JPH0288894A - Tunnel excavator with double erector - Google Patents

Tunnel excavator with double erector

Info

Publication number
JPH0288894A
JPH0288894A JP63240388A JP24038888A JPH0288894A JP H0288894 A JPH0288894 A JP H0288894A JP 63240388 A JP63240388 A JP 63240388A JP 24038888 A JP24038888 A JP 24038888A JP H0288894 A JPH0288894 A JP H0288894A
Authority
JP
Japan
Prior art keywords
segment
erector
tunnel
drum
double
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP63240388A
Other languages
Japanese (ja)
Other versions
JPH066880B2 (en
Inventor
Koichi Tanaami
康一 田名網
Koji Bando
坂東 幸次
Yasunori Kondo
保徳 近藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kawasaki Heavy Industries Ltd
Original Assignee
Kawasaki Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kawasaki Heavy Industries Ltd filed Critical Kawasaki Heavy Industries Ltd
Priority to JP63240388A priority Critical patent/JPH066880B2/en
Publication of JPH0288894A publication Critical patent/JPH0288894A/en
Publication of JPH066880B2 publication Critical patent/JPH066880B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

PURPOSE:To shorten the term of work by concentrically installing a drum supported by a guide beam to a shield frame, symmetrically disposing erectors before and behind the drum and forming double erectors. CONSTITUTION:With a rear erector 6, a segment S is received by a segment gripper 17, a turning wheel 7 is turned to the right by a motor 9, and the segment S is carried up to the right side of a tunnel. An expansion jack 13 and a sliding jack 16A are operated and the segment S is positioned, the posture of the segment S is controlled, and the segment S is incorporated into an existing segment S'. The erector 6 is turned up to an upper section again, and the segment S is received and incorporated in the upper section. With a front erector 6A, a lifting beam 14A is positioned at a lower section, and the segment S is gripped by a segment gripper 17A and assembled to the segment S' in the lower section of the tunnel. The gripper 17A is turned upward again, the segment S is received, the turning wheel is turned to the left and the segment S is carried up to the left side of the tunnel, and the segment S is assembled.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明は、トンネル掘削機によって掘削されたトンネ
ル内に短時間にセグメントリングを構築するため、同−
旋回範回を作動する二つのエレクタ−(以下、「ダブル
エレクタ−」という)を装備したトンネル掘削機に関す
る。
[Detailed Description of the Invention] [Industrial Field of Application] The present invention is aimed at constructing a segment ring in a short time in a tunnel excavated by a tunnel excavator.
The present invention relates to a tunnel excavator equipped with two erectors (hereinafter referred to as "double erectors") that operate the swing range.

〔従来の技術〕[Conventional technology]

トンネル掘削機によりトンネルを構築する場合の工期は
、カッターディスクによる掘削の時間と掘削後のエレク
タ−によるセグメント組立時間により決定される。従っ
て、トンネル掘削の工期を短縮させるためには、トンネ
ルライニングであるセグメントの組立時間を相対的に短
縮することが有効な手段となる。
When constructing a tunnel using a tunnel excavator, the construction period is determined by the excavation time using a cutter disk and the segment assembly time using an erector after excavation. Therefore, in order to shorten the construction period for tunnel excavation, it is effective to relatively shorten the assembly time of the segments that are tunnel linings.

ところで、従来のトンネル掘削機においては、シールド
フレーム内に回転自在に構成された旋回輪に支持アーム
、吊りビーム、セグメントチャッキング(把持)装置等
からなる一つのエレクタ二のみを備えている(例えば、
特開昭61−79000号公報、特開昭62−5059
9号公報、実開昭60−58698号公報、実開昭62
−50300号公報参照)。
By the way, in a conventional tunnel excavator, only one erector 2 consisting of a support arm, a hanging beam, a segment chucking (gripping) device, etc. is provided on a swing ring configured to be freely rotatable within a shield frame (for example, ,
JP-A-61-79000, JP-A-62-5059
Publication No. 9, Publication of Utility Model Application No. 1983-58698, Publication of Utility Model Application No. 1983
(Refer to Publication No.-50300).

トンネル周壁にセグメントリングを構築する場合、台車
やホイスト等で搬送されてきたセグメントをチャンキン
グ装置で把持して受取り、旋回輪や吊りビーム等を連動
操作してトンネル周壁の所定位置に一つ一つ搬送してリ
ング状に組み立て、既設のセグメントリングに組み入れ
ていく。
When constructing a segment ring on a tunnel peripheral wall, a chunking device grasps and receives the segments transported by a trolley or hoist, and then moves them one by one to a predetermined position on the tunnel peripheral wall by interlocking operations such as turning wheels and hanging beams. They are then transported, assembled into a ring, and then incorporated into the existing segment ring.

〔発明が解決しようとする課題〕[Problem to be solved by the invention]

しかしながら、従来のトンネル掘削機にはエレクタ−が
一つしか装備されていないので、セグメントを受は取る
作業と組立作業を同時に行ったり、或いはトンネル左右
のセグメント組立作業を同時に行うことができない。こ
れでは、セグメント組立に要する時間は必然的に膨大に
ならざるを得ない。特に、近年、トンネルの大口径化に
よりセグメントの分割数が増加していることから、セグ
メント組立時間が益々増大する傾向にある。
However, since a conventional tunnel excavator is equipped with only one erector, it is not possible to perform segment receiving and assembly operations at the same time, or to assemble segments on the left and right sides of the tunnel at the same time. This inevitably requires an enormous amount of time to assemble the segments. In particular, in recent years, the number of divided segments has increased due to the increase in the diameter of tunnels, so the time required to assemble segments has tended to increase.

一方、近年、掘削技術、掘削性能の向上によりトンネル
掘削機の掘削所要時間は短縮しつつある。例えば、セグ
メント組立作業の能率向上環のためその自動化が進めら
れているが、これにしてもセグメント組立時間の大幅短
縮化の要請に応えうるちのではない。
On the other hand, in recent years, due to improvements in excavation technology and excavation performance, the time required for excavation by tunnel excavators has been decreasing. For example, automation of segment assembly work is being promoted to improve efficiency, but even this is not enough to meet the demand for a significant reduction in segment assembly time.

そこで、本発明はかかる課題に鑑み、セグメントリング
を迅速に構築するために同一旋回範囲を同時作動可能に
構成された二つのエレクタ−(ダブルエレクタ−)を具
備したトン矛ル掘削機を提供することを目的とする。
Therefore, in view of this problem, the present invention provides a ton ram excavator equipped with two erectors (double erector) configured to be able to operate simultaneously in the same turning range in order to quickly construct a segment ring. The purpose is to

〔課題を解決するための手段〕[Means to solve the problem]

上記目的達成のため、本発明に係るトンネル掘削機は、
シールドフレームに保持され、このシルトフレーム軸方
向に延びるガイドビームを設け、このガイドビームに支
持されたドラムを前記シールドフレームに同心状に設け
ると共に、このドラムの前後に対称的にエレククーを配
装してダブルエレクタ−を形成したことを特徴とする。
In order to achieve the above object, the tunnel excavation machine according to the present invention has the following features:
A guide beam is provided which is held by a shield frame and extends in the axial direction of this silt frame, and a drum supported by this guide beam is provided concentrically with the shield frame, and electric units are arranged symmetrically in front and behind this drum. It is characterized by forming a double erector.

さらに、この構成において、ダブルエレクタ−それぞれ
が、シールドフレーム内周に沿って回動自在にトラム端
部に支持された旋回輪と、この旋回輪にその外周面上半
径方向に移動自在に設けられたアーチ状の吊りビームと
、この吊りビームにシールドフレーム軸方向に摺動自在
に設けられ前記ドラム周面上を旋回範囲とするセグメン
ト把持装置とから構成されたことを特徴とする。
Further, in this configuration, each of the double erectors includes a turning ring supported at the end of the tram so as to be rotatable along the inner periphery of the shield frame, and a turning ring provided on the turning ring so as to be movable in the radial direction on the outer circumferential surface of the turning ring. The present invention is characterized in that it is comprised of an arch-shaped suspension beam, and a segment gripping device that is provided on the suspension beam so as to be slidable in the axial direction of the shield frame and has a rotation range on the circumferential surface of the drum.

〔作用〕[Effect]

上記構成において、ドラム前後に対称的に設けられたダ
ブルエレクタ−を形成する各エレクタ−は、独立にセグ
メント組立のために動作する。すなわち、各旋回輪はそ
れぞれドラムに支持されてシールドフレーム内周に沿っ
て回動し、これに伴って各セグメント把持装置は同一旋
回範囲を形成するドラムの上を旋回移動する。ダブルエ
レクタ−の装備により、各エレクタ−は各り独立の動作
(旋回、伸縮、摺動、位置合わせ、セグメントの脱着)
ができる。そのため、両方(前後)のエレクタ−を同時
に作動させて、例えば、一方はセグメントの受取り、他
方はセグメントの組み付は作業、或いは一方はトンネル
右側のセグメントの組み付け、他方は左側のセグメント
の組み付は作業を同時に行うことができる。
In the above configuration, each erector forming the double erector provided symmetrically at the front and rear of the drum operates independently for segment assembly. That is, each swing ring is supported by a drum and rotates along the inner periphery of the shield frame, and accordingly, each segment gripping device swings on the drum forming the same swing range. Equipped with double erectors, each erector can operate independently (swivel, extend/contract, slide, position alignment, attach/detach segments)
Can be done. Therefore, both (front and rear) erectors can be operated at the same time, for example, one to receive the segment and the other to assemble the segment, or one to assemble the segment on the right side of the tunnel and the other to assemble the segment on the left side. can perform tasks at the same time.

〔実施例〕〔Example〕

以下、本発明の一実施例を図面を参照しながら説明する
An embodiment of the present invention will be described below with reference to the drawings.

第1図は本発明の要部であるダブルエレクタ−全体を示
す斜視図、第2図はダブルエレクタ−を具備したトンネ
ル掘削機の側断面図、第3図は同背面図を示す。
FIG. 1 is a perspective view showing the entire double erector, which is a main part of the present invention, FIG. 2 is a side sectional view of a tunnel excavator equipped with the double erector, and FIG. 3 is a rear view of the same.

第1図乃至第3図において、トンネル掘削機のシールド
フレーム1内にはその内周壁に沿ってシールドフレーム
1の補強を兼ねた支持リング2が設けられている。この
支持リング2の内周壁に左右一対の支柱3.3が設けら
れており、この各々の支柱3.3に一端が固定された片
持ちのガイドビーム4.4がシールドフレームの軸方向
に略水平に延びて設けられている。この各ガイドビーム
4.4は、断面がボックス状をなしており、その上下面
には軸方向に案内溝48.4aが刻設されている。
1 to 3, a support ring 2 which also serves to reinforce the shield frame 1 is provided inside a shield frame 1 of a tunnel excavating machine along its inner peripheral wall. A pair of left and right columns 3.3 are provided on the inner peripheral wall of the support ring 2, and a cantilevered guide beam 4.4, one end of which is fixed to each column 3.3, extends approximately in the axial direction of the shield frame. It extends horizontally. Each of the guide beams 4.4 has a box-like cross section, and has guide grooves 48.4a carved in the axial direction on its upper and lower surfaces.

上記ガイドビーム4.4に支持されたリング状のドラム
5がシールドフレームlに同心状に設けられている。す
なわち、ドラム5の左右両側にはガイドビーム4.4の
案内溝48.4aに係合する凸部を有する上下一対のガ
イドアーム5a、5bが取着されている。このように、
ガイドビーム4.4を上下両側から挟持するようにガイ
ドアーム5a、5bを設けることにより、後述する旋回
輪7.7Aの回転反力を支持するようになっている。
A ring-shaped drum 5 supported by the guide beam 4.4 is provided concentrically on the shield frame l. That is, a pair of upper and lower guide arms 5a and 5b having a convex portion that engages with the guide groove 48.4a of the guide beam 4.4 is attached to the left and right sides of the drum 5. in this way,
By providing guide arms 5a and 5b to sandwich the guide beam 4.4 from both upper and lower sides, it is possible to support the rotational reaction force of a turning ring 7.7A, which will be described later.

そして、下方のガイドアーム5b、5bとガイドビーム
4.4の間には、ドラム5をガイドビーム4.4に沿っ
てシールドフレーム軸方向に移動自在に構成するための
移動ジヤツキ8.8がガイドビーム4.4に沿って平行
に設けられている。
Between the lower guide arms 5b, 5b and the guide beam 4.4, a movable jack 8.8 for configuring the drum 5 to be movable in the axial direction of the shield frame along the guide beam 4.4 is provided as a guide. It is arranged parallel to the beam 4.4.

上記ドラム5には二つのエレクタ−(ダブルエレクタ−
) 6A、6が配装されている。図中、前エレクタ−6
Aに対するものには、符号に添字「A」を付して示す。
The drum 5 has two erectors (double erector).
) 6A, 6 are installed. In the figure, front erector-6
Those corresponding to A are indicated by adding the suffix "A" to the reference numeral.

ドラム5の前後に対称的に設けられた前エレクタ−6A
、後エレクタ−6は、それぞれ旋回輪7A、7、支持ア
ーム11A、11、吊りビーム14A 、 14、セグ
メント把持装置17A 、17等から構成されている。
Front erector 6A symmetrically provided before and after the drum 5
, the rear erector 6 is composed of turning wheels 7A, 7, support arms 11A, 11, suspension beams 14A, 14, segment gripping devices 17A, 17, etc., respectively.

以下、便宜上、後エレクタ−6の構成について詳述する
が、前エレクタ−6への構成も特記以外は同じである。
Hereinafter, for convenience, the configuration of the rear erector 6 will be described in detail, but the configuration of the front erector 6 is also the same except as specified.

上記ドラム5の後端に設けられた旋回輪7は、ベアリン
グ10を介してドラム5に回動自在に支持されている。
A turning ring 7 provided at the rear end of the drum 5 is rotatably supported by the drum 5 via a bearing 10.

この回動手段たる駆動モータ9は、各エレクタ−につき
4箇所配備されている。この駆動モータ9は、通常、油
圧モータが採用され、図示しない油圧ポンプユニットか
ら油圧ラインが導設され、接続されている。なお、図示
はしていないが、旋回輪7は従来と同様ラック&ピニオ
ン方式で駆動されようになっている。
The drive motors 9 serving as the rotation means are provided at four locations for each erector. This drive motor 9 is usually a hydraulic motor, and is connected to a hydraulic line from a hydraulic pump unit (not shown). Although not shown in the drawings, the swing wheel 7 is driven by a rack and pinion system as in the past.

上記旋回輪7の外周には、左右一対の支持アーム11.
11が半径方向に突出して形成されており、この両支持
アーム11.11の頂部間に旋回輪7の外周面上をアー
チ状の吊りビーム14が架設されている。この吊りビー
ム14の両端部には伸縮ロッド12(第3図)が突設さ
れ、支持アーム11に摺動自在に嵌挿されている。すな
わち、吊りビーム14と支持アーム11の間に伸縮ジヤ
ツキ13が設けてあり、この伸縮ジヤツキ13の伸縮に
より、伸縮ロッド12が支持アーム11にガイドされつ
つ、吊りビーム14が半径方向に移動するようになって
いる。
A pair of left and right support arms 11.
11 is formed to protrude in the radial direction, and an arch-shaped suspension beam 14 is installed on the outer peripheral surface of the swing ring 7 between the tops of both support arms 11.11. Telescopic rods 12 (FIG. 3) are protruded from both ends of the suspension beam 14, and are slidably fitted into the support arm 11. That is, a telescoping jack 13 is provided between the suspension beam 14 and the support arm 11, and as the telescoping jack 13 expands and contracts, the suspension beam 14 is moved in the radial direction while the telescoping rod 12 is guided by the support arm 11. It has become.

上記吊りビーム14には一対の摺動ロッド15.15が
ドラム5の外周面の上方にオーバハングして、トンネル
前方に突設されている。一方、前エレクタ−6への吊り
ビーム14Aにも同様に一対の摺動ロッド15A、、1
5Aがドラム5上方、トンネル後方に突設されているか
ら、前エレクタ−6Aの摺動ロッド15A 、 15A
と後エレクタ−6の摺動ロッド15.15  とは、第
3図に示すように、相対向した格好で、ドラム5周面上
同一旋回範囲を旋回移動するようになっている。
A pair of sliding rods 15, 15 are provided on the suspension beam 14, overhanging above the outer circumferential surface of the drum 5 and protruding toward the front of the tunnel. On the other hand, a pair of sliding rods 15A, 1 are also attached to the suspension beam 14A to the front erector 6.
5A protrudes above the drum 5 and at the rear of the tunnel, so the sliding rods 15A, 15A of the front erector 6A
As shown in FIG. 3, the sliding rods 15 and 15 of the rear erector 6 are opposed to each other and rotate in the same rotation range on the circumferential surface of the drum 5.

上記摺動ロッド15.15には、セグメント把持装置1
7を備えた摺動部材18が摺動自在に嵌合されている。
The sliding rod 15.15 has a segment gripping device 1
A sliding member 18 provided with 7 is slidably fitted.

すなわち、吊りビーム14と摺動部材18の間には摺動
ジヤツキ16.16が設けられていて、その伸縮により
摺動部材18、即ち、セグメント把持装置17が摺動ロ
ッドに沿ってシールドフレーム軸方向に移動できるよう
になっている。また、セグメント把持装置17は、摺動
部材18にセグメントSの姿勢制御を容易にするため球
面軸受18aを介して支承されている。
That is, a sliding jack 16.16 is provided between the suspension beam 14 and the sliding member 18, and the expansion and contraction of the sliding jack 16. It is possible to move in the direction. Further, the segment gripping device 17 is supported by a sliding member 18 via a spherical bearing 18a in order to facilitate posture control of the segment S.

第4図は、このセグメント把持装置17を示す要部斜視
図である。セグメントSを把持するためのセグメント受
台19の背面(内側)側には、セグメント組立時、セグ
メントの姿勢制御のために作動されるボジショニングジ
ャッキ20、ロータリジヤツキ21、キーセグメント用
のジヤツキ22等が配装されている。なお、特に図示は
していないが、セグメントSの把持はセグメント受台1
9の外面に設けた吸着パッドで吸着して行うようになっ
ている。なお、図中、24(第2図)はトンネル掘削機
を掘進させるためのシールドジヤツキ、26.26A(
第3図)は電線、油圧ホース、真空ホース用のケーブル
/ホースリールで、各エレクタ−につき左右各2台設け
である。
FIG. 4 is a perspective view of essential parts of this segment gripping device 17. On the back (inside) side of the segment holder 19 for gripping the segment S, there are a positioning jack 20, a rotary jack 21, and a key segment jack 22, which are operated to control the posture of the segment when assembling the segment. etc. are arranged. Although not particularly shown, the segment S is held by the segment holder 1.
This is done by suction using a suction pad provided on the outer surface of 9. In addition, in the figure, 24 (Figure 2) is a shield jack for making the tunnel excavator dig, and 26.26A (
Figure 3) is a cable/hose reel for electric wires, hydraulic hoses, and vacuum hoses, two on each side for each erector.

上記説明から明らかなように、ドラム5の前後に対称的
に設けた旋回輪7.7Aの回動に伴って、それぞれのセ
グメント把持装置17.17Aも同一旋回範囲であるド
ラム5の外周面上を旋回移動する。従って、両エレクタ
−6,6Δを同時使用してセグメント組立作業を行う際
、両者の干渉防止のための装置が必要となる。
As is clear from the above description, with the rotation of the turning wheels 7.7A provided symmetrically at the front and rear of the drum 5, the respective segment gripping devices 17.17A also move on the outer peripheral surface of the drum 5 within the same turning range. Rotate and move. Therefore, when performing segment assembly work using both erectors 6 and 6Δ at the same time, a device is required to prevent interference between the two.

そこで、第5図及び第6図に示すように、ケーブル/ホ
ースリール26.26(26A 、26A )取り付は
用の取付台27.27 (27A、27A)が左右の支
持アーム11.11(IIA、 IIA)の側面に、ド
ラム5周面上オーババングして突設されており、左右に
それぞれ干渉防止装置が形成される。すなわち、左側に
ある取付台27.27A端部の相対向位置に、後エレク
タ−6側にはスイッチブラケント29を介して近接スイ
ッチ28が、前エレクタ−6A側にはストライカブラケ
ント31Aを介してストライカ−30Aが設けられてい
る。右側にある取付台27.27Aにも同様に、前エレ
クタ−6A側にはスイッチブラケント29Aを介して近
接スイッチ28Aが、後エレクタ−6側にはストライカ
−ブラケット31を介してストライカ−30が設けられ
ている。
Therefore, as shown in FIGS. 5 and 6, the cable/hose reels 26.26 (26A, 26A) are attached to the mounting bases 27.27 (27A, 27A) on the left and right support arms 11.11 ( IIA, IIA) are protruded from the sides of the drum 5 so as to overhang the circumferential surface of the drum 5, and interference prevention devices are formed on the left and right sides, respectively. That is, the proximity switch 28 is connected to the rear erector 6 side via the switch bracket 29, and the front erector 6A side is connected to the proximity switch 28 via the striker bracket 31A, at opposite positions of the mounting base 27 and 27A end on the left side. A striker 30A is provided. Similarly, for the mounting base 27.27A on the right side, a proximity switch 28A is connected to the front erector 6A side via a switch bracket 29A, and a striker 30 is connected to the rear erector 6 side via a striker bracket 31. It is provided.

これにより、例えば、後エレクタ−6の旋回輪7が左旋
回して近接スイッチ28とストライカ−3OAが近接す
ると、近接スイッチ28と駆動モータ9へ接続されてい
る油圧ライン上の電磁切り換え弁(図示路)間が通電状
態になって弁ポートが切り換わり、駆動モータ9は停止
するようになっている。かくして、旋回輪7のそれ以上
の旋回は阻止され、セグメント把持装置17.17Aに
把持されているセグメントS同士が衝突することがない
ようになっている。
As a result, for example, when the swing wheel 7 of the rear erector 6 turns to the left and the proximity switch 28 and the striker 3OA approach each other, the electromagnetic switching valve (as shown) on the hydraulic line connected to the proximity switch 28 and the drive motor 9 ) becomes energized, the valve port is switched, and the drive motor 9 is stopped. In this way, further turning of the turning wheel 7 is prevented, and the segments S held by the segment gripping devices 17, 17A are prevented from colliding with each other.

なお、旋回輪7(7A)の旋回動の惰性を考慮して、ス
トライカ−30(30A )は長く形成され、しかもス
トライカーフ゛ラケント31(31A)にイ立置言周整
可能に取り付けられており、早めに近接状態を検知でき
るようになっている。また、パンクアップのため、近接
スイッチ28(28A)は各ブラケットに2個づつ設け
である。
In addition, in consideration of the inertia of the turning movement of the turning wheel 7 (7A), the striker 30 (30A) is formed long and is attached to the striker frame 31 (31A) so that its circumference can be adjusted vertically. , the proximity state can be detected early. Furthermore, in order to prevent a blowout, two proximity switches 28 (28A) are provided on each bracket.

次に、上記ダブルエレクタ−の動作について説明する。Next, the operation of the double erector will be explained.

第2回及び第3図において、今、前エレクタ−6Aは、
吊りビーム14Aを下方に位置させて、セグメント把持
装置17AでセグメントSを把持して、これより、トン
ネル下方部においてセグメントSを既設のセグメントリ
ングS′に組み付けようとしている段階である。一方、
後エレクタ−6は、吊りビーム14を上方に位置させて
、セグメント搬送用マガジンでトンネル下部に搬送され
てきた、これから組立てられるべきセグメンl−5をセ
グメント把持装置17で受取って把持した状態を示して
いる。
In the second and third figures, the front erector-6A is now
The hanging beam 14A is positioned below, the segment S is gripped by the segment gripping device 17A, and the segment S is now being assembled into the existing segment ring S' in the lower part of the tunnel. on the other hand,
The rear erector 6 is shown in a state in which the hanging beam 14 is positioned upward and the segment l-5 to be assembled, which has been transported to the lower part of the tunnel by the segment transport magazine, is received and gripped by the segment gripping device 17. ing.

後エレクタ−6はセグメンhsを受は取った後、駆動モ
ータ9で旋回輪7を右旋回させて、第3図においてトン
ネル右側の位置までセグメントを持ってくる。この場合
、上記した干渉防止装置が設けられているので両セグメ
ンl−5同士が衝突することはない。ここで、伸縮ジヤ
ツキ13や摺動ジヤツキ16等を連動操作してセグメン
l−5の位置決めを行い、また、ポジショニングジャッ
キ20やロータリジャンキ21を作動させてセグメント
Sの姿勢制御を行って、既設セグメントs′への組み付
は作業を行う。
After the rear erector 6 receives the segment hs, the drive motor 9 causes the swing wheel 7 to turn to the right to bring the segment to a position on the right side of the tunnel in FIG. In this case, since the above-mentioned interference prevention device is provided, both segments 1-5 will not collide with each other. Here, the telescopic jack 13, the sliding jack 16, etc. are operated in conjunction to position the segment L-5, and the positioning jack 20 and rotary jack 21 are operated to control the attitude of the segment S. Assembling to s' requires work.

一方、前エレクタ−6への方は、上記と同要領でトンネ
ル下部におけるセグメント組み付は作業を完了した後、
旋回輪7Aを右方向に回動させ、再びセグメントの受は
取りのために、セグメント把持装置17Aを上方位置ま
で旋回移動させる。そして、セグメントsを受は取った
後、左旋回させてトンネル左側の位置まで持っていき、
そこでセグメント組み付は作業を行う。この状態におい
て、後エレクタ−6は、右側のセグメント組み付けが完
了すれば再び上方位置まで旋回させてセグメントSを受
は取る。そして、上方位置においてセグメンl−5の組
み付は作業を行う。
On the other hand, for the front erector 6, after completing the segment assembly at the bottom of the tunnel in the same manner as above,
The turning wheel 7A is turned to the right, and the segment gripping device 17A is turned to the upper position in order to receive the segment again. Then, after picking up segment s, turn it to the left and bring it to the left side of the tunnel.
Therefore, segment assembly is performed. In this state, when the right side segment assembly is completed, the rear erector 6 is rotated again to the upper position to receive the segment S. Then, the assembly of segment 1-5 is performed in the upper position.

上記のように前後エレクタ−7A17は、同時にセグメ
ント組立作業を行うことができるようになっている。な
お、最後に組み付りられるキーセグメントはキーセグメ
ント用ジヤツキ22を利用して組み付けられる。
As mentioned above, the front and rear erectors 7A17 can perform segment assembly work at the same time. Note that the key segment to be assembled last is assembled using the key segment jack 22.

かくして、トンネル周面に新たなセグメントリングが構
築されたことになる。
In this way, a new segment ring is constructed on the tunnel circumference.

なお、移動ジヤツキ8.8を作動させて、ドラム5をガ
イドビーム4.4に沿ってトンネル後方に移動させれば
、トンネル掘削機のテールシール25(第2図)の交換
を極めて容易かつ迅速に行うことができる。
Furthermore, by operating the moving jack 8.8 and moving the drum 5 toward the rear of the tunnel along the guide beam 4.4, the tail seal 25 (Fig. 2) of the tunnel excavator can be replaced extremely easily and quickly. can be done.

〔発明の効果〕〔Effect of the invention〕

以上説明したように、本発明によれば、ドラム前後に対
称的にエレクタ−を設け、ダブルエレクタ−を構成した
ので、両方(前後)のエレクタ−を同時に作動させて、
同時にセグメント組立作業を行うことが可能となる。す
なわち、例えば、−方はセグメントの受取り、他方はセ
グメントの組み付け、或いは一方はトンネル右側のセグ
メントの組み付け、他方は左側のセグメントの組み付け
を同時に行うことができる。その結果、セグメント組立
に要する時間が従来の約半分で済み−トンネル掘削に要
する工期の大幅短縮化が実現できる工期の大幅短縮化に
伴い、トンネル内での作業時間も大幅に短縮されること
から、それだけ安全性が飛躍的に向上し、また、掘削に
要する経費も大幅に減少しうるという顕著な効果がある
As explained above, according to the present invention, the erectors are provided symmetrically before and after the drum to form a double erector, so both erectors (front and rear) can be operated at the same time.
It becomes possible to perform segment assembly work at the same time. That is, for example, one can receive segments and the other can assemble segments, or one can simultaneously assemble segments on the right side of the tunnel and the other assemble segments on the left side of the tunnel. As a result, the time required to assemble the segments is approximately half that of the conventional method - the construction period required for tunnel excavation can be significantly shortened.As the construction period is significantly shortened, the time required to work inside the tunnel is also significantly reduced. This has the remarkable effect of dramatically improving safety and significantly reducing the cost of excavation.

特に、近年のトンネル大口径化に伴い、セグメント組立
時間が益々増大する中で、本発明の効果は絶大なるもの
がある。
Particularly, as the segment assembly time increases with the recent increase in tunnel diameter, the effects of the present invention are tremendous.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図〜第6図は、本発明の詳細な説明するための図面
であって、第1図は本発明の要部であるダブルエレクタ
−全体の斜視図、第2図はダブルエレクタ−を具備した
シールド掘削機の側断面図、第3図は同背面図を示す。 第4図はセグメント把持装置の要部斜視図、第5図及び
第6図はダブルエレクタ−の干渉防止装置の説明図であ
る。 ■・・・シールドフレーム、 3・・・支柱、 5・・・ドラム、 6A・・・前エレク゛ター 8・・・移動ジヤツキ、 2・・・支持リング、 4・・・ ガイドビーム、 6・・・後エレクタ− 7,7A・・・旋回輪、 9.9A・・・駆動モータ、 10、IOA・・・ベアリング、11.11A・・・支
持アーム、14.14A・・・吊りビーム、15.15
A・・・摺動ロッド、17.17A・・・セグメント把
持装置、S・・・セグメント。
Figures 1 to 6 are drawings for explaining the present invention in detail. Figure 1 is a perspective view of the entire double erector, which is the main part of the present invention, and Figure 2 is a perspective view of the double erector. A side sectional view of the equipped shield excavator, and FIG. 3 shows a rear view of the same. FIG. 4 is a perspective view of the main part of the segment gripping device, and FIGS. 5 and 6 are explanatory diagrams of the interference prevention device of the double erector. ■...Shield frame, 3... Support column, 5... Drum, 6A... Front electric motor 8... Moving jack, 2... Support ring, 4... Guide beam, 6... Rear erector 7, 7A... Swivel wheel, 9.9A... Drive motor, 10, IOA... Bearing, 11.11A... Support arm, 14.14A... Hanging beam, 15.15
A...Sliding rod, 17.17A...Segment gripping device, S...Segment.

Claims (2)

【特許請求の範囲】[Claims] (1)シールドフレームに保持され、このシールドフレ
ーム軸方向に延びるガイドビームを設け、このガイドビ
ームに支持されたドラムを前記シールドフレームに同心
状に設けると共に、このドラムの前後に対称的にエレク
ターを配装してダブルエレクターを形成したことを特徴
とするダブルエレクターを有するトンネル掘削機。
(1) A guide beam is provided that is held by the shield frame and extends in the axial direction of the shield frame, and a drum supported by the guide beam is provided concentrically with the shield frame, and erectors are installed symmetrically in front and behind the drum. A tunnel excavator having a double erector characterized by being arranged to form a double erector.
(2)ダブルエレクターそれぞれが、シールドフレーム
内周に沿って回動自在にドラム端部に支持された旋回輪
と、この旋回輪にその外周面上半径方向に移動自在に設
けられたアーチ状の吊りビームと、この吊りビームにシ
ールドフレーム軸方向に摺動自在に設けられ前記ドラム
周面上を旋回範囲とするセグメント把持装置とから構成
されたことを特徴とする請求項1記載のダブルエレクタ
ーを有するトンネル掘削機。
(2) Each double erector has a slewing ring supported at the end of the drum so as to be rotatable along the inner periphery of the shield frame, and an arch-shaped swiveling ring provided on the swivel ring so as to be movable in the radial direction on the outer circumferential surface of the swivel ring. 2. The double erector according to claim 1, comprising a hanging beam and a segment gripping device that is provided on the hanging beam so as to be slidable in the axial direction of the shield frame and has a rotation range on the circumferential surface of the drum. Tunnel boring machine with.
JP63240388A 1988-09-26 1988-09-26 Tunnel excavator with double erector Expired - Lifetime JPH066880B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP63240388A JPH066880B2 (en) 1988-09-26 1988-09-26 Tunnel excavator with double erector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP63240388A JPH066880B2 (en) 1988-09-26 1988-09-26 Tunnel excavator with double erector

Publications (2)

Publication Number Publication Date
JPH0288894A true JPH0288894A (en) 1990-03-29
JPH066880B2 JPH066880B2 (en) 1994-01-26

Family

ID=17058740

Family Applications (1)

Application Number Title Priority Date Filing Date
JP63240388A Expired - Lifetime JPH066880B2 (en) 1988-09-26 1988-09-26 Tunnel excavator with double erector

Country Status (1)

Country Link
JP (1) JPH066880B2 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0350699U (en) * 1989-09-19 1991-05-16
JP2021095734A (en) * 2019-12-17 2021-06-24 株式会社奥村組 Erector device, lining body construction system, and lining body construction method
CN114856591A (en) * 2022-03-22 2022-08-05 中国矿业大学(北京) Self-locking dead blocking shield TBM construction auxiliary equipment
CN116085003A (en) * 2023-03-07 2023-05-09 河南金品建筑工程有限公司 Civil construction tunnel supporting system
CN116792125A (en) * 2022-03-25 2023-09-22 郑州轻工业大学 Construction method for simultaneously splicing multiple pipes in conventional tunnel construction
CN116792126A (en) * 2022-03-25 2023-09-22 郑州轻工业大学 Double-slide rail four-piece segment erector

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7046695B2 (en) * 2018-04-20 2022-04-04 地中空間開発株式会社 Shield digger

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0350699U (en) * 1989-09-19 1991-05-16
JP2021095734A (en) * 2019-12-17 2021-06-24 株式会社奥村組 Erector device, lining body construction system, and lining body construction method
CN114856591A (en) * 2022-03-22 2022-08-05 中国矿业大学(北京) Self-locking dead blocking shield TBM construction auxiliary equipment
CN116792125A (en) * 2022-03-25 2023-09-22 郑州轻工业大学 Construction method for simultaneously splicing multiple pipes in conventional tunnel construction
CN116792126A (en) * 2022-03-25 2023-09-22 郑州轻工业大学 Double-slide rail four-piece segment erector
CN116085003A (en) * 2023-03-07 2023-05-09 河南金品建筑工程有限公司 Civil construction tunnel supporting system
CN116085003B (en) * 2023-03-07 2023-12-15 重庆亿扬建筑工程有限公司 Civil construction tunnel supporting system

Also Published As

Publication number Publication date
JPH066880B2 (en) 1994-01-26

Similar Documents

Publication Publication Date Title
US3995746A (en) Hydraulic crane mechanism operable to provide enlarged parallel movement
EP2147756B1 (en) Transfer robot
US3329291A (en) Material handling apparatus
US10920436B2 (en) Arrangement and method for operating a hydraulically operated boom carrying a tool in a carrier
JPH0288894A (en) Tunnel excavator with double erector
GB2395187A (en) Excavating and loading machine
JPH0626639Y2 (en) Vacuum type segment grip device
JPH0654079B2 (en) Tunnel excavator
JPH0626640Y2 (en) Segment grip device
JP3845254B2 (en) Segment erector apparatus and shield machine using the same
CN214464193U (en) A blind area excavation device suitable for special-shaped pipe jacking machines
JP3075554B2 (en) Electa device
CN106437706A (en) Novel wheel-leg type rock drilling robot
JPH0633618B2 (en) Construction machinery
JP3107205B2 (en) Electa device of shield machine
JP2000352300A (en) Erector device and tunnel excavator
JP2584378B2 (en) Box shield machine
ITTO20010294A1 (en) DEVICE FOR POSITIONING AN OPERATING BODY, AND WELDING EQUIPMENT THAT USES IT.
JP2943130B2 (en) Pneumatic caisson
JP3360103B2 (en) Elector gripping device and erector using the same
JPH0349166Y2 (en)
JP3701425B2 (en) Segment erector device for shield machine
JPS6139027Y2 (en)
JPS621358Y2 (en)
JP2537512Y2 (en) Hydraulic excavator