JPH0313473B2 - - Google Patents

Info

Publication number
JPH0313473B2
JPH0313473B2 JP59161324A JP16132484A JPH0313473B2 JP H0313473 B2 JPH0313473 B2 JP H0313473B2 JP 59161324 A JP59161324 A JP 59161324A JP 16132484 A JP16132484 A JP 16132484A JP H0313473 B2 JPH0313473 B2 JP H0313473B2
Authority
JP
Japan
Prior art keywords
bellows
boundary
welded
manufacturing
skirts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP59161324A
Other languages
English (en)
Japanese (ja)
Other versions
JPS6138290A (ja
Inventor
Masayoshi Uno
Norihiro Suzuki
Juji Oooka
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kawasaki Heavy Industries Ltd
Original Assignee
Kawasaki Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kawasaki Heavy Industries Ltd filed Critical Kawasaki Heavy Industries Ltd
Priority to JP16132484A priority Critical patent/JPS6138290A/ja
Publication of JPS6138290A publication Critical patent/JPS6138290A/ja
Publication of JPH0313473B2 publication Critical patent/JPH0313473B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Joints Allowing Movement (AREA)
JP16132484A 1984-07-31 1984-07-31 二重ベローズ継手に於けるバウンダリー部の製作方法 Granted JPS6138290A (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16132484A JPS6138290A (ja) 1984-07-31 1984-07-31 二重ベローズ継手に於けるバウンダリー部の製作方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16132484A JPS6138290A (ja) 1984-07-31 1984-07-31 二重ベローズ継手に於けるバウンダリー部の製作方法

Publications (2)

Publication Number Publication Date
JPS6138290A JPS6138290A (ja) 1986-02-24
JPH0313473B2 true JPH0313473B2 (da) 1991-02-22

Family

ID=15732923

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16132484A Granted JPS6138290A (ja) 1984-07-31 1984-07-31 二重ベローズ継手に於けるバウンダリー部の製作方法

Country Status (1)

Country Link
JP (1) JPS6138290A (da)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008151588A (ja) * 2006-12-15 2008-07-03 Idemitsu Eng Co Ltd 二層ベローズの欠陥評価方法及びこれに用いる渦流探傷装置

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5962791A (ja) * 1982-09-30 1984-04-10 株式会社東芝 配管の伸縮継手装置

Also Published As

Publication number Publication date
JPS6138290A (ja) 1986-02-24

Similar Documents

Publication Publication Date Title
US3877730A (en) Method of repairing a flange face of a clamped-flange sealing-ring type pipe coupling
US2916308A (en) Welded branch connection with shrunkon reinforcing sleeve
US2545527A (en) Method of forming an expanded tube and tube seat connection with an intervening metallic bonding stratum of low fusion temperature
JPS6138290A (ja) 二重ベローズ継手に於けるバウンダリー部の製作方法
JPS62209293A (ja) 配管用伸縮継手
JPS5844960B2 (ja) 多管式熱交換器における耐熱衝撃板の取付構造及び取付方法
JPS6138291A (ja) 外圧型多重ベロ−ズ継手の構造
JP2519316B2 (ja) 長尺ハウジングの補修方法およびその補修構造
JPS62127591A (ja) 多層ベロ−ズ継手
JPH0225283A (ja) 渦巻型ガスケットの製造方法
JP2969882B2 (ja) 管内面取付溶接部の残留応力低減方法
US3986387A (en) Supporting fixtures for pressure-testing pipe sections
CN117840547B (zh) 厚壁奥氏体不锈钢管道和20MnMo钢管道的焊接工艺
JPS60196265A (ja) 管の溶接方法
JPS6279395A (ja) 高温ガス炉
JPH02224890A (ja) 容器貫通管の補修方法
JPH0711281Y2 (ja) 二重管型伝熱管を有する熱交換器
JPH0857641A (ja) 固定管の円周自動溶接方法
JPH02183795A (ja) 二重壁伝熱管の溶接方法及び熱交換器
JPS5943674B2 (ja) 圧力容器のフランジ部のシ−ル構造
Vinzens et al. Primary and secondary main piping systems
EP0580799A1 (en) Elbow fittings for double containment pipe assemblies
JP4029229B2 (ja) クレビス装置
CN117489866A (zh) 一种航天管路及舱段及航天管路的安装方法
Rangasamy et al. Challenges during construction of sodium piping systems for 500 MWe prototype fast breeder reactor