCRIPTION OF SYMBOLS 1... Melting furnace, 2 1 - 2 o ... Casting machine, 5... Guide rail as a conveyance path, 6... Water heater, 8...
...Controller as control means, 41...
CPU, 54A...First activation signal register as storage unit, K11 to K1o ...First activation button as first activation signal generating means, K21 to K2o ...Second
a second activation button as activation signal generating means;
Claims (1)
の鋳造機と前記溶解炉との間に配設された搬送路
と、この搬送路に沿つて移動自在に設けられ前記
溶解炉から湯を汲み上げそれを前記複数台の鋳造
機へ注湯する給湯装置と、前記各鋳造機において
注湯準備が所定の段階まで完了したことを条件と
して第1の起動信号を出力する第1の起動信号発
生手段と、前記各鋳造機において注湯準備が全て
完了したことを条件として第2の起動信号を出力
する第2の起動信号発生手段と、これら第1およ
び第2の起動信号発生手段からの起動信号に基づ
いて前記給湯装置の作動を制御する制御手段とを
備え、この制御手段は、前記第1の起動信号発生
手段からの第1の起動信号を順次記憶する記憶部
と、この記憶部に記憶された第1の起動信号の記
憶順位に従つて指定される鋳造機へ溶解炉からの
湯を順番に注湯すべく前記給湯装置を制御すると
ともに、その給湯装置が溶解炉から指定された鋳
造機へ移動する所定位置において前記第2の起動
信号発生手段からの第2の起動信号の有無を判別
し、その第2の起動信号があるときのみ指定され
た鋳造機への注湯動作を続行させる手段とを含む
ことを特徴とする自動給湯制御装置。1. A melting furnace, a plurality of casting machines, a conveyance path disposed between these plurality of casting machines and the melting furnace, and a conveyance path provided movably along the conveyance path for discharging hot water from the melting furnace. a water supply device that pumps up the molten metal and pours it into the plurality of casting machines; and a first activation signal that outputs a first activation signal on the condition that preparation for pouring the molten metal has been completed to a predetermined stage in each of the casting machines. generating means, a second starting signal generating means for outputting a second starting signal on the condition that all pouring preparations are completed in each of the casting machines, and a second starting signal generating means for outputting a second starting signal on the condition that all pouring preparations are completed in each of the casting machines; control means for controlling the operation of the water heater based on a start signal, the control means comprising: a storage section that sequentially stores the first start signal from the first start signal generation means; The water heater is controlled to sequentially pour hot water from the melting furnace into the casting machine designated according to the storage order of the first start signal stored in the melting furnace, and the water heater is determining the presence or absence of a second start signal from the second start signal generating means at a predetermined position to move to the specified casting machine, and pouring the metal into the designated casting machine only when the second start signal is present. An automatic hot water supply control device comprising: means for continuing.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2222482A JPS58138559A (en) | 1982-02-15 | 1982-02-15 | Automatic control device for charging of molten metal |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2222482A JPS58138559A (en) | 1982-02-15 | 1982-02-15 | Automatic control device for charging of molten metal |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS58138559A JPS58138559A (en) | 1983-08-17 |
| JPH0153149B2 true JPH0153149B2 (en) | 1989-11-13 |
Family
ID=12076826
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2222482A Granted JPS58138559A (en) | 1982-02-15 | 1982-02-15 | Automatic control device for charging of molten metal |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS58138559A (en) |
-
1982
- 1982-02-15 JP JP2222482A patent/JPS58138559A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS58138559A (en) | 1983-08-17 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP5749723B2 (en) | Pouring device and pouring method | |
| JP3632878B2 (en) | Automatic pouring method | |
| JPH0153149B2 (en) | ||
| JPH08174194A (en) | Casting apparatus | |
| JPH0153151B2 (en) | ||
| JPH0153150B2 (en) | ||
| JPH0128670B2 (en) | ||
| JPH0128671B2 (en) | ||
| JPH0128669B2 (en) | ||
| JP7344172B2 (en) | pouring equipment | |
| JPH0115350B2 (en) | ||
| JPH11123532A (en) | Automatic pouring machine | |
| JP4156263B2 (en) | Pouring method and pouring system in centrifugal casting equipment | |
| JPH067919A (en) | Method and device for automatically pouring molten metal | |
| JP2024152608A (en) | MECHANISM FOR SUPPLYING MEDIA FOR CASTING MACHINE AND METHOD FOR SUPPLYING MEDIA FOR CASTING MACHINE | |
| GB1381647A (en) | Molten metal pouring eqipment | |
| JPH11123534A (en) | Automatic molten metal pouring machine | |
| JPS5837060B2 (en) | Kanagatachi Yuzouki | |
| JP3653955B2 (en) | Automatic pouring machine | |
| JPH0481257A (en) | Method for controlling velocity in ladle molten metal supplying device | |
| JP2934289B2 (en) | Ladle hot water supply control method and device | |
| JP2721534B2 (en) | Die casting method and apparatus | |
| JP3020339B2 (en) | Casting system | |
| JPH1094870A (en) | Method for automatically pouring molten metal | |
| JPH03114646A (en) | Method and device for automatically setting inclining angle of ladle in ladle hot-water supply device |