JPH03224992A - Concrete placement method - Google Patents
Concrete placement methodInfo
- Publication number
- JPH03224992A JPH03224992A JP2019330A JP1933090A JPH03224992A JP H03224992 A JPH03224992 A JP H03224992A JP 2019330 A JP2019330 A JP 2019330A JP 1933090 A JP1933090 A JP 1933090A JP H03224992 A JPH03224992 A JP H03224992A
- Authority
- JP
- Japan
- Prior art keywords
- concrete
- amount
- displacement
- displacements
- formwork
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/003—Arrangement of measuring or indicating devices for use during driving of tunnels, e.g. for guiding machines
- E21D9/004—Arrangement of measuring or indicating devices for use during driving of tunnels, e.g. for guiding machines using light beams for direction or position control
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Bridges Or Land Bridges (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
Description
【発明の詳細な説明】
〔産業上の利用分野〕
本発明は、トンネル覆工や、アーチ橋等略半円形断面の
コンクリート内面を型枠支保を用いて打設する際のコン
クリート打設方法に関するものである。[Detailed Description of the Invention] [Field of Industrial Application] The present invention relates to a concrete pouring method for pouring concrete inner surfaces of substantially semicircular cross sections such as tunnel linings and arch bridges using formwork supports. It is something.
従来、上記のごとき略半円形断面構造物のコンクリート
を打設する際には、第1O図のトンネル覆工例のごとく
、掘削したトンネル坑1内のコンクリートの打設空間2
に沿って型枠3を配置し、この型枠3を、トンネル坑1
内のレール4上を移動可能に設けられたガントリー5及
びターンバックル6からなる型枠支保て支持した状態で
、打設空間2内にコンクリートを打設する。Conventionally, when pouring concrete for a structure with a substantially semicircular cross section such as the one described above, as in the example of tunnel lining shown in Figure 1O, the concrete pouring space 2 in the excavated tunnel shaft 1 is
The formwork 3 is placed along the tunnel shaft 1.
Concrete is placed in the placing space 2 while supported by a formwork consisting of a gantry 5 and a turnbuckle 6 which are movably provided on rails 4 inside.
その際、コンクリート打設中の型枠3や上記の型枠支保
の各変位量をダイヤルゲージ7により測定し、また型枠
3に設けた点検窓8により左右の打設高さを目視により
チエツクすることにより、コンクリートの打設速度や打
設位置を調整するという管理方法が用いられていた。At that time, the amount of displacement of the formwork 3 and the above-mentioned formwork supports during concrete pouring is measured using the dial gauge 7, and the left and right pouring heights are visually checked using the inspection window 8 provided in the formwork 3. By doing so, a management method was used in which the concrete placement speed and placement position were adjusted.
しかしながら、ダイヤルゲージ7は非常に敏感であり、
コンクリートの打設作業中に人や物が触れると測定がで
きなくなると共に、そのゲージを読みとるための手間が
かかり、かつ正確な管理が得られないという問題があっ
た。However, the dial gauge 7 is very sensitive;
There are problems in that if a person or object touches the concrete during pouring work, measurements cannot be taken, it takes time and effort to read the gauge, and accurate control cannot be obtained.
本発明は、前記従来の問題点を解決するためになされた
ものであり、略半円形断面のコンクリート内面を型枠支
保を用いて打設する際の型枠、または型枠支保の変位量
を確実に測定し、確認しながらコンクリートの打設を行
なえるコンクリート打設方法を提供することを解決課題
としたものである。The present invention was made in order to solve the above-mentioned conventional problems, and it is possible to reduce the amount of displacement of the formwork or formwork support when pouring the inner surface of concrete with a substantially semicircular cross section using the formwork support. The problem to be solved is to provide a concrete pouring method that allows concrete to be poured while reliably measuring and checking.
上記の課題を解決するための手段として、本発明のコン
クリート打設方法は、コンクリートの型枠支保の少なく
とも左右両側の各点と、それに対応した固定点とにそれ
ぞれ対向して設けたセンサーヘッドと反射板とにより計
測される型枠支保の各変位量を表示すると共に、それら
の変位量があらかじめ設定された許容変位量内にあるこ
とをCRT及び警報装置などで確認しながらコンクリー
トの打設を行なうことを特徴としたものであり、型枠支
保の変位量がほぼ同じになるようにコンクリートの打設
速度及び打設位置を適宜に調整することができる。As a means for solving the above-mentioned problems, the concrete placing method of the present invention includes a sensor head provided facing at least each point on both left and right sides of a concrete form support and a corresponding fixing point. Concrete is poured while displaying the amount of displacement of the formwork support measured by the reflector and confirming with a CRT and alarm device that these displacements are within the preset allowable displacement amount. The concrete placement speed and placement position can be adjusted as appropriate so that the amount of displacement of the formwork supports is approximately the same.
なお、型枠支保に固定されるセンサーヘッドとそれに対
応して設けられる反射板とは、型枠支保の左右両側の他
、そのつま側、または中心部等にも設けることができ、
それらセンサーヘッドと反射板とからなる光電センサー
装置の数を多数設けることにより、精度の高いコンクリ
ート打設が行なわれる。In addition, the sensor head fixed to the formwork support and the reflective plate provided corresponding thereto can be provided not only on both the left and right sides of the formwork support, but also on the toe side, the center, etc.
By providing a large number of photoelectric sensor devices each consisting of a sensor head and a reflector, highly accurate concrete placement can be achieved.
以下図面を参照して本発明の各実施例を説明するが、各
実施例及び第10図の従来例において、それぞれ同じ部
品は同じ部品番号で示している。Each embodiment of the present invention will be described below with reference to the drawings, and in each embodiment and the conventional example shown in FIG. 10, the same parts are indicated by the same part numbers.
まず、第1図の正面図、第2図の平面図、第1図のガン
トリーの右側要部拡大の正面図の第3図及び第4図の装
置構成図に示す実施例1においては、第10図の従来例
と同様にトンネル覆工のコンクリート打設空間に本発明
の方法を適用してコンクリート打設を行なう例を示して
いる。First, in Embodiment 1 shown in the front view of FIG. 1, the plan view of FIG. 10 shows an example in which the method of the present invention is applied to concrete placement in a concrete placement space of a tunnel lining, similar to the conventional example shown in FIG.
そこで、この実施例1では、第1図、第2図及び第3図
に示すように、コンクリートの型枠支保であるガントリ
ー5の左右両側の下部にそれぞれ2個所、即ち、第2図
のC及びEで示す空間の左右各1個所と、矢印Tで示す
トンネルのつま側と、矢印Rで示すラップ側のうちのつ
ま側Tに1個所の合計5個所に、センサーヘッド10.
IOAを固定し、これらのセンサーヘッド10.10A
の例えば、第3図のd−50〜70胴前方に対応して、
地盤G、L上に固定して各反射板11.IIAを設けて
いる。Therefore, in this embodiment 1, as shown in FIG. 1, FIG. 2, and FIG. The sensor head 10.
Fix the IOA and these sensor heads 10.10A
For example, corresponding to the front of the d-50 to 70 fuselage in Fig. 3,
Each reflecting plate 11 is fixed on the ground G and L. IIA has been established.
このセンサーヘッドio、IOAには、例えば半導体レ
ーザーと位置検出素子とから構成される測距式光電セン
サーが使用され、反射板11、IIAにこのセンサヘッ
ド10.IOAのレーザー光を反射させて、返ってくる
時間から上記距離dを計測するものである。For the sensor heads io and IOA, a distance-measuring photoelectric sensor composed of, for example, a semiconductor laser and a position detection element is used, and the sensor head 10. The distance d is measured by reflecting the IOA's laser beam and measuring the time it takes for it to return.
次に、第4図に示すごとく、上記センサーヘッド10.
IOAにより計測される型枠支保の許容変位量を任意に
設定できるコントロールボックス12及びそれらの変位
量を表示する表示ボックス13とプリンタ14とを設け
ると共に、許容変位量を超えた場合に作動する回転灯1
5及びブザー16等の警報装置、更にコンクリート打設
量と型枠3または型枠支保の変位量との相関を表示する
CRT17を設けている。Next, as shown in FIG. 4, the sensor head 10.
A control box 12 that can arbitrarily set the allowable displacement amount of the formwork support measured by IOA, a display box 13 that displays these displacement amounts, and a printer 14 are provided. light 1
5 and alarm devices such as a buzzer 16, and a CRT 17 that displays the correlation between the amount of concrete placed and the amount of displacement of the formwork 3 or formwork support.
なお、この場合のコンクリート打設量は、コンクリート
アジテータトラックの台数を数えるコンクリート量カウ
ント計18によって行なっている。The amount of concrete placed in this case is determined by a concrete amount counter 18 that counts the number of concrete agitator trucks.
そこで、各センサーヘッド10.IOAにより計測され
る変位量が、コントロールボックス12で設定された許
容変位量に対し、どれか1つでも超えると、上記の警報
装置が作動するようになっており、このような状態でコ
ンクリートの打設を行なうことになる。Therefore, each sensor head 10. If the amount of displacement measured by the IOA exceeds any one of the allowable displacements set in the control box 12, the above-mentioned alarm device is activated, and in this condition, the concrete The pouring will be done.
その結果、第5図に示すように、CRT17上にコンク
リート打設量Qと型枠支保の計測変位量Fとが表示され
、これを目視して、型枠支保の左右両側の変位量F、と
F2とがほぼ同じになるように、コンクリートの打設速
度及び打設位置を調整する。As a result, as shown in FIG. 5, the amount of concrete placed Q and the measured displacement amount F of the formwork support are displayed on the CRT 17, and by visually observing this, the amount of displacement F on both the left and right sides of the formwork support, The concrete placement speed and placement position are adjusted so that F2 and F2 are approximately the same.
この時に、型枠3の点検窓8から打設高さHを確認し、
内空変位量ΔSをメジャーで測定して入力することによ
りCRT17に同時に表示すれば更に好ましい。At this time, check the pouring height H through the inspection window 8 of the formwork 3,
It is more preferable if the internal space displacement amount ΔS is measured with a tape measure, inputted, and displayed on the CRT 17 at the same time.
なお、第3図において、型枠支保であるガントリー5の
脚部は、レール4上に油圧ジヤツキ9を介して支持され
ている。In FIG. 3, the legs of the gantry 5, which supports the formwork, are supported on the rails 4 via hydraulic jacks 9.
次に、第6図の正面図、第6図の中央部の要部拡大の正
面図の第7図及び第6図の右側の要部拡大の正面図の第
8図に示す実施例2は、アーチ橋などのアーチコンクリ
ートの打設に本発明の方法を適用した例であり、この実
施例2では、型枠支保20の左右両側の上部の2つの点
に、第8図のごとく反射板11Bを設け、これらに対応
した地盤G、L上の足場21の左右両側の上部の2つの
固定点にそれぞれセンサーヘッドIOBを設けており、
更に型枠支保20の中央下方の地盤G、 L上の固定
点にセンサーヘッドIOCを設け、このセンサーヘッド
IOCに対しては、型枠支保20の中心と地盤G、Lの
表面との間にピアノ線22を張設し、第7図に示すごと
く、センサーヘッドIOCに対向した位置に反射板11
Cを固定している。Next, the second embodiment shown in FIG. 6 is a front view, FIG. 7 is an enlarged front view of the central part of FIG. 6, and FIG. 8 is an enlarged front view of the main part on the right side of FIG. This is an example in which the method of the present invention is applied to the casting of arch concrete for an arch bridge, etc. In this second embodiment, reflective plates are placed at two points on the upper left and right sides of the form support 20 as shown in FIG. 11B, and sensor heads IOBs are installed at two fixed points on the upper left and right sides of the scaffolding 21 on the corresponding ground G and L, respectively.
Furthermore, a sensor head IOC is provided at a fixed point on the ground G, L below the center of the formwork support 20, and for this sensor head IOC, a sensor head is attached between the center of the formwork support 20 and the surface of the ground G, L. A piano wire 22 is stretched, and a reflection plate 11 is placed at a position facing the sensor head IOC, as shown in FIG.
C is fixed.
以上の構成からなる実施例2においても、前記実施例1
と同様に、上記各センサーヘッド10B、IOCにより
得られる型枠支保20の両側と中心部の変位量と、コン
クリートの打設量とをCRT17に表示しながらコンク
リートの打設を行ない、コンクリートの打設速度と打設
位置とを調整するが、この場合のCRT17に表示され
るコンクリート打設量Vcと型枠支保変位量SIとの関
係線図を第9図に示し、型枠支保20の左右の変位量を
F+、Fzで、そして中心部の変位量をC0Lで示して
いる。Also in the second embodiment having the above configuration, the first embodiment
Similarly, concrete is placed while displaying on the CRT 17 the amount of displacement on both sides and the center of the formwork support 20 obtained by each sensor head 10B and IOC, and the amount of concrete placed. The setting speed and placement position are adjusted. In this case, a relationship diagram between the concrete placement amount Vc displayed on the CRT 17 and the formwork support displacement amount SI is shown in FIG. The amount of displacement at the center is shown as F+ and Fz, and the amount of displacement at the center is shown as C0L.
なお、前記実施例1では、センサーヘッド10、IOA
を型枠支保であるガントリー5の左右両側の各点に設け
、これに対応した反射板11、IIAを地盤G、 L
上の固定点に対向して設け、一方、実施例2ではセンサ
ーヘッド10B、IOCを地盤G、L上の固定点に設け
ているが、これらセンサーヘッド10.IOA、10B
、IOCと反射板11.IIA、IIB。Note that in the first embodiment, the sensor head 10, the IOA
are installed at each point on both the left and right sides of the gantry 5 that supports the formwork, and corresponding reflectors 11 and IIA are installed on the ground G and L.
On the other hand, in the second embodiment, the sensor head 10B and IOC are provided at the fixed points on the ground G and L, but these sensor heads 10. IOA, 10B
, IOC and reflector 11. IIA, IIB.
11Cとは、型枠支保側、または固定点側のどちらに設
けてもよい。11C may be provided on either the formwork support side or the fixing point side.
以上に説明したごとく、本発明のコンクリート打設方法
によれば、コンクリート打設用の型枠または型枠支保の
変位量を確実に確認しながらコンクリートを打設できる
ので、変位傾向や変位量に支障をきたした場合に、コン
クリートの打設速度や打設位置を直ちに変更できるとい
う効果がある。As explained above, according to the concrete pouring method of the present invention, concrete can be poured while reliably confirming the amount of displacement of the concrete pouring formwork or formwork support. In the event of a problem, the concrete placement speed and placement position can be changed immediately.
また、アーチ橋のコンクリートやトンネル覆工用コンク
リートのように、左右均等にコンクリートを打設する必
要がある場合に、型枠または型枠支保の変位量を同時に
知ることができるので、施工が容易になるという利点が
ある。In addition, when it is necessary to place concrete evenly on the left and right sides, such as concrete for arch bridges or concrete for tunnel lining, the amount of displacement of formwork or formwork support can be known at the same time, making construction easier. It has the advantage of becoming
図面は本発明の方法を適用してコンクリート打設を行な
う場合の各実施例を示しており、第1図はその実施例1
における型枠支保を示す正面図、第2図は第1図の平面
図、第3図は第1図の右側要部拡大の正面図、第4図は
第1図の実施例Iにおける装置構成図、第5図は第4図
のCRTに表示されるコンクリート打設量と計測変位量
との関係線図、第6図はその実施例2における型枠支保
を示す正面図、第7図は第6図の中央部の要部拡大の正
面図、第8図は第6図の右側上部の要部拡大の正面図、
第9図は第6図の実施例2においてCRTに表示される
コンクリート打設量と型枠支保変位量との関係線図、第
10図は従来の方法によりコンクリート打設の際の型枠
支保の正面図である。
3・・・型枠、5・・・ガントリー、6・・・ターンバ
ックル、10.IOA、IOB、IOC・・・センサー
ヘッド、11.IIA、IIB、IIC・・・反射板、
17・・・CRT、20・・・型枠支保、G、 L・
・・地盤。
」喜15墨[l肌■
O
−
田
の
くThe drawings show various embodiments of concrete placement using the method of the present invention, and FIG. 1 shows embodiment 1 of the method.
2 is a plan view of FIG. 1, FIG. 3 is an enlarged front view of the right main part of FIG. 1, and FIG. 4 is a device configuration in Example I of FIG. 1. Figure 5 is a relationship diagram between the amount of concrete placed and the amount of measured displacement displayed on the CRT in Figure 4, Figure 6 is a front view showing the formwork support in Example 2, and Figure 7 is Fig. 6 is an enlarged front view of the central part of the main part of Fig. 6; Fig. 8 is an enlarged front view of the main part of the upper right part of Fig. 6;
Figure 9 is a relationship diagram between the amount of concrete placed and the amount of formwork support displacement displayed on the CRT in Example 2 of Figure 6. FIG. 3... Formwork, 5... Gantry, 6... Turnbuckle, 10. IOA, IOB, IOC...sensor head, 11. IIA, IIB, IIC...reflector,
17...CRT, 20...Form support, G, L.
··ground. ” Ki 15 ink [l skin ■ O - Tanoku
Claims (1)
、それに対応した固定点とにそれぞれ対向して設けたセ
ンサーヘッドと反射板とにより計測される型枠支保の各
変位量を表示すると共に、それらの変位量があらかじめ
設定された許容変位量内にあることを確認しながらコン
クリートの打設を行なうコンクリート打設方法。Displays each displacement amount of the formwork support measured by a sensor head and a reflector provided opposite at least each point on both the left and right sides of the concrete formwork support and the corresponding fixing point, and displays them. A concrete placement method in which concrete is placed while confirming that the amount of displacement is within a preset allowable amount of displacement.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2019330A JPH0786315B2 (en) | 1990-01-31 | 1990-01-31 | Concrete pouring method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2019330A JPH0786315B2 (en) | 1990-01-31 | 1990-01-31 | Concrete pouring method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH03224992A true JPH03224992A (en) | 1991-10-03 |
| JPH0786315B2 JPH0786315B2 (en) | 1995-09-20 |
Family
ID=11996401
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2019330A Expired - Fee Related JPH0786315B2 (en) | 1990-01-31 | 1990-01-31 | Concrete pouring method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0786315B2 (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH04179799A (en) * | 1990-11-13 | 1992-06-26 | Fujita Corp | How to position tunnel lining formwork |
| JP2010090541A (en) * | 2008-10-03 | 2010-04-22 | Ohbayashi Corp | Concrete spraying apparatus |
| JP2010163829A (en) * | 2009-01-19 | 2010-07-29 | Mac Kk | Concrete filling method and concrete filling system |
| CN105735145A (en) * | 2016-02-29 | 2016-07-06 | 中交第一公路工程局有限公司 | Bridge turning construction accurate centering control construction method and structure thereof |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS63226497A (en) * | 1987-03-17 | 1988-09-21 | 三井建設株式会社 | Moving formwork device |
| JPS63226498A (en) * | 1987-03-17 | 1988-09-21 | 三井建設株式会社 | Concrete-mortar placing-quantity controller in moving formwork |
| JPH01263509A (en) * | 1988-04-15 | 1989-10-20 | Hazama Gumi Ltd | Segment positioning method |
-
1990
- 1990-01-31 JP JP2019330A patent/JPH0786315B2/en not_active Expired - Fee Related
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS63226497A (en) * | 1987-03-17 | 1988-09-21 | 三井建設株式会社 | Moving formwork device |
| JPS63226498A (en) * | 1987-03-17 | 1988-09-21 | 三井建設株式会社 | Concrete-mortar placing-quantity controller in moving formwork |
| JPH01263509A (en) * | 1988-04-15 | 1989-10-20 | Hazama Gumi Ltd | Segment positioning method |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH04179799A (en) * | 1990-11-13 | 1992-06-26 | Fujita Corp | How to position tunnel lining formwork |
| JP2010090541A (en) * | 2008-10-03 | 2010-04-22 | Ohbayashi Corp | Concrete spraying apparatus |
| JP2010163829A (en) * | 2009-01-19 | 2010-07-29 | Mac Kk | Concrete filling method and concrete filling system |
| CN105735145A (en) * | 2016-02-29 | 2016-07-06 | 中交第一公路工程局有限公司 | Bridge turning construction accurate centering control construction method and structure thereof |
| CN105735145B (en) * | 2016-02-29 | 2017-09-19 | 中交第一公路工程局有限公司 | A construction method and its structure for accurate centering control of bridge swivel construction |
Also Published As
| Publication number | Publication date |
|---|---|
| JPH0786315B2 (en) | 1995-09-20 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107289903A (en) | Straight line bridge cantilever method Arched Bridge Construction Linear continuously measures monitoring system and monitoring method | |
| JP5681581B2 (en) | Concrete floor slab finish height management method | |
| JP7505957B2 (en) | Measurement method for winding space in tunnel construction | |
| JP6108337B2 (en) | Concrete stacking time interval management system | |
| RU2425328C1 (en) | Device to measure gantry rail span | |
| JPH0599648A (en) | Automatic measuring method for use in maintenance and management of base isolation building | |
| KR100430106B1 (en) | Device for testing crack progress with vernier type | |
| JPH0786315B2 (en) | Concrete pouring method | |
| JPH0829104A (en) | Foundation-based measuring instrument | |
| KR101291451B1 (en) | Level measurement staff having reflection apparatus | |
| JP3134537B2 (en) | Data display device | |
| CN207760903U (en) | High-precision coordinate measures excavator | |
| JPH10293023A (en) | Leveling ruler | |
| JP2590008B2 (en) | Automatic displacement measurement method for structures | |
| CN207050709U (en) | Straight line bridge cantilever method Arched Bridge Construction Linear continuously measures monitoring system | |
| JPH0754038B2 (en) | How to remodel the exterior wall of the building | |
| JPH0797032B2 (en) | Formwork position measuring device for structure construction | |
| ES2267366B1 (en) | SENSING SYSTEM FOR THE MEASUREMENT OF DEFORMATIONS IN STRUCTURES OR MACHINES. | |
| Park et al. | Model studies of subsidence and ground movement using laser holographic interferometry | |
| JPH01184411A (en) | Height and distance measuring meter | |
| JP3204609U (en) | Angle laser marking device | |
| KR102758287B1 (en) | Gliding type magnetic crack gauge | |
| JP2596971Y2 (en) | Laser beam center point display | |
| JP2021021638A (en) | Sprayed material thickness measuring instrument | |
| WO2020115345A1 (en) | Optical device for the verification of pile-driving |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |