JPH018628Y2 - - Google Patents

Info

Publication number
JPH018628Y2
JPH018628Y2 JP11297885U JP11297885U JPH018628Y2 JP H018628 Y2 JPH018628 Y2 JP H018628Y2 JP 11297885 U JP11297885 U JP 11297885U JP 11297885 U JP11297885 U JP 11297885U JP H018628 Y2 JPH018628 Y2 JP H018628Y2
Authority
JP
Japan
Prior art keywords
drainage
sub
permeable material
drainage channel
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP11297885U
Other languages
Japanese (ja)
Other versions
JPS6226490U (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP11297885U priority Critical patent/JPH018628Y2/ja
Publication of JPS6226490U publication Critical patent/JPS6226490U/ja
Application granted granted Critical
Publication of JPH018628Y2 publication Critical patent/JPH018628Y2/ja
Expired legal-status Critical Current

Links

Landscapes

  • Road Paving Structures (AREA)
  • Sewage (AREA)

Description

【考案の詳細な説明】 本考案は非沈砂型縁石兼用排水管ユニツトにか
かり、少量の雨水を排水する副排水路部と、多量
の雨水を排水する主排水路部を有するものにおい
て、少量の雨水のため排水路に堆積し易い土砂や
塵埃を副排水路部上面を被覆した透水性材面上に
滞留させて雨水だけ透過させ、この土砂等をスイ
ーパーにより除去するようにしてユニツト内に沈
積するのを防止しようとするものである。
[Detailed description of the invention] The present invention is a non-sediment type curb drainage pipe unit that has a sub-drainage section for draining a small amount of rainwater and a main drainage section for discharging a large amount of rainwater. Sediment and dust that tends to accumulate in the drainage channel due to rainwater is retained on the permeable material surface covering the top surface of the sub-drainage channel section, allowing only the rainwater to pass through, and this sediment is removed by a sweeper and deposited inside the unit. It is intended to prevent this from happening.

橋梁路面上には風や車両により運ばれてきた微
細な土砂、車両により削り取られたアスフアルト
粉塵、タイヤの摩耗塵等が飛散している。これが
雨水により路側の排水管に流れ込むが、橋梁上で
は設計上排水管の勾配を大きくとれないため、長
期間のうちに次第に内部に堆積し、しかも緊く締
固まつて排水効率が低下する。そして遂には溢水
するに至るので、定期的に清掃管理をしなければ
ならず、それに大変な手間と費用を必要としてい
る。
Fine earth and sand carried by the wind and vehicles, asphalt dust scraped off by vehicles, and tire wear dust are scattered on the bridge road surface. This rainwater flows into the roadside drainage pipes, but because the drainage pipes cannot be designed to have a large slope on bridges, they gradually accumulate inside the bridge over a long period of time, becoming compacted and reducing drainage efficiency. Eventually, the water overflows, so regular cleaning and management is required, which requires a great deal of effort and expense.

そこで、蓋を開閉式にしたり、蓋に長い透孔を
あけて、掃除をし易く工夫しているが、所詮人手
による作業であるため、甚だ能率が悪い。スイー
パーの刷毛の長さを大にすれば排水管の内部も清
掃できるが、逆にその分、路面舗装を痛めてしま
うので、これは実現不可能となつている。
Therefore, attempts have been made to make cleaning easier by making the lid open and close or by drilling a long hole in the lid, but this is extremely inefficient as the work is done manually. The inside of the drain pipe could be cleaned by increasing the length of the sweeper's brush, but this would damage the road surface pavement, making this impossible.

本考案はこのスイーパーによる清掃をその刷毛
を長くしなくても適用できるようにしたもので、
底板の前後縁及び中間から起立し互いに平行の主
副の排水路部を形成する前壁、これより高い後壁
及び後壁より低い仕切壁を有し、主排水路部の上
面を仕切壁方向に下りの斜面部に排水孔を有する
蓋によつて開閉自在に覆い、副排水路部の上面を
透水性材で被覆したことを特徴とする。
The present invention allows cleaning with this sweeper to be applied without having to use a long brush.
It has a front wall that stands up from the front and rear edges and the middle of the bottom plate and forms main and sub-drainage channels that are parallel to each other, a rear wall that is higher than this, and a partition wall that is lower than the rear wall, and the upper surface of the main drainage channel is directed toward the partition wall. The sub-drainage channel is covered with a lid that can be opened and closed, and the upper surface of the sub-drainage channel is covered with a water-permeable material.

これによれば、通常量の雨水は透水性材を透し
て副排水路部に流れ込み、土砂等はこの透水性材
に捕捉されて副排水路部や主排水路部には流入し
ない。この土砂等が透水性材上にある程度堆積す
ると副排水路部への透水効率が低下するので、ス
イーパーの刷毛をこの堆積層上に及ばせてこれを
掻き取つてやれば、再びこの透水効率が上昇す
る。長期の使用により目詰まりがひどくなつた
ら、この透水性材が新しいのと取換えてやればよ
い。またこの透水性材部分の幅は大型車のタイヤ
の幅より小さいので輪荷重が直に加わることはな
く、また透水性材自体がかなりの耐荷力を有して
いるので、車輪による損傷はまず考えられない。
豪雨の場合は透水性材を透して副排水路部に入る
ものと蓋の斜面部の排水孔を通して主排水路部に
入るものとに分かれるが、両者共同して多量の雨
水の排水に努める。主排水路部も必要に応じ蓋を
開けて清掃する。
According to this, a normal amount of rainwater passes through the permeable material and flows into the sub-drainage channel section, and earth and sand are captured by the water-permeable material and do not flow into the sub-drainage channel section or the main drainage channel section. If this sediment accumulates on the permeable material to a certain extent, the water permeability to the sub-drainage channel will decrease, so if you use the brush of the sweeper to reach over this accumulated layer and scrape it off, this water permeability will increase again. Rise. If the clogging becomes severe after long-term use, the water-permeable material can be replaced with a new one. In addition, the width of this water-permeable material is smaller than the width of the tires of a large vehicle, so the wheel load is not directly applied to it, and the water-permeable material itself has a considerable load-bearing capacity, so damage caused by the wheels is unlikely. Unthinkable.
In the case of heavy rain, there are two types of rainwater: one enters the sub-drainage channel through the permeable material, and the other enters the main drainage channel through the drainage hole on the slope of the lid, but both parties work together to drain a large amount of rainwater. . Open the lid of the main drain and clean it as necessary.

以下に本案の実施例を図面につき詳述する。 Embodiments of the present invention will be described in detail below with reference to the drawings.

1は底板、2は底板1の前縁から起立する前
壁、3は底板1の後縁から起立する後壁、4は底
板1の中間から起立する仕切壁で後壁3よりも低
くなつている。これらの壁2,3及び4は互いに
平行する主排水路部5と副排水路部6を形成して
いる。7は蓋で主排水路部5を覆うためのもの
で、仕切壁4方向に下りの斜面部8に主排水路部
5の方向に長い排水孔9が穿たれている。この蓋
7を仕切壁4と後壁3に取外しできるように適当
に係止する。図示の例では次のように係止してい
る。即ち、斜面部8の下端で下方に係止部10を
形成し、この係止部10の長さ方向に適当な間隔
で下端からの角型の切欠11を設け、これを仕切
壁4の主排水路部5側に同様間隔で植設した角型
のダボ12に嵌合させる。また斜面部8の上端で
水平部13を形成し、その端部を下方へ折曲して
係止部14を形成し、前記と同様に、この係止部
14の長さ方向に適当間隔で下端からの角型の切
欠15を設け、これを後壁3の主排水路部5側に
同様間隔で植設した角型のダボ16に嵌合させ
る。更に耐荷重性を増すために、係止部14の下
端面に当接する支持片17を後壁3に適当間隔で
固着してある。これらの構成は蓋7の係止の一例
に過ぎず、蝶番開閉式や合掌式等も採用できる。
他方副排水路部6の上面を透水性材18で被覆す
る。この透水性材18は市販品でよく、目詰まり
しにくく、耐荷重性があり、経年変化の少ないも
のがよい。この被覆の仕方も種々考えられるが、
この例では次のようになつている。副排水路部6
の内法に適合する幅を有しかつ適当な長さの支持
板19を前壁2と仕切壁4間にかつ副排水路部6
の長さ方向に適当な間隔で架着する。そしてこれ
らの支持板19と底板1間に補強板20を固着す
る。支持板19の前壁2側をこれに沿つて起立さ
せ、その上端部を水平に折り曲げて抑え片21を
形成し、仕切壁4の上端部もこの抑え片21に対
向させて折り曲げ、抑え片22を形成させておく
と、透水性材18が安定し、衝撃を受ても脱出し
たりしない。仕切板4の下端部に窓23をあけて
おけば、主副の排水路部5及び6を共用できる。
1 is a bottom plate, 2 is a front wall that stands up from the front edge of the bottom plate 1, 3 is a rear wall that stands up from the rear edge of the bottom plate 1, and 4 is a partition wall that stands up from the middle of the bottom plate 1 and is lower than the rear wall 3. There is. These walls 2, 3 and 4 form a main drain section 5 and a sub drain section 6 which are parallel to each other. Reference numeral 7 is for covering the main drainage channel section 5 with a lid, and a drainage hole 9 that is long in the direction of the main drainage channel section 5 is bored in the slope section 8 that extends downward in the direction of the partition wall 4 . This lid 7 is appropriately secured to the partition wall 4 and the rear wall 3 so as to be removable. In the illustrated example, the locking is performed as follows. That is, a locking portion 10 is formed downward at the lower end of the slope portion 8, square notches 11 are provided from the lower end at appropriate intervals in the length direction of the locking portion 10, and these are connected to the main part of the partition wall 4. The dowels 12 are fitted into square dowels 12 planted at similar intervals on the side of the drainage channel 5. Further, a horizontal portion 13 is formed at the upper end of the slope portion 8, and the end thereof is bent downward to form a locking portion 14, and similarly to the above, a horizontal portion 13 is formed at appropriate intervals in the length direction of the locking portion 14. Square notches 15 are provided from the lower end, and these are fitted into square dowels 16 implanted at the same spacing on the main drainage channel 5 side of the rear wall 3. Furthermore, in order to increase the load resistance, support pieces 17 that come into contact with the lower end surface of the locking part 14 are fixed to the rear wall 3 at appropriate intervals. These configurations are only examples of locking the lid 7, and a hinge opening/closing type, a palms-clasp type, etc. can also be adopted.
On the other hand, the upper surface of the sub-drainage channel section 6 is covered with a water-permeable material 18. This water-permeable material 18 may be a commercially available product, and should preferably be one that is resistant to clogging, has load-bearing properties, and has little deterioration over time. Various methods of covering this can be considered, but
In this example, it looks like this: Sub-drainage section 6
A support plate 19 of an appropriate length and having a width that matches the inner diameter of
Attach them at appropriate intervals along their length. A reinforcing plate 20 is then fixed between the support plate 19 and the bottom plate 1. The front wall 2 side of the support plate 19 is made to stand up along this side, and its upper end is bent horizontally to form a restraining piece 21, and the upper end of the partition wall 4 is also bent to face this restraining piece 21 to form a restraining piece. 22, the water-permeable material 18 is stable and will not escape even if subjected to impact. If a window 23 is opened at the lower end of the partition plate 4, the main and sub-drainage channels 5 and 6 can be shared.

なお図面で、Mはモルタル、Pは舗装層、Sは
床版、Jは継目板、Aはアンカーである。
In the drawings, M is mortar, P is pavement layer, S is floor slab, J is joint board, and A is anchor.

このユニツトは通常のように高架橋路側部の床
版上にモルタルMを用いて、かつ透水性材18の
表面をほぼ舗装層Pの表面の延長上に位置させ
て、設置される。ユニツトの端には同様のユニツ
トが順次継目板Jを介して水塞に接続され、所定
位置で縦管に導結されることも従来と変らない。
少量の降雨の場合は舗装面を流れた雨水が透水性
材18の表面に来てここで透過し、副排水路部6
に流れ落て、該部を勾配に沿つて流れ下る。舗装
層Pの表面上にあつてこの雨水と共に流れてきた
土砂等は、この透水性材18によつて捕捉されて
しまい、副排水路部6に堆積することはない。大
雨の場合は透水性材18を透す雨量だけでは吸収
しきれず、蓋7の斜面部8に至り、その排水孔9
を通つて主排水路部5に流下し、排出される。透
水性材18の表面に土砂等が堆積したら、スイー
パーを運転し、それを掻き取つてやれば、元通り
の透水効率を確保できる。長期の使用により目詰
まりがして透水効率が低下したら、透水性材18
を新品と交換してやればよい。
This unit is installed as usual on the deck of the road side of the viaduct using mortar M, and with the surface of the water-permeable material 18 located approximately on an extension of the surface of the pavement layer P. Similar units at the ends of the units are successively connected to the sluice through the joint plates J, and are connected to the vertical pipes at predetermined positions, as in the past.
In the case of a small amount of rainfall, the rainwater flowing on the paved surface comes to the surface of the permeable material 18 and permeates there, and the water flows through the sub-drainage channel section 6.
and flows down the slope along the slope. Sediment and the like that are on the surface of the pavement layer P and have flown with the rainwater are captured by the water-permeable material 18 and do not accumulate in the sub-drainage channel section 6. In the case of heavy rain, the amount of rain that passes through the permeable material 18 is not enough to absorb the rain, and the rain reaches the slope part 8 of the lid 7, and the drainage hole 9
It flows down through the main drainage channel section 5 and is discharged. If dirt or the like accumulates on the surface of the water-permeable material 18, by operating a sweeper and scraping it off, the water permeability efficiency can be restored to its original level. If the water permeability efficiency decreases due to clogging due to long-term use, use water permeable material 18.
You can replace it with a new one.

本考案によれば副排水路部上面を透水性材で被
覆したので、土砂等が副排水路部や主排水路部に
堆積し固まつて排水効率が低下するのを防止で
き、スイーパーによる除去も可能となつたので作
業性が飛躍的に向上し、維持管理も容易かつ廉価
になし得る効果がある。
According to the present invention, since the upper surface of the sub-drainage channel is covered with a water-permeable material, it is possible to prevent soil, etc. from accumulating and hardening in the sub-drainage channel and main drainage channel, reducing drainage efficiency, and removing it using a sweeper. This has the effect of dramatically improving work efficiency and making maintenance easier and cheaper.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本考案にかかるユニツトの具体例を示
す使用状態の横断面図、第2図は同一部切欠斜面
図である。 1……底板、2……前壁、3……後壁、4……
仕切壁、5……主排水路部、6……副排水路部、
7……蓋、8……斜面部、9……排水孔、18…
…透水性材。
FIG. 1 is a cross-sectional view of a specific example of the unit according to the present invention in a state of use, and FIG. 2 is a partially cutaway perspective view of the same. 1...Bottom plate, 2...Front wall, 3...Rear wall, 4...
Partition wall, 5... Main drainage channel section, 6... Sub-drainage channel section,
7...Lid, 8...Slope part, 9...Drain hole, 18...
...Water permeable material.

Claims (1)

【実用新案登録請求の範囲】 (1) 底板の前後縁及び中間から起立し互いに平行
の主副の排水路部を形成する前壁、これより高
い後壁及び後壁より低い仕切壁を有し、主排水
路部の上面を仕切壁方向に下りの斜面部に排水
孔を有する蓋によつて開閉自在に覆い、副排水
路部の上面を透水性材で被覆したことを特徴と
する非沈砂型縁石兼用排水管ユニツト。 (2) 副排水路部には長手方向の適所に透水性材を
支持する支持板が架着され、透水性材の上面両
縁部の少なくとも一部を抑え片によつて抑えら
れている実用新案登録請求の範囲第(1)項記載の
非沈砂型縁石兼用排水管ユニツト。 (3) 仕切壁下端部には主副排水路部を互いに連通
する切欠が設けられている。実用新案登録請求
の範囲第(1)又は(2)項記載の非沈砂型縁石兼用排
水管ユニツト。
[Scope of Claim for Utility Model Registration] (1) A front wall that stands up from the front and rear edges and the middle of the bottom plate and forms main and sub-drainage channels that are parallel to each other, a higher rear wall, and a lower partition wall than the rear wall. , a non-sedimentation system characterized in that the upper surface of the main drainage channel is covered with a lid that can be opened and closed and has a drainage hole on the slope facing downward toward the partition wall, and the upper surface of the auxiliary drainage channel is covered with a water-permeable material. Type curbstone drainage pipe unit. (2) A support plate for supporting a water-permeable material is attached to the sub-drainage channel at an appropriate location in the longitudinal direction, and at least a portion of both edges of the upper surface of the water-permeable material is held down by a holding piece. A non-sediment type curb stone drain pipe unit as set forth in claim (1) of the new patent registration claim. (3) A cutout is provided at the lower end of the partition wall to connect the main and sub-drainage channels with each other. A non-sediment type curbstone drain pipe unit as set forth in claim number (1) or (2) of the utility model registration claim.
JP11297885U 1985-07-25 1985-07-25 Expired JPH018628Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11297885U JPH018628Y2 (en) 1985-07-25 1985-07-25

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11297885U JPH018628Y2 (en) 1985-07-25 1985-07-25

Publications (2)

Publication Number Publication Date
JPS6226490U JPS6226490U (en) 1987-02-18
JPH018628Y2 true JPH018628Y2 (en) 1989-03-08

Family

ID=30994342

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11297885U Expired JPH018628Y2 (en) 1985-07-25 1985-07-25

Country Status (1)

Country Link
JP (1) JPH018628Y2 (en)

Also Published As

Publication number Publication date
JPS6226490U (en) 1987-02-18

Similar Documents

Publication Publication Date Title
Abbott et al. In‐situ hydraulic performance of a permeable pavement sustainable urban drainage system
CN210621457U (en) An asphalt bridge deck drainage structure
CN210216073U (en) Cement concrete pavement normal position adds spreads bituminous paving drainage structures
KR20190139420A (en) Automatic grating cover for preventing garbage
JPH0853808A (en) Water permeable sidewalk block
CN212224121U (en) Road structure with surface type water collecting function
DE3516654A1 (en) Road drainage channel
JP3728635B2 (en) Drainage channel for drainage pavement
JPH018629Y2 (en)
KR200311993Y1 (en) a linking cover for receiving rain and sewage
CN106337342B (en) A kind of road cross-sectional configuration for mountain highway
KR200405382Y1 (en) Water collecting well structure applied to cut surface
JP3553899B2 (en) Gutter for drainage pavement
CN210151515U (en) Excavation side slope super high road section road surface drainage system
KR200416889Y1 (en) Manhole structure.
CN113047405A (en) Town road combination formula drainage curb structure
JP2692951B2 (en) Seepage rainwater basin
JP3143782B2 (en) Drainage channel for drainage pavement
KR102789466B1 (en) Road drainage system
CH153142A (en) Street gutter.
JP3035851U (en) Drainage channel for drainage pavement and curb
CN224016054U (en) Asphalt pavement structure
KR102822205B1 (en) Sidewalk type penetration storage facility and sidewalk type penetration storage tank and its construction method
JPH0324705Y2 (en)
JP4528743B2 (en) Side gutter drainage and side gutter construction method