JPH0288710A - Method for changing over process gas in metallurgical furnace - Google Patents

Method for changing over process gas in metallurgical furnace

Info

Publication number
JPH0288710A
JPH0288710A JP23843488A JP23843488A JPH0288710A JP H0288710 A JPH0288710 A JP H0288710A JP 23843488 A JP23843488 A JP 23843488A JP 23843488 A JP23843488 A JP 23843488A JP H0288710 A JPH0288710 A JP H0288710A
Authority
JP
Japan
Prior art keywords
gas
switching
process gas
type
flow rate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP23843488A
Other languages
Japanese (ja)
Other versions
JPH049845B2 (en
Inventor
Zenji Fujiwara
藤原 善治
Yasuo Masuda
増田 康男
Takeya Fukumoto
福本 武也
Isao Tsuura
津浦 功
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Steel Corp
Fuji Electric Co Ltd
Original Assignee
Fuji Electric Co Ltd
Kawasaki Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuji Electric Co Ltd, Kawasaki Steel Corp filed Critical Fuji Electric Co Ltd
Priority to JP23843488A priority Critical patent/JPH0288710A/en
Publication of JPH0288710A publication Critical patent/JPH0288710A/en
Publication of JPH049845B2 publication Critical patent/JPH049845B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Manufacture And Refinement Of Metals (AREA)
  • Treatment Of Steel In Its Molten State (AREA)
  • Carbon Steel Or Casting Steel Manufacturing (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Abstract] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】[Detailed description of the invention] 【産業上の利用分野】[Industrial application field]

本発明は、冶金炉におけるプロセスガス切替え方法に係
り、特に、底吹転炉、上底吹転炉その他各種のプロセス
ガスを溶融金属中に吹込んで精錬する冶金炉において、
当該プロセスガスを、現在供給している先行ガスから、
これから供給しようとする後行ガスに切替える際に用い
るのに好適な、冶金炉におけるプロセスガス切替え方法
の改良に関する。
The present invention relates to a process gas switching method in a metallurgical furnace, particularly in a bottom-blown converter, a top-bottom blowing converter, and other metallurgical furnaces in which various process gases are injected into molten metal for refining.
From the preceding gas that is currently supplying the process gas,
The present invention relates to an improvement in a process gas switching method in a metallurgical furnace, which is suitable for use when switching to a trailing gas that is about to be supplied.

【従来の技術】[Conventional technology]

底吹転炉、上底吹転炉その他の冶金炉においては、操業
時に溶銑等の溶融金属の精錬を目的として、該溶融金属
中に、各種のプロセスガス(例えば酸素ガス、炭化水素
ガス)を吹込んでいる。このようにプロセスガスを吹込
む際には、各種条件に応じ、羽口の内管、外管から吹込
むガスを必要に応じて切替えている。又、溶融金属に羽
口か浸漬している場合、羽口への溶融金属の侵入を防止
するために、溶融金属の静圧にうち勝つようなガス圧力
を羽口先端に与えつつプロセスガスの切替えを行う必要
がある。 このような吹込みガスの切替え方法に関して従来から種
々の技術か提案されている。例えば特開昭57−894
17では、先行ガス圧力、後行ガス系の流量調節弁の開
度及び後行カス圧力を一定条件に制御し、カス切替を圧
力制御で行なうことにより、羽口先に圧力変動か発生す
るのを防止し羽口内への溶湯の侵入を阻止するようにし
た転炉の底吹ガス切替え方法が示されている。 ここで、底吹転炉へのプロセスガス供給設備に採用され
ている、−船釣な、シーゲンス制御によるプロセスガス
切替えのための制御装置の構成例を第5図に示す。第5
図の制御装置において、プロセスガス切替え制御に必要
な工程が工程選択押釦10で選択されると、ステップ選
択部11は、起動条件保持表示部12からの起動条件と
、切替スイッチ13の設定によりオペレーションモード
選択部14で選択されたオペレーションモードと、転炉
状態記憶部16に記憶されている、転炉が充炉あるいは
空炉のいずれの状態か否か等の条件とを診断チエツクの
上プロセスガス切替えに必要な切替えステップを選択す
る。この選択された切替えステップによりガスの種類が
決まる。このガスの種類はステップ始動部20に伝達さ
れる。 次いで、該ステップ始動部20によりステップが始動す
ると、使用ガスラインの選択部22は、決められたガス
の種類に応じて使用すべきカスラインの選択を行ない、
弁駆動指令部24を介して、後行カスを供給するガスラ
インの遮断弁26Aを開いて後行ガスの供給を開始する
と共に、前記ステップの切替条件成立後に先行ガスを供
給するガスラインの遮断弁26Bを閉じて先行ガスの供
給を停止するというプロセスガスの切替ステップを実行
する。なお、図において符号27はこのステップの切替
え条件が成立したか否かを、後に詳述する手順で判断す
る条件成立判断部であり、語句替え条件が成立しなかっ
た場合、カス変更部28からステップ始動部20ヘガス
変更指令を伝達する。一方、切替え条件が成立した場合
は当該切替えステップをステップ記憶部30で記憶し、
且つ、当該切替ステップが終了したことを前記使用カス
ライン選択部22に伝達する。 なお、第5図において、符号32は工程表示部であり、
表示灯32Aの点滅(フリッカ)により、現在進行中の
工程を表示する。又、34は調節計モード、流量設定部
であり、プロセスガスの流量設定の切替を接点36を介
して行なうと共に、調節計38へモード切替信号を入力
する。当該調節計38は流量設定及びモードに応じて流
量制御弁40によりプロセスガスの流量を制御するが、
この場合、流量制御弁40の作動は前記弁駆動指令部2
4から作動指令が出て接点42がオンした際に行われる
。更に、44は遮断弁26A、26B等の開、閉状態を
検出し、いずれのプロセスガスが吹込み中か否かを検知
するためのリミットスイッチ、46はこのリミットスイ
ッチ44の出力信号により表示灯46Aを点滅させて、
吹込み中のガス種の表示を行なう表示部、48は前記調
節計38が稼動中であることを表示灯48Aの点滅によ
り表示する表示部、50は前記遮断弁26A、26B、
流量制御弁40等の各カス弁の状態をステップ信号や流
量、圧力、状態信号(リミットスイッチの接点信号等と
して検出)と比較して監視するための監視部である。 前記ステップ成立判断部27の判断手順は、第6図に示
されるように、先ず、ステップ始動信号が入力された後
T1秒経過したか否かを判断しくPl)、T1秒経過し
ていない場合は当該判断を継続し、一方、T1秒経過し
た場合は切替ステップ成立の条件が整っているか否かを
判断する(P2)。 切替ステップ成立の条件が整ったと判断されたならば、
前記第5図のステップ記憶部30の処理を行う。一方、
切替ステップ成立の条件が整わないときは、ステップ始
動時がらか否かを判断する(P3)。 判定結果が否のときは前記第5図に示すカス変更部28
の処理を行う。一方、判定結果が正のときは、ステップ
始動からT2秒間経過したか否かを判定する(P4)。 判定結果が正のときは前記ガス変更部28の処理を行う
。一方、判定結果が否のときは、P2に戻り、P2以降
の手順を再び実行する。なお、前記第5図の監視部50
から監視信号か出力された場合も、P2以降の手順を実
行し、ステップ成立条件を判定する。 上記のようにしてプロセスガスの切替えを実行する場合
、切替える先行ガス及び後行ガスの組合せは、例えば操
業工程の種類、底吹羽口の内管、外管別、ガス種類別に
存在し、しかも、切替えの際に駆動する遮断弁26A、
26Bは、プラントによって異なるが、数十〜数百個に
近い個数となり、更には、供給するプロセスガスは単一
種類のガスのみならず、2種類以上のカスを混合したも
のを使用するときがある。 従って、1つの工程が選択されてから、プロセスガス切
替えに必要な遮断弁の開閉動作を決定するまでのロジッ
クが複雑なものとなるため、前記従来のプロセスガス切
替え制御装置は複雑化、高容量化し、コストが高いもの
となるという問題点があった。
In bottom-blown converters, top-bottom blown converters, and other metallurgical furnaces, various process gases (e.g., oxygen gas, hydrocarbon gas) are added to molten metal such as hot metal for the purpose of refining the molten metal during operation. It's infused. When blowing process gas in this way, the gas to be blown from the inner tube and outer tube of the tuyere is switched as necessary depending on various conditions. In addition, when the tuyere is immersed in molten metal, in order to prevent the molten metal from entering the tuyere, process gas is applied to the tip of the tuyere while applying gas pressure that overcomes the static pressure of the molten metal. It is necessary to make a switch. Conventionally, various techniques have been proposed regarding such a method of switching the blown gas. For example, JP-A-57-894
17, by controlling the leading gas pressure, the opening degree of the flow rate control valve of the trailing gas system, and the trailing waste pressure to constant conditions, and controlling the waste switching by pressure control, it is possible to prevent pressure fluctuations from occurring at the tip of the tuyere. A method of switching over to bottom-blown gas in a converter is disclosed which prevents the intrusion of molten metal into the tuyeres. Here, FIG. 5 shows an example of the configuration of a control device for switching process gases using Siegen control, which is employed in equipment for supplying process gases to bottom-blowing converters. Fifth
In the control device shown in the figure, when a process necessary for process gas switching control is selected using the process selection push button 10, the step selection section 11 performs an operation based on the startup conditions from the startup condition holding display section 12 and the settings of the changeover switch 13. After a diagnostic check of the operation mode selected in the mode selection section 14 and the conditions stored in the converter state storage section 16, such as whether the converter is in a full or empty state, the process gas is Select the switching steps required for switching. This selected switching step determines the type of gas. The type of gas is transmitted to the step starting section 20. Next, when the step is started by the step starting section 20, the gas line selection section 22 selects the waste line to be used according to the determined type of gas,
Via the valve drive command unit 24, the cutoff valve 26A of the gas line that supplies the trailing waste is opened to start supplying the trailing gas, and after the switching condition of the step is satisfied, the gas line that supplies the leading gas is shut off. A process gas switching step is performed in which the valve 26B is closed and the supply of the preceding gas is stopped. In addition, in the figure, reference numeral 27 is a condition fulfillment determination unit that determines whether the switching condition of this step is satisfied in a procedure that will be described in detail later. A gas change command is transmitted to the step starting section 20. On the other hand, if the switching condition is satisfied, the switching step is stored in the step storage unit 30,
Moreover, the fact that the switching step has been completed is transmitted to the used waste line selection section 22. In addition, in FIG. 5, the reference numeral 32 is a process display section,
The process currently in progress is displayed by blinking (flickering) the indicator light 32A. Reference numeral 34 denotes a controller mode and flow rate setting section, which switches the process gas flow rate setting via a contact 36 and inputs a mode switching signal to the controller 38. The controller 38 controls the flow rate of the process gas using a flow control valve 40 according to the flow rate setting and mode.
In this case, the operation of the flow rate control valve 40 is controlled by the valve drive command section 2.
This is performed when an activation command is issued from 4 and the contact 42 is turned on. Furthermore, 44 is a limit switch for detecting the open/closed state of the shutoff valves 26A, 26B, etc., and detecting which process gas is being blown in, and 46 is an indicator light based on the output signal of this limit switch 44. Flashing 46A,
A display section 48 displays the type of gas being blown, a display section 48 indicates that the controller 38 is in operation by blinking the indicator light 48A, and 50 indicates the cutoff valves 26A, 26B,
This is a monitoring unit for monitoring the state of each waste valve such as the flow rate control valve 40 by comparing it with a step signal, flow rate, pressure, and status signal (detected as a contact signal of a limit switch, etc.). As shown in FIG. 6, the judgment procedure of the step establishment judgment unit 27 is to first judge whether T1 seconds have elapsed since the step start signal was input (Pl), and if T1 seconds have not elapsed, then continues this determination, and if T1 seconds have elapsed, it is determined whether the conditions for establishing the switching step are met (P2). If it is determined that the conditions for establishing the switching step are met,
The processing of the step storage section 30 shown in FIG. 5 is performed. on the other hand,
If the conditions for the establishment of the switching step are not met, it is determined whether or not the step is starting (P3). When the judgment result is negative, the waste changing section 28 shown in FIG.
Process. On the other hand, when the determination result is positive, it is determined whether T2 seconds have elapsed since the step start (P4). When the determination result is positive, the process of the gas changing section 28 is performed. On the other hand, if the determination result is negative, the process returns to P2 and the steps after P2 are executed again. Note that the monitoring unit 50 in FIG.
Even when a supervisory signal is output from , the steps from P2 onwards are executed to determine the step establishment condition. When switching the process gas as described above, the combinations of the leading gas and trailing gas to be switched exist, for example, depending on the type of operation process, the inner pipe and outer pipe of the bottom blowing tuyere, and the type of gas. , a shutoff valve 26A that is driven during switching;
The number of 26B varies depending on the plant, but the number is close to several tens to hundreds.Furthermore, the process gas to be supplied is not only a single type of gas but also a mixture of two or more types of gas. be. Therefore, the logic from the selection of one process to the determination of the opening/closing operation of the shutoff valve required for process gas switching is complicated, so the conventional process gas switching control device has become complicated and has a high capacity. However, there was a problem in that the cost was high.

【発明が解決しようとする課題】[Problem to be solved by the invention]

本発明は、前記従来の技術の問題点を解消するべくなさ
れたもので、プロセスガスを切替えるための切替えロジ
ックの集約化及び簡素化が図れ、且つ、自由なプロセス
ガスの組合せを設定可能とする冶金炉におけるプロセス
ガス切替え方法を提供することを課題とする。
The present invention has been made in order to solve the problems of the conventional technology, and it is possible to centralize and simplify the switching logic for switching process gases, and to set a free combination of process gases. An object of the present invention is to provide a process gas switching method in a metallurgical furnace.

【課題を達成するための手段】[Means to achieve the task]

本発明は、冶金炉の溶融金属中に羽口から供給するプロ
セスガスを、先行ガスから後行ガスに切替える方法にお
いて、プロセスガス切替時の先行カスと後行ガスとの組
合せを、羽口及びプロセスガスの種類に応じて必要数の
単位に類別し、類別された各単位毎に、プロセスガス切
替え時にいかにプロセスガスの流量が変化すべきかを、
「流し始め」、「m続」、「流し終り」、及び「切替に
無関係」の4つのパターンに分けて認識し、認識された
各パターンの流量変化の内容に基づき、各単位毎にプロ
セスガスの切替え制御を行なうためのスレーブシーケン
スを定義し、定義されたスレーブシーケンスを、羽口及
びプロセスガスの種類に応じたマスターシーゲンスで制
御してプロセスガスを切替えるようにしたことにより、
前記課題を達成したものである。
The present invention provides a method for switching the process gas supplied from the tuyere into the molten metal of a metallurgical furnace from the leading gas to the trailing gas. Classify the process gas into the necessary number of units depending on the type of process gas, and for each classified unit, determine how the flow rate of the process gas should change when switching the process gas.
The process gas is divided into four patterns: "start of flow", "m-continuation", "end of flow", and "irrespective of switching", and based on the contents of the flow rate change of each recognized pattern, process gas is By defining a slave sequence for controlling the switching of the tuyere and controlling the defined slave sequence with a master sequence depending on the type of tuyere and process gas, the process gas is switched.
The above-mentioned problem has been achieved.

【発明の作用及び効果】[Operation and effects of the invention]

発明者らは種々の検討の結果、プロセスガス供給装置に
おいて、現在供給している先行ガスをこれから供給しよ
うとする後行カスに切替える際に、羽口の内管、外管及
びプロセスガスの種類に応じて、先行ガスと後行ガスの
組合せを必要な数の単位に類別し、その類別された各単
位毎に、ガス切替えによって「先行カス」、後行ガスの
各プロセスガスの流量がどう変化するかを分類すると、
「流し始め」、「継続」、「流し終り」、「切替えに無
関係」の4つのパターンに区分して認識できることに着
目し本発明を創案したものである。 即ち、「流し始め」は、所定のプロセスガスを先行ガス
として供給していないが後行ガスとして供給する場合で
あり、第1図(A)の如くガス流量が変化する。 又、「継続」は、所定のプロセスガスを先行ガスとして
供給しており、且つ、後行ガスとしても供給する場合で
あり、第1図(B)の如くガス流量が変化する。 更に、「流し終り」は、所定のプロセスガスを先行ガス
として供給しているが、後行ガスとしては供給しない場
合であり、第1図(C)の如くガス流量が変化する。 又、「切替えに無関係」は、所定のプロセスガスを先行
ガス、後行ガスのいずれとしても供給していない場合で
あり、第1図(D)の如くガス流量が変化する。 上記のように4つのパターンに区分して認識された結果
に基づき、前記各単位毎にプロセスガスの切替え制御を
行なうためのスレーブシーケンスを定義する。定義され
るスレーブシーケンスにおいては、入力される条件信号
として、例えば先行ガスライン、後行ガスラインの各遮
断弁の開閉条件、各流量、各圧力の条件があり、出力さ
れる制御信号として、例えば遮断弁の開、閉指令、流量
調節弁、圧力調節弁への制御指令がある。 上記のスレーブシーケンスによって各単位毎のプロセス
ガスの基本的な切替え制御を行なうことができるか、羽
口毎の切替タイミングや各羽口におけるガス種別の切替
タイミングを制御する必要がある。この場合、羽口が内
管、外管を有する二重羽口構造のものであれば、切替タ
イミングを内管、外管毎に制御する必要がある。 そこで、本発明においては、羽口及びプロセスガスの種
類毎にマスターシーケンスで切替え条件の成立をチエツ
ク等するようにして前記スレーブシーケンスを制御し、
ガス切替えを行なうようにしている。 従って、本発明によれば、適切なプロセスガスの切替え
が、パターン化されたスレーブシーケンスの組合せによ
り実行可能なため、切替ロジックが簡素化され、且つ、
自由な組合せの切替が簡単にできるようになる。又、カ
ス切替えのロジック変更については、基本的な4つのパ
ターンが変化せず、マスターシーケンスのみの変更で対
応可能なため容易なロジック変更を行なうことができる
。 よって、ガス切替えに用いる制御用計算機、例えばマイ
クロコンピュータの容量や台数が減少し、設備コストが
安く、且つ、メンテナンスが容易なものとなる。
As a result of various studies, the inventors found that in a process gas supply device, when switching the currently supplied leading gas to the trailing gas to be supplied from now on, the inner and outer pipes of the tuyere and the type of process gas According to the above, the combination of leading gas and trailing gas is classified into the necessary number of units, and for each classified unit, the flow rate of each process gas, ``leading gas'' and trailing gas, is determined by gas switching. If you classify whether it changes,
The present invention was created by focusing on the fact that it is possible to distinguish and recognize four patterns: "start of flow,""continuation,""end of flow," and "irrespective of switching." That is, "start of flow" is a case where a predetermined process gas is not supplied as a leading gas but is supplied as a trailing gas, and the gas flow rate changes as shown in FIG. 1(A). Further, "continuation" refers to a case where a predetermined process gas is supplied as a leading gas and also as a trailing gas, and the gas flow rate changes as shown in FIG. 1(B). Furthermore, the "end of flow" is a case where a predetermined process gas is supplied as a leading gas but not as a trailing gas, and the gas flow rate changes as shown in FIG. 1(C). Moreover, "irrespective of switching" is a case where the predetermined process gas is not supplied as either the leading gas or the trailing gas, and the gas flow rate changes as shown in FIG. 1(D). Based on the results recognized in the four patterns as described above, a slave sequence for controlling process gas switching is defined for each unit. In the defined slave sequence, input condition signals include, for example, opening/closing conditions for each shutoff valve of the leading gas line and trailing gas line, each flow rate, and each pressure condition, and output control signals include, for example, There are commands to open and close the shutoff valve, and control commands to the flow control valve and pressure control valve. Is it possible to perform basic switching control of the process gas for each unit by the above slave sequence, or is it necessary to control the switching timing for each tuyere and the switching timing for the gas type in each tuyere. In this case, if the tuyere has a double tuyere structure having an inner tube and an outer tube, it is necessary to control the switching timing for each inner tube and outer tube. Therefore, in the present invention, the slave sequence is controlled by checking whether the switching conditions are satisfied in the master sequence for each type of tuyere and process gas,
I am trying to switch gases. Therefore, according to the present invention, appropriate process gas switching can be performed by a combination of patterned slave sequences, thereby simplifying the switching logic, and
You can easily switch between free combinations. Further, regarding the change in the logic of dregs switching, the four basic patterns do not change, and the change can be made by changing only the master sequence, making it possible to easily change the logic. Therefore, the capacity and number of control computers, such as microcomputers, used for gas switching are reduced, resulting in lower equipment costs and easier maintenance.

【実施例】【Example】

以下、図面を参照して本発明の実施例を詳細に説明する
。 この実施例は、前出第5図に示したプロセスガス供給設
備のプロセスガス切替え制御装置に本発明を採用したも
のである。この場合、各構成機器の構成は前記した通り
であるため説明は略す。 実施例においては後行ガスの遮断弁26A、同じく、流
量制御弁4OA、先行ガスの遮断弁26B、同じく、流
量制御弁40Bなどを次の手順で作動させて、前出第1
図に示したガス切替時のパターンを実行する。 即ち、第1図(A)に示した「流し始め」のパターンに
ついては、後行カスラインの遮断弁26Aを開とし、流
量制御弁4OA等で必要な圧力制御、流量制御を行なう
。又、第1図(C)に示した「流し終り」のパターンに
ついては、先行ガスの遮断弁26Bを閉にすると共に、
先行ガスの圧力制御、流量制御を中止する。更に、第1
図(B)示した「継続」のパターンについては、先行ガ
スの遮断後も同一のプロセスガスを後行カスとして使用
する。又、第1図<D)に示した「切替に無関係」のパ
ターンについては、遮断弁26A、26Bを作動させず
カス切替に関係しないことを示す。 前記ガス切替時におけるプロセスガス流量の変化が上記
の4つのパターンのうちのいずれのパターンに属するか
否かの認識は、第2図に概念的に示すような、ロジック
により行う。この場合、先行ガス及び後行カスは同様に
3種類のプロセスガス(カス種1〜カス種3)を有して
おり、同種のプロセスガス(ガス種n)の流量変化を、
図中符号101〜104で示すAND、NOTの判定ロ
ジックにより判定して、切替えのパターンを知るように
なっている。 判定ロジック101は、先行ガスが遮断され、後行ガス
か流通されることを判定するものであり、ガス種nの「
流し始め」を判断する。又、判定ロジック102は、先
行ガス、後行ガス共に流れていることを判定するもので
あり、ガス種nの「継続」を判断する。更に判定ロジッ
ク103は先行ガスが流れているが後行ガスが遮断され
るのを判定するものであり、ガス種nの「流し終り」を
判断する。又、判定ロジック104は、先行カス、後行
ガスが共に流れていないことを判定するものであり、ガ
ス種nは「切替えに無関係」なことを判断する。 上記のようなロジックを用いて、例えば先行ガスのガス
種2を後行ガスのガス種1に切替える場合を認識すると
、ガス種1は「流し始め」のパターンであり、ガス種2
は「流し終り」のパターンであり、ガス種3は「切替に
無関係」のパターンとなる。 次に、冶金炉の羽口の内管、外管共にプロセスガスをガ
ス種2からガス種1へ切替える場合において、各オス種
のプロセスガスを制御するためのスレーブシーケンスの
タイムチャートを第3図に示す。第3図(A)は内管の
スレーブシーケンスのタイムチャートを示し、第3図(
B)は外管のスレーブシーケンスのタイムチャートを示
している。第3図(A)、(B)に示すように、内管の
ガス種1は時間tiから「流し始め」のパターンで制御
し、内管のガス種2は、時間tmから「流し終り」のパ
ータンで制御している。又、外管のガス種1は時間ti
から「流し始め」のパターンで制御し、外管のガス種2
は時間tmから「流し終り」のパータンで制御している
。 しかしながら、このようなスレーブシーケンスのみでガ
ス切替えを制御した場合、各々のスレーブシーケンスで
条件判断、制御を独立して行っており、内管と外管間の
切替動作のタイミング、ガス種間の切替え動作のタイミ
ングは時間tn、tmで固定され、所望のタイミングに
制御できない。 そこで、マスターシーケンスを用いて羽口の内管、外管
及びカス種別にスレーブシーケンスのタイミングを制御
する。このマスターシーケンスのタイムチャートの例を
第4図に示す。 第4図(A)は前記羽口の内管のマスターシーケンスの
タイムチャートを示し、第4図(B)は当該マスターシ
ーケンスで制御されるスレーブシーケンスのタイムチャ
ートを示すものである。マスターシーケンスは、スレー
ブシーケンスの開始と終了を決定しており、これにより
、ガス種1の流し始めは第4図の時間toから始まり、
ガス種2の流し終りは第4図の時間tPになる。この時
間to、tpはマスターシーケンスで自在に設定可能で
あるため、ガス切替を所望のタイミングで行えるように
なる。 なお、前記実施例においては、第1図に示されるような
変化パターンで3つのガス種の先行ガス及び後行カスの
切替え制御を行う場合について説明したが、本発明を実
施する際の変化パターン及びガス種の数は実施例のもの
に限定されるものではない。即ち、各変化パターンのカ
ス流量変化は例えば「流し始め」のパターンにおいて第
1図(A)の如く、ステップ状に立上がるものでなく、
段階状にカス流量が増化するものであってもよい。 又、プロセスガスの種類は4種類以上であってもよい。 更に、プロセスガスは、単一種類のカス、複数のガスが
混合されたカスでもよい。
Embodiments of the present invention will be described in detail below with reference to the drawings. In this embodiment, the present invention is applied to the process gas switching control device of the process gas supply equipment shown in FIG. 5 above. In this case, the configuration of each component device is as described above, so a description thereof will be omitted. In the embodiment, the trailing gas cutoff valve 26A, the flow rate control valve 4OA, the leading gas cutoff valve 26B, the flow rate control valve 40B, etc.
Execute the gas switching pattern shown in the figure. That is, for the "flow start" pattern shown in FIG. 1(A), the shutoff valve 26A of the trailing waste line is opened, and the necessary pressure control and flow rate control are performed by the flow rate control valve 4OA and the like. Also, regarding the "flow end" pattern shown in FIG. 1(C), while closing the preceding gas cutoff valve 26B,
Stop the pressure control and flow rate control of the preceding gas. Furthermore, the first
Regarding the "continuation" pattern shown in Figure (B), the same process gas is used as the trailing waste even after the leading gas is shut off. Furthermore, the "unrelated to switching" pattern shown in FIG. 1<D) indicates that the cutoff valves 26A and 26B are not operated and are not related to waste switching. Recognition of which of the four patterns described above the change in process gas flow rate at the time of gas switching belongs to is performed by logic as conceptually shown in FIG. 2. In this case, the leading gas and the trailing dregs similarly have three types of process gases (dregs type 1 to dregs type 3), and the flow rate change of the same type of process gas (gas type n) is
The switching pattern is determined by AND and NOT determination logic indicated by reference numerals 101 to 104 in the figure. The determination logic 101 determines whether the leading gas is cut off and the trailing gas is allowed to flow.
Determine when the flow begins. Further, the determination logic 102 determines whether both the leading gas and the trailing gas are flowing, and determines whether the gas type n is "continuing". Furthermore, the determination logic 103 determines whether the leading gas is flowing but the trailing gas is shut off, and determines whether the gas type n is "flowing complete". Further, the determination logic 104 determines that both the leading gas and the trailing gas are not flowing, and determines that the gas type n is "irrelevant to switching." Using the above logic, for example, when recognizing the case where gas type 2 of the leading gas is switched to gas type 1 of the trailing gas, gas type 1 is the pattern for "starting to flow", and gas type 2
is a pattern of "flow end", and gas type 3 is a pattern "irrelevant to switching". Next, when switching the process gas from gas type 2 to gas type 1 for both the inner tube and outer tube of the tuyere of a metallurgical furnace, Fig. 3 shows a time chart of the slave sequence for controlling the process gas of each male type. Shown below. Figure 3 (A) shows a time chart of the slave sequence of the inner tube, and Figure 3 (A) shows the time chart of the slave sequence of the inner tube.
B) shows a time chart of the slave sequence of the outer tube. As shown in FIGS. 3(A) and 3(B), gas type 1 in the inner tube is controlled in a pattern that starts flowing from time ti, and gas type 2 in the inner tube is controlled in a pattern that starts flowing from time tm. It is controlled by the following pattern. Also, gas type 1 in the outer tube is at time ti
The flow is controlled by the pattern of "starting to flow" from
is controlled in a pattern from time tm to "end of flow". However, when gas switching is controlled only by such slave sequences, each slave sequence performs condition judgment and control independently, and the timing of the switching operation between the inner and outer pipes and the switching between gas types are difficult. The timing of the operation is fixed at times tn and tm, and cannot be controlled to a desired timing. Therefore, the master sequence is used to control the timing of the slave sequence for the inner pipe, outer pipe, and waste type of the tuyere. An example of a time chart of this master sequence is shown in FIG. FIG. 4(A) shows a time chart of a master sequence for the inner tube of the tuyere, and FIG. 4(B) shows a time chart of a slave sequence controlled by the master sequence. The master sequence determines the start and end of the slave sequence, so that the flow of gas type 1 starts from time to in FIG.
The end of the flow of gas type 2 is at time tP in FIG. Since these times to and tp can be freely set in the master sequence, gas switching can be performed at desired timing. In the above embodiment, a case has been described in which the switching control of the leading gas and the trailing gas of three gas types is performed using the change pattern shown in FIG. 1, but the change pattern when implementing the present invention is And the number of gas species is not limited to those in the examples. In other words, the waste flow rate change in each change pattern does not rise in a step-like manner as shown in FIG.
The waste flow rate may be increased in stages. Furthermore, the number of types of process gas may be four or more. Further, the process gas may be a single type of waste or a mixture of a plurality of gases.

【図面の簡単な説明】[Brief explanation of drawings]

第1図(A)〜(D)は、本発明に係るガス切替時にお
ける変化パターンの各側を示す線図、第2図は同じく、
変化パターンの認識手順を説明するためのブロック図、
第3図はスレーブシーケンスのタイムチャートの例を示
す線図、第4図はマスターシーケンスでスレーブシーケ
ンスを制御する場合のタイムチャートの例を示す線図、
第5図は実施例が適用される一般的なガス供給設備に採
用されるガス切替え制御装置の構成例を示すブロック図
、第6図は前記制御装置におけるステップ成立条件を判
定するための手順を示す流れ図である。 18・・・ステップ選択部、 22・・・使用カスラインの選択部、 24・・・弁駆動指令部、 26A、26B・・・遮断弁、 36・・・調節計モード、流量設定部、40・・・流量
制御弁。
FIGS. 1A to 1D are diagrams showing each side of the change pattern during gas switching according to the present invention, and FIG.
A block diagram to explain the change pattern recognition procedure,
FIG. 3 is a diagram showing an example of a time chart of a slave sequence, and FIG. 4 is a diagram showing an example of a time chart when controlling a slave sequence with a master sequence.
FIG. 5 is a block diagram showing an example of the configuration of a gas switching control device employed in general gas supply equipment to which the embodiment is applied, and FIG. 6 shows a procedure for determining step fulfillment conditions in the control device. FIG. DESCRIPTION OF SYMBOLS 18... Step selection part, 22... Use waste line selection part, 24... Valve drive command part, 26A, 26B... Shutoff valve, 36... Controller mode, flow rate setting part, 40... ...Flow control valve.

Claims (1)

【特許請求の範囲】[Claims] (1)冶金炉の溶融金属に羽口を介して供給するプロセ
スガスを、先行ガスから後行ガスに切替える方法におい
て、 プロセスガス切替え時の先行ガスと後行ガスとの組合せ
を、羽口及びプロセスガスの種類に応じて必要数の単位
に類別し、 類別された各単位毎に、プロセスガス切替え時にいかに
プロセスガスの流量が変化すべきかを、「流し始め」、
「継続」、「流し終り」、及び「切替えに無関係」の4
つのパターンに分けて認識し、 認識された各パターンの流量変化の内容に基づき、各単
位毎にプロセスガスの切替え制御を行なうためのスレー
ブシーケンスを定義し、 定義されたスレーブシーケンスを、羽口及びプロセスガ
スの種類に応じたマスターシーケンスで制御してプロセ
スガスを切替えるようにしたことを特徴とする冶金炉に
おけるプロセスガス切替え方法。
(1) In a method of switching the process gas supplied to molten metal in a metallurgical furnace via a tuyere from a leading gas to a trailing gas, the combination of leading gas and trailing gas at the time of process gas switching is Classify the process gas into the necessary number of units depending on the type of process gas, and for each classified unit, determine how the flow rate of the process gas should change when switching the process gas.
4: “Continue”, “End of flow”, and “Irrelevant to switching”
A slave sequence for controlling process gas switching is defined for each unit based on the content of the flow rate change of each recognized pattern. A process gas switching method in a metallurgical furnace, characterized in that the process gas is switched by controlling a master sequence according to the type of process gas.
JP23843488A 1988-09-22 1988-09-22 Method for changing over process gas in metallurgical furnace Granted JPH0288710A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP23843488A JPH0288710A (en) 1988-09-22 1988-09-22 Method for changing over process gas in metallurgical furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP23843488A JPH0288710A (en) 1988-09-22 1988-09-22 Method for changing over process gas in metallurgical furnace

Publications (2)

Publication Number Publication Date
JPH0288710A true JPH0288710A (en) 1990-03-28
JPH049845B2 JPH049845B2 (en) 1992-02-21

Family

ID=17030158

Family Applications (1)

Application Number Title Priority Date Filing Date
JP23843488A Granted JPH0288710A (en) 1988-09-22 1988-09-22 Method for changing over process gas in metallurgical furnace

Country Status (1)

Country Link
JP (1) JPH0288710A (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5789417A (en) * 1980-11-22 1982-06-03 Nippon Steel Corp Switching method of bottom blowing gas of converter
JPS6092302U (en) * 1983-11-29 1985-06-24 博多計器株式会社 pressure regulator

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5789417A (en) * 1980-11-22 1982-06-03 Nippon Steel Corp Switching method of bottom blowing gas of converter
JPS6092302U (en) * 1983-11-29 1985-06-24 博多計器株式会社 pressure regulator

Also Published As

Publication number Publication date
JPH049845B2 (en) 1992-02-21

Similar Documents

Publication Publication Date Title
JP5662006B2 (en) Diesel engine particulate removal filter regeneration device and method
CN115386684B (en) Ladle bottom brick blowing method and related equipment
EP0134857A1 (en) Method for the fabrication of special steels in metallurgical vessels
JPH049845B2 (en)
CN100465294C (en) Intelligent Control Method of Argon Blowing at the Bottom of Refining Furnace
CN114317868A (en) Dynamic control method for converter oxygen lance blowing lance position
GB1447642A (en) Method and apparatus for controlling the operation of a steel refining converter
KR20010038392A (en) Apparatus and method for coating interior of converter using nitrogen blowing
CN102943144B (en) Carbon Steel Converter Automatic Control Method Adaptable to Shutdown Operation
JPS5856729B2 (en) Blowing control method for pure oxygen top-blown converter
JPS6151608B2 (en)
JPH01319613A (en) Method of administrating operation of blast furnace
KR100328058B1 (en) Oxygen blowing piping pressure control method of converter
JPH0987726A (en) Automatic control method for converter slag coating
JP3494215B2 (en) Program control unit
CN115743572B (en) A helicopter fuel transfer control method
CN215103371U (en) Converter smelting execution device with high-precision intelligent control function
Bencini et al. Automation for refining and slag control in LD process at AFP/Piombino Steel Shop
JPH059538A (en) Converter steel making method for charging hot metal in which cold iron or the like is melted
JP2672720B2 (en) Plant control device
JPS626602B2 (en)
SU1276671A1 (en) Method of controlling converter melting process
KR100398407B1 (en) An automatic control apparatus of hot metal tap hole at mud gun
JPS6274017A (en) Protecting method for double pipe tuyere
CN208099327U (en) A kind of oil-gas two-way Ladle-casting apparatus