Construction method for forming concrete pillar

Info

Publication number
JPH0197706A
JPH0197706A JP25471487A JP25471487A JPH0197706A JP H0197706 A JPH0197706 A JP H0197706A JP 25471487 A JP25471487 A JP 25471487A JP 25471487 A JP25471487 A JP 25471487A JP H0197706 A JPH0197706 A JP H0197706A
Authority
JP
Japan
Prior art keywords
concrete
legs
scaffold
scaffolding
scaffolds
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP25471487A
Other languages
Japanese (ja)
Other versions
JPH0532524B2 (en
Inventor
Kohei Mio
三尾 興平
Nobusada Aitsu
合津 信貞
Shigeru Yoshida
茂 吉田
Densuke Sakai
酒井 伝祐
Takeshi Nakagawa
毅 中川
Shunsuke Shirai
俊輔 白井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP25471487A priority Critical patent/JPH0197706A/en
Publication of JPH0197706A publication Critical patent/JPH0197706A/en
Publication of JPH0532524B2 publication Critical patent/JPH0532524B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Movable Scaffolding (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

PURPOSE: To greatly reduce working labors and costs by forming a column having a split part where it is bifurcated, through the placement of concrete while only scaffolds outside legs are pushed up at portions above the split part. CONSTITUTION: Concrete is placed as scaffolds 10 are pushed upward step by step along the legs 6, 7 of a concrete column, and when the inner scaffolds 10A, 10B of the legs 6, 7 are combined at a split part 8, a connecting scaffold 36 is assembled above their confluent part. Scaffolds 10B, 11B outside the legs are pushed upward and concrete is placed in the split part surrounded by the connecting scaffold 36 and the scaffolds 10B, 11B outside the legs. Further, as the scaffolds 10B, 11B outside the legs are pushed upward step by step along a vertical part 9 above the split part 8, concrete is placed in the vertical part 9.

Description

【発明の詳細な説明】 [産業上の利用分野] 本発明は、例えば橋の支柱等に使用される二又に分かれ
た分流部を有するコンクリート柱を形成する工法に関す
る。
DETAILED DESCRIPTION OF THE INVENTION [Industrial Field of Application] The present invention relates to a construction method for forming a concrete column having a bifurcated branch part, which is used, for example, as a support for a bridge.

[従来技術] 例えば第8図および第9図で示すように、二又に分かれ
た分流部を有するコンクリート柱を支柱として使用して
いる橋を構築する場合において、全体を符号1で示す橋
は、道路として用いられる本体部2と、この本体部2を
支持する基部3.3と、基部の上方に形成された支柱4
.4と、支柱4.4を支持するためのワイヤ5・・・と
から構成されている。ここで支柱4は、本体部2をワイ
ヤ5・・・で吊り上げることによりtI!J1の#I造
を強化し、しかも橘全体の美観を向上するために形成さ
れている。
[Prior Art] For example, as shown in FIGS. 8 and 9, when constructing a bridge using concrete pillars as supports having a bifurcated watershed section, the bridge whose entirety is designated by the reference numeral 1 is , a main body 2 used as a road, a base 3.3 that supports this main body 2, and a support 4 formed above the base.
.. 4, and wires 5 for supporting the pillars 4.4. Here, the support 4 is fixed at tI! by lifting the main body 2 with the wire 5... It was formed to strengthen the #I structure of J1 and improve the overall beauty of Tachibana.

支柱4は鉄骨を組み上げてコンクリートを打設するか、
あるいは鉄骨を組み上げずに鉄筋コンクリートを打設す
ることによって形成され、その形状は第9図に示されて
いる。第9図において、支柱4は斜めに伸びている左右
の脚部6.7と、脚部6.7が合流する部分、換言する
と二又に分かれてい名分流部8と、分流部8の上方で垂
直に仲びている垂直部9とから成っており、ここで第9
図においては複数本のワイヤ5・・・は図示されていな
い。
For pillar 4, either build a steel frame and pour concrete, or
Alternatively, it may be formed by pouring reinforced concrete without assembling a steel frame, and its shape is shown in Fig. 9. In FIG. 9, the strut 4 has left and right legs 6.7 extending diagonally, and a portion where the legs 6.7 meet, in other words, it is divided into two parts. It consists of a vertical part 9 that is vertically connected to the 9th part.
In the figure, the plurality of wires 5... are not shown.

支柱4を形成するには、先ず鉄骨を支柱4の形状に対応
する所定の形状に組み立て、その後コンクリートを打設
するか、あるいは鉄骨を組み上げることなく鉄筋を植え
込んでコンクリートを打設する。ここでコンクリートを
打設するに際して、型枠を設置するなめに従来は支柱の
全体を包囲するような巨大な足場を組み上げた後にコン
クリートを打設する必要があった。
To form the pillar 4, first, steel frames are assembled into a predetermined shape corresponding to the shape of the pillar 4, and then concrete is poured, or concrete is poured by implanting reinforcing bars without assembling the steel frame. When pouring concrete here, conventionally it was necessary to erect a gigantic scaffold that would surround the entire pillar in order to install the formwork, and then pour the concrete.

しかし、支柱全体を包囲するような巨大な足場を組み上
げる作業は多大な労力を必要とする。しかも足場の組み
上げ作業は大部分は人手によって行われるので人件費が
高くなり、その結果ミ支柱4を形成するのに費やされる
コストも増加する。
However, constructing a huge scaffolding that surrounds the entire pillar requires a great deal of effort. Moreover, most of the work for assembling the scaffolding is done manually, resulting in high labor costs, and as a result, the cost for forming the pillars 4 also increases.

これに対して、例えば第3A図に示す様に、−定長さの
足場10を下方(第3A図中矢印りの方向)から押し上
げて移動できるように構成し、予め組立てられた鉄骨に
コンクリートを打設し、あるいは鉄骨を組立てずに鉄筋
コンクリートを打設し、その後、足場10を一定距離だ
け上方へ押し上げ、上方の鉄骨部分に型枠を設置してコ
ンクリートを打設し、あるいは上方の部分に鉄筋コンク
リートを打設する技術(所謂クライミングアップ工法)
が提案されている。このクライミングアップ工法は、施
工に際して支柱4全体を包囲するような巨大な足場を組
み上げる必要がないので、垂直に伸びている支柱のコン
クリート打設に好適である。
On the other hand, as shown in FIG. 3A, for example, a scaffold 10 of a fixed length is constructed so that it can be moved by pushing it up from below (in the direction of the arrow in FIG. 3A), and concrete is attached to a pre-assembled steel frame. or pour reinforced concrete without assembling the steel frame, then push the scaffolding 10 upwards by a certain distance, set formwork on the upper steel frame part and pour concrete, or cast concrete on the upper part. Technology for placing reinforced concrete (so-called climbing up method)
is proposed. This climbing up construction method is suitable for concrete pouring of vertically extending columns, since it is not necessary to assemble a huge scaffold that surrounds the entire column 4 during construction.

しかし、クライミングアップ工法を用いる場合、垂直方
向に伸びた単一のコンクリート柱を建造することはでき
ても、第9図に示すように二又に分かれた分流部8を有
するコンクリート柱の建造には応用することができない
、第1A図で示すように、分流部8の下方において、脚
部6用の足場10の内側の足場(脚部7に向い合う側の
足J%)10Aと、脚部7用の足場11の内側の足場1
1Aとが合流して相互に干渉し合うので、足場10およ
び11をそれよりも上方へ引き上げることが不可能とな
ってしまうからである。
However, when using the climbing up method, although it is possible to construct a single vertically extending concrete column, it is difficult to construct a concrete column that has a bifurcated branch section 8 as shown in Figure 9. As shown in FIG. 1A, below the diversion section 8, the scaffold 10A inside the scaffold 10 for the leg section 6 (the leg J% on the side facing the leg section 7) and the leg Scaffold 1 inside scaffold 11 for section 7
1A and interfere with each other, making it impossible to lift the scaffolds 10 and 11 higher than that.

そのため二又に分かれた分流部を有する支柱を形成する
際に、従来は作業コストが高価になっても、支柱全体を
包囲するような足場を組み上げる必要があった。
For this reason, when forming a column having a bifurcated flow branch, it has conventionally been necessary to assemble a scaffold that surrounds the entire column, even though the work cost is high.

[発明の目的] 本発明は上記した従来技術の欠点に鑑みて提案されたも
のであり、支柱全体を包囲するような巨大な足場を組み
上げるための作業を要せずに、二又に分かれた分流部を
有する支柱のコンクリート打設作業を行うことができる
コンクリート柱形成工法を提供することを目的としてい
る。
[Object of the Invention] The present invention was proposed in view of the above-mentioned shortcomings of the prior art. The object of the present invention is to provide a concrete column forming method that enables concrete pouring work for columns having a diversion section.

[発明の構成] 本発明のコンクリート柱形成工法は、二又に分かれた分
流部を有するコンクリート柱を形成する工法において、
コンクリート柱の胛部に沿って足場を漸次上方へ押し上
げつつコンクリートを打設する工程と、脚部の内側の°
足場が合流する部分の上方に連結足場を組み立て、且つ
脚部の外側の足場を上方へ押し上げる工程と、連結足場
および脚部外側の足場によって囲まれた分流部にコンク
リートを打設する工程と、分流部上方の垂直部に沿って
上記の脚部外側の足場を漸次上方へ押し上げつつその垂
直部にコンクリートを打設する工程とを含んでいる。
[Structure of the Invention] The concrete column forming method of the present invention is a method for forming a concrete column having a bifurcated part, which includes:
The process of pouring concrete while gradually pushing the scaffolding upwards along the legs of the concrete pillars, and
a step of assembling a connecting scaffold above the part where the scaffolds merge and pushing up the scaffolding on the outside of the leg; and a step of pouring concrete in the diversion area surrounded by the connecting scaffold and the scaffolding on the outside of the leg. The method includes the step of gradually pushing up the scaffolding on the outside of the legs along the vertical part above the diversion part and pouring concrete into the vertical part.

[発明の作用効果] 本発明は、足場を漸次上方へ押し上げつつコンクリート
を打設するクライミングアップ工法を改良した工法であ
り、そのため支柱全体を包囲するような巨大な足場を組
み上げる必要がないという従来のクライミングアップ工
法の特色が生かされており、これに加えて、本発明によ
れば、分流部において脚部外側の足場のみを上方へ押し
上げ、且つ脚部内側の足場が合流する部分の上方に連結
足場を組み立てることによって、二又に分かれた分流部
にコンクリートを打設することが可能になる。その結果
、従来の工法に比較して二又の分流部を有するコンクリ
ート柱の形成に費やされる作業労力および作業コストが
極めて減少されるのである。
[Operations and Effects of the Invention] The present invention is an improvement on the climbing up method in which concrete is poured while gradually pushing the scaffolding upwards, and as a result, there is no need to assemble a huge scaffolding that surrounds the entire pillar. In addition, according to the present invention, only the scaffolding on the outside of the legs is pushed upward at the diversion section, and the scaffolding on the inside of the legs joins above the part where the scaffolds on the inside of the legs join. By assembling the connecting scaffolding, it becomes possible to pour concrete into the bifurcated watershed. As a result, the labor and costs involved in forming a concrete column with bifurcated sections are significantly reduced compared to conventional construction methods.

[好ましい実施の態様] 本発明の実施に際して、予め鉄骨を組み立てておき、そ
の鉄骨に沿って足場を漸次上方へ押し上げつつコンクリ
ートを打設しても良く、あるいは鉄骨を組み立てること
をせずに、鉄筋コンクリートを打設しても良い。
[Preferred Embodiment] When implementing the present invention, a steel frame may be assembled in advance, and concrete may be poured while gradually pushing the scaffolding upward along the steel frame, or the steel frame may not be assembled. Reinforced concrete may be placed.

また、足場を上方に押し上げる際には、打設されたコン
クリートへレールを取り付け、足場がそのレールに沿っ
て移動するように構成するのが好ましい。
Further, when pushing the scaffolding upward, it is preferable to attach a rail to the poured concrete so that the scaffold moves along the rail.

更に、足場を上方へ押し上げる手段としてはジヤツキお
よびロック手段を用いるのが好ましい。
Furthermore, it is preferable to use jacks and locking means as means for pushing the scaffold upward.

ここで、ロック手段としては、油圧シリンダによって駆
動するカムとリンクFsf/Nとを組合せたタイプのも
の、あるいは油圧シリンダによ・て駆動するくさび状の
チャンバとリンクi楢とを組み合せたタイプのもの等が
好ましい。
Here, the locking means may be of a type that combines a cam driven by a hydraulic cylinder and a link Fsf/N, or a type that combines a wedge-shaped chamber driven by a hydraulic cylinder and a link i oak. Preferably.

なお、flめに伸びている脚部と垂直に伸びている垂直
部の双方について安全で且つ作業効率の良い足場を提供
するため、足場の隣接する二辺−にターンバックルを設
置するのが好ましい。
In addition, in order to provide a safe and highly efficient scaffold for both the legs extending in the fl direction and the vertical part extending vertically, it is preferable to install turnbuckles on two adjacent sides of the scaffold. .

[実施例コ 以下、図面を参照して本発明の実施例について説明する
[Embodiments] Hereinafter, embodiments of the present invention will be described with reference to the drawings.

第9図で示すようなコンクリート支柱4を形成するには
、前述したようにまず鉄骨を所定の形状に組み立て、次
にその鉄骨の下方からコンクリートを打設するか、ある
いは鉄骨を組み立てることなく鉄筋コンクリートを下方
から順次打設するかの、何れかの方式が採用される0図
示の実施例は鉄骨を予め組み立てる方式ではなく、その
都度鉄筋を植え込み且つコンクリートを打設して鉄筋コ
ンクリート構築物を建造していく方式のものを示してお
り、図中符号12は鉄筋を示す、ここで、鉄筋コンクリ
ートの打設は脚部6.7の下方から分流部8に向って漸
次性われる。
To form a concrete support 4 as shown in Fig. 9, as described above, first assemble the steel frame into a predetermined shape, then pour concrete from below the steel frame, or cast reinforced concrete without assembling the steel frame. The illustrated embodiment does not involve assembling steel frames in advance, but constructs a reinforced concrete structure by planting reinforcing bars and pouring concrete each time. The reference numeral 12 in the figure indicates a reinforcing bar, and the reinforced concrete is placed gradually from below the legs 6.7 toward the diversion section 8.

第3A図、第3B図、第3C図においては、脚部に沿っ
て足場を漸次上方へ押し上げつつ脚部の下方から分流部
まで鉄筋コンクリートを打設する工程の様子を示してい
る。この工程は従来のクライミングアップ工法と略々同
様な態様で施工される。
Figures 3A, 3B, and 3C show the process of pouring reinforced concrete from below the legs to the diversion section while gradually pushing the scaffold upwards along the legs. This process is carried out in substantially the same manner as the conventional climbing up method.

第3A図において、脚部6にコンクリートを打設するた
めに足場10が組み立てられており、そして足場10の
下方(第3A図中矢印し方向)では鉄筋コンクリートC
が既に打設されている。
In FIG. 3A, a scaffold 10 is assembled to pour concrete into the legs 6, and below the scaffold 10 (in the direction of the arrow in FIG. 3A), a reinforced concrete C
has already been cast.

足場10は多数のフレームを組み合せて構成されており
、脚部6の長手方向は7つの区画13.14.15.1
6.17.18.19に分けられている。これ等の区画
には鉄筋コンクリートが既に打設されており、区画16
.17のコンクリートは打設後の養生期間中である。
The scaffold 10 is constructed by combining a large number of frames, and the longitudinal direction of the legs 6 is divided into seven sections 13.14.15.1.
It is divided into 6.17.18.19. Reinforced concrete has already been placed in these sections, and section 16
.. 17 concrete is in the curing period after being poured.

足場10の各区画13〜19においては、打設された鉄
筋コンクリートの重さ等によって足場が変形しないよう
に、隣り合うフレーム間にターンバックル20.20・
・・が設けられている。なお、第3八図中符号21はコ
ンクリート用の型枠−を示す。
In each section 13 to 19 of the scaffold 10, turnbuckles 20, 20 and 20 are installed between adjacent frames to prevent the scaffold from deforming due to the weight of the poured reinforced concrete, etc.
... is provided. Incidentally, the reference numeral 21 in Fig. 38 indicates a formwork for concrete.

足場10は、鉄筋コンクリートを打設した部分に取り付
けられたレール22.22に沿って移動することができ
る0足場10を上方に押し上げて移動させる部材はジヤ
ツキ23である。このジヤツキ23は第2A図、第2B
図において詳細に示されており、打設された鉄筋コンク
リートCにボルト25・・・によって取付けられでいる
The scaffolding 10 can be moved along rails 22, 22 attached to a portion where reinforced concrete is cast. A jack 23 is a member that pushes the scaffolding 10 upward and moves it. This jack 23 is shown in Figures 2A and 2B.
It is shown in detail in the figure, and is attached to cast reinforced concrete C by bolts 25.

脚部6の鉄筋コンクリート打設作業を行う際には、先ず
区画14.15.16.17.18.19のうち最も下
方の区画18.19において鉄筋12の植え込みおよび
コンクリートの打設作業(鉄筋コンクリートの打設)が
行われ、区画18.19の鉄筋コンクリートの養生期間
経過後に区画16.17においてコンクリートが打設さ
れる。
When performing reinforced concrete placement work for the legs 6, first place the reinforcing bars 12 and place concrete (reinforced concrete After the curing period for the reinforced concrete in section 18.19 has elapsed, concrete is poured in section 16.17.

更に区画16.17のコンクリートの養生期間が経過す
ると区画14.15にコンクリートが打設される。その
後、第2図に示すジヤツキ23により足場10全体を上
方(第3A図中矢印H方向)に押し上げる。そして、直
前に打設された鉄筋コンクリートの養生期間が経過した
後に、足場10で新たに包囲された鉄骨の部分に型枠が
設置されて鉄筋コンクリートが打設されるのである。上
記の手順を順次繰り返せば、足場10を漸次上方へ押し
上げつつ脚部6に鉄筋コンクリートが打設されるのであ
る。なお、クライミングアップ工法により脚部7にコン
クリートを打設する態様は、脚部6におけるコンクリー
トの打設と全く同一であるので説明を省略する。
Further, after the curing period for the concrete in sections 16 and 17 has elapsed, concrete is poured in sections 14 and 15. Thereafter, the entire scaffold 10 is pushed upward (in the direction of arrow H in FIG. 3A) by the jack 23 shown in FIG. 2. Then, after a curing period for the previously placed reinforced concrete has elapsed, a formwork is installed on the steel frame newly surrounded by the scaffolding 10, and reinforced concrete is poured. By repeating the above steps in sequence, reinforced concrete is placed on the legs 6 while gradually pushing the scaffolding 10 upward. Note that the manner in which concrete is poured into the leg portion 7 using the climbing up method is exactly the same as the manner in which concrete is poured into the leg portion 6, so a description thereof will be omitted.

足場10を上方へ押し上げる態様について、第4A図、
第4B図、第4C図、第5A図、第5B図、第6A図、
第6B図、第7A図、第7B図を用いて更に詳細に説明
する。
Regarding the manner in which the scaffold 10 is pushed upward, FIG. 4A,
Figure 4B, Figure 4C, Figure 5A, Figure 5B, Figure 6A,
This will be explained in more detail using FIG. 6B, FIG. 7A, and FIG. 7B.

第4A図において、1部分だけ示されている足場10と
レール22との間には、上昇用ジヤツキ23と足場をロ
ックするためのリンク機tIt26.27が設けられて
いる。第4A図では、上部リンクam26はフリー状態
(足場10をレール22に対してロックしていない状態
)にあり、下部リンクtll構27はロック状態にあり
、ジヤツキ23は収縮状態になっている。この状態から
足場10を上方へ押し上げるには、ジヤツキ23を伸長
状態とする。即ち、ジヤツキ23を伸長することによっ
て足場10およびフリー状態の上部リンク機構26が上
方へ押し上げられるのである(第4B図)、そしてジヤ
ツキ23が所定量だけ伸長したら上部リンクIatR2
6をロック状態にする。次に、ロック状態にある下部リ
ンクam27をフリー状態にしてジヤツキ23を収縮さ
せる。ここで、上部リンク機構26がロック状態になっ
ているので、ジヤツキ23を収縮すれば第4C図で示す
ように下部リンクl1ltl127が上方へ移動する。
In FIG. 4A, between the scaffold 10 and the rail 22, only a portion of which is shown, a lifting jack 23 and a link tIt 26, 27 for locking the scaffold are provided. In FIG. 4A, the upper link am26 is in a free state (the scaffold 10 is not locked to the rail 22), the lower link tll structure 27 is in a locked state, and the jack 23 is in a contracted state. In order to push the scaffolding 10 upward from this state, the jack 23 is brought into an extended state. That is, by extending the jack 23, the scaffold 10 and the upper link mechanism 26 in the free state are pushed upward (Fig. 4B), and when the jack 23 is extended by a predetermined amount, the upper link IatR2
6 into the locked state. Next, the lower link am27, which is in the locked state, is brought into a free state, and the jack 23 is contracted. Here, since the upper link mechanism 26 is in the locked state, when the jack 23 is retracted, the lower link l1ltl127 moves upward as shown in FIG. 4C.

第4C図の状態から、下部リンク機f7t27をロック
して且つ上部リンク機構26をフリー状態とすれば、第
4A図に示す状態と同一になる。以下、上記の手順を籠
り返すことによって、足場10を必要量だけ上方に押し
上げることができるのである。
If the lower link mechanism f7t27 is locked and the upper link mechanism 26 is set free from the state shown in FIG. 4C, the state will be the same as that shown in FIG. 4A. Thereafter, by repeating the above steps, the scaffold 10 can be pushed upward by the required amount.

上部リンクIH!26および下部リンクIt ’m 2
7がレール22に対して足部をロックし、あるいはロッ
ク状態を解除してフリー状態とするための構成には、種
々のタイプのものが適用される。飼えば第5A図、第5
B図に示す構成において、リンク機41126.27は
レバー28を介して油圧シリンダ29に接続されるカム
30と、リンク31と、リンク31に取付けられたフリ
クションバッド32と、これ等のリンク機構を足場10
に取付けるための本体部33とを含んでいる。第5A図
に示すフリー状態では、油圧シリンダ29は収縮してお
りカム30はフリクションバッド32を取付けたリンク
節34を押圧していない、これに対して第5B図に示す
ようなロック状態においては、油圧シリンダ29が伸長
しており、その結果カム30が第5A図の状態から時計
方向へ90度回転してリンク節34およびフリクション
バッド32をレール22に向けて押圧する。そしてフリ
クションバッド32がレール22と摩擦係合するので、
本体部33を介して足場10がレール22に対してロッ
クされるのである。
Top link IH! 26 and the bottom link It'm 2
Various types of configurations can be applied to the configuration for locking the feet of the foot 7 to the rail 22 or releasing the locked state to create a free state. If kept, Figure 5A, Figure 5
In the configuration shown in Figure B, the link machine 41126.27 includes a cam 30 connected to the hydraulic cylinder 29 via the lever 28, a link 31, a friction pad 32 attached to the link 31, and a link mechanism including these. scaffolding 10
It includes a main body part 33 for attachment to the main body part 33. In the free state shown in FIG. 5A, the hydraulic cylinder 29 is contracted and the cam 30 does not press the link node 34 to which the friction pad 32 is attached. On the other hand, in the locked state shown in FIG. 5B, , the hydraulic cylinder 29 is extended, and as a result, the cam 30 rotates 90 degrees clockwise from the state shown in FIG. Since the friction pad 32 frictionally engages with the rail 22,
The scaffold 10 is locked to the rail 22 via the main body 33.

第6A図、第6B図に示すリンク機構26.27は第5
A図、第5B図に示すものと類似した構成を有するが、
リンク31Aの形状が異なっている。第6A図はフリー
状態を示し、第6B図はロック状態を示しており、その
作用は第5A図、第5B図の場合と同一であるので説明
を省略する。
The link mechanism 26, 27 shown in FIGS. 6A and 6B is the fifth
It has a configuration similar to that shown in Figures A and 5B, but
The shape of the link 31A is different. FIG. 6A shows a free state, and FIG. 6B shows a locked state, and since the operation is the same as that in FIGS. 5A and 5B, the explanation will be omitted.

第7A図および第7B図は、くさび状をしているキャン
バ一部材35Bをリンク31Bと組み合せたタイプのリ
ンク機構26.27を示している。
7A and 7B show a link mechanism 26, 27 of a type in which a wedge-shaped camber member 35B is combined with a link 31B.

第7A図はフリー状態を示しており、油圧シリンダ29
Bは収縮しており、キャンバ一部材35Bはフリクショ
ンバッド32を取付けたリンク節34Bを鉄筋コンクリ
ートCに向けて押圧していない、しかし、第7B図で示
すロック状態においては、油圧シリンダ29Bが伸長し
てキャンバ一部材35Bを前方に押圧するので、リンク
節34Bは鉄筋コンクリートCに向けて押圧される。そ
の結果、足場10は本体部33Bを介してレール22に
対して固定されるのである。
FIG. 7A shows a free state, in which the hydraulic cylinder 29
B is contracted, and the camber member 35B does not press the link node 34B to which the friction pad 32 is attached toward the reinforced concrete C. However, in the locked state shown in FIG. 7B, the hydraulic cylinder 29B is extended. Since the camber member 35B is pressed forward, the link node 34B is pressed toward the reinforced concrete C. As a result, the scaffold 10 is fixed to the rail 22 via the main body portion 33B.

クライミングアップ工法による脚部6.7のコンクリー
ト打設作業が進行すれば、最終的には第1A図で示ずよ
うに、脚部6のコンクリート打設用足場10の内側足場
10Aと、脚部7の足場11の外側足場11Aとが分流
部8の下方において合流する(部分35)、なお、第1
八図中、符号11Bは脚部7の足場11の外側を示して
いる。
As the concrete placement work for the legs 6.7 by the climbing up method progresses, the inner scaffold 10A of the concrete casting scaffold 10 for the legs 6 and the legs 6. The outer scaffold 11A of the scaffold 11 of No. 7 merges with the outer scaffold 11A below the diversion section 8 (part 35).
In Figure 8, reference numeral 11B indicates the outside of the scaffold 11 of the leg portion 7.

第1A図゛に示すような状態になってしまうと内側足場
10A、IIAを合流部分35よりも上方へ押し上げる
ことはできない、そこで、第1B図で示すように、外側
足場10B、11Bのみを上方へ押し上げ、且つ合流部
分35の上方に連結足場36を組み立てる。これによっ
て脚部6の上端は足場10Bと36とによって包囲され
、脚部7の上端は足場36と11Bとによって包囲され
るので、脚部6.7の上端に鉄筋12を植え込み、型枠
を設置してコンクリートを打設することができる。そし
て第1C図に示すように外側足場10BおよびIIBを
更に上方まで押し上げ且つ連結足場36を更に貴く組み
上げ、型枠を設置する。
If the state shown in FIG. 1A is reached, the inner scaffolds 10A and IIA cannot be pushed upward beyond the confluence portion 35. Therefore, as shown in FIG. 1B, only the outer scaffolds 10B and 11B are pushed upward. and assemble the connecting scaffold 36 above the merging portion 35. As a result, the upper end of the leg 6 is surrounded by the scaffolds 10B and 36, and the upper end of the leg 7 is surrounded by the scaffold 36 and 11B, so reinforcing bars 12 are implanted at the upper end of the leg 6.7, and the formwork is It can be installed and concrete can be poured. Then, as shown in FIG. 1C, the outer scaffolds 10B and IIB are further pushed upward, the connecting scaffold 36 is assembled even more tightly, and the formwork is installed.

その後、連結足場36を第1D図で示すように左右両方
向に継ぎ足して、連結足場の下部の巾を広くして安定性
を向上すると共に、支柱の分流部8を足場10B、II
Bおよび連結足場36で包囲する。そして第1E図で示
すように連結足場36を更に高く組み立て且つ分流部8
の下半部の形状に合せて型枠37を設置する。そして分
流部の下半部に鉄筋コーンクリートを打設する。
After that, as shown in FIG. 1D, connecting scaffolds 36 are added in both the left and right directions to increase the width of the lower part of the connecting scaffolds to improve stability, and to connect the branch parts 8 of the columns to the scaffolds 10B, II.
B and connecting scaffold 36. Then, as shown in FIG.
A formwork 37 is installed to match the shape of the lower half. Then, a reinforced cone concrete will be installed in the lower half of the diversion section.

次に分流部8の上半部へ第1F図で示すように鉄筋12
を植え込み、コンクリート型枠38を設置する。ここで
、その上半部は連結足場36、足場10B、11Bで包
囲されている。そして型枠38を設置された上手部に鉄
筋コンクリートを打設すれば分流部8のコンクリート打
設が完了する(第1G図)。
Next, as shown in Fig. 1F, a reinforcing bar 12 is inserted into the upper half of the diversion section 8.
and concrete formwork 38 is installed. Here, its upper half is surrounded by the connecting scaffold 36 and the scaffolds 10B and 11B. Then, by pouring reinforced concrete into the upper part where the formwork 38 is installed, the concrete pouring of the diversion section 8 is completed (Fig. 1G).

分流部8の鉄筋コンクリート打設作業が完了したならば
、分流部8の上方の垂直部9(第9図)の鉄筋コンクリ
ート打設作業を行う。
Once the reinforced concrete placement work for the diversion section 8 is completed, the reinforced concrete placement work for the vertical section 9 (FIG. 9) above the diversion section 8 is carried out.

垂直部9の鉄筋コンクリート打設に一際して、先ず、足
場10BおよびIIBの区画14.15を第1H図で示
すように垂直に立てる。垂直部9の形状に対応した型枠
を設置するように足場を組み立てるためである0次に養
生期間が経過した部分のコンクリート型枠38を取り外
し、足場10B、11Bを垂直部9の側部に位置するよ
うに上方へ押し上げ、且つ型枠39を設置する(第1I
図)。
Before placing reinforced concrete in the vertical section 9, first, sections 14 and 15 of the scaffolding 10B and IIB are erected vertically as shown in Fig. 1H. Remove the concrete formwork 38 in the part where the curing period has elapsed for assembling the scaffold so as to install a formwork corresponding to the shape of the vertical part 9, and install the scaffolds 10B and 11B on the side of the vertical part 9. push it upward so that it is in the correct position, and install the formwork 39 (1st I
figure).

そして、鉄筋コンクリートを打設する。その後、足場1
0BおよびIIBを漸次上方へ押し上げつつ通常のクラ
イミングアップ工法と同一の態様にて、垂直部9の鉄筋
コンクリートの打設作業を行うのである(第1J図、第
1K図、第1L図)。
Then, reinforced concrete is poured. After that, scaffolding 1
The work of placing reinforced concrete in the vertical section 9 is carried out in the same manner as the normal climbing up method, while gradually pushing up 0B and IIB (Fig. 1J, Fig. 1K, Fig. 1L).

[まとめコ 以上説明したように、本発明のコンクリート柱形成工法
によれば、二又に分かれた分流部を有する支柱を形成す
る場合に、その支柱全体を包囲するような巨大な足場を
組み立てる必要がなく、所謂クライミングアップ工法の
特色を利用してコンクリート打設作業を行うことができ
る。したがって、そのような支柱を構築する作業労力お
よびコストを大巾に低減することができるのである。
[Summary] As explained above, according to the concrete column forming method of the present invention, when forming a column having a bifurcated branch, it is necessary to assemble a huge scaffold that surrounds the entire column. There is no problem, and concrete pouring work can be performed using the characteristics of the so-called climbing up method. Therefore, the labor and cost of constructing such supports can be greatly reduced.

なお、本発明の工法は橋の支柱の形成にのみ用いられる
ものではなく、二又に分かれた分流部を有する建造物を
形成する全ての場合に適用し得る旨を付記する。
It should be noted that the construction method of the present invention is not only used for forming bridge supports, but can be applied to all cases of forming a structure having a bifurcated watershed.

【図面の簡単な説明】[Brief explanation of the drawing]

第1A図、第1B図、第1C図、第1D図、第1E図、
第1F図、第1G図、第1H図、第1I図、第1J図、
第1K図、第1L図はそれぞれ本発明の工法によってコ
ンクリート柱が形成される様子を説明する正面図、第2
A図、第2B図はそれぞれ本発明の実施例で用いられる
ジヤツキの側面図および正面図、第3A図はクライミン
グアップ工法を用いてコンクリート柱の脚部を形成する
様子を示す正面図、第3B図は第3A図に示す脚部およ
び足場の側面図、第3C図は第3A図に示す脚部および
足場の底面図、第4A図、第4B図、第4C図はそれぞ
れ足場を上方へ押し出す工程を説明する側面図、第5A
図、第5B図は足場を鉄筋コンクリートにロックするリ
ンク機構をそれぞれ説明する側面図、第6A図、第6B
図はリンク機構の他の構成をそれぞれ説明する側面図、
第7A図、第7B図は更に別のリンク機構の構成をそれ
ぞれ説明する側面図、第8図は二又に分かれた分流部を
有する支柱を備えた橋の正面図、第9図は第8図におけ
る支柱の正面図である。 4・・・支柱  6.7・・・脚部  8・・・分流部
  9・・・垂直部  10.11・・・足1%  I
OA、11A・・・脚部内側の足場10B、11B・・
・脚部外側の足場  12・・・鉄筋  23・・・ジ
ヤツキ  26.27・・・リンク機1*   35・
・・合流部分36・・・連結足yR37,38,39・
・・型枠 笛 2A図 第5A図 第55図 第6A図 第bB図 第7,41 第78図 CIF3
Figure 1A, Figure 1B, Figure 1C, Figure 1D, Figure 1E,
Figure 1F, Figure 1G, Figure 1H, Figure 1I, Figure 1J,
Figure 1K and Figure 1L are a front view and Figure 2, respectively, illustrating how a concrete column is formed by the method of the present invention.
Figures A and 2B are a side view and a front view of the jack used in the embodiment of the present invention, respectively, Figure 3A is a front view showing how the legs of a concrete column are formed using the climbing up method, and Figure 3B is a front view of the jack used in the embodiment of the present invention. The figure is a side view of the legs and scaffolding shown in Fig. 3A, Fig. 3C is a bottom view of the legs and scaffolding shown in Fig. 3A, and Figs. 4A, 4B, and 4C are respectively pushing the scaffold upward. Side view explaining the process, No. 5A
Fig. 5B is a side view, Fig. 6A, and Fig. 6B are respectively illustrative of the link mechanism that locks the scaffolding to reinforced concrete.
The figures are side views explaining other configurations of the link mechanism,
7A and 7B are side views each illustrating the configuration of another link mechanism, FIG. 8 is a front view of a bridge equipped with a support having a bifurcated flow divider, and FIG. It is a front view of the support column in a figure. 4... Support column 6.7... Leg part 8... Diversion part 9... Vertical part 10.11... Leg 1% I
OA, 11A... Scaffolding inside the leg 10B, 11B...
・Scaffolding on the outside of the leg 12...Reinforcing bar 23...Jet 26.27...Link machine 1* 35.
・・Confluence part 36・Connecting legs yR37, 38, 39・
...Formwork whistle Figure 2A Figure 5A Figure 55 Figure 6A Figure bB Figure 7, 41 Figure 78 CIF3

Claims (1)

【特許請求の範囲】[Claims] 二又に分かれた分流部を有するコンクリート柱を形成す
る工法において、コンクリート柱の脚部に沿って足場を
漸次上方へ押し上げつつコンクリートを打設する工程と
、脚部の内側の足場が合流する部分の上方に連結足場を
組み立て、且つ脚部の外側の足場を上方へ押し上げる工
程と、連結足場および脚部外側の足場によって囲まれた
分流部にコンクリートを打設する工程と、分流部上方の
垂直部に沿って上記の脚部外側の足場を漸次上方へ押し
上げつつその垂直部にコンクリートを打設する工程とを
含むことを特徴とするコンクリート柱形成工法。
In the construction method of forming a concrete column with a bifurcated branch, the process of pouring concrete while gradually pushing the scaffolding upward along the legs of the concrete column, and the part where the scaffolding inside the legs join together. The process of assembling the connecting scaffold above and pushing the scaffolding outside the leg upwards, the process of pouring concrete in the diversion area surrounded by the connecting scaffold and the scaffolding outside the leg, and the process of placing concrete in the vertical area above the diversion area. A method for forming a concrete column comprising the step of gradually pushing up the scaffolding outside the leg part along the vertical part and pouring concrete in the vertical part thereof.
JP25471487A 1987-10-12 1987-10-12 Construction method for forming concrete pillar Granted JPH0197706A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP25471487A JPH0197706A (en) 1987-10-12 1987-10-12 Construction method for forming concrete pillar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP25471487A JPH0197706A (en) 1987-10-12 1987-10-12 Construction method for forming concrete pillar

Publications (2)

Publication Number Publication Date
JPH0197706A true JPH0197706A (en) 1989-04-17
JPH0532524B2 JPH0532524B2 (en) 1993-05-17

Family

ID=17268828

Family Applications (1)

Application Number Title Priority Date Filing Date
JP25471487A Granted JPH0197706A (en) 1987-10-12 1987-10-12 Construction method for forming concrete pillar

Country Status (1)

Country Link
JP (1) JPH0197706A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019143425A (en) * 2018-02-23 2019-08-29 本州四国連絡高速道路株式会社 Scaffold installation method and scaffold installation structure
JP2025073847A (en) * 2023-10-27 2025-05-13 日鉄エンジニアリング株式会社 Work scaffolding, method for removing work scaffolding, and method for installing work scaffolding

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019143425A (en) * 2018-02-23 2019-08-29 本州四国連絡高速道路株式会社 Scaffold installation method and scaffold installation structure
JP2025073847A (en) * 2023-10-27 2025-05-13 日鉄エンジニアリング株式会社 Work scaffolding, method for removing work scaffolding, and method for installing work scaffolding

Also Published As

Publication number Publication date
JPH0532524B2 (en) 1993-05-17

Similar Documents

Publication Publication Date Title
KR102296982B1 (en) Transfer Structure Construction Method Using U-shaped Steel Girder
JP2010053574A (en) Construction method for tunnel entrance
JP2023090622A (en) How to construct a concrete building
JP3125652B2 (en) Bridge girder erection equipment
CN213978605U (en) Prefabricated pier-column connection structure
CN109837924B (en) Construction method for intersection part of lattice column and main body structure of foundation pit support
JP3752999B2 (en) Upper and lower integrated bridge and its construction method
JP3125653B2 (en) Bridge girder construction method
JPH0197706A (en) Construction method for forming concrete pillar
CN108468412A (en) A kind of prefabricated column connected node of inflection point and its assembly method
CN213804941U (en) Variable cross section day style of calligraphy empty stomach thin wall mound reinforcing bar subregion prefabricated bed-jig
JP2829363B2 (en) Formwork equipment for pillar construction
CN213116337U (en) Special tunnel lining platform truck of foldable widening section
JP3455115B2 (en) Hollow section bridge and method of constructing the same
JPH0759845B2 (en) Scaffold connection device for concrete column forming device
JPH09111721A (en) Construction method of pier and structure of pier
JP2635872B2 (en) How to build a composite structure
JPH0197705A (en) Construction method for forming concrete pillar
JPH0742114A (en) Construction method of concrete filled steel pipe multi-column type pier
JP3187618B2 (en) How to assemble beam reinforcement
JPH06306931A (en) Construction of steel frame reinforced concrete structure
JPH0949264A (en) Constructing method for reinforced concrete framework and structure, and member therefor
JP3369248B2 (en) How to join the bottom floor RPC column base
CN117188605A (en) A new type of large-diameter concrete cylinder construction structure and its construction method
JP3364185B2 (en) Temporary scaffold for assembling wooden ramen and method of assembling wooden ramen using the temporary scaffold

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees