JPH02101295A - Shield and lining method using the same - Google Patents

Shield and lining method using the same

Info

Publication number
JPH02101295A
JPH02101295A JP63253590A JP25359088A JPH02101295A JP H02101295 A JPH02101295 A JP H02101295A JP 63253590 A JP63253590 A JP 63253590A JP 25359088 A JP25359088 A JP 25359088A JP H02101295 A JPH02101295 A JP H02101295A
Authority
JP
Japan
Prior art keywords
shield
concrete
main body
jack
mortar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP63253590A
Other languages
Japanese (ja)
Inventor
Tomio Tamura
富雄 田村
Kikuo Ishida
石田 喜久雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsui Construction Co Ltd
Original Assignee
Mitsui Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsui Construction Co Ltd filed Critical Mitsui Construction Co Ltd
Priority to JP63253590A priority Critical patent/JPH02101295A/en
Publication of JPH02101295A publication Critical patent/JPH02101295A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/0607Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield being provided with devices for lining the tunnel, e.g. shuttering

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

PURPOSE:To perform curve construction by providing a concrete feeding means on a press ring section provided integrally with the main body of a rear shield and providing a drilling jack between a formwork support member provided on the inside of the press ring section and the main body. CONSTITUTION:When a shield 1 is advanced in the arrow A direction by one ring L1 of a formwork 13B, the ram 6a of a drilling jack 6 is fully protruded in the arrow B direction. The ram 6a is then retreated in the direction A by the distance L1, and the first concrete placement space 23 is formed between the formwork 13B, a gauge ring 11, a press ring section 5f and a construction joint face 29A. Concrete mortar 21 is placed in the space 23. A front shield 2 is drilled in the direction A, a rear shield 5 is drilled, the second concrete placement space is formed, and mortar 21 is placed in the space. When the ground is drilled by the distance L1, the drilling with the jack 6 is stopped.

Description

【発明の詳細な説明】 (a)、産業上の利用分野 本発明は、T!A場打ちコンクリート・モルタル(ここ
で言う[コンクリート・モルタル」とは。
DETAILED DESCRIPTION OF THE INVENTION (a) Industrial Application Field The present invention is directed to T! A: Cast-in-place concrete/mortar (What is meant by "concrete/mortar" here?

「コンクリート」又は「モルタル」の意である。It means "concrete" or "mortar."

以下同様。)により覆工を構築することの出来るシール
ド及び該シールドを用いた覆工の構築方法に関する。
Same below. ) and a method for constructing a lining using the shield.

(b)、従来の技術 従来、シールド掘削機等のシールドにより掘削されたト
ンネルの覆工を構築する際には、円環状のコンクリート
・モルタルを数個に分割した形状のセグメントをトンネ
ル径に応じて何種類も製造しなければならなかったが、
その不都合を解消するため、最近、シールド掘削機等に
より掘削されたトンネルの覆工を現場打ちコンクリート
・モルタルで構築するための種々の提案がなされている
。例えば、特開昭63−156198や特開昭63−1
56199に開示されているように、円筒状の外殻とプ
レスリングから構成され、テールボイドを有効に充填し
得るシールド掘削機もその一つである。
(b), Conventional technology Conventionally, when constructing a lining for a tunnel excavated by a shield such as a shield excavator, annular concrete mortar is divided into several segments according to the diameter of the tunnel. We had to manufacture several types of
In order to eliminate this inconvenience, various proposals have recently been made for constructing the lining of a tunnel excavated by a shield excavator or the like using cast-in-place concrete and mortar. For example, JP-A-63-156198 and JP-A-63-1
56199, a shield excavator consisting of a cylindrical outer shell and a press ring and capable of effectively filling the tail void is one example.

(C)1発明が解決しようとする問題点しかし、これで
は、プレスリングに相当する分シールドの機長が長くな
らざるを得す1曲線施工が困難であった。また、コンク
リート打設とシールド掘進を同時に行なうことが出来ず
1作業時間が長いという欠点を有していた。
(C) 1 Problem to be Solved by the Invention However, with this method, the length of the shield must be increased by the length corresponding to the press ring, making it difficult to construct a single curve. Another disadvantage is that concrete placement and shield excavation cannot be carried out at the same time, resulting in a long working time.

本発明は、上記の問題点を解消すべく、曲線施工が可能
で、作業時間も短くて済むシールド及び該シールドを用
いた覆工の構築方法を提供することを目的とする。
SUMMARY OF THE INVENTION In order to solve the above-mentioned problems, it is an object of the present invention to provide a shield that can be constructed in a curved line and requires less work time, and a method for constructing a lining using the shield.

(d)1問題点を解決するための手段 即ち1本発明の内、シールドの発明は、前シールド(2
)の本体(2c)と後シールド(5°)の本体(5d)
を相対的に移動自在に設けると共に、それ等本体(2c
、5d)間に、加圧ジヤツキ(9)を該前シールド(2
)の本体(2C)と該後シールド(5)の本体(5d)
を接続する形で設け、前記前シールド(2)の本体(2
c)と前記後シールド(5)の本体(5d)の接続部(
17)に、可撓性を有するシール部材(2b)を地山(
19)と機内空間(16)を遮断する形で設け、前記後
シールド(5)に、前記後シールド(5)の本体(5d
)と一体に形成されたプレスリング部(5f)を形成し
、該プレスリング部(5f)に、コンクリート供給手段
(5a)を、その供給方向をシールド掘進方向に設け、
更に前記プレスリング部(5f)の内側に、型枠支持部
材(11)をシールド掘進方向に移動自在に設け、該型
枠支持部材(11)と前記前シールド(2)の本体(2
c)との間に1wI進用ジヤツキ(6)を設けて構成さ
れる。
(d) Among the means for solving 1 problem, that is, 1 present invention, the shield invention is based on the front shield (2
) body (2c) and rear shield (5°) body (5d)
are relatively movable, and their main bodies (2c
, 5d), connect the pressure jack (9) to the front shield (2).
) body (2C) and the body (5d) of the rear shield (5)
The main body (2) of the front shield (2) is connected to the main body (2) of the front shield (2).
c) and the connection part (5d) of the rear shield (5)
17), a flexible sealing member (2b) is attached to the ground (
19) and the cabin space (16), and the rear shield (5) is provided with a main body (5d) of the rear shield (5).
), a press ring part (5f) is formed integrally with the press ring part (5f), and a concrete supply means (5a) is provided in the press ring part (5f), the supply direction of which is in the shield excavation direction,
Further, a formwork support member (11) is provided inside the press ring part (5f) so as to be movable in the shield excavation direction, and the formwork support member (11) and the main body (2) of the front shield (2) are provided.
c), and a 1wI advance jack (6) is provided between the two.

また1本発明の内、該シールドを用いた覆工の構築方法
の発明は、シールド(1)を用いて覆工(20)を構築
する際には、掘進用ジヤツキ(6)を駆動して型枠支持
部材(11)を掘進方向に移動させて、該型枠支持部材
(11)に型枠(13)を設置し、該型枠(13)とプ
レスリング部(5f)の間に形成された1次コンクリー
ト打設空間(23)にコンクリート・モルタル(21)
を打設し、次いで前記掘進用ジヤツキ(6)を駆動して
、前シールド(2)及び後シールド(5)の本体(5d
)を掘進方向に移動させると同時に、前記1次コンクリ
ート打設空間(23)と地山(19)の間に形成された
2次コンクリート打設空間(26)に、コンクリート・
モルタル(21)をコンクリート供給手段(5a)を介
して注入し、更に加圧ジヤツキ(9)を駆動して。
Further, one aspect of the present invention relates to a method for constructing a lining using the shield, when constructing the lining (20) using the shield (1), the excavation jack (6) is driven. The formwork support member (11) is moved in the excavation direction, the formwork (13) is installed on the formwork support member (11), and the formwork is formed between the formwork (13) and the press ring part (5f). Concrete and mortar (21) are placed in the primary concrete placement space (23).
and then drive the excavation jack (6) to remove the main bodies (5d) of the front shield (2) and the rear shield (5).
) is moved in the excavation direction, and at the same time, concrete is placed in the secondary concrete placement space (26) formed between the primary concrete placement space (23) and the ground (19).
Mortar (21) is injected via the concrete supply means (5a), and the pressure jack (9) is driven.

前記後シールド(5)の本体(5d)を前記前シールド
(2)に引き寄せると同時に、該引き寄せ動作に伴って
生じた、前記1次コンクリート打設空間(23)と他山
(19)の間の空間(31)に、コンクリート・モルタ
ル(21)を前記コンクリート供給手段(5a)を介し
て注入し、次いで前記プレスリング部(5f)を、該注
入された未硬化のコンクリート・モルタル(21)を押
圧する形で移動させるようにして構成される。また、掘
進用ジヤツキ(6)を駆動して、前シールド(2)及び
後シールド(5)の本体(5d)を掘進方向に移動させ
る際に、該前シールド(2)を該後シールド(5)の本
体(5d)に対して傾けた状態で行なうようにして構成
してもよい。
At the same time as the main body (5d) of the rear shield (5) is pulled toward the front shield (2), the space between the primary concrete placement space (23) and the other pile (19) that is generated due to the pulling operation. Concrete mortar (21) is poured into the space (31) through the concrete supply means (5a), and then the press ring part (5f) is poured into the uncured concrete mortar (21). It is configured so that it can be moved by pressing on it. Further, when driving the excavation jack (6) to move the main bodies (5d) of the front shield (2) and the rear shield (5) in the excavation direction, the front shield (2) is moved to the rear shield (5). ) may be configured to be performed while being tilted with respect to the main body (5d).

なお、括弧内の番号等は1図面における対応する要素を
示す便宜的なものであり、従って、本記述は図面上の記
載に限定拘束されるものではない。以下のr (e)、
作用」の欄についても同様である。
Note that the numbers in parentheses are for convenience to indicate corresponding elements in one drawing, and therefore, this description is not limited to the description on the drawing. r(e) below,
The same applies to the column "Effect".

(0)0作用 上記した構成により1本発明は、後シールド(5)の本
体(5d)と一体に形成されたプレスリング部(5f)
により、シールド(1)の掘進と同時にコンクリート打
設が行なわれるように作用する。
(0) 0 effect With the above-described configuration, the present invention provides a press ring portion (5f) integrally formed with the main body (5d) of the rear shield (5).
Therefore, the concrete is placed simultaneously with the excavation of the shield (1).

(f)、実施例 以下、図面に基づき1本発明の詳細な説明する。(f), Example Hereinafter, the present invention will be explained in detail based on the drawings.

第1図は本発明によるシールドの一実施例を示す正断面
図、 第2図は第1図の■−■線による断面図、第3図は本発
明によるシールドを構成する前後シールドの各本体の接
続部の拡大図、第4図乃至第9図は本発明によるシール
ドを用い、て覆工を構築する際の一例を示す工程図であ
る。
Fig. 1 is a front sectional view showing an embodiment of the shield according to the present invention, Fig. 2 is a sectional view taken along the line ■-■ in Fig. 1, and Fig. 3 is the main body of the front and rear shields constituting the shield according to the present invention. 4 to 9 are process diagrams showing an example of constructing a lining using the shield according to the present invention.

本発明によるシールド1は、第1図に示すように、前シ
ールド2及び後シールド5から構成されている。前シー
ルド2は円筒状に形成された本体2cを有しており1本
体2Cの前面、即ち第1図左側面にはカッター3が回転
自在に支持されている。カッター3は1本体2C内部の
空間を図中左右方向に遮断する形で設けられた隔壁2a
に設けられた駆動モーター3aと接続している。また、
隔壁2aには掘進用ジヤツキ6が複数個、第1図及び第
2図に示すように1本体2Cに沿った形で円環状に配列
設置されており、掘進用ジヤツキ6にはラム6aが矢印
A、B方向に突出後退自在に設けられている。ラム6a
の先端には円環状に形成されたゲージリング11がピン
継手7を介して装;nされている。
A shield 1 according to the present invention is composed of a front shield 2 and a rear shield 5, as shown in FIG. The front shield 2 has a main body 2c formed in a cylindrical shape, and a cutter 3 is rotatably supported on the front surface of the main body 2C, that is, the left side surface in FIG. The cutter 3 has a partition wall 2a provided to block the space inside the main body 2C in the horizontal direction in the figure.
The drive motor 3a is connected to the drive motor 3a provided in the drive motor 3a. Also,
On the bulkhead 2a, a plurality of digging jacks 6 are arranged in a circular ring along one main body 2C as shown in FIGS. It is provided so that it can protrude and retreat in the A and B directions. ram 6a
A gauge ring 11 formed in an annular shape is attached to the tip of the pin through a pin joint 7.

更に、隔壁2aには加圧ジヤツキ9が本体2Cに沿った
形で円環状に複数個配置されており、加圧ジヤツキ9に
はラム9aが矢印A、B方向に突出後退自在に設けられ
ている。また、本体2cの第1図右側の後端部及び後述
する後シールド5の本体5dの第1図左側の前端部から
構成される接続部17は、第1図及び第3図に示すよう
に、薄く円環状に形成されたシール部2dを有しており
、シール部2dの内周面にはゴム等の可撓性材料からな
るシール部材2b、2bが全周に互って環状に装着され
ている。なお、シール部2dの矢印A、B方向の長さL
3は、ラム9aの最大ストローク長よりやや長く形成さ
れている。
Furthermore, a plurality of pressurizing jacks 9 are arranged in an annular shape along the main body 2C on the partition wall 2a, and a ram 9a is provided on the pressurizing jack 9 so that it can protrude and retreat in the directions of arrows A and B. There is. In addition, a connecting portion 17 constituted by a rear end on the right side in FIG. 1 of the main body 2c and a front end on the left side in FIG. 1 of the main body 5d of the rear shield 5, which will be described later, is as shown in FIGS. , has a sealing part 2d formed in a thin annular shape, and sealing members 2b, 2b made of a flexible material such as rubber are attached to the inner peripheral surface of the sealing part 2d in an annular shape alternately around the entire circumference. has been done. Note that the length L of the seal portion 2d in the directions of arrows A and B
3 is formed slightly longer than the maximum stroke length of the ram 9a.

前シールド2の後方、即ち第1図右側には。Behind the front shield 2, that is, on the right side in Figure 1.

本体2cと同径の円筒状に形成された本体5dを有する
後シールド5が接続設置されており1本体5dの内側に
は、第4図に示すように、本体5dと一体に形成された
厚さT1なるプレスリング部5fが形成されている。プ
レスリング部5fの矢印A、B方向の長さL5は、後述
の型枠13の矢印A、B方向の1リング分の長さとラム
9aの最大ストローク長を加え合わせた長さより長く形
成されている。プレスリング部5fには、第1図及び第
2図に示すように、複数のコンクリート供給路5aが、
その供給方向を矢印A、B方向に平行に貫通穿設されて
おり、コンクリート供給路5aの一端は、プレスリング
部5fの側面、即ちプレス而5eに開口し、他端にはコ
ンクリート供給ホース30が接続されている。また、プ
レスリング部5fの内側には、前記ゲージリング11が
プレスリング部5fの内周面5cに接する形で矢印A、
B方向に摺動自在に設けられている。更に、ゲージリン
グ11には円環状に組立られた型枠13が第1図左右方
向に接続された形で設けられている。
A rear shield 5 having a cylindrical main body 5d having the same diameter as the main body 2c is connected and installed, and inside the main body 5d, as shown in FIG. A press ring portion 5f having a diameter T1 is formed. The length L5 of the press ring portion 5f in the directions of arrows A and B is longer than the sum of the length of one ring of the formwork 13 in the directions of arrows A and B, which will be described later, and the maximum stroke length of the ram 9a. There is. As shown in FIGS. 1 and 2, the press ring portion 5f has a plurality of concrete supply channels 5a.
The concrete supply path 5a is perforated in parallel to the directions of arrows A and B, and one end of the concrete supply path 5a opens to the side surface of the press ring section 5f, that is, the press ring section 5e, and the other end is connected to a concrete supply hose 30. is connected. Further, inside the press ring portion 5f, the gauge ring 11 is arranged as shown by the arrow A in contact with the inner circumferential surface 5c of the press ring portion 5f.
It is provided so as to be slidable in the B direction. Further, the gauge ring 11 is provided with a mold 13 assembled in an annular shape and connected in the left-right direction in FIG.

また、後シールド5の本体5dの第1図左方にはフラン
ジ5jが環状に形成されており、フランジ5jはピン継
手10を介して前記加圧ジヤツキ9のラム9aに接続さ
れている。更に1本体5dの第1図左側の前端部には、
第1図及び第3図に示すように、本体5dの外径よりや
や小さい外径を有する形で同心円筒状に形成されたシー
ル部5hが形成されており、シール部5hの外周面は前
記シール部材2bに接している。なお、シール部5hの
矢印A、B方向の長さL4は、前記シール部2dの長さ
L3と同程度に形成されている。
Further, a flange 5j is formed in an annular shape on the left side of the main body 5d of the rear shield 5 in FIG. 1, and the flange 5j is connected to the ram 9a of the pressure jack 9 via a pin joint 10. Furthermore, at the front end of the main body 5d on the left side in FIG.
As shown in FIGS. 1 and 3, a seal portion 5h is formed in a concentric cylindrical shape with an outer diameter slightly smaller than the outer diameter of the main body 5d, and the outer peripheral surface of the seal portion 5h is It is in contact with the seal member 2b. The length L4 of the seal portion 5h in the directions of arrows A and B is approximately the same as the length L3 of the seal portion 2d.

シールド1は、以上のような構成を有するので、トンネ
ル15の掘削に際しては、駆動モーター3aを駆動して
カッター3を回転させると共に。
Since the shield 1 has the above configuration, when excavating the tunnel 15, the cutter 3 is rotated by driving the drive motor 3a.

掘進用ジヤツキ6のラム6aを第1図左右方向に突出さ
せて、隔壁2aを介してカッター3を切羽22方向、即
ち矢印入方向に抑圧する。すると、その押圧力により、
切羽22と回転するカッター3は所定の接触圧力で接し
、切羽22はカッター3により掘削されると同時に、前
後シールド2.5は矢印入方向に推進してトンネル15
がシールド1の後方、即ち図中右方に形成されていく。
The ram 6a of the digging jack 6 is made to protrude in the left-right direction in FIG. 1, and the cutter 3 is suppressed in the direction of the face 22, that is, in the direction of the arrow, through the partition wall 2a. Then, due to the pressing force,
The face 22 and the rotating cutter 3 are in contact with each other with a predetermined contact pressure, and at the same time the face 22 is excavated by the cutter 3, the front and rear shields 2.5 are propelled in the direction of the arrow to open the tunnel 15.
is formed behind the shield 1, that is, to the right in the figure.

こうして、トンネル15が形成されていくにつれ、掘削
された地山上9の崩壊を防止するために覆工20を構築
する必要があるが、この覆工20の構築は以下の手順で
行なわれる。即ち、シールド1が型枠13の1リング分
の長さLlだけ矢印へ方伺に掘進した状態では、掘進用
ジヤツキ6のラム6aは、第4図に示すように、矢印B
方向にほぼ突出し切った状態となっており、加圧ジヤツ
キ9のラム9aは、掘進鹸と同じく矢印B方向にほぼ突
出し切ったままとなっている。
As the tunnel 15 is formed in this way, it is necessary to construct the lining 20 in order to prevent the excavated ground 9 from collapsing, and the construction of the lining 20 is performed in the following steps. That is, when the shield 1 is dug in the direction of the arrow by a length Ll corresponding to one ring of the formwork 13, the ram 6a of the digging jack 6 is moved in the direction of the arrow B as shown in FIG.
The ram 9a of the pressurizing jack 9 remains almost fully protruding in the direction of arrow B, similar to the digging jack.

この状態で、第5図に示すように、ラム6aを矢印入方
向に距IILIだけ後退させる。すると。
In this state, as shown in FIG. 5, the ram 6a is moved back by a distance IILI in the direction of the arrow. Then.

直前に打設されたコンクリート・モルタル21の打ち継
ぎ面29A及び型枠13Aからゲージリング】1が離れ
て矢印入方向に移動し、打ち継ぎ面29A及び型枠13
Aとゲージリング11との間に距、ILlなる空間が形
成される。そこで、該空間部分に1図中想像線で示すよ
うに、パンチプレートや鉄筋等からなる補強部材12を
設置し、更に型枠13Aに接する形で型枠13Bを組立
設置し、該型枠13B、ゲージリンク11、プレスリン
グ部5f及び打ち継ぎ面29Aの間に1次コンクリート
打設空間23を形成する。
Gauge ring] 1 separates from the pouring surface 29A of the concrete/mortar 21 and the formwork 13A that were placed just before and moves in the direction of the arrow,
A distance ILl is formed between A and the gauge ring 11. Therefore, as shown by the imaginary line in Figure 1, a reinforcing member 12 made of punch plates, reinforcing bars, etc. is installed in the space, and a formwork 13B is assembled and installed in contact with the formwork 13A. , a primary concrete placement space 23 is formed between the gauge link 11, the press ring portion 5f, and the pouring surface 29A.

この状態で、第6図に示すように、型枠13Bにコンク
リート供給管25を接続して、コンクリート供給管25
により1次コンクリート打設空間23中にコンクリート
・モルタル21を打設する。
In this state, as shown in FIG. 6, the concrete supply pipe 25 is connected to the formwork 13B.
Concrete mortar 21 is placed in the primary concrete placement space 23 by the following steps.

次に、カッター3を駆動すると共に、第7図に示すよう
に、掘進用ジヤツキ6を駆動して、ラム6aを矢印B方
向に突出させ、トンネル15の掘進を開始する。この際
、ラム6aはビン継手7、ゲージリング11を介して型
枠13がら反力を取る形となり、これにより前シールド
2は矢印A方向に掘進する。前シールド2が矢印入方向
に掘進すると、加圧ジヤツキ9を介して接続されている
後シールド5も前シールド2と共に矢印A方向に掘進を
開始し、その結果、後シールド5のプレスリング部5f
の通過した後には円環状の2次コンクリート打設空間2
6が形成される。そこで1前後シールド2,5の掘進と
同時に、コンクリートモルタル21をコンクリート供給
ホース30からコンクリ−1−供給路5aを介して吐出
口51から2次コンクリート打設空間26中に注入し、
2次コンクリート打設空間26をコンクリート・モルタ
ル21で充填する。こうして、1リングに相当する距I
JLIだけ掘進したところで、掘進用ジヤツキ6を介し
た掘進を停止する。
Next, the cutter 3 is driven, and as shown in FIG. 7, the excavation jack 6 is also driven to project the ram 6a in the direction of arrow B, thereby starting to excavate the tunnel 15. At this time, the ram 6a takes a reaction force from the formwork 13 via the bottle joint 7 and the gauge ring 11, so that the front shield 2 digs in the direction of arrow A. When the front shield 2 digs in the direction of the arrow A, the rear shield 5 connected via the pressure jack 9 also starts digging in the direction of the arrow A together with the front shield 2, and as a result, the press ring portion 5f of the rear shield 5
After passing through, there is a circular secondary concrete placement space 2.
6 is formed. Therefore, at the same time as the first and rear shields 2 and 5 are excavated, concrete mortar 21 is injected from the concrete supply hose 30 into the secondary concrete placement space 26 from the discharge port 51 via the concrete supply path 5a.
The secondary concrete placement space 26 is filled with concrete mortar 21. In this way, the distance I corresponding to one ring
After excavating by JLI, the excavation via the excavation jack 6 is stopped.

次に、この状態で、第8図に示すように、加圧ジヤツキ
9を駆動してラム9aを矢印入方向に距ML2だけ後退
させる。すると、ラム9aに接続された後シールド5の
本体5dも矢印A方向に距1%iL2だけ移動するので
、2次コンクリート打設空間26に打設されたコンクリ
ート・モルタル21の第1図左側に空間31が形成され
る。そこで、コンクリート・モルタル21を、2次コン
クリート打設空間26中への注入と同様の手順で、該空
間31にも注入、充填する。なお、この際。
Next, in this state, as shown in FIG. 8, the pressure jack 9 is driven to move the ram 9a backward by a distance ML2 in the direction of the arrow. Then, after being connected to the ram 9a, the main body 5d of the shield 5 also moves by a distance of 1% iL2 in the direction of the arrow A, so that it moves to the left side of the concrete mortar 21 placed in the secondary concrete placement space 26 in FIG. A space 31 is formed. Therefore, the concrete mortar 21 is injected into the space 31 to fill it in the same manner as in the injection into the secondary concrete placement space 26. In addition, at this time.

掘進用ジヤツキ6のラム6aの突出(即ち、トンネル1
5の掘進動作)と加圧ジヤツキ9のラム9aの後退(即
ち、後シールド5の前シールド2への引き寄せ動作)を
同時に行なって1作業時間を短縮することも可能である
The protrusion of the ram 6a of the excavation jack 6 (i.e., the tunnel 1
It is also possible to shorten one working time by simultaneously performing the digging operation of step 5) and the retreat of the ram 9a of the pressurizing jack 9 (that is, the pulling operation of the rear shield 5 toward the front shield 2).

こうして、距fiL1+L2に亙る2次コンクリート打
設空間26へのコンクリ−1・・モルタル21の打設、
充填が完了したところで、第9図に示すように、加圧ジ
ヤツキ9を駆動してラム9aを矢印B方向に距離L2だ
け突出させる。すると。
In this way, concrete 1...mortar 21 is placed in the secondary concrete placement space 26 over the distance fiL1+L2,
When the filling is completed, the pressure jack 9 is driven to project the ram 9a by a distance L2 in the direction of arrow B, as shown in FIG. Then.

ピン継手10を介して後シールド5の本体5dが矢印B
方向に距ML2だけ移動して、プレスリング部5fのプ
レス面5eが2次コンクリート打設空間26に打設され
たコンクリート・モルタル21を図中右側に押圧する。
The main body 5d of the rear shield 5 is connected to the arrow B through the pin joint 10.
By moving in the direction by a distance ML2, the press surface 5e of the press ring portion 5f presses the concrete mortar 21 placed in the secondary concrete placement space 26 to the right side in the figure.

ここで、2次コンクリート打設空間26へのコンクリ−
1−・モルタル21の打設からラム9aの矢印B方向へ
の突出までは短時間で行なわれるので、2次コンクリー
ト打設空間26に打設されたコンクリート・モルタル2
1は硬化していない。従って、プレスリング部5fによ
り第9図右側に押圧された未硬化のコンクリート・モル
タル21は、図中右側へ流動する。
Here, concrete is poured into the secondary concrete placement space 26.
1-.Since the process from placing the mortar 21 to protruding the ram 9a in the direction of arrow B takes a short time, the concrete/mortar 2 placed in the secondary concrete placing space 26
1 is not cured. Therefore, the unhardened concrete/mortar 21 pressed to the right side in FIG. 9 by the press ring portion 5f flows to the right side in the figure.

すると、先程の2次コンクリート打設空間26へのコン
クリート・モルタル21の打設時には充填し切れなかっ
た、コンクリート・モルタル21と地山19の間に形成
されたテールボイド27がコンクリート・モルタル21
で充填される。なお、コンクリート供給路5aの吐出口
51は、プレスリング部5fのプレス面5eに円環状に
複数個配置されているので、コンクリート・モルタル2
1が2次コンクリート打設空間26の全体に亙って均一
に充填され、かつ円環状のプレスリング部5fの側面全
面がプレス面5eとなっているので、均一に充填された
コンクリート・モルタル21をプレスリング部5fの全
周に亙り均一な圧力で抑圧することが出来、従ってテー
ルボイド27の充填動作は本体5d全周に互り均一で良
好な状態で行なわれる。
Then, the tail void 27 formed between the concrete mortar 21 and the ground 19, which was not completely filled when the concrete mortar 21 was poured into the secondary concrete placement space 26, is filled with the concrete mortar 21.
filled with. In addition, since a plurality of discharge ports 51 of the concrete supply path 5a are arranged in an annular shape on the press surface 5e of the press ring portion 5f, the concrete/mortar 2
1 is uniformly filled throughout the secondary concrete placement space 26, and the entire side surface of the annular press ring portion 5f serves as the press surface 5e, so that the concrete/mortar 21 is evenly filled. can be suppressed with a uniform pressure over the entire circumference of the press ring portion 5f, so that the filling operation of the tail void 27 is performed uniformly and in good condition around the entire circumference of the main body 5d.

なお、以上の作業工程において、加圧ジヤツキ9のラム
9aの矢印A、B方向の突出後退動作に伴って、前後シ
ールド2.5の本体2c、5dは突出後退量L2だけ離
れたり近づいたりするが、本体2c、5dの接続部17
は最大限離れたときでも、第3図に示すように、本体2
cに装着されたシール部材2b、2bにより、地山19
と本体2c、5d内の機内空間16は遮断されているの
で、地山19の土砂等が、接続部17から機内空間16
に侵入することはない。
In addition, in the above work process, as the ram 9a of the pressurizing jack 9 protrudes and retreats in the directions of arrows A and B, the main bodies 2c and 5d of the front and rear shields 2.5 move away or approach by the amount of protrusion and retreat L2. However, the connecting portion 17 of the main bodies 2c and 5d
As shown in Fig. 3, even when the main body 2 is as far away as possible,
The sealing members 2b, 2b attached to c
Since the interior space 16 inside the main bodies 2c and 5d is blocked off, the earth and sand from the ground 19 can be transferred from the connection part 17 to the interior space 16.
will not invade.

こうして、シールド1が1リング分掘進すると、掘進用
ジヤツキ6のラム6aは、第4図に示すように、矢印B
方向に突出した形となり、1リング分の覆工20の構築
が完了する。なお、1リング分の覆工2oが構築される
と1次の1リング分の覆工20を構築するため、既に述
べたように、掘進用ジヤツキ6のラムG aを、第5図
に示すように、矢印入方向に後退させて、ゲージリンク
11を矢印A方向に移動させるが、この際には、ゲージ
リング11と接触している部分のコンクリート・モルタ
ル21は、円環状に十分に固化しているので、打ち継ぎ
面29Aは崩壊することなく自立し、その後の補強部材
12の設置作業も円滑に行なわれる。
In this way, when the shield 1 digs one ring, the ram 6a of the digging jack 6 moves as shown by the arrow B.
The shape protrudes in the direction, and the construction of one ring's worth of lining 20 is completed. In addition, once the lining 2o for one ring is constructed, the lining 20 for the first ring is constructed, so as already mentioned, the ram G a of the excavation jack 6 is shown in Fig. 5. The gauge link 11 is moved in the direction of the arrow A by retreating in the direction indicated by the arrow as shown in FIG. Therefore, the splicing surface 29A stands on its own without collapsing, and the subsequent installation work of the reinforcing member 12 can be carried out smoothly.

こうして、シールド1が1リング分ずつ掘進とコンクリ
ート・モルタル21の打設を並行して行なっていくうち
に、何らかの理由で曲線施工を行なう場合には、前シー
ルド2を後シールド5に対して所定の向きに傾けて、上
述の手順と同様にしてシールド掘進とコンクリート・モ
ルタル打設の並行作業を行ない、1リング分の覆工20
を構築した後、更に前シールド2を後シールド5に対し
て所定の向きに傾けて、同様にシールド掘進とコンクリ
ート・モルタル打設の並行作業を行ない。
In this way, as the shield 1 is excavated one ring at a time and the concrete/mortar 21 is placed in parallel, if for some reason a curved construction is to be performed, the front shield 2 is moved to the rear shield 5 in a predetermined position. Excavate the shield and place concrete and mortar in parallel using the same procedure as above, and complete the lining for 1 ring by 20 mm.
After constructing the front shield 2, the front shield 2 is further tilted in a predetermined direction with respect to the rear shield 5, and parallel work of shield excavation and concrete/mortar pouring is similarly performed.

次の1リング分の覆工20を構築し、必要なだけ同じ作
業を繰り返すことにより、所望の曲線円筒状の覆工20
を構築することが出来る。この際、前後シールド2,5
の本体2c、5dは接続部17で折れ曲がるが、接続部
17のシール部材2b、2bが可撓性を有しており、か
つ加圧ジヤツキ9のラム9a及び掘進用ジヤツキ6のラ
ム6aが各々フランジ5j及びゲージリング11とピン
接合しているので、機内空間16と地山19の遮断状態
を保ちながら無理のない曲線施工を行なうことが可能と
なる。
By constructing the lining 20 for the next one ring and repeating the same operation as necessary, the desired curved cylindrical lining 20 is obtained.
can be constructed. At this time, the front and rear shields 2, 5
Although the main bodies 2c and 5d are bent at the connecting part 17, the sealing members 2b and 2b of the connecting part 17 are flexible, and the ram 9a of the pressure jack 9 and the ram 6a of the digging jack 6 are bent, respectively. Since it is pin-connected to the flange 5j and the gauge ring 11, it is possible to carry out reasonable curved construction while maintaining a state of isolation between the interior space 16 and the ground 19.

以上のように覆工20を構築していくと、コンクリート
・モルタル21の打ち継ぎ面29は。
As the lining 20 is constructed as described above, the pouring surface 29 of the concrete/mortar 21 becomes...

第1図に示すように、階段状に形成されることとなる。As shown in FIG. 1, it is formed in a step-like manner.

(g)8発明の効果 以上、説明したように本発明は、前シールド2の本体2
cと後シールド5の本体5dを相対的に移動自在に設け
ると共に、それ等本体2G、5d間に、加圧ジヤツキ9
を該前シールド2の本体2cと該後シールド5の本体5
dを接続する形で設け、前記前シールド2の本体2Cと
前記後シールド5の本体5dの接続部17に、可撓性を
有するシール部材2bを地山19と機内空間16を遮断
する形で設け、前記後シールド5に、前記後シールド5
の本体5dと一体に形成されたプレスリング部5fを形
成し、該プレスリング部5fに、コンクリート供給路5
8等のコンクリート供給手段を、その供給方向を矢印A
、B方向等のシールド掘進方向に設け、更に前記プレス
リング部5fの内側に、ゲージリング11等の型枠支持
部材をシールド掘進方向に移動自在に設け、該型枠支持
部材と前E己前シールド2の本体2cとの間に、掘進用
ジヤツキ6を設けて構成したので、テールボイド27が
、プレスリング部5fにより有効にコンクリート・モル
タル21で充填され、地盤沈下を誘発しない信頼性の高
いトンネル覆工20の構築が可能となる。
(g) 8 Effects of the Invention As explained above, the present invention provides the main body 2 of the front shield 2.
c and the main body 5d of the rear shield 5 are provided relatively movably, and a pressure jack 9 is provided between the main bodies 2G and 5d.
The main body 2c of the front shield 2 and the main body 5 of the rear shield 5
d is connected, and a flexible sealing member 2b is provided at the connecting portion 17 of the main body 2C of the front shield 2 and the main body 5d of the rear shield 5 in a form that blocks the ground 19 and the interior space 16. and the rear shield 5 is provided with the rear shield 5.
A press ring portion 5f is formed integrally with the main body 5d, and a concrete supply path 5 is connected to the press ring portion 5f.
8 grade concrete supply means, its supply direction is indicated by arrow A.
, is provided in the shield excavation direction such as the B direction, and furthermore, a formwork support member such as a gauge ring 11 is provided inside the press ring portion 5f so as to be movable in the shield excavation direction, and the formwork support member and the front Since the excavation jack 6 is provided between the shield 2 and the main body 2c, the tail void 27 is effectively filled with concrete/mortar 21 by the press ring part 5f, resulting in a highly reliable tunnel that does not induce ground subsidence. Construction of the lining 20 becomes possible.

また、後シールド5のプレスリング部5fは本体5dと
一体に形成されており、シールド1は、従来のシールド
掘削機等にみられた、外殻とプレスリング間等の摺動部
分を有しないので、シールド1の製作にあたって精密な
加工精度を必要とせず、容易に製作可能である。
Further, the press ring portion 5f of the rear shield 5 is formed integrally with the main body 5d, and the shield 1 does not have a sliding part between the outer shell and the press ring, which is found in conventional shield excavators. Therefore, the shield 1 does not require precise machining accuracy and can be easily manufactured.

また、シールド1を用いて覆工20を構築する際には、
掘進用ジヤツキ6を駆動してゲージリング11等の型枠
支持部材を掘進方向に移動させて、該型枠支持部材に型
枠13を設置し、該型枠13とプレスリング部5fの間
に形成された1次コンクリート打設空間23にコンクリ
ート・モルタル21を打設し、次いで前記掘進用ジヤツ
キ6を駆動して、前シールド2及び後シールド5の本体
5dを掘進方向に移動させると同時に、前記1次コンク
リート打設空間23と地山19の間に形成された2次コ
ンクリート打設空間26に、コンクリート・モルタル2
1をコンクリフト供給路5a等のコンクリート供給手段
を介して注入し、更に加圧ジヤツキ9を駆動して、前記
後シールド5の本体5dを前記前シールド2に引き寄せ
ると同時に、該引き寄せ動作に伴って生じた、前記1次
コンクリート打設空間23と地山19の間の空間31に
、コンクリート・モルタル21を前記コンクリート供給
手段を介して注入し、次いで前記プレスリング部5fを
、該注入された未硬化のコンクリート・モルタル21を
押圧する形で移動させるようにして構成したので、コン
クリート・モルタル21の打設とシールド掘進の並行作
業が可能となり5作業時間か短縮される。また、覆工2
0におけるコンクリート・モルタル21の打ち継ぎ面2
9を階段状に形成することが出来るので、止水効果の大
きいトンネル15の構築が可能となる。
In addition, when constructing the lining 20 using the shield 1,
The excavation jack 6 is driven to move the formwork support member such as the gauge ring 11 in the excavation direction, the formwork 13 is installed on the formwork support member, and the formwork 13 is installed between the formwork 13 and the press ring part 5f. Concrete mortar 21 is placed in the formed primary concrete placement space 23, and then the excavation jack 6 is driven to move the main bodies 5d of the front shield 2 and the rear shield 5 in the excavation direction, and at the same time, Concrete mortar 2 is placed in the secondary concrete placement space 26 formed between the primary concrete placement space 23 and the ground 19.
1 is injected through a concrete supply means such as a concrete supply channel 5a, and furthermore, the pressure jack 9 is driven to draw the main body 5d of the rear shield 5 to the front shield 2, and at the same time, along with the pulling operation. Concrete/mortar 21 is injected into the space 31 between the primary concrete placement space 23 and the ground 19 created by the concrete supply means, and then the press ring part 5f is Since the structure is such that the unhardened concrete mortar 21 is moved while being pressed, it is possible to carry out the work of placing the concrete mortar 21 and digging the shield in parallel, and the work time is shortened by 5 hours. In addition, lining 2
Pour joint surface 2 of concrete mortar 21 at 0
Since the tunnel 9 can be formed into a step-like shape, it is possible to construct a tunnel 15 with a large water-stopping effect.

また、掘進用ジヤツキ6を駆動して、前シールド2及び
後シールド5の本体5dを掘進方向に移動させる際に、
該前シールド2を該後シールド5の本体5dに対して傾
けた状態で行なうようにして構成すると、シールド1は
、地山19と機内空間16を遮断した状態のまま接続部
17で折れ曲がり、曲線施工が可能となり、シールド1
の適用範囲が拡大する。
Further, when driving the excavation jack 6 to move the main bodies 5d of the front shield 2 and the rear shield 5 in the excavation direction,
When the front shield 2 is configured to be tilted with respect to the main body 5d of the rear shield 5, the shield 1 is bent at the connecting portion 17 and curved while keeping the ground 19 and the interior space 16 isolated. Construction is now possible and Shield 1
The scope of application will be expanded.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明によるシールドの一実施例を示す正断面
図、 第2図は第1図の■−■線による断面図、第3図は本発
明によるシールドを構成する前後シールドの各本体の接
続部の拡大図、第4図乃至第9図は本発明によるシール
ドを用いて覆工を構築する際の一例を示す工程図である
。 1・・・・・・シールド 2・・・・・・前シールド 2b・・・・・・シール部材 2c・・・・・・本体 5・・・・・後シールド 5a・・・・・・コンクリート供給手段(コンクリ−1
−供給路) 5d・・・・・・本体 5f・・・・・・プレスリング部 6・・・・・・掘進用ジヤツキ 9・・・・・・加圧ジヤツキ 11・・・・・・型枠支持部材(ゲージリンク)13・
・・・・型枠 1G・・・・・・機内空間 17・・・・・・接続部 19・・・・・・地山 20・・・・・・覆工 1・・・・・コンクリート・モルタル 3・・・・・1次コンクリート打設空間6・・・ 2次
コンクリート打設空間 1・・・・・・空間
Fig. 1 is a front sectional view showing an embodiment of the shield according to the present invention, Fig. 2 is a sectional view taken along the line ■-■ in Fig. 1, and Fig. 3 is the main body of the front and rear shields constituting the shield according to the present invention. 4 to 9 are process diagrams showing an example of constructing a lining using the shield according to the present invention. 1...Shield 2...Front shield 2b...Seal member 2c...Body 5...Rear shield 5a...Concrete Supply means (concrete 1
- Supply path) 5d...Main body 5f...Press ring portion 6...Drilling jack 9...Pressure jack 11...Model Frame support member (gauge link) 13・
...Formwork 1G...In-machine space 17...Connection section 19...Mound 20...Lining 1...Concrete Mortar 3...Primary concrete placement space 6...Secondary concrete placement space 1...Space

Claims (3)

【特許請求の範囲】[Claims] (1)、筒状に形成された本体を有する前シールド及び
筒状に形成された本体を有する後シールドから構成され
るシールドにおいて、 前シールドの本体と後シールドの本体を相対的に移動自
在に設けると共に、 それ等本体間に、加圧ジャッキを該前シールドの本体と
該後シールドの本体を接続する形で設け、 前記前シールドの本体と前記後シールドの本体の接続部
に、可撓性を有するシール部材を地山と機内空間を遮断
する形で設け、 前記後シールドに、前記後シールドの本体と一体に形成
されたプレスリング部を形成し、該プレスリング部に、
コンクリート供給手段を、その供給方向をシールド掘進
方向に設け、更に前記プレスリング部の内側に、型枠支
持部材をシールド掘進方向に移動自在に設け、該型枠支
持部材と前記前シールドの本体との間に、掘進用ジャッ
キを設けて構成したシールド。
(1) In a shield consisting of a front shield having a cylindrical body and a rear shield having a cylindrical body, the body of the front shield and the body of the rear shield are relatively movable. At the same time, a pressure jack is provided between the bodies to connect the main body of the front shield and the main body of the rear shield, and a flexible A sealing member having a sealing member is provided to isolate the earth from the interior space of the machine, a press ring portion formed integrally with the main body of the rear shield is formed on the rear shield, and the press ring portion includes:
A concrete supplying means is provided whose supply direction is in the shield excavation direction, and further a formwork support member is provided inside the press ring part so as to be movable in the shield excavation direction, and the formwork support member and the main body of the front shield are provided. A shield consisting of a jack for digging in between.
(2)、特許請求の範囲第1項記載のシールドを用いて
覆工を構築する際には、 掘進用ジャッキを駆動して型枠支持部材を掘進方向に移
動させて、該型枠支持部材に型枠を設置し、 該型枠とプレスリング部の間に形成された1次コンクリ
ート打設空間にコンクリート・モルタルを打設し、 次いで前記掘進用ジャッキを駆動して、前シールド及び
後シールドの本体を掘進方向に移動させると同時に、 前記1次コンクリート打設空間と地山の間に形成された
2次コンクリート打設空間に、コンクリート・モルタル
をコンクリート供給手段を介して注入し、 更に加圧ジャッキを駆動して、前記後シールドの本体を
前記前シールドに引き寄せると同時に、 該引き寄せ動作に伴って生じた、前記1次コンクリート
打設空間と地山の間の空間に、コンクリート・モルタル
を前記コンクリート供給手段を介して注入し、 次いで前記プレスリング部を、該注入された未硬化のコ
ンクリート・モルタルを押圧する形で移動させるように
して構成した該シールドを用いた覆工の構築方法。
(2) When constructing a lining using the shield recited in claim 1, driving the excavation jack to move the formwork support member in the excavation direction; A formwork is installed in the mold, concrete mortar is placed in the primary concrete placement space formed between the formwork and the press ring part, and then the excavation jack is driven to remove the front shield and the rear shield. At the same time, concrete mortar is injected into the secondary concrete placement space formed between the primary concrete placement space and the ground through the concrete supply means, and further addition is performed. Driving the pressure jack to pull the main body of the rear shield to the front shield, and at the same time pouring concrete and mortar into the space between the primary concrete placement space and the ground created by the pulling operation. A method for constructing a lining using the shield, comprising: injecting concrete via the concrete supply means; and then moving the press ring part to press the injected uncured concrete/mortar.
(3)、掘進用ジャッキを駆動して、前シールド及び後
シールドの本体を掘進方向に移動させる際に、該前シー
ルドを該後シールドの本体に対して傾けた状態で行なう
ようにして構成した特許請求の範囲第2項記載の該シー
ルドを用いた覆工の構築方法。
(3) When the excavation jack is driven to move the bodies of the front shield and the rear shield in the excavation direction, the front shield is tilted with respect to the body of the rear shield. A method for constructing a lining using the shield according to claim 2.
JP63253590A 1988-10-07 1988-10-07 Shield and lining method using the same Pending JPH02101295A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP63253590A JPH02101295A (en) 1988-10-07 1988-10-07 Shield and lining method using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP63253590A JPH02101295A (en) 1988-10-07 1988-10-07 Shield and lining method using the same

Publications (1)

Publication Number Publication Date
JPH02101295A true JPH02101295A (en) 1990-04-13

Family

ID=17253487

Family Applications (1)

Application Number Title Priority Date Filing Date
JP63253590A Pending JPH02101295A (en) 1988-10-07 1988-10-07 Shield and lining method using the same

Country Status (1)

Country Link
JP (1) JPH02101295A (en)

Similar Documents

Publication Publication Date Title
JPH0511195B2 (en)
JP2936236B2 (en) Lining method of shield tunnel
JP2676691B2 (en) Construction method of shield and lining using shield
JPH02132295A (en) Constructing method for tunnel lining work
JP3309304B2 (en) Method of lining shield tunnel and frame structure of shield machine
JPH0519000B2 (en)
JP2881666B2 (en) Shield tunneling machine and shield tunnel construction method
JP3299904B2 (en) Wife formwork in shielded excavators
JP2634883B2 (en) Construction method of tunnel lining
JP4392577B2 (en) Tunnel construction method and shield excavator
JPH03281898A (en) Method for connecting shield tunnel to structure or shield tunnels each other, and device therefor
JPH02178500A (en) Shield excavator and lining constructing method
JP2704891B2 (en) Construction method of shield excavator and tunnel lining
JPS62206198A (en) Method of constructing tunnel lining
JPH02132297A (en) Lining work constructing method
JPH04353195A (en) Tunnel lining device and lining method
JPH055039B2 (en)
JPH0351499A (en) Cast-in-place lining shield excavator
JPH01312199A (en) Construction of tunnel linining work
JPH02225799A (en) Lining construction
JPH02178493A (en) Shield excavator
JPH07122398B2 (en) Shield excavator
JPH047490A (en) Backfilling method for tunnel and backfilling device for shield
JPH0642296A (en) Concrete placing device for tunnel lining
JPH02153198A (en) Shield excavator