JPH0220271Y2 - - Google Patents
Info
- Publication number
- JPH0220271Y2 JPH0220271Y2 JP5620883U JP5620883U JPH0220271Y2 JP H0220271 Y2 JPH0220271 Y2 JP H0220271Y2 JP 5620883 U JP5620883 U JP 5620883U JP 5620883 U JP5620883 U JP 5620883U JP H0220271 Y2 JPH0220271 Y2 JP H0220271Y2
- Authority
- JP
- Japan
- Prior art keywords
- steel pipe
- pile
- steel
- pipe pile
- support beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 229910000831 Steel Inorganic materials 0.000 claims description 43
- 239000010959 steel Substances 0.000 claims description 43
- 239000004570 mortar (masonry) Substances 0.000 claims description 9
- 239000004567 concrete Substances 0.000 description 5
- 238000010276 construction Methods 0.000 description 4
- 230000003014 reinforcing effect Effects 0.000 description 4
- 230000008878 coupling Effects 0.000 description 2
- 238000010168 coupling process Methods 0.000 description 2
- 238000005859 coupling reaction Methods 0.000 description 2
- 238000009415 formwork Methods 0.000 description 2
- 239000011150 reinforced concrete Substances 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
- Piles And Underground Anchors (AREA)
- Foundations (AREA)
Description
【考案の詳細な説明】
産業上の利用分野
この考案は線路下横断構造物の施工に使用され
る水平鋼管矢板端部支持の仮設構造物である受梁
と杭の結合装置に関するものである。[Detailed description of the invention] Industrial field of application This invention relates to a coupling device for a support beam and a pile, which is a temporary structure supporting the end of a horizontal steel pipe sheet pile, used in the construction of an under-track crossing structure.
考案の解決しようとする問題点
従来の水平鋼管矢板の端部支持構造物は現場に
て鉄筋コンクリート製の杭、受梁を施工するため
鉄筋組立、型枠組立、コンクリート打設等の大掛
りな作業となり、その杭と受梁の接合もコンクリ
ート打設による一体構造である。しかも水平鋼管
矢板の下部に本体構造のコンクリートボツクスを
現場施工した後は不要となる前記杭と受梁を解
体、撤去するので、その作業に相当の手間を要す
る。Problems that the invention aims to solve: Conventional horizontal steel pipe sheet pile end support structures require large-scale work such as reinforcing bar assembly, formwork assembly, and concrete pouring because reinforced concrete piles and support beams are constructed on site. Therefore, the connection between the pile and support beam is also an integral structure made by pouring concrete. Moreover, after the concrete box of the main structure is constructed on site at the bottom of the horizontal steel pipe sheet pile, the unnecessary piles and support beams must be dismantled and removed, which requires considerable effort.
この考案は前記従来の問題点を解消すべく開発
したもので、鋼管杭と鋼製受梁とを使用し、それ
らを簡便、確実な手段で接合し、杭、受梁の撤去
時には所要の箇所をガス切断することにより容易
に対処でき、大巾な工数の節減を可能ならしめる
べくしたものである。 This idea was developed to solve the above-mentioned conventional problems.It uses steel pipe piles and steel support beams, connects them by a simple and reliable means, and when the piles and support beams are removed, the required points can be removed. This can be easily handled by gas cutting, and it is possible to save a large amount of man-hours.
考案の構成とその実施例
この考案に係る受梁と杭の結合装置の要旨とす
るところは、鋼製受梁下面に、鋼管杭内径より小
径で、所要長さの鋼製筒体が突設して固定してあ
り、この鋼製筒体を鋼管杭内に挿入し、鋼製杭内
壁と鋼製筒体外壁間にモルタル類を充填硬化させ
たものである。Structure of the invention and its implementation examples The gist of the device for connecting support beams and piles according to this invention is that a steel cylindrical body with a diameter smaller than the inner diameter of the steel pipe pile and a required length protrudes from the lower surface of the steel support beam. This steel cylinder is inserted into a steel pipe pile, and mortar is filled and hardened between the inner wall of the steel pile and the outer wall of the steel cylinder.
その詳細を図示した実施例に基いて説明する。 The details will be explained based on the illustrated embodiment.
施工に際しては先ず鋼管杭1を線路Aの両側方
に所定間隔をもつて打込み、その鋼管杭1の頂部
にH形鋼等からなる受梁2を載置して鋼管杭1と
受梁2とを結合する。そしてこの結合手段がこの
考案に係るものである。すなわち鋼管杭1の位置
に対応する下面には、杭内径より小径の鋼管3が
溶接等により受梁2の下面に固定してあり、この
鋼管3を鋼管杭1の頭部内に挿入し、鋼管杭1の
内壁と鋼管3の外壁との間にモルタルあるいはコ
ンクリート等のモルタル類4が充填してある。 During construction, first, steel pipe piles 1 are driven on both sides of the track A at a predetermined interval, and a support beam 2 made of H-shaped steel or the like is placed on top of the steel pipe pile 1, and the steel pipe pile 1 and support beam 2 are connected to each other. combine. This coupling means is related to this invention. That is, on the lower surface corresponding to the position of the steel pipe pile 1, a steel pipe 3 having a diameter smaller than the inside diameter of the pile is fixed to the lower surface of the support beam 2 by welding or the like, and this steel pipe 3 is inserted into the head of the steel pipe pile 1, A mortar 4 such as mortar or concrete is filled between the inner wall of the steel pipe pile 1 and the outer wall of the steel pipe 3.
なお以上の結合部近傍の受梁2には梁の局部変
形防止のためのリブ5を設ける。また鋼管杭1の
内部には杭頭より2D1〜5D(Dは杭内径)の位置
に必要により落し蓋6を設ける。 Note that ribs 5 are provided on the receiving beam 2 near the above-mentioned joint to prevent local deformation of the beam. Moreover, a drop cover 6 is provided inside the steel pipe pile 1 at a position 2D 1 to 5D (D is the inside diameter of the pile) from the pile cap, if necessary.
また鋼管杭1内の土の上にモルタル類4をその
まま充填してもよい。 Further, the mortar 4 may be directly filled onto the soil inside the steel pipe pile 1.
ところで前記鋼管3の長さLは受梁2から鋼管
杭1への荷重伝達が有効となるよう0.5D〜2Dと
する。また結合強度が不足する際には鋼管杭1の
内壁、鋼管3の外壁に適宜異形鉄筋7をフープ状
に取付ける。 By the way, the length L of the steel pipe 3 is set to 0.5D to 2D so that the load can be effectively transmitted from the support beam 2 to the steel pipe pile 1. Further, when the bonding strength is insufficient, deformed reinforcing bars 7 are appropriately attached to the inner wall of the steel pipe pile 1 and the outer wall of the steel pipe 3 in a hoop shape.
受梁2の巾が鋼管杭1の径に等しいか、広い場
合には、その受梁2にモルタル注入口8、エアー
抜き口9を設ける。 If the width of the support beam 2 is equal to or wider than the diameter of the steel pipe pile 1, a mortar injection port 8 and an air vent 9 are provided in the support beam 2.
以上のようにして堤体の両側、すなわち線路A
の左右側に所要長さの受梁2を鋼管杭1上に仮置
きする。 As described above, both sides of the embankment body, that is, the track A
Temporarily place support beams 2 of the required length on the steel pipe piles 1 on the left and right sides of.
その後受梁2上に水平鋼管矢板10を順次継手
によつて連結しながら所要数挿入する。次いで水
平鋼管矢板10の下部の土砂を掘削し、本体のコ
ンクリートボツクスを掘削遂道内に造成し、それ
の完成後受梁2の各ブロツク間の接合箇所を外
し、鋼管杭1の頭部で落し蓋より若干下の部分を
ガス切断し、解体する。 Thereafter, a required number of horizontal steel pipe sheet piles 10 are sequentially connected onto the support beam 2 by joints and inserted. Next, the earth and sand at the bottom of the horizontal steel pipe sheet pile 10 is excavated, and a concrete box for the main body is created within the excavation path. After the box is completed, the joints between each block of the support beam 2 are removed, and the head of the steel pipe pile 1 is used to drop the lid. Gas cut the slightly lower part and dismantle it.
考案の効果
この考案は以上の構成からなり受梁と杭の結合
に際し、杭設置のずれを生じた場合でも容易にそ
の誤差を吸収でき、また型枠、鉄筋組立が不要で
あるとともにモルタル等の使用量も少なく、した
がつてモルタル類が硬化するまでの養生期間も短
くてよい。さらに従来の鉄筋コンクリート製の構
造に比較して施工、解体および撤去が容易で工期
の大巾短縮が可能となる。Effects of the invention This invention has the above-mentioned structure, and even if there is a deviation in the pile installation when connecting the support beam and the pile, it can easily absorb the error, and it does not require the assembly of formwork or reinforcing bars, and it does not require the use of mortar, etc. The amount used is small, and therefore the curing period until the mortar hardens can be shortened. Furthermore, compared to conventional reinforced concrete structures, it is easier to construct, dismantle, and remove, making it possible to significantly shorten the construction period.
第1図、第2図はこの考案を実施する線路下横
断構造物の施工状態の概要を示した断面図、第3
図、第4図はこの考案の実施例の平面図と縦断面
図、第5図は他の実施例の縦断面図である。
1……鋼管杭、2……受梁、3……鋼管、4…
…モルタル類、5……リブ、6……落し蓋、7…
…鉄筋、8……注入口、9……エアー抜き口、1
0……水平鋼管矢板、A……線路。
Figures 1 and 2 are cross-sectional views showing the outline of the construction state of the under-track crossing structure implementing this idea, and Figure 3
4 are a plan view and a longitudinal sectional view of an embodiment of this invention, and FIG. 5 is a longitudinal sectional view of another embodiment. 1... Steel pipe pile, 2... Support beam, 3... Steel pipe, 4...
...mortars, 5...ribs, 6...drop lids, 7...
...Reinforcing bar, 8...Inlet, 9...Air vent, 1
0...Horizontal steel pipe sheet pile, A...Railway.
Claims (1)
長さの鋼製筒体が突設して固定してあり、この鋼
製筒体を鋼管杭内に挿入し、鋼管杭内壁と鋼製筒
体外壁間にモルタル類を充填硬化させてある受梁
と杭の結合装置。 A steel cylindrical body with a diameter smaller than the inner diameter of the steel pipe pile and the required length is protruded and fixed on the lower surface of the steel support beam.This steel cylindrical body is inserted into the steel pipe pile, and the inner wall of the steel pipe pile and the steel cylindrical body are fixed. A beam and pile connection device in which mortar is filled and hardened between the outer walls of a cylindrical body.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP5620883U JPS59163609U (en) | 1983-04-15 | 1983-04-15 | Connecting device for support beams and piles |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP5620883U JPS59163609U (en) | 1983-04-15 | 1983-04-15 | Connecting device for support beams and piles |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS59163609U JPS59163609U (en) | 1984-11-01 |
| JPH0220271Y2 true JPH0220271Y2 (en) | 1990-06-04 |
Family
ID=30186530
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP5620883U Granted JPS59163609U (en) | 1983-04-15 | 1983-04-15 | Connecting device for support beams and piles |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS59163609U (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5860723B2 (en) * | 2012-02-24 | 2016-02-16 | 新日鉄住金エンジニアリング株式会社 | Floor slab bridge using square steel pipe and its construction method. |
| JP6266997B2 (en) * | 2014-02-17 | 2018-01-24 | 大成建設株式会社 | Pier construction method and steel pipe cap |
| JP6929170B2 (en) * | 2017-09-04 | 2021-09-01 | 株式会社竹中工務店 | Joint structure of steel pipe piles |
-
1983
- 1983-04-15 JP JP5620883U patent/JPS59163609U/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS59163609U (en) | 1984-11-01 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2543667B2 (en) | Rainwater storage tank | |
| JP2899463B2 (en) | Material | |
| JP2024042107A (en) | Underground structure design method, underground structure construction method, and underground structure | |
| JPH0325103A (en) | Joint work for pc pillar and pc cap beam | |
| JP3008795B2 (en) | Joint structure of reinforced concrete beams | |
| JPH0813494A (en) | Fixing method of earth retaining wall and timbering | |
| JPH084033A (en) | Construction method of the pressure barrier against the outer perimeter of the building | |
| JPH01315520A (en) | Construction method for underground external walls of buildings | |
| JPS5821848Y2 (en) | Precast Concrete Buzaiorinal Kisobarino | |
| JPH116162A (en) | Construction method for reinforced concrete underground external wall | |
| JPH0453223B2 (en) | ||
| JPS5855819B2 (en) | Reinforcement method for wall-type reinforced concrete structures | |
| JPH108482A (en) | Joint structure between trussed columns and piles and post-construction method for trussed columns | |
| JP2572680B2 (en) | Underground structure by reverse strike method | |
| JPH0339573A (en) | Construction method of underground wall of structure | |
| JPS5938553Y2 (en) | Reinforcement structure of existing culvert | |
| JP2001248168A (en) | Joint structure between column base and pile | |
| JPH0649897A (en) | Joining method for beam and pillar and precast concrete pillar applied to above method | |
| JPS6346833B2 (en) | ||
| JP2643760B2 (en) | How to build foundation beams | |
| JPH02128018A (en) | Construction of basement | |
| JPS5817846Y2 (en) | Column and beam joining equipment | |
| JPS5822605B2 (en) | Underground continuous wall construction method | |
| JPH06167017A (en) | Reinforcing member for cast-in-place pile and execution method for reinforcing member | |
| JPH04360908A (en) | Construction of underground continuous wall and formwork therefor |