JPH0285468A - Scaffolding for installing structure in container - Google Patents

Scaffolding for installing structure in container

Info

Publication number
JPH0285468A
JPH0285468A JP23553888A JP23553888A JPH0285468A JP H0285468 A JPH0285468 A JP H0285468A JP 23553888 A JP23553888 A JP 23553888A JP 23553888 A JP23553888 A JP 23553888A JP H0285468 A JPH0285468 A JP H0285468A
Authority
JP
Japan
Prior art keywords
flange
pipe
scaffolding
shroud
cup
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP23553888A
Other languages
Japanese (ja)
Inventor
Akihiko Kobayashi
明彦 小林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP23553888A priority Critical patent/JPH0285468A/en
Publication of JPH0285468A publication Critical patent/JPH0285468A/en
Pending legal-status Critical Current

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

PURPOSE:To simplify the carry-in and carry-out works and simplify the assembly work by mutually connecting and inserting the cylindrical first - fourth members having flanges at the edge parts. CONSTITUTION:Each of the lower pipe 1 of the first member, intermediate pipe 2 of the second member, upper pipe 3 of the third member, and the receiving cup 4 of the fourth member is formed by connecting and inserting a cylindrical member having a flange at the edge part. Further, a lower flange 2a is installed at the lower edge of the intermediate pipe 2, and an upper flange 2b for supporting the flange 3a of the upper pipe 3 and the flange 4a of the receiving cup 4 is installed at the upper edge. The upper pipe 3 having the flange 3a for fixing a scaffolding plate 6 at the upper edge of the upper pipe 3 by bolts 7 is inserted into the intermediate pipe 2 and the lower pipe 1. Therefore, the period necessary for the installation work for an inside structure body can be shortened.

Description

【発明の詳細な説明】 [発明の目的] (産業上の利用分野〉 本発明は原子炉圧力容器等大型容器内に設置する構造物
の据付時の仮設足場に関する。
DETAILED DESCRIPTION OF THE INVENTION [Object of the Invention] (Industrial Application Field) The present invention relates to a temporary scaffold for the installation of a structure installed in a large vessel such as a nuclear reactor pressure vessel.

(従来の技術) 原子力発電プラント等の原子炉圧力容器等大型の容器に
ついてはその内部に種々の炉内構造物を据付ける工事が
あるが、例えば円筒状のシュラウドについてはその下部
胴と上部胴との溶接時に生ずる変形を防止するためにも
、下部には炉心支持板、上部にはシュラウド芯出し治具
を装着し、炉心支持板及びシュラウド芯出し治具付近に
夫々ベンチマークを取付けて、その2点と原子炉圧力容
器の底部に設けた制御棒駆動機構取付スタブチューブの
中心とを結ぶ線でシュラウドの“倒れ″を検査している
。このシュラウド溶接時に設置する足場は、シュラウド
専用として原子炉圧力容器内の下部に設置している。こ
のシュラウドの溶接後に次の作業として格子状の炉心支
持板の据付工事があるが、この際には作業位置がシュラ
ウド据付時とは高さが異なるため、シュラウド芯出し治
具、炉心支持板及びシュラウド専用足場等を解体して−
旦原子炉圧力容器外に搬出した後に、改めて内部に炉心
支持板専用足場を組立ていた。
(Prior art) There is work to install various reactor internals inside large vessels such as reactor pressure vessels of nuclear power plants, etc. For example, for a cylindrical shroud, the lower and upper shells In order to prevent deformation that occurs when welding with A line connecting the two points and the center of the control rod drive mechanism attachment stub tube provided at the bottom of the reactor pressure vessel is used to check for shroud ``collapse.'' The scaffolding used to weld the shroud is installed at the bottom of the reactor pressure vessel specifically for the shroud. After welding this shroud, the next step is to install the lattice-shaped core support plate, but at this time, the work position is at a different height than when the shroud was installed, so the shroud centering jig, core support plate, Dismantling the shroud-specific scaffolding, etc.
After the reactor pressure vessel was removed, a special scaffold for the core support plate was reassembled inside the reactor pressure vessel.

(発明が解決しようとする課題) 低位置のシュラウドの据付時にはその上部に位置する炉
心支持板を仮据付すして行い、しかもシュラウド専用足
場が必要であり、次いで炉心支持板の据付時には先に設
置したシュラウド芯出し治具、炉心支持板及びシュラウ
ド専用足場を撤去してから炉心支持板専用足場を組立て
なければならず、据付構造物の位置、形状により原子炉
圧力容器内における作業は輻輳し、かつ所要期間も長く
かかる欠点かあった。
(Problem to be solved by the invention) When installing a low-position shroud, the core support plate located above it is temporarily installed, and a scaffold dedicated to the shroud is required, and then when the core support plate is installed, it must be installed first. The shroud centering jig, core support plate, and shroud-dedicated scaffold had to be removed, and then the core support plate-dedicated scaffold had to be assembled, and work inside the reactor pressure vessel was congested due to the location and shape of the installed structures. Another disadvantage was that it took a long time.

本発明は上記に鑑みてなされたもので、その目的とする
ところは、作業足場の高さが調節でき、さらに解体が容
易な構造で、シュラウド及び炉心支持板据付等容器内に
おける作業等に共用できる容器内構造物の据付用足場を
提供することにおる。
The present invention has been made in view of the above, and its purpose is to provide a structure in which the height of the work scaffold can be adjusted, and which can be easily dismantled, so that it can be used commonly for work inside the vessel, such as installing shrouds and core support plates. Our purpose is to provide scaffolding for installing container internal structures.

[発明の構成] (課題を解決するための手段) 円筒状で一端に容器等の底部に設けられている穴に嵌着
するフランジと他端に第2の部材と連結するフランジを
備えた第1の部材と、一端に前記第1の部材と連結する
フランジと他端に第3の部材を支持するフランジを備え
た第2の部材と、−端に足場板を取付けるフランジを備
え前記第2の部材及び第1の部材内に挿通可能とした第
3の部材と、内部に前記第3の部材を挿入し一端に前記
第2の部材のフランジに当接するフランジと他端に前記
第3の部材の先端を当接して支持する底部を備えて前記
第2の部材内に嵌着可能とした第4の部材を具備する。
[Structure of the Invention] (Means for Solving the Problems) A cylindrical body having a flange fitted into a hole provided at the bottom of a container, etc. at one end, and a flange connected to a second member at the other end. a second member having a flange connected to the first member at one end and a flange supporting a third member at the other end; a third member that can be inserted into the member and the first member, a flange into which the third member is inserted, one end abutting the flange of the second member, and the other end the third member. The fourth member is provided with a bottom portion that abuts and supports the tip of the member, and is capable of being fitted into the second member.

(作 用) 多数の円筒状の足場部材を予め寸法を設定して、第1の
部材と第2の部材をボルトナツトで連結し、この内部に
第3の部材を挿入して仮止めし、外形を小さくまとめて
組立て容器内に搬入する。容器の底部に設けられている
多数の穴に第1の部材を嵌着し、第1の部材の上端にあ
るフランジに足場板をポル]〜ナツトで互いに固定して
、容器下部に対する足場が完成する。この容器下部にお
りる作業終了後、続いて容器上部の作業のために足場板
を上昇設置するには、足場板を第3の部材ごとクレーン
にて一旦第3の部材が第2の部材より抜けでるまで持上
げ、第4の部材を第2の部材の上部に嵌着してボルトナ
ツトで固定した後、第3の部材の先端底部を第4の部材
内に挿入し、第4の部材によりこれを支持させれば上部
の足場が完成する。
(Function) The dimensions of a large number of cylindrical scaffolding members are set in advance, the first member and the second member are connected with bolts and nuts, and the third member is inserted into this and temporarily fixed, and the outer shape is determined. Pack them into small pieces and transport them into the assembly container. Fit the first member into the numerous holes provided at the bottom of the container, and secure the scaffolding boards to the flanges at the top of the first member with nuts to complete the scaffolding for the bottom of the container. do. After the work to go down to the lower part of the container is completed, in order to raise and install the scaffolding board for the work on the upper part of the container, the scaffolding board and the third member are moved by a crane, and the third member is moved from the second member. Lift the fourth member until it comes out, fit the fourth member onto the top of the second member, and secure it with a bolt and nut. Then, insert the bottom end of the third member into the fourth member, and tighten it with the fourth member. By supporting it, the upper scaffolding will be completed.

また足場の解体、搬出は上記組立てと逆工程により当初
の足場部材搬入時と同様に小さくまとめるか、あるいは
各部材を単体に分解して外形、重量共小さくし、取扱い
易くして容器外へ搬出する。
In addition, when dismantling and transporting the scaffold, the scaffolding can be assembled into smaller pieces in the same way as when the original scaffolding members were brought in by reversing the assembly process described above, or each member can be disassembled into individual parts to make them smaller in size and weight, making them easier to handle, and then transporting them out of the container. do.

なお第1の部材及び第2の部材相互を水平方向に補強具
により連結してあくと、足場全体の剛性が増してより安
全性が向上する。
Note that if the first member and the second member are interconnected horizontally using reinforcing tools, the rigidity of the entire scaffold increases and safety is further improved.

(実施例) 本発明の一実施例を図面を参照して説明する。(Example) An embodiment of the present invention will be described with reference to the drawings.

第1図は斜視図で、第2図は縦断面図である。本発明は
第1の部材である下部パイプ1と第2の部材である中間
パイプ2、第3の部材である上部パー 4 = イブ3及び第4の部材である受はカップ4のいずれも端
部にフランジを設けた円筒状の部材を互いに連結、挿入
して構成されていて、下部パイプ1の下端には原子炉圧
力容器9の底部に設けられている制御棒駆動機構のスタ
ブチューブ5に嵌着する下部フランジ1aが、上端には
中間パイプ2の下部フランジ2aと結合する上部フラン
ジ1bが形成しである。また中間パイプ2の下端には下
部フランジ2aと、上端には上部パイプ3のフランジ3
a及び受はカップ4のフランジ4aを支持する上部フラ
ンジ2bが設(プである。上部パイプ3は上端に足場板
6をボルトナツト7により固定するフランジ3aを備え
て中間パイプ2及び下部パイプ1の中に挿入され、中間
パイプ2に受はカップ4を使用した時には受はカップ4
の内周に嵌着され、底部3bが受はカップ4の底部4b
に当接して支持される。
FIG. 1 is a perspective view, and FIG. 2 is a longitudinal sectional view. The present invention consists of a lower pipe 1 which is a first member, an intermediate pipe 2 which is a second member, and an upper part which is a third member. The lower end of the lower pipe 1 is connected to the stub tube 5 of the control rod drive mechanism provided at the bottom of the reactor pressure vessel 9. A lower flange 1a to be fitted is formed at the upper end thereof, and an upper flange 1b to be connected to the lower flange 2a of the intermediate pipe 2. Further, a lower flange 2a is provided at the lower end of the intermediate pipe 2, and a flange 3 of the upper pipe 3 is provided at the upper end.
The upper pipe 3 is provided with an upper flange 2b that supports the flange 4a of the cup 4.The upper pipe 3 has a flange 3a on its upper end that fixes the scaffold board 6 with bolts and nuts 7. When the cup 4 is inserted into the middle pipe 2 and the cup 4 is used, the cup 4 is inserted into the intermediate pipe 2.
The bottom part 3b is fitted onto the inner circumference of the cup 4, and the bottom part 3b is inserted into the bottom part 4b of the cup 4.
It is supported by contacting with.

下部パイプ1と中間パイプ2は互いに夫々の上部フラン
ジ1bと下部フランジ2aをインロー及びボルトナラ]
〜7で連結し、中間パイプ2と受りカップ4は受しプカ
ツプ4の外周を中間パイプ2の内部に嵌着して、互いの
上部フランジ2bとフランジ4aをボルトナツト7で締
付けて結合し組立てる。なお第3図は受はカップ4の斜
視図で、第4図は受はカップ4を使用しない場合の縦断
面図、また第5図は原子炉底部の縦断面図で、シュラウ
ド据付時の足場の状態を示し、第6図は第5図のVl 
−Vl線に沿った横断面図で必る。ざらに第7図は原子
炉底部の縦断面図で、炉心支持板据付時の足場の状態を
示ず。
The lower pipe 1 and the intermediate pipe 2 are connected to each other by connecting the upper flange 1b and the lower flange 2a with the spigot and bolt bolts]
~ 7, and the intermediate pipe 2 and the receiving cup 4 are assembled by fitting the outer periphery of the receiving cup 4 into the inside of the intermediate pipe 2, and tightening the upper flanges 2b and 4a of each other with bolts and nuts 7. . Figure 3 is a perspective view of the receiver cup 4, Figure 4 is a vertical cross-sectional view of the receiver without the cup 4, and Figure 5 is a vertical cross-sectional view of the bottom of the reactor, showing the scaffolding when installing the shroud. Figure 6 shows the state of Vl in Figure 5.
-Required in a cross-sectional view along the Vl line. Roughly speaking, Figure 7 is a vertical cross-sectional view of the bottom of the reactor, and does not show the state of the scaffolding when the core support plate was installed.

次に上記構成による作用について、原子炉圧力容器にお
けるシュラウド10及び炉心支持板12の据付を例にし
て説明する。なお本発明は原則として複数台を使用して
足場を設置するもので、通常は第4図に示すように下部
パイプ1と中間パイプ2をボルトナツト7止めし、さら
に上部パイプ3も中間パイプ2に仮止めして全長を短く
して炉内に搬入する。勿論搬入路、設置場所の状態に応
じ、単体として寸法、重量を小さくしても良い。
Next, the effect of the above configuration will be explained using the installation of the shroud 10 and the core support plate 12 in a reactor pressure vessel as an example. In principle, the present invention uses a plurality of scaffolds to install the scaffold, and normally, as shown in Fig. 4, the lower pipe 1 and the intermediate pipe 2 are fastened with bolts and nuts 7, and the upper pipe 3 is also connected to the intermediate pipe 2. Temporarily fix it to shorten the overall length and then transport it into the furnace. Of course, the size and weight of the unit may be reduced depending on the conditions of the entrance path and the installation location.

足場の設置は先ず第5図に示すシュラウド10の据付用
足場から行う。下部パイプ1と中間パイプ2及び上部パ
イプ3を第4図に示ずように組立て、作業足場の設置範
囲の原子炉圧力容器9に植立している多数の制御棒駆動
機構のスタブチューブ5に、下部パイプ1の下部フラン
ジ1aの突起部を嵌着する。なおこの組立てた下部パイ
プ1及び中間パイプ2全体の長さは、予めシュラウド据
(=l用の足場高さに合せて製作しておく。次いで上部
バンプ3のフランジ3aの上に足場板6をボルトナツト
7で固定して、シュラウド据付用の足場を完成する。な
おこの際、隣接する下部パイプ1及び中間パイプ2間を
互いに固定部8bと調節部8aを有する補強具8を掛は
渡して補強すると足場全体の剛性が増し、安全性が向上
する。この足場によってシュラウド10の上部と下部の
溶接、及びシュラウドサポート11への据付等の作業を
実施する。
The scaffolding is first installed from the shroud 10 installation scaffold shown in FIG. Assemble the lower pipe 1, intermediate pipe 2, and upper pipe 3 as shown in FIG. , the protrusion of the lower flange 1a of the lower pipe 1 is fitted. The overall length of the assembled lower pipe 1 and intermediate pipe 2 is made in advance to match the height of the scaffolding for the shroud installation (=l).Next, the scaffolding board 6 is placed on the flange 3a of the upper bump 3. Fix it with bolts and nuts 7 to complete the scaffolding for installing the shroud.At this time, a reinforcing tool 8 having a fixing part 8b and an adjusting part 8a is passed between the adjacent lower pipe 1 and intermediate pipe 2 to reinforce it. This increases the rigidity of the entire scaffold and improves safety.Works such as welding the upper and lower parts of the shroud 10 and installing it on the shroud support 11 are performed using this scaffold.

次いで炉心支持板12据付のための足場に変更をするが
、これには前記のシュラウド据付用足場の状態から、作
業内容に合せてざらに必要な部材及び足場板6の追加、
あるいは削除をした後、第7図に示すように足場板6に
設けたフック13に上部に設置した図示しないクレーン
からの吊りワイヤー14を掛けて、−旦上部パイブ3の
底部3bが中間パイプ2の上部フランジ2bから離れる
高さまで吊上げる。この状態を維持したまま、別途原子
炉圧力容器1内に搬入した、第3図に示す受りカップ4
を第1図及び第2図に示ずように中間パイプ2内に上部
より嵌着し、フランジ4aを中間パイプ2の上部フラン
ジ2bとボルトナツト7で固定する。この後にクレーン
の吊りワイヤー14を緩めて、上部パイプ3を受はカッ
プ4内に挿着し、底部3bを受はカップ4の底部4bに
当接して完了する。この足場により炉心支持板12の据
付作業を行う。なお上部パイプ3の長さは全て予め前記
シュラウド10据付用と本炉心支持板12据付用の場合
の足場高さの差と同じ寸法に設定しておく。
Next, the scaffolding for installing the core support plate 12 is changed, but this involves adding roughly necessary members and scaffolding plates 6 according to the work content from the state of the shroud installation scaffold described above.
Alternatively, after the deletion, as shown in FIG. Lift it up to a height away from the upper flange 2b. While maintaining this state, the receiving cup 4 shown in FIG. 3 was separately carried into the reactor pressure vessel 1.
is fitted into the intermediate pipe 2 from above as shown in FIGS. 1 and 2, and the flange 4a is fixed to the upper flange 2b of the intermediate pipe 2 with bolts and nuts 7. After this, the hanging wire 14 of the crane is loosened, the upper pipe 3 is inserted into the cup 4, and the bottom part 3b is brought into contact with the bottom part 4b of the cup 4, thereby completing the process. The installation work of the core support plate 12 is performed using this scaffold. The lengths of the upper pipes 3 are all set in advance to be the same as the difference in height of the scaffolding for installing the shroud 10 and for installing the main core support plate 12.

作業終了後の足場撤去は、上記の逆工程として部材を第
4図の状態に仮まとめして搬出するか、各部材を個別に
分解し小分(プにして搬出する。
To remove the scaffolding after the work is completed, either the members are temporarily assembled in the state shown in Figure 4 and transported out as a reverse process to the above, or each member is disassembled individually and transported in small pieces.

以上のように足場部材がいずれも小さく、現場への搬入
、搬出が簡便で、足場の設置と移動が作業工程順にしか
も迅速に行なえる。また各部材の標準化が容易である。
As mentioned above, all of the scaffolding members are small and easy to carry in and out of the site, and the scaffolding can be installed and moved in the order of work steps and quickly. Moreover, standardization of each member is easy.

なお各部材はその寸法、重量等取扱の必要に応じて夫々
を複数に分割し、適宜連結して使用しても良い。
Note that each member may be divided into a plurality of parts depending on the handling requirements such as its size, weight, etc., and may be used by appropriately connecting them.

第8図は他の実施例を示し下部パイプ1及び中間パイプ
2の側面にパイプを貫通する穴15を複数箇所おけ、こ
の穴15にスl〜ツバ−16を通して、足場板6を取付
けた上部パイプ3の底部3bを当接支持する。またスト
ッパー16を通す穴15の位置を選定することにより、
足場板6の高さを種々に選定できる。この場合もその作
用効果は上記一実施例と同様であるが、第3図の受はカ
ップ4は必要とせず、足場高さを種々に変更できる。
FIG. 8 shows another embodiment, in which a plurality of holes 15 are provided on the side surfaces of the lower pipe 1 and the intermediate pipe 2, and the holes 15 are passed through the slots 16 to 16, and the scaffolding board 6 is attached to the upper part. The bottom portion 3b of the pipe 3 is abutted and supported. Also, by selecting the position of the hole 15 through which the stopper 16 passes,
The height of the scaffold board 6 can be selected variously. In this case as well, the operation and effect are the same as in the above-mentioned embodiment, but the cup 4 of FIG. 3 is not required, and the height of the scaffolding can be varied in various ways.

[発明の効果] 以上本発明によれば、大型容器である例えば原子炉圧力
容器の内部構造物であるシュラウドや炉心支持板等の据
付けに使用する仮設足場が、その作業毎に設置する必要
がなく、しかも搬入、搬出と組立てが容易で、内部構造
物の据付作業に要する期間を短縮する効果がある。
[Effects of the Invention] According to the present invention, temporary scaffolding used for installing a shroud, a core support plate, etc., which are internal structures of a large vessel such as a reactor pressure vessel, does not need to be installed for each work. Moreover, it is easy to carry in, carry out, and assemble, and has the effect of shortening the period required for installing internal structures.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は本発明の斜視図、第2図は受はカップ使用時の
縦断面図、第3図は受はカップの斜視図、第4図は受は
カップなしの縦断面図、第5図は原子炉底部の縦断面図
で、シュラウド据付時を示す、第6図は第5図のVl 
−Vl線に沿った横断面図、第7図は原子炉底部の縦断
面図で、炉心支持板据付時を示す、第8図は他の実施例
の縦断面図でおる。 1・・・下部パイプ、 1a、2a・・・下部フランジ、 1b、2b、3a、4a・・・上部フランジ、2・・・
中間パイプ、   3・・・上部パイプ、3b、4b・
・・底部、  4・・・受はカップ、5・・・制御棒駆
動機構のスタブチューブ、6・・・足場板、     
7・・・ボルトナツト、8・・・補強具、     8
a・・・調節部、8b・・・固定部、 9・・・原子炉圧力容器、 10・・・シュラウド、 12・・・炉心支持板。 代理人 弁理士 大 胡 典 夫 第  1  図 第  2  図 63α  7 第  4  図 第  3  図 第5図 第  6  図 /4− 第  7  図 第  8  図
Fig. 1 is a perspective view of the present invention, Fig. 2 is a longitudinal cross-sectional view of the receiver when the cup is in use, Fig. 3 is a perspective view of the cup with the receiver, Fig. 4 is a longitudinal cross-sectional view of the receiver without the cup, and Fig. 5 is a longitudinal cross-sectional view of the receiver without the cup. The figure is a vertical cross-sectional view of the bottom of the reactor, showing the shroud installed. Figure 6 is the Vl of Figure 5.
FIG. 7 is a vertical cross-sectional view of the bottom of the reactor when the core support plate is installed, and FIG. 8 is a vertical cross-sectional view of another embodiment. 1...Lower pipe, 1a, 2a...Lower flange, 1b, 2b, 3a, 4a...Upper flange, 2...
Middle pipe, 3... Upper pipe, 3b, 4b.
...Bottom, 4...Support is cup, 5...Stub tube of control rod drive mechanism, 6...Scaffold plate,
7... Bolt nut, 8... Reinforcement tool, 8
a...Adjustment part, 8b...Fixing part, 9...Reactor pressure vessel, 10...Shroud, 12...Reactor core support plate. Agent Patent Attorney Norio Ogo Figure 1 Figure 2 Figure 63α 7 Figure 4 Figure 3 Figure 5 Figure 6 Figure/4- Figure 7 Figure 8

Claims (1)

【特許請求の範囲】[Claims] 円筒状で一端に容器の底部に設けられている穴部に嵌着
するフランジと他端に第2の部材と連結するフランジを
備えた第1の部材と、円筒状で一端に前記第1の部材と
連結するフランジと他端に第3の部材を支持するフラン
ジを備えた第2の部材と、円筒状で一端に足場板を取付
けるフランジを備え前記第2の部材及び第1の部材内に
挿通可能とした第3の部材と、円筒状で内部に前記第3
の部材を挿入し一端に前記第2の部材のフランジに当接
するフランジと他端に前記第3の部材の先端を当接して
これを支持する底部を備えて前記第2の部材内に嵌着可
能とした第4の部材からなることを特徴とする容器内構
造物の据付用足場。
a first member having a cylindrical shape and having at one end a flange that fits into a hole provided in the bottom of the container and a flange at the other end that connects to the second member; a second member having a flange connected to the member and a flange supporting a third member at the other end; and a cylindrical flange having a flange at one end to which a scaffolding board is attached; a third member that is insertable; and a cylindrical third member that is inserted therein;
The member is inserted into the second member, and has a flange that abuts the flange of the second member at one end and a bottom that abuts and supports the tip of the third member at the other end, and is fitted into the second member. 1. A scaffold for installing a structure inside a container, characterized by comprising a fourth member that allows
JP23553888A 1988-09-20 1988-09-20 Scaffolding for installing structure in container Pending JPH0285468A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP23553888A JPH0285468A (en) 1988-09-20 1988-09-20 Scaffolding for installing structure in container

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP23553888A JPH0285468A (en) 1988-09-20 1988-09-20 Scaffolding for installing structure in container

Publications (1)

Publication Number Publication Date
JPH0285468A true JPH0285468A (en) 1990-03-26

Family

ID=16987465

Family Applications (1)

Application Number Title Priority Date Filing Date
JP23553888A Pending JPH0285468A (en) 1988-09-20 1988-09-20 Scaffolding for installing structure in container

Country Status (1)

Country Link
JP (1) JPH0285468A (en)

Similar Documents

Publication Publication Date Title
JPH0285468A (en) Scaffolding for installing structure in container
JP2833428B2 (en) Jig device for positioning steel columns
JP2005171508A (en) Construction method of cast-in-place concrete column and position fixing jig for column main reinforcement used for it
JP2867141B2 (en) Mounting and dismantling method of work scaffold in step-up method
JPS6320985B2 (en)
CN218346877U (en) Steel reinforcement cage butt joint support
JPS58168889A (en) Protective method for condenser under transportation
JPS6229584B2 (en)
JP3462962B2 (en) Construction method of concrete containment vessel
JP2006162137A (en) Installation method and installation structure of suspension type boiler
EP0072817A1 (en) Collapsible scaffolding
JPH0412296Y2 (en)
JPH05214806A (en) Frame unit for scaffolding plate
JP3044822U (en) Lightweight auxiliary scaffold for boiler furnace hopper
JPH01178671A (en) Tool for prefabricated column reinforcing bar
JPS581037B2 (en) Construction method of lining tank
JPS6349470Y2 (en)
JPH04312691A (en) Ladder device
JP4286369B2 (en) Vertical pipe unit
JP2669305B2 (en) Structure using covered steel tube concrete columns
JPH09228645A (en) Steel pipe connection structure
JPH10331415A (en) Furnace wall inspection scaffolding in boiler fire pit hopper and construction method of working floor
JPH1061902A (en) Installation method and installation structure for horizontal heat transfer pipes
JPH1181728A (en) Reaction tower and its construction
KR20030016605A (en) A Unit for Reinforcing a Head of a Steel Tube Pile and a Reinforcement Structure Using the Unit