JPH0320524B2 - - Google Patents

Info

Publication number
JPH0320524B2
JPH0320524B2 JP7050384A JP7050384A JPH0320524B2 JP H0320524 B2 JPH0320524 B2 JP H0320524B2 JP 7050384 A JP7050384 A JP 7050384A JP 7050384 A JP7050384 A JP 7050384A JP H0320524 B2 JPH0320524 B2 JP H0320524B2
Authority
JP
Japan
Prior art keywords
concrete
steel
girder
slab
composite
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP7050384A
Other languages
Japanese (ja)
Other versions
JPS60212506A (en
Inventor
Hiroo Kishida
Hirofumi Takenaka
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HARUMOTO TETSUKOSHO KK
Original Assignee
HARUMOTO TETSUKOSHO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HARUMOTO TETSUKOSHO KK filed Critical HARUMOTO TETSUKOSHO KK
Priority to JP7050384A priority Critical patent/JPS60212506A/en
Priority to DE8484201618T priority patent/DE3483413D1/en
Priority to EP84201618A priority patent/EP0141478B1/en
Priority to EP19890202096 priority patent/EP0350139A3/en
Publication of JPS60212506A publication Critical patent/JPS60212506A/en
Priority to US06/915,900 priority patent/US4710994A/en
Publication of JPH0320524B2 publication Critical patent/JPH0320524B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

【発明の詳細な説明】[Detailed description of the invention]

本発明は、たとえば合成桁橋を架設するとき
に、鉄筋コンクリート床版と鋼桁とを合成させて
合成桁を形成するに当たつて鉄筋コンクリート床
版に予め圧縮応力を与え、次に鉄筋コンクリート
床版と鋼桁を一体化させ、その後前記圧縮応力を
所望量だけ解放することによつて合成桁全体に引
張力および曲げモーメントを所望量だけ発生させ
ることができる工法に関する。 従来、合成構造部材として多用されているもの
の例としては、橋梁の合成桁橋における鉄筋コン
クリート床版と鋼桁とを合成させた合成桁(梁)
がある。これは、鉄筋コンクリート床版と鋼桁と
をジベルなどのコネクターを用いて一体化させ、
その後の荷重に対しては両者が共同して抵抗する
ようにしたものである。この従来の工法では鉄筋
コンクリート床版の施工は、まず鋼桁を架設し、
次に型枠を施工してからコンクリートを打設して
いる。したがつて型枠、床版の施工に要する工数
が大であり費用が高くつく。そのため鋼桁の軽量
化および小型化が所望されている。 本発明の目的は、上述の技術的課題を解決し、
合成構造部材の小型化および軽量化を実現するこ
とができる応力調整可能な合成構造部材形成工法
を提供することであり、さらに詳しくは本発明を
たとえば合成桁橋へ適用することによつて鉄筋コ
ンクリート床版の施工に要する工数、費用の低減
と鋼桁の軽量化、小型化が実現でき、経済的な合
成桁橋を架橋することが可能となる応力調整を伴
なう合成構造部材形成工法を提供することであ
る。 第1図は本発明が用いられる橋梁の一実施例の
側面図であり、第2図はその平面図である。橋梁
1は両端部で橋台2,3によつて支持される。橋
梁1は、その軸線方向に延びる工形断面の鋼桁か
らなる複数の主桁4とこれらの主桁によつて支持
されている横桁あるいは対傾構と呼ばれる鋼製の
部材5などを含む骨組を有する。鋼桁4の上面に
は通路板6が設置されている。この通路板6は第
2図において図解を容易にするため右半分が省略
されている。この通路板6は、複数のコンクリー
ト床版7が連接して構成される。このコンクリー
ト床版7は後述するようにその内部に幅方向に延
びるpc鋼(高張力鋼)線8が複数個相互に平行
に埋設されている。なお、コンクリート床版7は
その内部に埋設されているpc鋼線8が鋼桁4と
平行になるように設置される。なお、pc鋼線8
に代えてpc鋼棒が用いられてもよい。 第3図はコンクリート床版7が鋼桁4に取付け
られた状態を簡略化して示す斜視図であり、第4
図は矢符A側から見た側面図であり、第5図は矢
符B側から見た平面図であり、第6図は第5図の
切断面線−から見た断面図である。水平方向
に延びる鋼桁4は鉛直方向に延びるウエブ9と、
ウエブ9の両端部でウエブ9に直角方向に延びる
上フランジ10および下フランジ11とを含む。
上フランジ10の上面にはコンクリート床版7の
すべりを防止するためのすべり防止部材12が備
えられる。このすべり防止部材12はたとえばジ
ベルであり、複数の棒状の突起13から成り、上
フランジ10の上面に溶植されて固定される。こ
のすべり防止部材12は上フランジ10の上面に
間隔をあけて複数個配置されている。 コンクリート床版7には鋼桁4間に敷設された
時にすべり防止部材12が嵌入することができる
長孔14が、突起13の位置に対応して複数個コ
ンクリート床板7の幅方向に沿つて形成されてい
る。またコンクリート床版7には幅方向に貫通す
るシース管15が予め複数個挿入されている。こ
のシース管15の径はpc鋼線8が緩やかに挿通
することができる値に選ばれている。 コンクリート床版7を鋼桁4に敷設して通路板
6を形成する工程を以下に説明する。 まずコンクリート床版7を鋼桁4間に隙間なく
仮接合する。その後各コンクリート床版7の継目
部分40に接着剤を塗布またはセメントモルタル
などを注入または打設して各コンクリート床版7
間の一体化を図る。次にコンクリート床版7に鋼
桁4の部材軸方向沿うプレストレスを導入し、コ
ンクリート床版7に圧縮応力を与える。具体的に
説明すると、シース管15内にpc鋼線8を挿入
する。その後ジヤツキなどによつてpc鋼線8に
張力を与えて支持板16および定着部材17によ
つて固定する。この時コンクリートには支持板1
6を介して圧縮力が作用し、内部に圧縮応力が発
生する。定着部材17はコンクリート床版7に圧
縮応力を固定定着させるための手段であり、また
後述するようにコンクリート床版7内の圧縮応力
を任意に調整することができる機能も果たしてい
る。 このようにしてプレストレスが導入されたコン
クリート床版7を鋼桁4と一体化させる。具体的
に説明すればコンクリート床版7の長孔14にコ
ンクリートやセメントモルタルなどを充填して施
工する。これによつてコンクリート床版7と鋼桁
4とは相互に固定され一体化される。こうして鋼
桁4とコンクリート床版7とは合成桁となる。こ
のようにしてコンクリート床版7を鋼桁4と合成
した後に、コンクリート床版7の軸方向のプレス
トレスを除荷することによつて鋼桁4に引張力と
曲げモーメントを発生させることができる。具体
的にその手順を説明すれば、定着部材17を緩め
ることによつてpc鋼線8の張力が解放される。
これによつてプレストレス(予め発生している圧
縮応力)によつて縮められていたコンクリート床
版7は橋軸方向に延びようとする。しかしながら
コンクリート床版7と鋼桁4とは一体化されてい
るのでその延びは拘束され、そのため鋼桁4には
梁を上方に彎曲させる。すなわちこの曲げモーメ
ントと引張力が作用する。そのためプレストレス
が与えられていない通常のコンクリート床版を、
鋼桁に設置して構成したとする場合に比べて本発
明に従う合成桁はこの曲げモーメントの分だけ正
の曲げモーメントが小さくなる。その結果たとえ
ば自動車や人などの活荷重による正の曲げモーメ
ントが与えられても、許容曲げ応力までには十分
の余裕があり、したがつて鋼桁断面を小さくする
ことも可能となる。なおプレストレスの除荷後は
シース管15はセメントペーストなどでグラウト
する。 なおプレストレスの解放に際しては、定着部材
17を用いて所望量だけ解放することによつて、
合成構造部材全体としての作用する応力を調整す
ることが可能となる。 なお本実施例ではコンクリート床版7は工場に
おいて予め製造されていたけれども、従来の現場
打ちコンクリートのように型枠を用いてこの型枠
内にコンクリートを流し込んで形成するようにし
てもよい。 第7図はコンクリート床版の他の実施例の平面
図であり、第8図はその一部を拡大した斜視図で
ある。このコンクリート床版7aには、その長手
方向に沿う両端部に凹凸面21が形成されてい
る。この凹凸面21は凹所22がその幅方向に沿
つて複数個形成されている。たとえばこのコンク
リート床版7aの幅長は1.5mであるとすれば、
この凹所22の奥行d1は2mであり、ピツチd
2は20cmである。なおこの凹凸面21の形状は第
7図示のような形状に限定されるものではなく、
また奥行d1およピツチd2の値もこれに限定さ
れるものではないことは勿論である。このような
形状を有するコンクリート床版7aを鋼桁4の上
フランジ10上に一定の間隔をあけて対向させて
配置させる。その後は前述の実施例と同様にプレ
ストレスを導入し、圧縮応力が発生した後は定着
部材17によつて固定する。その後コンクリート
床版7aを鋼桁4に一体化させるにあたつて、コ
ンクリート床版7aの凹凸面21と、その対向す
る凹凸面21との空間23に固着剤としてのたと
えばコンクリートやセメントモルタルなどを充填
することによつてコンクリート床版7aと鋼桁4
とを一体化させる。その後のプレストレスの除荷
の方法は前述の実施例と同様である。このように
本実施例ではコンクリート床版7aに凹凸面21
を形成するようにしたので、コンクリート床版7
aが鋼桁4に確実に一体化され、そのためプレス
トレスが解放されたときにも、コンクリート床版
7aが鋼桁4上を滑つてしまうというような事態
の発生が防がれる。 第9図は鋼桁4に第1図示のコンクリート床版
7が設置されたときの、鋼桁4およびコンクリー
ト床版7の応力度を説明するための図であり、第
10図は第9図に対応した曲げモーメント図を示
している。第9図では説明の簡略化を図るために
鋼桁4は両端で単純支点26,27で支持されて
いるものと想定する。鋼桁4が支点26,27で
支持されている状態は第9図1で示される。この
状態では鋼桁4には自重による等分布荷重によつ
て第10図1に示されるように放物線で表わされ
る正の曲げモーメントl1が作用する。鋼桁4に
コンクリート床版7を設置して一体化した状態は
第9図2で示される。この状態における曲げモー
メントl2は第10図2で示される。次にコンク
リート床版7の内部に発生しているプレストレス
を解放すると、第9図3図示のようにコンクリー
トが元の形状に戻ろうとする引張力pが鋼桁4に
作用し、これによつて負の曲げモーメントl3が
鋼桁4に作用する。すなわち第10図3で示され
るプレストレスによる負の曲げモーメントl3が
第10図2の曲げモーメントに加わり、その結果
鋼桁4は第10図4で示されるような曲げモーメ
ントl4が発生することになる。第10図4にお
いて仮想線l5で示される通常の合成桁の曲げモ
ーメントよりも、プレストレスによる曲げモーメ
ントl3だけ小さくなつている。このようにして
通常の合成桁と比較すると、本発明によれば正の
曲げモーメントを小さくできるので、鋼桁4の断
面を小さくすることができる。 第11図は、プレストレス解放後のコンクリー
ト床版7と鋼桁4とに作用する応力度を具体的に
解析するための基礎となる図である。合成断面に
作用する断面力すなわち軸方向応力Nと曲げモー
メントMは第1式および第2式で表わされる。 N=−pc ……(1) M=Ndc=−pc・dc ……(2) ただしpcはプレストレスであり、dcはコンク
リート床版7の断面の重心cと合成断面の重心v
との距離を示す。 鋼桁4の縁応力δsu、δslは第3式で表わされ
る。 δsu=N/Av−M/Ivyvsu δsl=N/Av−M/Ivyvsl ……(3) ここでAvは合成断面の断面積であり、Ivは合
成断面の断面2次モーメントであり、yvsuは合
成断面の重心と上フランジとの距離であり、yvsl
は合成断面の重心と下フランジとの距離である。 したがつて第1式および第2式を第3式に代入
して縁応力δsu、δslは第4式で示される。 δsu=−pc/Av+pc・dc/Ivyvsu δsl=−pc/Av+pc・dc/Ivyvsl ……(4) コンクリート床版7の縁応力δcu、δclは当初プ
レストレスpc/コンクリート床版の断面積Acの
圧縮力が生じているので第5式および第6式で示
される。 δcu=pc/Av+N/nAv−M/n・Ivyvcu =pc/Ac−pc/n・Av+pc・dc/n・Ivyvcu……(5
) δcl=pc/Ac+N/n・Av−M/n・Ivyvcl =pc/Ac−pc/n・Av+pc・dc/nIvyvcl ……(6) ここでnはコンクリートの弾性係数Ecと鋼桁
の弾性係数の比、すなわちn=Es/Ecであり、
yvcuは合成断面の重心vとコンクリート床版7
の上面との距離であり、yvclは合成断面の重心v
と上フランジとの距離である。 単純活荷重合成桁が用いられる道路橋を型枠を
使用して組立てる場合の合成構造を形成する前に
考慮する荷重は一般には表1で示される。
For example, when constructing a composite girder bridge, the reinforced concrete deck slab is combined with a steel girder to form a composite girder, compressive stress is applied to the reinforced concrete deck slab in advance, and then the reinforced concrete deck slab and the steel girder are combined. The present invention relates to a construction method capable of generating a desired amount of tensile force and bending moment in the entire composite girder by integrating steel girders and then releasing the compressive stress by a desired amount. An example of what has traditionally been widely used as a composite structural member is composite girder (beam), which is a composite of reinforced concrete deck slabs and steel girders in composite girder bridges.
There is. This is done by integrating the reinforced concrete slab and steel girder using connectors such as dowels.
Both of them jointly resist the subsequent load. In this conventional construction method, the reinforced concrete slab is constructed by first erecting steel girders,
Next, the formwork is constructed and then concrete is poured. Therefore, the number of man-hours required for constructing the formwork and floor slabs is large and the cost is high. Therefore, it is desired to reduce the weight and size of steel girders. The purpose of the present invention is to solve the above-mentioned technical problems,
It is an object of the present invention to provide a stress-adjustable method for forming synthetic structural members that can reduce the size and weight of synthetic structural members. We provide a method for forming composite structural members that involves stress adjustment, which reduces the man-hours and costs required for slab construction, and makes steel girders lighter and smaller, making it possible to construct economical composite girder bridges. It is to be. FIG. 1 is a side view of an embodiment of a bridge in which the present invention is used, and FIG. 2 is a plan view thereof. The bridge 1 is supported by abutments 2 and 3 at both ends. The bridge 1 has a framework including a plurality of main girders 4 made of steel girders with a shaped cross section extending in the axial direction, and steel members 5 called transverse girders or anti-tilt structures supported by these main girders. has. A passage plate 6 is installed on the upper surface of the steel girder 4. The right half of the passage plate 6 is omitted in FIG. 2 for ease of illustration. This passage board 6 is constructed by connecting a plurality of concrete floor slabs 7. As will be described later, a plurality of PC steel (high tensile strength steel) wires 8 extending in the width direction are embedded in the concrete slab 7 in parallel with each other. The concrete slab 7 is installed so that the PC steel wire 8 buried therein is parallel to the steel girder 4. In addition, PC steel wire 8
A PC steel bar may be used instead. FIG. 3 is a simplified perspective view showing the state in which the concrete slab 7 is attached to the steel girder 4;
The figure is a side view seen from the arrow A side, FIG. 5 is a plan view seen from the arrow B side, and FIG. 6 is a sectional view taken from the cutting plane line - in FIG. A steel girder 4 extending in the horizontal direction has a web 9 extending in the vertical direction,
The web 9 includes an upper flange 10 and a lower flange 11 extending perpendicularly to the web 9 at both ends thereof.
A slip prevention member 12 is provided on the upper surface of the upper flange 10 to prevent the concrete slab 7 from slipping. This anti-slip member 12 is, for example, a dowel, and is made up of a plurality of rod-shaped protrusions 13, and is fixed by welding on the upper surface of the upper flange 10. A plurality of these anti-slip members 12 are arranged at intervals on the upper surface of the upper flange 10. A plurality of elongated holes 14 into which the anti-slip members 12 can fit when installed between the steel girders 4 are formed in the concrete slab 7 along the width direction of the concrete slab 7 in correspondence with the positions of the protrusions 13. has been done. Further, a plurality of sheath pipes 15 are inserted in advance into the concrete slab 7 to penetrate in the width direction. The diameter of this sheath tube 15 is selected to a value that allows the PC steel wire 8 to be inserted gently. The process of laying the concrete slab 7 on the steel girder 4 to form the passage board 6 will be described below. First, the concrete slab 7 is temporarily joined between the steel girders 4 without any gaps. After that, adhesive is applied to the joint part 40 of each concrete floor slab 7, or cement mortar is injected or poured into each concrete floor slab 7.
Aiming for unification between the two. Next, prestress along the member axis direction of the steel girder 4 is introduced into the concrete slab 7, and compressive stress is applied to the concrete slab 7. Specifically, the PC steel wire 8 is inserted into the sheath pipe 15. Thereafter, tension is applied to the PC steel wire 8 by jacking or the like, and the PC wire 8 is fixed by the support plate 16 and the fixing member 17. At this time, support plate 1 is placed on the concrete.
Compressive force acts through 6, and compressive stress is generated inside. The fixing member 17 is a means for fixing compressive stress to the concrete floor slab 7, and also functions to arbitrarily adjust the compressive stress within the concrete floor slab 7, as will be described later. The concrete deck slab 7 into which prestress has been introduced in this way is integrated with the steel girder 4. Specifically, the long holes 14 of the concrete slab 7 are filled with concrete, cement mortar, or the like. As a result, the concrete deck slab 7 and the steel girder 4 are fixed to each other and integrated. In this way, the steel girder 4 and the concrete slab 7 become a composite girder. After the concrete deck slab 7 is combined with the steel girder 4 in this way, tensile force and bending moment can be generated in the steel girder 4 by unloading the prestress in the axial direction of the concrete deck slab 7. . Specifically, the tension in the PC steel wire 8 is released by loosening the fixing member 17.
As a result, the concrete slab 7, which had been contracted by prestress (compressive stress generated in advance), attempts to extend in the axial direction of the bridge. However, since the concrete deck slab 7 and the steel girder 4 are integrated, their extension is restricted, and therefore the beam of the steel girder 4 is curved upward. That is, this bending moment and tensile force act. Therefore, ordinary concrete slabs that are not prestressed are
Compared to the case where the composite girder is installed on a steel girder, the positive bending moment of the composite girder according to the present invention is reduced by this bending moment. As a result, even if a positive bending moment is applied due to a live load such as an automobile or a person, there is sufficient margin up to the allowable bending stress, and it is therefore possible to reduce the cross section of the steel girder. Note that after the prestress is removed, the sheath pipe 15 is grouted with cement paste or the like. Note that when releasing the prestress, by releasing the desired amount using the fixing member 17,
It becomes possible to adjust the stresses acting on the composite structural member as a whole. In this embodiment, the concrete slab 7 was manufactured in advance at a factory, but it may also be formed by pouring concrete into a form using a form, as in conventional cast-in-place concrete. FIG. 7 is a plan view of another embodiment of the concrete slab, and FIG. 8 is a partially enlarged perspective view. This concrete floor slab 7a has an uneven surface 21 formed at both ends along its longitudinal direction. This uneven surface 21 has a plurality of recesses 22 formed along its width direction. For example, if the width of this concrete slab 7a is 1.5m,
The depth d1 of this recess 22 is 2 m, and the pitch d
2 is 20cm. Note that the shape of this uneven surface 21 is not limited to the shape shown in FIG.
Furthermore, it goes without saying that the values of the depth d1 and pitch d2 are not limited to these values. The concrete slab 7a having such a shape is placed on the upper flange 10 of the steel girder 4 so as to face each other at a constant interval. Thereafter, prestress is introduced in the same manner as in the previous embodiment, and after compressive stress is generated, the fixing member 17 is used to fix the structure. After that, when integrating the concrete slab 7a with the steel girder 4, a bonding agent such as concrete or cement mortar is applied to the space 23 between the uneven surface 21 of the concrete slab 7a and the opposing uneven surface 21. By filling the concrete slab 7a and the steel girder 4
and integrate them. The subsequent method of unloading the prestress is similar to the previous embodiment. In this way, in this embodiment, the uneven surface 21 is provided on the concrete floor slab 7a.
Since the concrete slab 7
a is reliably integrated with the steel girder 4, so that even when the prestress is released, a situation such as the concrete deck slab 7a slipping on the steel girder 4 is prevented from occurring. FIG. 9 is a diagram for explaining the stress level of the steel girder 4 and the concrete deck slab 7 when the concrete deck slab 7 shown in the first diagram is installed on the steel girder 4, and FIG. The corresponding bending moment diagram is shown. In FIG. 9, in order to simplify the explanation, it is assumed that the steel girder 4 is supported at both ends by simple supports 26 and 27. The state in which the steel girder 4 is supported by the fulcrums 26 and 27 is shown in FIG. 91. In this state, a positive bending moment l1 represented by a parabola acts on the steel girder 4 due to the uniformly distributed load due to its own weight, as shown in FIG. 10. The state in which the concrete deck slab 7 is installed and integrated with the steel girder 4 is shown in FIG. 92. The bending moment l2 in this state is shown in FIG. 102. Next, when the prestress generated inside the concrete slab 7 is released, a tensile force p that tries to return the concrete to its original shape acts on the steel girder 4, as shown in Figure 9. Therefore, a negative bending moment l3 acts on the steel girder 4. That is, the negative bending moment l3 due to prestress shown in FIG. 10 3 is added to the bending moment shown in FIG. 10 2, and as a result, the steel girder 4 experiences a bending moment l 4 as shown in FIG. Become. The bending moment 13 due to prestress is smaller than the bending moment of a normal composite girder, which is indicated by the imaginary line 15 in FIG. 10 and 4. In this way, when compared with a normal composite girder, according to the present invention, the positive bending moment can be reduced, so the cross section of the steel girder 4 can be made smaller. FIG. 11 is a diagram that serves as a basis for specifically analyzing the degree of stress acting on the concrete deck slab 7 and the steel girder 4 after prestress is released. The cross-sectional force, that is, the axial stress N and bending moment M acting on the composite cross section are expressed by the first equation and the second equation. N=-pc...(1) M=Ndc=-pc・dc...(2) However, pc is prestress, and dc is the center of gravity c of the cross section of the concrete slab 7 and the center of gravity v of the composite cross section.
Indicates the distance from The edge stresses δsu and δsl of the steel girder 4 are expressed by the third equation. δsu=N/Av-M/Ivyvsu δsl=N/Av-M/Ivyvsl...(3) Here, Av is the cross-sectional area of the composite cross section, Iv is the second moment of area of the composite cross section, and yvsu is the composite cross-sectional area. The distance between the center of gravity of the cross section and the upper flange, yvsl
is the distance between the center of gravity of the composite cross section and the lower flange. Therefore, by substituting the first and second equations into the third equation, the edge stresses δsu and δsl are expressed by the fourth equation. δsu=-pc/Av+pc・dc/Ivyvsu δsl=-pc/Av+pc・dc/Ivyvsl ...(4) Edge stress δcu of concrete slab 7, δcl is initially prestressed PC/compression of cross-sectional area Ac of concrete slab Since a force is generated, it is expressed by the fifth and sixth equations. δcu=pc/Av+N/nAv−M/n・Ivyvcu=pc/Ac−pc/n・Av+pc・dc/n・Ivyvcu……(5
) δcl=pc/Ac+N/n・Av−M/n・Ivyvcl=pc/Ac−pc/n・Av+pc・dc/nIvyvcl ……(6) Here, n is the elastic modulus of concrete Ec and the elastic modulus of steel girder is the ratio of n=Es/Ec,
yvcu is the center of gravity v of the composite section and concrete slab 7
is the distance from the top surface of , and yvcl is the center of gravity v of the composite cross section
and the distance from the upper flange. When assembling a road bridge using formwork using simple live load composite girders, the loads to be considered before forming the composite structure are generally shown in Table 1.

【表】 したがつて通常の合成桁のときの考慮する荷重
は0.700t/m2〜1.050t/m2であるが、型枠を使用
しない本件では考慮する荷重は0.600t/m2〜
0.950t/m2となる。したがつて床版施工時の死荷
重を14%〜10%軽くすることができる。 さらに上述の結果、および第4式〜第6式を用
いて、本件発明者が通常の合成桁と本件による合
成桁とを設計計算した一例が第2表に示されてい
る。なお、第2表では許容応力は±2100Kg/cm2と
し、コンクリート断面は横が2736cm、縦が230cm
とする。
[Table] Therefore, the load to be considered for ordinary composite girders is 0.700t/m 2 to 1.050t/m 2 , but in this case, where formwork is not used, the load to be considered is 0.600t/m 2 to 1.050t/m 2
It becomes 0.950t/ m2 . Therefore, the dead load during floor slab construction can be reduced by 14% to 10%. Further, Table 2 shows an example in which the present inventor designed and calculated a normal composite girder and a composite girder according to the present invention using the above-mentioned results and Equations 4 to 6. In addition, in Table 2, the allowable stress is ±2100Kg/ cm2 , and the concrete cross section is 2736cm in width and 230cm in length.
shall be.

【表】【table】

【表】 第2表によつて鋼桁の重量比は第7式で示され
る。 388.2−341.6/388.3×100=12.0% ……(7) すなわち、本発明によれば、鋼桁の重量を従来
よりも12.0%軽くすることができることになる。 通常、合成桁橋の鋼桁部には、鋼桁、床版、地
覆、高欄、舗装等の死荷重および活荷重などの鉛
直荷重によつて正の曲げモーメントが作用し、上
縁側に圧縮応力、下縁側に引張応力が発生してい
る。本工法では内部に圧縮応力の発生しているコ
ンクリート床版と鋼桁とを一体化した後、コンク
リート床版の応力解放によつて鋼桁部には引張力
と負の曲げモーメントが作用するので、通常の工
法に比べて上縁側の圧縮応力、下縁側の引張応力
ともに小さくなる。従つて通常の工法よりも大き
な荷重に抵抗ができることになる。すなわち、同
じ鉛直荷重に対して両者を比較すれば、本工法の
方が鋼桁部の所要断面積は小さくてすむことにな
り、鋼桁の軽量化、小型化が図れる。また鋼桁断
面を小さくすることによつて、桁高さを低くする
ことができるので、風圧などの橋梁側面に加わる
荷重を小さくすることが可能となる。また、桁下
空間が制限される箇所にも適用でき、取付け道路
の嵩上げ高さを低くすることによつて経済的にも
有利となる。 また従来の工法では鉄筋コンクリート床版を施
工するためには型枠を組立てる必要があるが、本
工法においては予め工場等において製作されたプ
レキヤスト床版を用いることもできこの場合には
型枠を必要とせず、床版の施工に要する工数、費
用の低減が図れる。 また本発明を圧縮力の作用する合成構造部材に
適用した場合には、部材の設計に際して考慮され
る荷重によつて圧縮力が作用する基礎部材に対し
それと一体化させた内部に圧縮応力の発生してい
るコンクリート部材の応力を解放することによつ
て、基礎部材には引張力が作用することになり、
荷重によつて発生する圧縮力を打消すことにな
る。すなわち合成桁橋へ適用した場合と同様に、
型枠施工の省略による工数、費用の低減と部材の
軽量化、小型化が図れ、経済的な合成構造部材を
創ることができる。 なお、前述の実施例では、合成構造部材を形成
するにあたつては、基礎部材として鋼製の部材を
用い、補助部材としてコンクリート部材を用いた
けれども、基礎部材としてコンクリート部材を用
い、補助部材として鋼製の部材を用いてもよく、
また基礎部材および補助部材として鋼製の部材を
用いてもよく、さらにまた基礎部材および補助部
材としてコンクリート部材を用いてもよい。また
基礎部材および補助部材はコンクリート製および
鋼製の複合体からなる部材であつてもよい。 以上のように、本発明によれば合成構造部材を
形成する際、その内部に発生している圧縮応力を
解放することにより、設計上考慮される荷重によ
つて部材に発生する圧縮力あるいは曲げモーメン
トとは逆方向の力が与えられ、そのため部材の軽
量化、小型化が図れる。
[Table] According to Table 2, the weight ratio of the steel girder is shown by equation 7. 388.2−341.6/388.3×100=12.0% (7) That is, according to the present invention, the weight of the steel girder can be reduced by 12.0% compared to the conventional one. Normally, a positive bending moment acts on the steel girder part of a composite girder bridge due to vertical loads such as dead loads and live loads of the steel girders, deck slabs, ground covering, handrails, pavement, etc., causing compression on the upper edge side. Tensile stress is generated on the lower edge side. In this construction method, after the concrete slab and steel girder, which have internal compressive stress, are integrated, tensile force and negative bending moment are applied to the steel girder by releasing the stress in the concrete slab. , both the compressive stress on the upper edge side and the tensile stress on the lower edge side are smaller than in the normal construction method. Therefore, it is able to withstand greater loads than conventional construction methods. In other words, if we compare the two for the same vertical load, this method requires a smaller cross-sectional area for the steel girder, making the steel girder lighter and smaller. Furthermore, by reducing the cross section of the steel girder, the height of the girder can be lowered, making it possible to reduce loads such as wind pressure applied to the side surfaces of the bridge. Moreover, it can be applied to places where the space under the girder is limited, and it is economically advantageous by lowering the height of the access road. In addition, with conventional construction methods, it is necessary to assemble formwork in order to construct reinforced concrete slabs, but with this method, precast slabs that have been manufactured in advance at a factory etc. can also be used, and in this case, formwork is not required. It is possible to reduce the man-hours and costs required for constructing the floor slab. Furthermore, when the present invention is applied to a composite structural member on which compressive force acts, compressive stress is generated inside the foundation member on which compressive force acts due to the load taken into consideration when designing the member. By releasing the stress in the concrete members, tensile force will be applied to the foundation members.
This will cancel out the compressive force generated by the load. In other words, similar to when applied to composite girder bridges,
By omitting formwork construction, man-hours and costs can be reduced, and components can be made lighter and smaller, making it possible to create economical composite structural components. In addition, in the above-mentioned example, when forming a composite structural member, a steel member was used as the foundation member and a concrete member was used as the auxiliary member. A steel member may be used as
Further, steel members may be used as the foundation member and the auxiliary member, and furthermore, concrete members may be used as the foundation member and the auxiliary member. Further, the base member and the auxiliary member may be members made of a composite material made of concrete and steel. As described above, according to the present invention, when forming a composite structural member, by releasing the compressive stress generated inside the composite structural member, the compressive force or bending force generated in the member due to the load considered in the design can be reduced. A force in the opposite direction to the moment is applied, so the member can be made lighter and smaller.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明が使用される橋梁の一実施例の
側面図、第2図はその平面図、第3図はコンクリ
ート床版7が鋼桁4に取り付けられた状態を簡略
化して示す斜視図、第4図は第3図の矢符A側か
ら見た側面図、第5図は第3図の矢符B側から見
た平面図、第6図は第5図の切断面線−から
見た断面図、第7図はコンクリート床版の他の平
面図、第8図はその一部を拡大した斜視図、第9
図は綱桁4およびコンクリート床版7の応力度を
説明するための図、第10図は第9図に対応した
曲げモーメント図、第11図はコンクリート床版
7と綱桁4とに作用する応力度を具体的に解析す
るための基礎となる図である。 1……橋梁、4……綱桁、7,7a……コンク
リート床版、8……pc綱線、12……すべり防
止部材、14……長孔、16……支持板、17…
…定着部材、40……継ぎ目。
FIG. 1 is a side view of an embodiment of a bridge in which the present invention is used, FIG. 2 is a plan view thereof, and FIG. 3 is a simplified perspective view showing a concrete deck 7 attached to a steel girder 4. 4 is a side view seen from the arrow A side in FIG. 3, FIG. 5 is a plan view seen from the arrow B side in FIG. 3, and FIG. 6 is a section line - Figure 7 is another plan view of the concrete slab, Figure 8 is a partially enlarged perspective view, Figure 9 is a cross-sectional view as seen from
The figure is a diagram for explaining the stress degree of the rope girder 4 and the concrete deck slab 7, FIG. 10 is a bending moment diagram corresponding to FIG. 9, and FIG. FIG. 3 is a diagram that serves as a basis for specifically analyzing stress levels. 1...Bridge, 4...Tie girder, 7,7a...Concrete floor slab, 8...PC cable wire, 12...Slip prevention member, 14...Long hole, 16...Support plate, 17...
...Fixing member, 40... Seam.

Claims (1)

【特許請求の範囲】[Claims] 1 補助部材を基礎部材に仮接合し、次に補助部
材に圧縮応力発生手段によつてその内部に圧縮応
力を発生させ、その後補助部材を基礎部材に前記
圧縮応力の作用方向と基礎部材の部材軸方向とが
平行になるよう固定的に設置し、次いで圧縮応力
調整手段によつて圧縮応力の解放量を調整するこ
とによつて、基礎部材に前記解放量に対応した前
記作用方向に沿う引張力および曲げモーメントを
発生させることを特徴とする応力調整を伴なう合
成構造部材形成工法。
1 Temporarily join the auxiliary member to the foundation member, then generate compressive stress in the auxiliary member by means of a compressive stress generating means, and then attach the auxiliary member to the foundation member in the direction of action of the compressive stress and the members of the foundation member. The base member is fixedly installed so that it is parallel to the axial direction, and then the amount of compressive stress released is adjusted by the compressive stress adjustment means, so that the foundation member is subjected to tensile force along the acting direction corresponding to the amount of release. A method of forming composite structural members with stress adjustment characterized by the generation of forces and bending moments.
JP7050384A 1983-11-07 1984-04-09 Formation of synthetic structural member accompanying stressadjustment Granted JPS60212506A (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
JP7050384A JPS60212506A (en) 1984-04-09 1984-04-09 Formation of synthetic structural member accompanying stressadjustment
DE8484201618T DE3483413D1 (en) 1983-11-07 1984-11-07 METHOD FOR PRODUCING A COMPOSED COMPONENT.
EP84201618A EP0141478B1 (en) 1983-11-07 1984-11-07 A method for forming a composite structural member
EP19890202096 EP0350139A3 (en) 1983-11-07 1984-11-07 A method for forming a composite structural member
US06/915,900 US4710994A (en) 1983-11-07 1986-10-06 Method of forming a composite structural member

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7050384A JPS60212506A (en) 1984-04-09 1984-04-09 Formation of synthetic structural member accompanying stressadjustment

Publications (2)

Publication Number Publication Date
JPS60212506A JPS60212506A (en) 1985-10-24
JPH0320524B2 true JPH0320524B2 (en) 1991-03-19

Family

ID=13433394

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7050384A Granted JPS60212506A (en) 1983-11-07 1984-04-09 Formation of synthetic structural member accompanying stressadjustment

Country Status (1)

Country Link
JP (1) JPS60212506A (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030075064A (en) * 2002-03-15 2003-09-22 아이앤아이스틸 주식회사 mothod and structure for construction of a bridge
KR100544304B1 (en) * 2002-06-18 2006-01-23 (주) 선암기술연구소 Building blocks for bridge deck
JP2008063803A (en) * 2006-09-07 2008-03-21 Jfe Engineering Kk Synthetic floor slabs, synthetic floor slab bridges, or composite girder bridges with inner ribbed shaped steel

Also Published As

Publication number Publication date
JPS60212506A (en) 1985-10-24

Similar Documents

Publication Publication Date Title
US4710994A (en) Method of forming a composite structural member
US4147009A (en) Precast panel building construction
US2948995A (en) Connections between reinforced, precast concrete structures and method of making same
KR101937680B1 (en) Prefabricated Precast Structure and Construction Method Thereof
CN100570065C (en) Construction methods for PSC girder bridges
US6543195B2 (en) Composite structural framing system
JP3588325B2 (en) Construction method of single span and multi span composite girder bridges
KR100949828B1 (en) Steel beam and hybrid beam of steel concrete for slim floor
KR101432087B1 (en) Composite rahman bridge using preflex beam and horizontal shear connectors and construction method thereof
JP7266808B1 (en) Main girder continuous rigid connection method
JP2978903B1 (en) Viaduct
JPH0475322B2 (en)
JP7716615B2 (en) Panel-type buried formwork, concrete structure and construction method thereof
US3374592A (en) Precast column with shear-head sections
KR101157607B1 (en) Prestressed steel composite girder with prestressed non-introducing portions provided at both ends of lower flange casing concrete, manufacturing method thereof, and Rahmen structure and construction method thereof
KR101752285B1 (en) Hybrid beam with wide PSC lower flange and enlarged section upper flange and structure frame using the same
JPH05340031A (en) Prestressed concrete girder and its manufacture
JPH1121816A (en) Bridge structure
JPS60212506A (en) Formation of synthetic structural member accompanying stressadjustment
JP7783582B1 (en) Pile head joint structure and joint method
JPH0426483Y2 (en)
JPH05311922A (en) Earthquake resistant wall
JP7772994B1 (en) Wall panel support structure and wall structure
JPH03881B2 (en)
CN215858253U (en) Concrete floor stand node connection structure