JPH02225717A - Landslide protection using foundation pile - Google Patents

Landslide protection using foundation pile

Info

Publication number
JPH02225717A
JPH02225717A JP4618689A JP4618689A JPH02225717A JP H02225717 A JPH02225717 A JP H02225717A JP 4618689 A JP4618689 A JP 4618689A JP 4618689 A JP4618689 A JP 4618689A JP H02225717 A JPH02225717 A JP H02225717A
Authority
JP
Japan
Prior art keywords
protection wall
foundation pile
landslide protection
excavation
landslide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP4618689A
Other languages
Japanese (ja)
Inventor
Kazuma Misaka
一磨 三阪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fudo Tetra Corp
Original Assignee
Fudo Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fudo Construction Co Ltd filed Critical Fudo Construction Co Ltd
Priority to JP4618689A priority Critical patent/JPH02225717A/en
Publication of JPH02225717A publication Critical patent/JPH02225717A/en
Pending legal-status Critical Current

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

PURPOSE:To prevent the deformation of a landslide protection wall in case of excavation by providing an extension section extending upward from the last excavation surface to be planned to a foundation pile coming close to the landslide protection wall, and excavating in such a state as the landslide protection wall is supported by the inside thereof. CONSTITUTION:A foundation pile 2 driven by coming close to a landslide protection wall 1 is extended upward from the last excavation surface 3 to be planned, and an extension section 4 is swelled out on the way to provide a projection 5 coming into contact with the internal surface of the landslide protection wall 1. A landslide protection wall timbering is executed to the inside area A of the landslide protection wall 1, and excavation is made while preventing the transformation of the slide protection wall 1 by the foundation pile 2 to cut off the extension section 4 when the erection of the landslide protection wall timbering has been completed. According to the present constitution, the erection of the landslide protection wall timbering is surely carried out.

Description

【発明の詳細な説明】 (発明が属する技術分野) 本発明は建物構築予定地を掘削する際の山留め工法に関
する。
DETAILED DESCRIPTION OF THE INVENTION (Technical field to which the invention pertains) The present invention relates to a heap retaining method when excavating a planned building construction site.

(発明の課題とその特徴点) 建物荷重を支持する基礎杭は通常、建物構築予定地の掘
削に先立って打設されるが、この基礎杭を掘削時の山留
めにI極的に利用することは従来行われていない、 本発明は、基礎杭を掘削時における山留め壁の変形防止
に利用する新規工法を提供することを目的としているも
のであって、その構成上の特徴は特許請求の範囲に記載
したとおりである6すなわち1本発明では、山留め壁に
近接して打設される基礎杭に予定最終掘削面より上方に
延びる延長部を設け5この延長部に設けた張り出し部に
より山留め壁を内側から支持した状態で掘削を行い、前
記基礎杭を掘削時における山留め壁の変形防止に利用す
るが、掘削は通常の山留め支保工を併用し、て行い、山
留め壁の変形防止に利用した基礎杭の延長部は山留め支
保工の架設が完了した段階で切断もしくは取り外して撤
去する7本発明は基礎杭が場所打ち杭と既製杭の何れで
あっても適用でき、場所打ち杭の場合は、延長部を場所
打ち杭の延長もしくは既製材の建て込みで形成し、既製
杭の場合は、既製材から成る延長部を予め既製杭の上端
に連結しておく、そして、延長部が場所打ち杭の延長で
ある場合は、抗体を部分的に膨出させて張り出し部を形
成し、延長部が既製材から成る場合は、例えば、既製材
に予め取り付けておいた張り出し材を格納位置から張り
出し位置に回動させて張り出し部を形成する。
(Problem to be solved by the invention and its features) Foundation piles that support the building load are usually driven prior to excavation of the site where the building is planned to be constructed, but it is important to utilize these foundation piles for retaining piles during excavation. The purpose of the present invention is to provide a new construction method that uses foundation piles to prevent deformation of retaining walls during excavation, and its structural features are within the scope of the claims. 6 In other words, in the present invention, an extension part extending upward from the planned final excavation surface is provided on the foundation pile to be driven close to the retaining wall. Excavation was carried out with the foundation pile supported from the inside, and the foundation pile was used to prevent deformation of the retaining wall during excavation. The extension part of the foundation pile is cut or removed when the erection of the support is completed.7 The present invention can be applied whether the foundation pile is a cast-in-place pile or a ready-made pile; , the extension part is formed by extending a cast-in-place pile or by erecting ready-made timber; in the case of a ready-made pile, the extension part made of ready-made timber is connected in advance to the upper end of the ready-made pile; If it is an extension of a pile, the antibody is partially inflated to form an overhang, and if the extension is made of pre-fabricated material, for example, the overhang material previously attached to the pre-fabricated material is extended from the stored position. Rotate it into position to form an overhang.

(図面による発明の説明) 図面は基礎杭が場所打ちコンクリート杭である場合の説
明図であり、図中、1は山留め壁、2は山留め壁1に近
接した位置の基礎杭、2゛は山留め壁lから離れた位置
の基礎杭、3は予定最終掘削面を示している。
(Description of the invention using drawings) The drawing is an explanatory diagram when the foundation pile is a cast-in-place concrete pile, and in the figure, 1 is a retaining wall, 2 is a foundation pile located close to the retaining wall 1, and 2 is a retaining wall. Foundation pile 3 located away from wall l indicates the planned final excavation surface.

第1図の場合は、山留め壁1に近接して打設される基礎
杭2を予定最終掘削面3よりも上方に延長して打設し、
かつ、この延長部4の途中を膨出させて山留め壁1の内
面に接する張り出し部5を設けている。
In the case of Fig. 1, the foundation pile 2 that is driven close to the retaining wall 1 is extended above the planned final excavation surface 3, and
In addition, a projecting part 5 is provided in the middle of the extension part 4 to bulge out and come into contact with the inner surface of the retaining wall 1.

この図示の状態で山留め壁1の内側区域Aの掘削を開始
し、基礎杭2で山留め壁1の変形を防止しながら、L[
次、通常の山留め支保工を施して、掘削を進め、山留め
支保工の架設が完了した段階で延長部4を切断して撤去
する。
In this illustrated state, excavation of the inner area A of the retaining wall 1 is started, and while preventing the deformation of the retaining wall 1 with the foundation piles 2, the L[
Next, ordinary heaping shoring is applied, excavation is continued, and when the erection of the heaping shoring is completed, the extension portion 4 is cut and removed.

図示の場合は、延長部4を地表まで設けているが、延長
部4の長さは任意であり、また、張り出し部5の位置や
数も適当に選定すればよく、例えば、予定最終掘削面3
の直上位置に延長部兼張り出し部を形成する場合も本発
明に含まれる。
In the illustrated case, the extension part 4 is provided to the ground surface, but the length of the extension part 4 is arbitrary, and the position and number of the overhang parts 5 may also be selected appropriately. For example, the planned final excavation surface 3
The present invention also includes a case where an extension portion/projection portion is formed directly above the portion.

第2図は延長部を既製材6で形成する場合を示しており
、この場合は、基礎杭2を予定最終掘削面3の位1まで
打設した段階で、基礎杭打設用ケーシング内に既製材6
を入れ、基礎杭2の上に一体的に建て込んで延長部を形
成し、張り出し部は。
Figure 2 shows the case where the extension part is formed from ready-made timber 6. In this case, when the foundation pile 2 is driven to the final planned excavation surface 3, it is shown that the extension part is formed in the foundation pile driving casing. Ready-made lumber 6
and built it integrally on top of the foundation pile 2 to form an extension part, and the overhang part is.

基礎杭打設用ケーシングを引き抜いた後、既製材6に予
め回動自在に取り付けておいた張り出し材7を適宜手段
(例えばジヤツキ等)で格納位置から図示の張り出し位
置に回動させて形成しており、この場合の既製材6は撤
去後、再使用することができる。
After pulling out the foundation pile driving casing, the overhang material 7, which has been rotatably attached in advance to the ready-made lumber 6, is rotated from the storage position to the overhang position shown in the figure using an appropriate means (for example, jacks) to form the overhang material. In this case, the ready-made timber 6 can be reused after being removed.

基礎杭2が既製杭の場合は、図示しないが、予め基礎杭
の上端に第2図に示すような既製材6を着脱自在に連結
しておけばよい。
If the foundation pile 2 is a ready-made pile, although not shown, a ready-made material 6 as shown in FIG. 2 may be connected in advance to the upper end of the foundation pile in a detachable manner.

(発明の効果) 本発明は、以上のようなものであって、山留め壁に近接
して打設した基礎杭で山留め壁を一時的に支保し、掘削
時における山留め壁の変形を防1卜するので1本来の山
留め支保工の架設を容易かつ確実に行うことができると
ともに、堀削作業の安全性が向上する。
(Effects of the Invention) The present invention is as described above, in which the retaining wall is temporarily supported by foundation piles driven close to the retaining wall, thereby preventing deformation of the retaining wall during excavation. Therefore, the original pile shoring can be easily and reliably erected, and the safety of excavation work is improved.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は基礎杭が場所打ち杭で、延長部ら場所打ちであ
る場合の掘削開始前の状態を示す断面図。 第2図は基礎杭が場所打ち杭で、延長部が既製材である
場合の同上図である。 1−山留め壁、2,2° :基礎杭、3:予定最終掘削
面、4:延長部、5;張り出し部、6:既製材、7:張
り出し材。 特許出願人   不動建設株式会社 代理人弁理士  染 谷 廣 司 第1図 第2図
FIG. 1 is a sectional view showing the state before excavation starts when the foundation pile is a cast-in-place pile and the extension is cast-in-place. Figure 2 is the same diagram as above when the foundation piles are cast-in-place piles and the extensions are made of ready-made timber. 1 - retaining wall, 2,2°: foundation pile, 3: planned final excavation surface, 4: extension, 5: overhang, 6: ready-made timber, 7: overhang. Patent applicant: Fudo Construction Co., Ltd. Patent attorney: Hiroshi Sometani Figure 1 Figure 2

Claims (1)

【特許請求の範囲】[Claims] 山留め壁に近接して打設される基礎杭に予定最終掘削面
より上方に延びる延長部を設け、この延長部に設けた張
り出し部により山留め壁を内側から支持した状態で掘削
を行い、前記基礎杭を掘削時における山留め壁の変形防
止に利用することを特徴とする基礎杭利用の山留め工法
The foundation pile to be driven close to the retaining wall is provided with an extension extending upward from the planned final excavation surface, and excavation is carried out with the retaining wall supported from inside by the overhang provided on this extension, and the foundation pile is A mountain retaining construction method using foundation piles, characterized in that the piles are used to prevent deformation of the retaining wall during excavation.
JP4618689A 1989-02-27 1989-02-27 Landslide protection using foundation pile Pending JPH02225717A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4618689A JPH02225717A (en) 1989-02-27 1989-02-27 Landslide protection using foundation pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4618689A JPH02225717A (en) 1989-02-27 1989-02-27 Landslide protection using foundation pile

Publications (1)

Publication Number Publication Date
JPH02225717A true JPH02225717A (en) 1990-09-07

Family

ID=12740013

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4618689A Pending JPH02225717A (en) 1989-02-27 1989-02-27 Landslide protection using foundation pile

Country Status (1)

Country Link
JP (1) JPH02225717A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014051830A (en) * 2012-09-07 2014-03-20 Takenaka Komuten Co Ltd Method for restoring displacement of existing structure and structure

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5124016A (en) * 1974-08-22 1976-02-26 Obayashi Constr Co Ltd
JPS6414425A (en) * 1987-07-07 1989-01-18 Shimizu Construction Co Ltd Landslide protection wall method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5124016A (en) * 1974-08-22 1976-02-26 Obayashi Constr Co Ltd
JPS6414425A (en) * 1987-07-07 1989-01-18 Shimizu Construction Co Ltd Landslide protection wall method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014051830A (en) * 2012-09-07 2014-03-20 Takenaka Komuten Co Ltd Method for restoring displacement of existing structure and structure

Similar Documents

Publication Publication Date Title
JP5103516B2 (en) Pre-support tunnel construction method for large section tunnel
US3226933A (en) Sheeting wall system and method of constructing same
US5145291A (en) Method for forming a piling beneath a structure
JPH02225717A (en) Landslide protection using foundation pile
JP3002126B2 (en) Temporary receiving method for structures
JP3091859B2 (en) Piling method for shafts with openings at the top
JPS59134228A (en) Integration work of pile or continuous wall and footing
JPS6018769B2 (en) Construction method of underground structure
JPH0721196B2 (en) Reverse construction method of underground structure
JPH04115024A (en) Sheathing method
GB2233688A (en) Constructing an open space beneath a structure
JPS61151325A (en) Method of reinforcing pile head part against horizontal force
JP3275191B2 (en) Mountain retaining method
JPS61186623A (en) Method of building foundation of building
JPH0355610B2 (en)
JPH0447021A (en) Construction method for sheathing guide pile
JPS6049734B2 (en) How to form a basement
JPS6322916A (en) Construction of continuous underground wall in artificial islet
JPH06173282A (en) Construction method for underground structure under road
JPS5921831A (en) Reverse placement work
JPH03140594A (en) Construction work of water-stopping shaft
JP2001336164A (en) Working gantry for underground structure construction and its construction method
JPH0441817A (en) Sheathing method
JPS62296009A (en) Piling work
JPS59233028A (en) Residential land formation work on sloped ground