JPH0230896A - Water stopper for shield machine - Google Patents

Water stopper for shield machine

Info

Publication number
JPH0230896A
JPH0230896A JP63180588A JP18058888A JPH0230896A JP H0230896 A JPH0230896 A JP H0230896A JP 63180588 A JP63180588 A JP 63180588A JP 18058888 A JP18058888 A JP 18058888A JP H0230896 A JPH0230896 A JP H0230896A
Authority
JP
Japan
Prior art keywords
water
shield machine
concrete
tail plate
shield
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP63180588A
Other languages
Japanese (ja)
Inventor
Akio Shiseki
志関 彰男
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toda Corp
Original Assignee
Toda Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toda Corp filed Critical Toda Corp
Priority to JP63180588A priority Critical patent/JPH0230896A/en
Publication of JPH0230896A publication Critical patent/JPH0230896A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/0635Tail sealing means, e.g. used as end shuttering

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

PURPOSE:To enhance the reliability and economy of water stopping by a method in which packings provided to the periphery of prespring and the inner surface of the rear end of tail plate are concurrently or alternately operated according to operating methods of lining shield construction work. CONSTITUTION:A water-stop packing 9 is provided to the periphery of a prespring in an expandible and press force-adjustable manner for the inner surface of a tail plate 12. Also, a water-stop packing 16 is provided to the inner surface of the rear end of the plate 12 in an expandible and press force- adjustable manner for the periphery of an existing concrete 18. According to operating processes of a lining shield construction work to cover the wall of tunnel excavated by a shield machine with in-situ concrete, the packings 9 and 16 are concurrently or alternately used to prevent the intrusion of water from outside. Even in the ground of high groundwater pressure, highly reliable water stopping work can be attained.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、場所打ちライニングシールド工法における止
水装置に関し、特に地下水位の高い地盤においても信頼
性の高い止水装置を提供することより、場所打ちライニ
ングシールド工法に対する適用地盤条件を拡張できるよ
うにし、地下水位の高い地盤条件においても現場打ちラ
イニングシールド工法による経済的なトンネル構造を提
供できるようにしたものである。
[Detailed Description of the Invention] [Industrial Application Field] The present invention relates to a water stop device in the cast-in-place lining shield construction method, and in particular provides a water stop device that is highly reliable even in ground with a high groundwater level. The applicable ground conditions for the cast-in-place lining shield method can be expanded, and an economical tunnel structure using the cast-in-place lining shield method can be provided even in ground conditions where the groundwater level is high.

〔従来の技術〕[Conventional technology]

従来、地下水位の高い地盤においてはセグメントを用い
たトンネル覆工が行われており、地下水位が高い地盤に
おいて現場打ちライニングシールド工法が実施された例
はない。即ち、高水圧の場所打ちライニングシールドで
は適切なテール部止水方法がなくこのような条件では使
われていないのが現状である。一般に場所打ちライニン
グシールドでは新なコンクリート打設予定箇所において
は、プレスリングを打設箇所より切羽側によせて空間部
を作る必要がある。
Conventionally, tunnel lining using segments has been carried out in ground with a high groundwater level, and there is no example of a cast-in-place lining shield method being implemented in ground with a high groundwater level. In other words, the current situation is that there is no suitable way to stop water in the tail part of a cast-in-place lining shield with high water pressure, and it is not used under such conditions. In general, with cast-in-place lining shields, it is necessary to create a space by moving the press ring closer to the face than the place where new concrete is to be poured.

このとき外部からの侵入水に対して耐水能力が最も小さ
くなる期間であり、この状態でコンクその後プレスジヤ
ツキを伸ばしてプレスリングによって型枠の妻止めをな
し、さらにフレッシーコンクリートを投入後加圧作業を
するものである。なお、現場打ちライニングシールド工
法における止水方法として、例えば、特開昭63−63
896号、特開昭63−147097号などに開示され
ている技術があるが、これらはいずれもシールド機の推
進時において打設されたフレッシーコンクリートの遮水
効果を期待するもので、実るとは言えないものがある。
This is the period when the water-resistance ability against water intrusion from the outside is at its lowest, and in this state, the concrete is stretched out, the press jack is stretched out, the end of the formwork is secured by the press ring, and the fresh concrete is poured in, followed by pressurization. It is something that does. In addition, as a water stop method in the cast-in-place lining shield construction method, for example, Japanese Patent Application Laid-Open No. 63-63
There are technologies disclosed in Japanese Patent Application Laid-open No. 896 and Japanese Patent Application Laid-open No. 63-147097, etc., but all of these are expected to have a water-shielding effect on the fresh concrete placed during the propulsion of the shield machine, and have not been successful. There are things I can't say.

〔発明が解決しようとする問題点〕[Problem that the invention seeks to solve]

従来より実施されているセグメントを用いたトンネル覆
工ではセグメントの製作費が高いことと、セグメントの
組み立て及び裏込め注入などの作業時間が長くなるとい
う問題点があった。
Tunnel lining construction using segments, which has been carried out in the past, has had problems in that the production cost of the segments is high and the work time for assembling the segments and injecting backfilling is long.

また、前記の開示技術においては、シールド機の推進時
にはまだ固まらないフレッシュコンクリートに遮水効果
を期待しているため、その止水能力に高い信頼性が得ら
れないという問題点があった。本発明は上記問題点に鑑
みてなされたものであり、その目的は地下水位の高い地
盤条件においても現場打ちライニングシールド工法によ
る経済的なトンネル構造を提供することにある。
In addition, in the above-mentioned disclosed technology, since a water-blocking effect is expected from fresh concrete that has not yet solidified when the shielding machine is propelled, there is a problem in that high reliability cannot be obtained in its water-blocking ability. The present invention has been made in view of the above-mentioned problems, and its purpose is to provide an economical tunnel structure using the cast-in-place lining shield construction method even in ground conditions where the groundwater level is high.

〔問題点を解決するための手段〕[Means for solving problems]

この発明はシールド機により掘削したトンネル坑壁を現
場打ちコンクリートで覆工するライニングシールド工法
において、テールプレート内周に対し伸縮自在かつ押付
力の調整を自在にルプレート後端部内周に設けられた止
水パツキンとからなり、前記現場打ちライニングシール
ド工法における作業工程に応じて両止水パッキンを同時
又は交互に使用することによってシールド機の外部から
の浸水を防止できるようにしたことにより問題点を解決
したものである。
This invention uses a lining shield construction method in which a tunnel wall excavated by a shield machine is lined with cast-in-place concrete, and a tail plate is provided on the inner periphery of the rear end of the tail plate so that it can expand and contract with respect to the inner periphery and the pressing force can be freely adjusted. This problem has been solved by making it possible to prevent water from entering the shield machine from outside by using both water-stop packings simultaneously or alternately depending on the work process in the cast-in-place lining shield construction method. It is resolved.

〔作 用〕[For production]

本発明では前述の耐水能力の最も小さい作業時間にも耐
水能力を向上するため2箇所の止水装置を使い分けるも
のであり、前記作業時間中ネルコンクリートを外側から
締め付けることによって止水をする。このときは当然シ
ールド機が停止している状態であり、鉄筋組み立て、型
枠 組み立て、コンクリートMW作業が行われている時
間である。その後打ち込まれたフレッシーコンクリート
を加圧すればテール部の止水能力は大きくなるがプレス
リング外周から地下水等の侵入やコンクリートの漏洩が
ありうるのでその対策としてプレスリングに組み込まれ
た油圧ジヤツキと止水装置によって対処する。その後切
羽を掘進しながらシールド機は前進することになるので
、前記テール部の止水装置は作用させたままでは完成済
のコンクリートとこすられて損傷する恐れがあり、その
対策として事前にテール部止水装置を収縮格納させてか
らシールド機を前進させるものである。シールド前進時
には勿論プレスジヤツキによる加圧作業とプレスリング
に組み込んだ止水装置は作動させたままである。
In the present invention, two water stop devices are used to improve the water resistance even during the working time when the water resistance is the smallest, and water is stopped by tightening the flannel concrete from the outside during the working time. At this time, the shielding machine was of course stopped, and reinforcing steel assembly, formwork assembly, and concrete MW work were being carried out. If the poured fresh concrete is then pressurized, the water-stopping ability of the tail section will be increased, but there is a possibility that underground water etc. may infiltrate from the outer periphery of the press ring or leakage of concrete, so as a countermeasure, a hydraulic jack built into the press ring is used. Deal with this problem by using a water stop device. After that, the shield machine will move forward while excavating the face, so if the water stop device at the tail section is left in operation, there is a risk that it will rub against the finished concrete and be damaged. The shield machine is moved forward after the water stop device is retracted and retracted. Of course, when the shield moves forward, the pressurizing work by the press jack and the water stop device built into the press ring remain in operation.

前記手段による作用は現場打ちライニングシールド工法
の作業工程に応じて以下のように説明される。
The effect of the above means will be explained as follows according to the work process of the cast-in-place lining shield construction method.

(1)  コンクリート打設予定部での鉄筋・型枠の組
み立て作業時にはテールプレート後端部内周に設けられ
た止水パツキンを硬化し始めた既設コンクリート外周に
押し付けることにより、シールド機の外部からの侵入を
防止する。
(1) When assembling reinforcing bars and formwork in areas where concrete is to be poured, the water-stop gasket provided on the inner periphery of the rear end of the tail plate is pressed against the outer periphery of existing concrete that has begun to harden, thereby preventing water from entering the shield machine from outside. Prevent intrusion.

(2)  コンクリートの打設及び加圧作業並びにシー
ルド機の推進作業時においては、プレスリング外周に設
けられた止水パツキンをテールプレート内周に押し付け
ることにより、地下水や泥水工法を採用した場合の泥水
がフレッシーコンクリートとテールプレートの境界面か
ら侵入するのを防止する。
(2) During concrete placement and pressurization work, as well as shield machine propulsion work, by pressing the water-stop gasket provided on the outer periphery of the press ring against the inner periphery of the tail plate, it is possible to prevent the Prevents muddy water from entering from the interface between fresh concrete and tail plate.

(3)トンネル坑内での作業を中断しているときには、
上記2種類の止水パツキンを同時に作業させ、不測の浸
水を2重に防止することも可能である。
(3) When work inside the tunnel is suspended,
It is also possible to operate the above two types of water-stop gaskets at the same time to double prevent unexpected flooding.

〔実施例〕〔Example〕

本発明の構成はシールド機1内に設けたプレスジヤツキ
2によって前後に摺動する断面箱型のプレスリング3を
プレスジャ・ツキ2の後端に取り付け、プレスリング3
の外周側板4に一定間隔を保って多数の孔5を穿ち、該
孔5の位置する箇所においてプレスリング3の内部にプ
レスリング3の外周方向に突出するロッド6を有するオ
イルジヤツキ7を孔5の数だけ設け、複数のロッド6に
またがって円周方向に於いて数個に分割したアングル材
8を複数のロッド6の先端に取り付けると共に、複数の
アングル材8の外周に弾力性のある無端状の止水パツキ
ン9を取り付け、かつオイルジヤツキ7にオイルホース
10を連結し、更にプレスリング3の内周にも弾力性の
ある無端状の止水パツキン11を取り付けるものである
。一方シールド機1のテールプレート12の後方におい
て、テールプレート12の全周に一定間隔毎に内部に突
出するロッド13を有するオイルジヤツキ14を設け、
該ロッド13の内端に複数に分割した平板状のパッキン
受は金具15を設け、受は金具15の内周に弾力性の有
る無端状の′止水パツキンi6を設けると共に、オイル
ジヤツキ14にオイルホース17を連結してなるもので
ある。
The configuration of the present invention is such that a press ring 3 having a box-shaped cross section that slides back and forth by a press jack 2 provided in a shielding machine 1 is attached to the rear end of the press jack 2.
A large number of holes 5 are bored at regular intervals in the outer peripheral side plate 4 of the press ring 3, and an oil jack 7 having a rod 6 protruding toward the outer circumference of the press ring 3 is inserted into the inside of the press ring 3 at the location where the holes 5 are located. The angle members 8 are divided into several pieces in the circumferential direction across the plurality of rods 6 and are attached to the tips of the plurality of rods 6, and the outer periphery of the plurality of angle members 8 is provided with an elastic endless shape. A water stop gasket 9 is attached thereto, an oil hose 10 is connected to the oil jack 7, and an elastic endless water stop gasket 11 is also attached to the inner periphery of the press ring 3. On the other hand, behind the tail plate 12 of the shield machine 1, an oil jack 14 having rods 13 protruding inward at regular intervals is provided around the entire circumference of the tail plate 12,
A metal fitting 15 is provided on the inner end of the rod 13, which is a flat plate-shaped packing receiver divided into a plurality of parts. It is formed by connecting hoses 17.

本発明は前記構成よりしてその施工について説明すれば
コンクリート打設後シールド機lのプレスリング3の内
部に設けたオイルジヤツキ7にオイルを送り、ロッド6
をプレスリング3の外周に突出させて止水パツキン9を
テールプレート12の内面に加圧して押し付け、打設さ
れたフレッシュコンクリート18をプレスジヤツキ2に
より加圧すると共にシールド機lを推進させて地山を掘
削する。掘削が終了しシールド機lが停止した段階でシ
ールド機1のテールプレート12の後端部近くの内周に
設けたオイルジヤツキ14にオイルを送り、オイルジヤ
ツキ14のロッド13をテールプレー)12の内部方向
に加圧して押し出し止水パツキン16を既設コンクリー
ト18の外周に押し付け、ロッド6を収縮させて止水パ
ツキン9のテールプレート12への押付力を解放する。
The construction of the present invention will be explained based on the above-mentioned configuration. After concrete pouring, oil is sent to the oil jack 7 provided inside the press ring 3 of the shielding machine l, and the rod 6
is made to protrude from the outer periphery of the press ring 3, and the water stop packing 9 is pressurized and pressed against the inner surface of the tail plate 12, and the poured fresh concrete 18 is pressurized by the press jack 2, and the shield machine 1 is propelled to remove the ground. dig. When the excavation is completed and the shield machine 1 has stopped, oil is sent to the oil jack 14 provided on the inner circumference near the rear end of the tail plate 12 of the shield machine 1, and the rod 13 of the oil jack 14 is moved in the inner direction of the tail plate 12. Pressure is applied to press the extruded water stop packing 16 against the outer periphery of the existing concrete 18, and the rod 6 is contracted to release the pressing force of the water stop packing 9 to the tail plate 12.

次いで、プルレスリング3を切羽側に引き戻して作業空
間を構築し、鉄筋及び型枠を所定の位置にセットした後
、プレスジヤツキ2によりプレスリング3を所定の位置
にセットする。その後、再びオイルジヤツキ7により止
水パツキン9を作動させてテールプレート12の内面に
押し付け、止水パツキン16の作動を解除して、コンク
リートを打設するという工程を繰り返す。以上のように
して現場打ちライニングシールド工法の作業工程に応じ
て止水パツキン9及び16を作動させることによりシー
ルド機1の外部からの浸水を防止するようにしたもので
ある。
Next, the pull ring 3 is pulled back to the face side to construct a working space, the reinforcing bars and the formwork are set in a predetermined position, and then the press ring 3 is set in a predetermined position by the press jack 2. Thereafter, the process of activating the water stopper 9 again by the oil jack 7 and pressing it against the inner surface of the tail plate 12, releasing the operation of the water stopper 16, and pouring concrete is repeated. As described above, water intrusion from the outside of the shield machine 1 is prevented by operating the water stop gaskets 9 and 16 according to the work process of the cast-in-place lining shield method.

第1図は泥水式の場所打ちライニングシールド工法の実
施例を示すものであるが、本発明は泥水式シールド工法
にのみ適用されるものではなく、土圧式シールド工法に
も適用可能である。
Although FIG. 1 shows an embodiment of the muddy water type cast-in-place lining shield construction method, the present invention is not only applicable to the muddy water type shield construction method, but can also be applied to the earth pressure type shield construction method.

また掘削推進は旋回モーター26を゛駆動してカッタ1
9にて掘削し推進ジヤツキ24で型枠25に反力を取り
シールド機lを推進させ送泥管21より隔壁23に送泥
して隔壁23内を加圧しながら掘削土を排泥管22より
排泥し一定距離掘削したらば推進ジヤツキ24を縮め型
枠25を組み、型枠25と地山27、プレスリング3及
び既設のコンクリートに囲まれた空間にコンクリート1
8を打設しプレスジヤツキ2でプレスしながら施工する
ものである。
In addition, the excavation is propelled by driving the swing motor 26 to drive the cutter 1.
9, excavation is carried out, and the propulsion jack 24 takes a reaction force to the formwork 25, propels the shield machine l, and feeds mud from the mud feeding pipe 21 to the partition wall 23. While pressurizing the inside of the partition wall 23, the excavated soil is pumped through the mud removal pipe 22. After removing the mud and excavating a certain distance, the propulsion jack 24 is retracted, the formwork 25 is assembled, and the concrete 1 is placed in the space surrounded by the formwork 25, the ground 27, the press ring 3, and the existing concrete.
8 and press it with the press jack 2 during construction.

〔効 果〕〔effect〕

本発明によれば地下水圧の高い地盤においても信頼性の
高い止水を行うことができるので、高価なセグメントが
不要の現場打ちライニングシールド工法による経済的な
トンネル構造を構築することが可能になる。更に泥水シ
ールド工法を用いた場合でも切羽に作用する泥水圧がテ
ールに回り、トンネル内に流入することを防止すること
ができる。従って、現場打ちライニングシールド工法の
適用地盤条件を拡大することができるものである。
According to the present invention, highly reliable water stoppage can be performed even in ground with high groundwater pressure, making it possible to construct an economical tunnel structure using the cast-in-place lining shield method that does not require expensive segments. . Furthermore, even when using the muddy water shield method, it is possible to prevent the muddy water pressure acting on the face from flowing into the tail and flowing into the tunnel. Therefore, the ground conditions to which the cast-in-place lining shield method can be applied can be expanded.

なお、プレスリング外周に設けられた止水パッキンハ伸
縮自在であるので、テールプレートに防水シートを内張
すすることも可能となり、より止水性の高いトンネル構
造を得ることもできる。
In addition, since the water-stop packing provided on the outer periphery of the press ring is expandable and retractable, it is also possible to line the tail plate with a waterproof sheet, and it is also possible to obtain a tunnel structure with higher water-stop properties.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は施工状態の全体の断面図、第2図及び第3図は
第1図のA−A及びB−B断面図、第4図は要部の拡大
断面図、第5図はプレスリングの一部の斜視図、第6図
はシールド機のテールプレートの斜視図を示すものであ
る。
Figure 1 is an overall sectional view of the construction state, Figures 2 and 3 are AA and B-B sectional views of Figure 1, Figure 4 is an enlarged sectional view of the main parts, and Figure 5 is a press FIG. 6 is a perspective view of a portion of the ring, and FIG. 6 is a perspective view of the tail plate of the shield machine.

Claims (1)

【特許請求の範囲】[Claims] (1)シールド機により掘削したトンネル坑壁を現場打
ちコンクリートで覆工する現場打ちライニングシールド
工法において、テールプレート内周に対し伸縮自在かつ
押付力の調整を自在にプレスリング外周に設けられた止
水パッキンと、既設コンクリート外周面に対し伸縮自在
かつ押付力の調整を自在にテールプレート後端部内周に
設けられた止水パッキンとからなり、前記現場打ちライ
ニングシールド工法における作業工程に応じて両止水パ
ッキンを同時又は交互に使用することによってシールド
機の外部からの浸水を防止することを特徴とするシール
ド機の止水装置。
(1) In the cast-in-place lining shield construction method, in which the tunnel wall excavated by a shield machine is lined with cast-in-place concrete, a stopper provided on the outer periphery of the press ring is used to expand and contract the inner periphery of the tail plate and to freely adjust the pressing force. It consists of a water packing and a water-stop packing provided on the inner periphery of the rear end of the tail plate, which is expandable and contractible against the outer circumferential surface of the existing concrete and whose pressing force can be freely adjusted. A water stop device for a shield machine, characterized in that water stop packing is used simultaneously or alternately to prevent water from entering the shield machine from outside.
JP63180588A 1988-07-20 1988-07-20 Water stopper for shield machine Pending JPH0230896A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP63180588A JPH0230896A (en) 1988-07-20 1988-07-20 Water stopper for shield machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP63180588A JPH0230896A (en) 1988-07-20 1988-07-20 Water stopper for shield machine

Publications (1)

Publication Number Publication Date
JPH0230896A true JPH0230896A (en) 1990-02-01

Family

ID=16085889

Family Applications (1)

Application Number Title Priority Date Filing Date
JP63180588A Pending JPH0230896A (en) 1988-07-20 1988-07-20 Water stopper for shield machine

Country Status (1)

Country Link
JP (1) JPH0230896A (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60261896A (en) * 1984-03-30 1985-12-25 ホツホテイ−フ、アクチエンゲゼルシヤフト、フオ−ルマ−ルス、ゲブリユ−ダ−、ヘルフマン End surface shell longitudinally movable between shield peripheral surface and tunnel inside shell of tunnel drilling machine
JPS63147097A (en) * 1986-12-09 1988-06-20 戸田建設株式会社 Method of concrete lining construction at site of shielding tunnel

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60261896A (en) * 1984-03-30 1985-12-25 ホツホテイ−フ、アクチエンゲゼルシヤフト、フオ−ルマ−ルス、ゲブリユ−ダ−、ヘルフマン End surface shell longitudinally movable between shield peripheral surface and tunnel inside shell of tunnel drilling machine
JPS63147097A (en) * 1986-12-09 1988-06-20 戸田建設株式会社 Method of concrete lining construction at site of shielding tunnel

Similar Documents

Publication Publication Date Title
JP2696420B2 (en) Enlargement method of existing sewer and tunnel excavator used for the method
JPH0230896A (en) Water stopper for shield machine
JP3231289B2 (en) Underground junction type shield machine
JP2933278B1 (en) Underground junction type shield machine
JPH0821183A (en) Method for starting tunnel excavation
JP3171459B2 (en) Shield method
JP2597412Y2 (en) Underground dockable shield excavator
JP2930576B1 (en) Branch shield excavation method and shield excavator capable of branch excavation
JPS6145037B2 (en)
JP3347312B2 (en) Underground joining type shield machine and underground joining method
JP3392795B2 (en) Tunnel backfill equipment
KR102207553B1 (en) Tube propulsion apparatus capable of arrival directly in the underground structure
JPH05118194A (en) Sealing method of lining in cast-in-place lining shield method
JPH05311995A (en) Construction method of tunnel structure using bellows steel plate
JP3866648B2 (en) Tunnel cross-section change method
JPH03166491A (en) shield tunneling machine
JPH0658035B2 (en) Tunnel joining method in shield excavation
JPH0517359B2 (en)
JP2634633B2 (en) Shield method
JPH0527596Y2 (en)
JP2585365B2 (en) Shield method
JPH0639879B2 (en) Lining sealing method in cast-in-place lining shield method
JPS6059399B2 (en) Expandable flexible pipe construction method underground
JPH03281898A (en) Method for connecting shield tunnel to structure or shield tunnels each other, and device therefor
JPH0423080B2 (en)