JPH0340703A - Wire carrying/drawing method - Google Patents

Wire carrying/drawing method

Info

Publication number
JPH0340703A
JPH0340703A JP1177009A JP17700989A JPH0340703A JP H0340703 A JPH0340703 A JP H0340703A JP 1177009 A JP1177009 A JP 1177009A JP 17700989 A JP17700989 A JP 17700989A JP H0340703 A JPH0340703 A JP H0340703A
Authority
JP
Japan
Prior art keywords
wire
carrier
rope
support
wires
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP1177009A
Other languages
Japanese (ja)
Other versions
JPH0685604B2 (en
Inventor
Tetsuyo Asami
哲世 浅見
Masayasu Imai
今井 正康
Yoshisada Ishida
石田 吉貞
Toshio Kaido
海道 敏男
Hideo Akai
赤井 秀夫
Susumu Sato
進 佐藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yasuda Seisakusho Co Ltd
Original Assignee
Yasuda Seisakusho Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yasuda Seisakusho Co Ltd filed Critical Yasuda Seisakusho Co Ltd
Priority to JP17700989A priority Critical patent/JPH0685604B2/en
Publication of JPH0340703A publication Critical patent/JPH0340703A/en
Publication of JPH0685604B2 publication Critical patent/JPH0685604B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

PURPOSE:To shorten the schedule and to stretch the wire safely by holding a plurality of wires precut according to the length of wire stretching section on a carrier then pulling the carrier independently on a supporting rope in the wire stretching section by means of a pull rope and repeating the operation. CONSTITUTION:An intermediate support 2 is suspended from a steel tower standing between a drum station D and an engine station E located at the opposite ends of a wire stretching section Ki. A supporting rope S on which a carrier 3 travels and a rope J for pulling the carrier 3 are inserted horizontally, while separating each other, into the intermediate support 2. A wire W is previously cut into such length as corresponding to the wire stretching section Ki. At first, front end of a leading wire W1 is connected with a terminal carrier 3t at the drum station D. Then the wires W1 are held on a plurality of intermediate carriers 3 and connected, in chain, with the pull rope J which is then wound in the engine station E until the rear end of the wire W1 exits a drawing vehicle R. The wire W1 is temporarily placed on a specific arm of the steel tower T and secured thereto. In similar manner, wires W2, W3 are stretched sequentially and secured. By such method, schedule is shortened and the wire is stretched smoothly.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明は、電線を搬器により搬送して延線する搬送延
線工法に関する。
DETAILED DESCRIPTION OF THE INVENTION [Industrial Application Field] The present invention relates to a conveying and extending method for conveying and extending electric wires using a carrier.

尚、この明細書で「ロープ」と言う場合には繊維ロープ
及びワイヤロープのいずれをも含むものとする。また、
「電線」と言う場合には、通常の送電線のみでなく、光
フアイバケーブルのような通信ケーブル、あるいは光フ
アイバケーブルを内蔵した光ファイバ複合架空地線つま
り0PGW等も含むものとする。
In this specification, the term "rope" includes both fiber ropes and wire ropes. Also,
The term "electric wire" includes not only ordinary power transmission lines, but also communication cables such as optical fiber cables, and optical fiber composite overhead ground wires (0PGWs) that incorporate optical fiber cables.

〔従来の技術及び発明が解決しようとする課題〕搬送延
線工法というのは電線を搬器により担持・搬送するもの
であるから、以下のような多くのメリットを持っている
[Prior Art and Problems to be Solved by the Invention] Since the conveying wire extension method involves carrying and conveying electric wires using a carrier, it has many advantages as described below.

(a)延線中において電線に延線張力や回転等の無理が
掛からないし、また金車に付着する砂塵や鉄粉等による
電線の損傷という現象がないので、高品質の延線ができ
る。
(a) High-quality wire can be drawn because the wire is not subjected to strain such as wire tension or rotation during wire drawing, and there is no damage to the wire due to dust or iron powder adhering to the metal wheel.

(b)延線張力が掛からず、また電線の回転が少ないの
で延線中における電線の伸びが極めて少なくなり、高品
質化と共に多導体における緊線作業を容易化することが
できる。
(b) Since no wire tension is applied and there is little rotation of the electric wire, the elongation of the electric wire during the wire stretching is extremely small, making it possible to improve the quality and simplify the wire tensioning work for multi-conductors.

(e)引留クランプの事前圧縮ができるので、工期の短
縮を図れる。
(e) Since the retaining clamp can be compressed in advance, the construction period can be shortened.

(d)延線中に引留クランプに曲げ力が掛かることがな
いので、引留クランプ用のプロテクタが不要となる。つ
まり、ドラム場におけるプロテクタの装着及び鉄塔上で
のプロテクタの取外しという作業が不要となるので、作
業の合理化と共に工期の短縮を図れる。
(d) Since no bending force is applied to the retaining clamp during wire drawing, a protector for the retaining clamp is not required. In other words, since the work of installing the protector at the drum field and removing the protector on the steel tower is not necessary, it is possible to streamline the work and shorten the construction period.

(e)電線引抜き用ロープの延線が不要となる。特に、
この引抜き用ロープの延線のための線交わしゃ配列替え
という職人的な作業を不要とできる点で、大きく作業の
合理化を図れる。
(e) It becomes unnecessary to extend the rope for pulling out the electric wire. especially,
The work can be greatly streamlined because the work required by craftsmen to cross and rearrange the lines for extending the pulling rope is eliminated.

これらのメリットは、勿論、一般の電力線の延線でも活
かされるものであるが、特に電線にほとんど延線張力を
かけずに行なえるという点から延線張力による電線の伸
びを最も嫌うプレハブ延線、また特に従来のものに比べ
立地条件が悪く引抜き工法を適用し難いという事情や通
常のもの以上に大きな信頼性を要求されるという事情を
持つUHV(100万ボルト送電)のプレハブ延線、あ
るいは張力や回転についてより厳しい条件が要求される
0PGWの延線等において最もその効用が発揮される。
These advantages can, of course, be utilized in general power line stretching, but especially in prefabricated wire stretching, where stretching can be done with little tension on the wire, stretching of the wire due to wire tension is the least of concern. In addition, UHV (1 million volt power transmission) prefabricated cable extensions, which have poor location conditions and are difficult to apply the pull-out construction method compared to conventional cables, and which require greater reliability than normal cables, or Its effectiveness is most demonstrated in 0PGW wire extensions, etc., which require stricter conditions regarding tension and rotation.

他方、搬送延線工法にはデメリットや、あるいは前記の
メリットが得られない場合もある。
On the other hand, the conveyance wire extension method may have disadvantages or may not provide the above-mentioned advantages.

すなわち、引抜き工法における金車に相当する中間支持
器の他に比較的高価な搬器を大量に必要としそれだけコ
ストアップとなり、また搬器の回収という作業が加わり
この搬器回収作業がもろに付加される形になると前述の
工期短縮要因を相殺してしまい、結果的に工期短縮とい
うメリットか得られない、あるいは急峻な山岳地では長
大な急傾斜により電線の全自重が電線の引っ張り方向に
かかるような状態になることにより、特に電線の前端側
に相当の張力が生じ必ずしも低張力延線とならない場合
がある等の点である。
In other words, in addition to intermediate supports, which correspond to metal wheels in the pull-out construction method, a large number of relatively expensive carriers are required, which increases costs accordingly, and the work of recovering the carriers is added to the process. In this case, the above-mentioned factors to shorten the construction period will be canceled out, and as a result, the advantage of shortening the construction period will not be obtained, or in steep mountainous areas, the entire weight of the wire will be applied in the direction of the wire's pull due to the long steep slope. As a result, considerable tension is generated especially on the front end side of the electric wire, which may not necessarily result in low-tension wire drawing.

このような搬送延線工法の従来例としては、例えば、送
電線建設資料第33集(送電線建設技術研究会;昭和6
2年12月発行)の第61頁〜第131頁に示されるよ
うな工法がある。
Conventional examples of such conveyance and extension construction methods include, for example, the 33rd collection of power transmission line construction materials (Transmission line construction technology research group;
There are construction methods such as those shown on pages 61 to 131 of the publication published in December 2013.

しかし、この従来工法は0PGWを延線するたに開発さ
れたもので、前述のようなデメリットについて十分な配
慮がなされておらず、多導体である電力線の延線にその
まま適用しても、必ずしも搬送延線工法における前述の
ようなメリットを十分に活かし得ないものである。
However, this conventional construction method was developed for the purpose of extending 0PGW, and sufficient consideration has not been given to the disadvantages mentioned above, and even if it is applied as is to the extension of multi-conductor power lines, it will not necessarily work. This method does not allow the above-mentioned advantages of the conveyance wire extension method to be fully utilized.

また、この技術は、支持ロープと牽引ロープとを垂直方
向で分離・並列させるようにしているものであるから、
例えば、支持ロープと牽引ロープとに混触つまりそれぞ
れのロープに掛かる荷重や張力のバランスの変動に応じ
て本来支持ロープの下に一定間隔で離れているべき牽引
ロープが浮き上がって支持ロープに対し接触したりある
いは交差してしまうという現象の発生を避けられない。
In addition, since this technology separates and parallels the support rope and tow rope in the vertical direction,
For example, the support rope and the towing rope may come into contact with each other, which means that the tow rope, which should normally be located at a certain distance below the support rope, may float up and come into contact with the support rope as the balance of load and tension on each rope fluctuates. It is unavoidable that the phenomenon of crossing or crossing occurs.

そして、この混触が生じると、中間支持器に対する搬器
の通過性が悪くなったり、あるいは搬器が搬送中に反転
したりして、延線作業に思わぬトラブルや遅延を招いて
しまうようなことがある。
If this contact occurs, the ability of the carrier to pass through the intermediate support may deteriorate, or the carrier may turn over during transportation, causing unexpected trouble or delays in the line extension work. be.

そこで、この発明では、搬送延線工法のメリットつまり
高品質で且つ工期短縮が可能というメリットを最大限に
活かせるようにし、機器の増加によるコストアップを補
って余りあるような搬送延線工法を提供しようとするも
のである。
Therefore, in this invention, we have developed a method that can maximize the advantages of the conveyor wire extension method, that is, high quality and shortened construction time, and can more than compensate for the increase in cost due to the increase in equipment. This is what we are trying to provide.

〔課題を解決するための手段及び作用〕具体的には、牽
引ロープで数珠つなぎ状に牽引され支持ロープ上を走行
する搬器により電線を搬送して延線するについて、牽引
ロープと支持ロープとを横方向で分離・並列するように
してなる搬送延線工法を提供する。
[Means and effects for solving the problem] Specifically, when electric wires are transported and extended by a carrier that is pulled in a daisy-like manner by a tow rope and runs on a support rope, the tow rope and the support rope are To provide a conveyance and extension method in which the wires are separated and arranged in parallel in the horizontal direction.

このような搬送延線工法の特徴は、支持ロープと牽引ロ
ープとが水平方向で分離・並列させられるので、当然に
混触の問題は生じない。
A feature of such a conveying wire extension construction method is that the support rope and the pulling rope are separated and arranged in parallel in the horizontal direction, so naturally there is no problem of contact between them.

また、支持ロープと牽引ロープとが水平方向で分離・並
列するという構造は、大きな谷部のように支持ロープや
牽引ロープに引上げ力が働くところにも搬送延線工法を
容易に適用可能とするという利点ももたらす。
In addition, the structure in which the support rope and the traction rope are separated and arranged in parallel in the horizontal direction allows the conveyor extension method to be easily applied to areas where pulling force is applied to the support rope and traction rope, such as in large valleys. It also brings the advantage of

また、牽引ロープで数珠つなぎ状に牽引され支持ロープ
上を走行する搬器により電線を搬送して延線するについ
て、予め緊線区間に対応する長さに切断した電線を、前
後両端が各々端末用搬器にて保持され中間部位が複数の
中間用搬器にて担持される状態で、各電線間に適宜の間
隔を与えて各々独立的に搬送し、電線が該当緊線区間に
到達したら、両端末用搬器を切り離した後、この電線を
中間用搬器から自動的に開放させ、そして、中間用搬器
から開放された電線を対応する鉄塔アームに移動させて
板上げ乃至緊線を行いつつ、牽引ロープを巻き取り空に
なった各搬器を回収すると共に次の電線を該当緊線区間
に到達させ、この電線について先の電線と同様の作業を
行い、さらに以降に続く各電線について同様の作業を延
線区間全体について延線が完了するまで繰り返すように
してなる搬送延線工法を提供する。
In addition, in order to carry and extend electric wires using a carrier that is towed in a daisy-like manner by a tow rope and runs on a support rope, we cut the electric wires in advance to a length corresponding to the tensioned line section, so that both the front and rear ends are used as terminals. With the intermediate parts held by a carrier and carried by multiple intermediate carriers, each wire is transported independently with an appropriate interval between them, and when the wire reaches the corresponding tension section, both terminals are After the utility carrier is disconnected, the wire is automatically released from the intermediate carrier, and the wire released from the intermediate carrier is moved to the corresponding tower arm to raise the plank or tighten the wire while the tow rope is removed. At the same time as winding up and collecting each empty carrier, the next wire is brought to the relevant wire section, the same work is done on this wire as on the previous wire, and the same work is postponed on each subsequent wire. To provide a conveyance line extension construction method that repeats until the line extension is completed for the entire line section.

この搬送延線工法の特徴の一つは、電線を各々独立的に
搬送する、つまり電線を分割的に搬送すると共に該当緊
線区間に到達した電線から順次板上げ乃至緊線を行いつ
つこれに平行して後に続く電線の搬送及び搬器の回収を
行うようにしている点である。つまり、板上げ乃至緊線
と後に続く電線の搬送及び搬器の回収とを平行して行う
ことにより、単に搬器回収作業が工期の増殖要因となる
のを避けられるだけでなく、板上げ及び緊線作業の時間
さえも搬送時間に含ませることができ、工期の短縮が大
きく図られることになる。
One of the characteristics of this conveying wire extension construction method is that each wire is conveyed independently, that is, the wires are conveyed in parts, and the wires are boarded up or strung in sequence starting from the wire that has reached the relevant strain section. The point is that the following electric wires are transported and the carrier is collected in parallel. In other words, by carrying out board hoisting or tensioning in parallel with the subsequent transport of electric wires and recovery of the carrier, it is possible not only to avoid the carrier recovery work from becoming a factor in increasing the construction period, but also to avoid raising the board and tensioning. Even the work time can be included in the transportation time, which will greatly shorten the construction period.

また、前記のような搬送延線工法において、搬器に電線
を把持させるようにすることにより、どのような急傾斜
の所でも搬器と搬器の間の電線性の自重以上の張力が電
線に生じることがなくなり、理想通りの低張力延線つま
り高品質延線を実現できる。また、把持は電線の回転防
止にも働くことによっても高品質化に大きく寄与するも
のである。
In addition, in the above-mentioned conveying wire extension method, by having the electric wires held by the electric wires, a tension greater than the weight of the electric wires between the two conveyors is generated on the electric wires, no matter how steep the slope. This eliminates the need for low-tension wire drawing, making it possible to achieve high-quality wire drawing. In addition, the grip also works to prevent the electric wire from rotating, which greatly contributes to higher quality.

さらに、前記のような搬送延線工法において、搬器から
の電線の自動開放を、電線の板上げに伴う引き上げによ
り搬器を反転させ、この搬器の反転状態を利用して搬器
の扉を開くことにより行うようにすれば、この開放作業
の時間及び作業員を節約でき、工期の短縮と共に工事の
合理化をも図れることになる。
Furthermore, in the above-mentioned wire transfer method, the automatic release of the wire from the carrier can be achieved by inverting the carrier by pulling it up as the wire is raised, and by opening the door of the carrier using the inverted state of the carrier. If this is done, the time and labor required for this opening work can be saved, the construction period can be shortened, and the construction can be streamlined.

〔実 施 例〕〔Example〕

以下、この発明の実施例を図面に基づき順を追って説明
する。尚、以下の説明では、先ず工法について説明し、
その後に関連する延線機器について説明する。
Hereinafter, embodiments of the present invention will be described step by step based on the drawings. In the following explanation, we will first explain the construction method,
After that, related wire extending equipment will be explained.

支持ロープ及び牽引ロープの延線(第1図)支持ロープ
S及び牽引ロープJを延線区間全体に亘って鉄塔Tの最
下部の腕木に延線する。この延線には従来より知られて
いる方法を適宜に利用できる。そして、支持ロープSを
各鉄塔Tに設けた中間支持器2により支持させると共に
牽引ロープJを中間支持器2内に通す。
Extension of support rope and traction rope (Fig. 1) The support rope S and traction rope J are extended to the lowermost arm of the steel tower T over the entire extension section. For this wire extension, conventionally known methods can be used as appropriate. Then, the support ropes S are supported by intermediate supports 2 provided on each steel tower T, and the traction ropes J are passed through the intermediate supports 2.

そして、支持ロープS及び牽引ロープJを中間支持器2
により支持させる。中間支持器2は後述するような構造
を持っているため、これにより支持ロープSと牽引ロー
プJとは横方向で分離・並列することになる。
Then, the support rope S and the traction rope J are connected to the intermediate support 2.
Supported by Since the intermediate support device 2 has a structure as described later, the support rope S and the traction rope J are separated and arranged in parallel in the lateral direction.

電線の搬送(第2図) この搬送延線工法では、電線Wを予め緊線区間Kiに対
応する長さに切断してプレハブ化して電線Wiとし、そ
の両端に引留クランプCを圧縮しておく。尚、引留クラ
ンプCの圧縮はドラム場りで行うこともできるが、予め
工場などで行うようにした方が工期の短縮という点でよ
り好ましい。
Transportation of electric wire (Figure 2) In this transportation and extension method, the electric wire W is cut in advance to a length corresponding to the tension section Ki and prefabricated to form the electric wire Wi, and retaining clamps C are compressed at both ends of the electric wire Wi. . Although the compression of the retaining clamp C can be performed at the drum factory, it is more preferable to perform the compression in advance at a factory or the like in terms of shortening the construction period.

先ず、ドラム場りにおいて先頭の電線Wlの前端を端末
用搬器3tに接続する。
First, the front end of the leading electric wire Wl is connected to the terminal carrier 3t at the drum station.

それから、複数の中間用搬器3.3、・・・」こ電線W
lを担持させると共にこれらの搬器3.3、゛パ゛−を
所定の間隔(通常20〜30m)で牽引ロープJに数珠
つなぎ状に接続しつつエンジン場E側でこの牽引ロープ
Jを電線Wlの後端が延線車Rより出るまで巻き取る。
Then, a plurality of intermediate carriers 3.3,...'' electric wires W
At the engine station E side, the carriers 3.3 and 2 are connected to the tow rope J in a stringed manner at predetermined intervals (usually 20 to 30 m), and the tow rope J is connected to the electric wire Wl. Wind it up until the rear end of it comes out of the railway car R.

ここで、電線Wiは、単に担持されるだけではなく、後
述するような搬器3の構造により、各搬器3間において
電線Wiに一定の「垂れ」つまり一定の「サブデイツプ
」が生じるような状態となったところで把持されるよう
にもしている。
Here, the electric wire Wi is not only supported, but also in a state in which a certain "sagging", that is, a certain "sub-dip" occurs in the electric wire Wi between the respective carriers 3 due to the structure of the carrier 3 as described later. It is also designed so that it can be grasped at any point.

このような把持構造としたのは、勿論、各搬器3ごとに
電線Wiを把持することにより、急傾斜地での電線Wi
の下側への流れを防止すると共に、端末用搬器3tに接
続される電線Wiの前端側にその自重が集中するのを防
止するという目的があるが、さらに各搬器3間の「サブ
デイツプ」を均一化するためでもある。つまり、一定の
「サブデイツプ」が生じるまでは電線Wiに対し搬器3
の担持器3bを自由に動かし、一定の「サブデイツプ」
が生じたところで電線Wiを把持することにより各搬器
3間に均一な「サブデイツプ」を生じさせるものである
。このように「サブデイツプ」を均一化させることの目
的は、各搬器3の姿勢を垂直状態に保たせて中間支持器
2に対する通過性を良くするためである。
Of course, such a gripping structure was adopted because each carrier 3 grips the electric wire Wi.
The purpose is to prevent the electric wire Wi from flowing downward and to prevent its own weight from concentrating on the front end side of the electric wire Wi connected to the terminal carrier 3t. It is also for uniformity. In other words, until a certain "sub-dip" occurs, the carrier 3
The carrier 3b can be moved freely to create a certain "sub-dip".
By gripping the electric wire Wi at the point where the electric wire Wi is generated, a uniform "sub-dip" is created between the respective carriers 3. The purpose of making the "sub-dip" uniform in this way is to maintain the posture of each carrier 3 in a vertical state and improve the passage through the intermediate support 2.

次いで、電線Wlの後端に端末用搬器3tを前端の場合
と同様にして接続する。
Next, the terminal carrier 3t is connected to the rear end of the electric wire Wl in the same manner as the front end.

尚、第3図に示すように、端末用搬器3tの電線Wiへ
の接続には、接続治具Pが用いられており、この接続治
具PにカウンタウェイトC前が取り付けられている。
As shown in FIG. 3, a connection jig P is used to connect the terminal carrier 3t to the electric wire Wi, and the front of the counterweight C is attached to this connection jig P.

それから、電線Wlの後端に対し適宜の間隔を開けるよ
うにして、次の電線W2を電線WIと同様に処理する。
Then, the next electric wire W2 is processed in the same manner as the electric wire WI, leaving an appropriate distance from the rear end of the electric wire Wl.

以降、電線W、以下について同様の作業を繰り返す。Thereafter, the same operation is repeated for the electric wire W and the following.

尚、各電線Wl間に適宜の間隔を開けるようにするのは
、延線区間が長く多数の緊線区間を含む場合に、支持ロ
ープSに掛かる荷重を軽減するという目的である。つま
り、各電線Wl間に適宜の間隔を開けるとそれだけ支持
ロープSに対する負担が小さなものとなってより細い支
持ロープSで済むことになり、その結果、牽引ロープJ
の巻取り長は増えるものの、支持ロープSの延線作業、
それに用いる機器や中間支持器の仕様等の関係から、ト
ータルとしてはより合理的なものになる。
The purpose of providing an appropriate interval between the electric wires Wl is to reduce the load applied to the support rope S when the wire extension section is long and includes many tension sections. In other words, if an appropriate interval is left between each electric wire Wl, the load on the support rope S will be reduced accordingly, and a thinner support rope S will be sufficient.As a result, the traction rope J
Although the winding length increases, the extension work of the support rope S,
Considering the specifications of the equipment and intermediate supports used for this purpose, the overall result is more reasonable.

また、このように各電線Wiは相互に適宜の間隔を持っ
てそれぞれ独立的に搬送される訳であるが、このことは
従来の工法では当然とされていた各電線Wl間をつなぐ
「割りワイヤ」を用いないということであり、途中での
「割りワイヤ」の処理作業がなくなるという点で工期の
短縮及び合理化に大きく寄与する。
In addition, each wire Wi is transported independently with an appropriate interval from each other, but this is different from the "split wire" that connects each wire Wl, which was taken for granted in conventional construction methods. ” This means that there is no need to process “split wire” during the process, which greatly contributes to shortening and streamlining the construction period.

亙縁凶返圭ザ(第4図及び第5図) 先頭の電線Wlの後端が該当緊線区間に、に到達したら
、先ず、この緊線区間に1の手前側端の鉄塔Tfにおい
て電線Wlの後端に後の引上げに用いる引上げロープ(
セミ組)UR及び送出しロープSRを取り付けると共に
後端の端末用搬器3t(第4図及び第5図では図示を省
略している)を電線Wlから切り離す。
When the rear end of the leading electric wire Wl reaches the relevant strain section, first, the electric wire is connected to the steel tower Tf at the near end of 1 in this strain section. At the rear end of Wl is a lifting rope (
Semi-assembly) UR and delivery rope SR are attached, and the terminal carrier 3t at the rear end (not shown in FIGS. 4 and 5) is separated from the electric wire Wl.

次いで、送出しロープSRを送り出しつつ電線Wlの前
端がこの緊線区間に1の先側端の鉄塔Tbに到達するま
で牽引ロープJを巻き取る。
Next, while sending out the sending rope SR, the pulling rope J is wound up until the front end of the electric wire Wl reaches the steel tower Tb at the forward end of the electric wire Wl in this tension section.

それから、電線Wlの前端が鉄塔Tbに到達したら、こ
の鉄塔Tbにおいて電線Wlの前端部に引上げロープO
R及び送出しロープSRを取り付けると共に端末用搬器
3tを電線Wlから切り離す。
Then, when the front end of the electric wire Wl reaches the steel tower Tb, a pulling rope O is attached to the front end of the electric wire Wl at this steel tower Tb.
R and sending rope SR are attached, and the terminal carrier 3t is separated from the electric wire Wl.

そして、・引上げロープOR及び送出しロープSRを利
用して電線Wlを該当する腕木まで引き上げる。
Then, use the pulling rope OR and sending rope SR to pull up the electric wire Wl to the corresponding arm.

この際、電線WIが引き上げられることにより搬器3が
反転すると、後述するような搬器3の構造により、搬器
3から電線Wlが自動的に開放される。
At this time, when the carrier 3 is reversed by pulling up the electric wire WI, the electric wire Wl is automatically released from the carrier 3 due to the structure of the carrier 3, which will be described later.

該当の腕木まで引き上げた電線Wlに対しては、板上げ
乃至状況に応じて緊線まで行う。
For the wires Wl that have been pulled up to the relevant arm, the wires will be hoisted up or, depending on the situation, up to the tension line.

搬器の回収(第6図) 搬器3から電線Wlが開放されたら、前述の板上げ乃至
緊線作業と平行して、再び牽引ロープJの巻取りを開始
し、次の電線W2の後端が該当緊線区間に、(電線Wl
の緊線区間に、と同じ場合もあるしそうでない場合もあ
る)に達するまで搬送し、この電線W2について電線W
lと同様の作業を行う。これに応じて端末用搬器3を及
び搬器3.3、・・・・・・・・がエンジン場Eに順次
到達するから、そこでこれらの端末用搬器3を及び搬器
3.3、・・・・・・・を牽引ロープJから取り外して
回収する。
Retrieval of the carrier (Fig. 6) When the electric wire Wl is released from the carrier 3, in parallel with the above-mentioned board raising and wire tensioning work, the winding of the towing rope J is started again, and the rear end of the next electric wire W2 is In the relevant wire section, (wire Wl
wire W2, which may or may not be the same as
Perform the same operation as in l. In response to this, the terminal carriers 3, 3.3, . Remove ... from the tow rope J and collect it.

繰返し 以降、各電線について同様の作業を繰り返し、延線区間
全体について延線を行う。
After the repetition, the same work is repeated for each wire, and the entire wire extension section is extended.

この繰返しに関しては、種々の形式が考えられるが、そ
の好ましい一例は以下のようなものである。
Various formats are possible for this repetition, but a preferred example is as follows.

すなわち、先ず延線区間全体について1層分を通し、耐
張鉄塔にたわみが生じないようにしておき、それから各
緊線区間ごとに順次片付けてゆく、という形式である。
That is, first, one layer is passed through the entire line section to prevent the tension tower from sagging, and then each section of the line is cleared one by one.

尚、以上説明してきたものは最も基本的なもので、必要
に応じて種々のバリエーションが可能である。
Incidentally, what has been explained above is the most basic one, and various variations are possible as necessary.

例えば、電線Wiの引上げを一つの緊線区間ごとに行う
のではなく、複数の緊線区間について同時に行うように
することも可能である。
For example, it is also possible to pull up the electric wire Wi not for each tension section, but for a plurality of tension sections at the same time.

また、支持ロープS及び牽引ロープJを1本ずつ用いる
1条延線だけでなく、支持ロープS及び牽引ロープJを
2本ずつ以上用いる多条延線も可能であるし、さらに支
持ロープS及び牽引ロープ、Jをループ化する「ループ
延線」も可能である。
In addition, it is possible not only to run a single wire using one supporting rope S and one pulling rope J, but also to run a multi-thread wire using two or more supporting ropes S and two or more pulling ropes J. A "loop extension" in which the tow rope J is looped is also possible.

特に、「ループ延線」は、本工法の特徴であるところの
搬器からの電線の自動的開放及び板上げ乃至緊線作業と
平行した搬送をより効率的に活かし得るものである。
In particular, "loop wire extension" can more efficiently take advantage of the features of this construction method, such as automatically releasing the wire from the carrier and conveying it in parallel with the board raising or wire tensioning work.

また、この搬送延線工法は0PGWについても適用でき
る。
Moreover, this conveying line extension method can also be applied to 0PGW.

0PGWの場合(第7図) OPGWの場合は、基本的には前述のものと余り相違が
ないが、その端末の処理に引下げ鉄塔(耐張鉄塔に相当
する)に設置されている光接続箱(図示せず)が用いら
れ、しかもこの端末処理のために数十mの鉄塔内引下げ
部分Ldが前後両端に与えられているという点で特殊性
がある。以下、この点について一例を説明する。
In the case of 0PGW (Figure 7) In the case of OPGW, there is basically no difference from the above, but the optical connection box installed on the pull-down tower (corresponding to the tension tower) is used to process the terminal. (not shown) is used, and is unique in that several tens of meters of lowered portions Ld within the tower are provided at both front and rear ends for this terminal treatment. An example of this point will be explained below.

鉄塔内引下げ部分Ldがあるため、前述の場合と同様の
引上げロープOR及び送出しローブSRを鉄塔内引下げ
部分Ldの基端部に取り付ける他に、鉄塔内引下げ部分
Ldを鉄塔内に引き下げるための引下げロープDRを鉄
塔内引下げ部分Ldの先端部に取り付ける。
Since there is a pull-down part Ld inside the steel tower, in addition to attaching the same pulling rope OR and sending lobe SR as in the case described above to the base end of the pull-down part Ld inside the steel tower, a The pulling down rope DR is attached to the tip of the pulling down part Ld inside the steel tower.

この各ロープUR,SR,DRの取付は作業に際しては
、鉄塔内引下げ部分Ldの先端部と基端部の間が数十m
もあるので、その都度各搬器3t。
When installing these ropes UR, SR, and DR, the distance between the tip and base of the lowered part Ld in the tower is several tens of meters.
There are also 3 tons of carriers each time.

3、”°′°−の前進・後退を繰り返して各ロープOR
1SR,DRの前述の取付は部位が鉄塔Tf乃至Tbに
来るようにし、各ロープUR,SR,DRの取付は作業
を鉄塔Tf乃至Tb上において行うようにする。
3. Repeat the forward and backward movement of "°'°-" to each rope.
The above-mentioned installation of 1SR and DR is done so that the parts are located on the steel towers Tf to Tb, and the work for installing each rope UR, SR, and DR is performed on the steel towers Tf to Tb.

各ロープUR,5R1DRの取付けが完了したら両端末
用搬器3tを切り離す訳であるが、この作業は端末用搬
器3tを鉄塔Tf乃至Tbまで持ってきて行うようにし
てもよいし、また鉄塔Tf乃至Tb上から例えば操作用
のロープを用いた遠隔操作で行うようにしてもよい。
When the installation of each rope UR, 5R1DR is completed, the carriers 3t for both terminals are separated, but this work may be carried out by bringing the carriers 3t for terminals to the steel towers Tf to Tb, or This may be done by remote control from above Tb using, for example, a rope for operation.

次いで、各ロープUR,5RXDRを用いて0PGW全
体を地線腕木まで引き上げると共に鉄塔内引下げ部分L
dを鉄塔T内へ引き下げる。この際、図中に見られるよ
うに鉄塔内引下げ部分Ldの基端部分がある程度的がる
ことになるが、この曲がりの曲率が0PGWに許容され
ている曲率(500ff1m以上)より小さなものとな
ることがないようにするために、引上げローブUR及び
送出しロープSRの取付は用であるカムアロングCmか
ら例えば曲率500mmまでは曲がるがそれ以上は曲が
らない構造を持つプロテクタ(図示せず)を延設し、こ
のプロテクタにより鉄塔内引下げ部分Ldの基端部分を
保護させる。
Next, use each rope UR and 5RXDR to pull up the entire 0PGW to the ground wire arm, and also lift the lowered part L inside the tower.
Lower d into the steel tower T. At this time, as seen in the figure, the base end of the lowered part Ld inside the tower will be targeted to some extent, but the curvature of this bend will be smaller than the curvature allowed for 0PGW (500ff1m or more). In order to prevent this from happening, a protector (not shown) with a structure that can bend up to a curvature of 500 mm, but not beyond that, should be extended from the come-along Cm that is used to attach the pulling lobe UR and sending rope SR. However, this protector protects the base end portion of the intra-tower pull-down portion Ld.

以下、関連する延線機器の主なものとして中間支持器2
及び搬器3の一例について説明する。
Below, intermediate supports 2 are the main related wire rolling equipment.
An example of the carrier 3 will be explained.

虫匪失泣旦 中間支持器2は、第8図及び第9図に示すように、側部
上フレームlO1上部フレーム11及び側部補助フレー
ム12を門形状に形成し、この門形内に牽引ロープJ支
持用の第1支持部13及び支持ロープS支持用の第2支
持部14を適宜の間隔で横方向(水平方向)に分離・並
列させて設けてなるもので、上部フレーム11に設けら
れている吊下部15を介して鉄塔に懸架されて使用され
る。
As shown in FIGS. 8 and 9, the intermediate support device 2 has a side upper frame lO1 upper frame 11 and a side auxiliary frame 12 formed into a gate shape, and is pulled into the gate shape. A first support part 13 for supporting the rope J and a second support part 14 for supporting the support rope S are separated and arranged in parallel at appropriate intervals in the lateral direction (horizontal direction), and are provided on the upper frame 11. It is used by being suspended from a steel tower via a hanging part 15.

ここで、横方向(水平方向)に分離・並列とは、必ずし
も支持ロープSと牽引ロープJが同一水平面内に位置す
る場合だけを意味するものではなく、要は、支持ロープ
Sと牽引ロープJの間に混触が生じない程度に両者が横
方向(水平方向)に分離された状態を意味するものとす
る。
Here, separating and paralleling in the lateral direction (horizontal direction) does not necessarily mean only when the support rope S and the tow rope J are located in the same horizontal plane; in short, the support rope S and the tow rope J This refers to a state in which the two are separated in the lateral direction (horizontal direction) to the extent that no contact occurs between them.

第1支持部13は、側部上フレームIOより門形内へ向
けて突設された主ブラケット16上に形成されるもので
、それぞれ前後一対で横設された下部支持ローラ17.
17及び上部規制ローラ18.18、それに立設された
左右一対の側部規制ローラ19a、19bで支持空間2
1を形成するようにしてなる。そして、上部規制ローラ
18は、下部支持ローラ17に比べ短めにされており、
側部規制ローラ19aとの間に一定の間隙が通過間隙2
2として形成されるようになっている。尚、この例は、
後述するように中間支持器2を3個一組にして用いる場
合のためのものであるから、左右一対の側部規制ローラ
]、 9 a、19bしか設けていないが、後述する他
の例のように単独で用いるものの場合には前後にも対に
して設けるようにする。
The first support portion 13 is formed on a main bracket 16 that protrudes from the side upper frame IO toward the inside of the portal, and is provided with a pair of front and rear lower support rollers 17.
17, upper regulating rollers 18 and 18, and a pair of left and right side regulating rollers 19a and 19b installed upright therein to form a support space 2.
1. The upper regulation roller 18 is shorter than the lower support roller 17,
There is a certain gap between the side regulating roller 19a and the passing gap 2.
2. Furthermore, in this example,
As described later, this is for the case where the intermediate supports 2 are used in a set of three, so only a pair of left and right side regulating rollers], 9a and 19b are provided, but in other examples described later. In the case of a device that is used alone, it should be provided in pairs at the front and rear as well.

この第1支持部13における支持空間21は通過間隙2
2を有するだけであるので、牽引ロープJの脱線を防止
するには十分な構造を持っており、必要な安全性は確保
されている。また1、必要に応じて平成1年特許願第1
09202号に示される延線機器における「連結板」を
用いる構造の採用により通過間隙22を閉じて完全な閉
空間とすることも容易である。
The support space 21 in this first support part 13 is the passage gap 2
2, it has a sufficient structure to prevent derailment of the towing rope J, and the necessary safety is ensured. In addition, 1. If necessary, the first patent application filed in 1999
By employing a structure using a "connecting plate" in the wire drawing equipment shown in No. 09202, it is easy to close the passing gap 22 and create a completely closed space.

第2支持部14は、主ブラケット16よりさらに補助ブ
ラケット23を延設し、この補助ブラケット23の先端
に設けられるもので、断面U字形の保持クランプ24が
支持ロープS支持用の支持ローラ25に被さるような状
態で設けられており、この保持クランプ24にて保持す
ることにより、前後方向では支持ロープSの第2支持部
14に対する相対的な動きを許すが、上下、左右につい
ては支持ロープSの動きに第2支持部14、つまり中間
支持器2が追随するような「半固定状態コで支持ロープ
Sを支持できるようになっている。
The second support part 14 has an auxiliary bracket 23 extending further from the main bracket 16, and is provided at the tip of the auxiliary bracket 23. A holding clamp 24 having a U-shaped cross section is attached to a support roller 25 for supporting the support rope S. By holding it with this holding clamp 24, the support rope S is allowed to move relative to the second support part 14 in the front-back direction, but the support rope S is provided in an overlapping state in the vertical and horizontal directions. The second support portion 14, that is, the intermediate support device 2 follows the movement of the support rope S in a semi-fixed state so that the support rope S can be supported.

このように支持ロープSを第2支持部14に半固定状態
とすることにより、後述するように、カテナリ角等の変
化による支持ロープSの動きに中間支持器2が常に追随
することになり、その結果、搬器3の安定的通過性が確
保されるものである。
By semi-fixing the support rope S to the second support part 14 in this way, the intermediate support 2 will always follow the movement of the support rope S due to changes in the catenary angle, etc., as will be described later. As a result, stable passage of the carrier 3 is ensured.

補助ブラケット23の下方に設けられているのは、ロッ
ク解除手段26であるが、その機能については搬器3と
の関係で後述する。
A lock release means 26 is provided below the auxiliary bracket 23, and its function will be described later in relation to the carrier 3.

第9図に示すのは、鉄塔へ吊り下げるための吊下部30
を有するベース体31を介して3個の中間支持器2を一
組にして使用する場合の例である。
Figure 9 shows a hanging part 30 for hanging from a steel tower.
This is an example in which three intermediate supports 2 are used as a set via a base body 31 having a structure.

すなわち、3個の中間支持器2をベース体31に対し搬
器3の走行方向で対称となるようにして懸架しているも
ので、各中間支持器2とベース体31との間隔は支持ロ
ープSの動きに応じて自動的に調整可能な状態とされて
おり、鉄塔における支持ロープSのカテナリ角に応じた
曲線上に各中間支持器2が自動的に配列するようにされ
ている。
That is, three intermediate supports 2 are suspended from a base body 31 symmetrically in the traveling direction of the carrier 3, and the distance between each intermediate support 2 and the base body 31 is equal to the support rope S. The intermediate supports 2 are automatically arranged on a curve corresponding to the catenary angle of the support rope S in the steel tower.

具体的には、前後の各中間支持器2a、2aは、それぞ
れ可動懸架部材32により懸架され、中央の中間支持器
2bは固定懸架部材33により懸架されており、可動懸
架部材32は、左右方向(前後方向)に細長くしてベー
ス体31に形成された長孔34を介してベース体31に
懸架されている。
Specifically, each of the front and rear intermediate supports 2a, 2a is suspended by a movable suspension member 32, the central intermediate support 2b is suspended by a fixed suspension member 33, and the movable suspension member 32 is It is suspended from the base body 31 through a long hole 34 formed in the base body 31 and elongated in the front-rear direction.

また、各中間支持器2 a −、2b % 2 aは、
各中間支持器2a、2b、2aに対し固定された固定連
結部材35.35、−“°°を相互にヒンジ結合するこ
とによりその下端側が相互に連結され、また各中間支持
器2a、2b、2aに対し両端をヒンジ結合させる伸縮
連結部材36を介してその上端側が相互に連結されてい
る。
Moreover, each intermediate supporter 2a-, 2b% 2a is
Fixed connecting members 35.35, -"°, fixed to each intermediate support 2a, 2b, 2a are mutually connected by hinges at their lower end sides, and each intermediate support 2a, 2b, The upper ends thereof are connected to each other via a telescopic connecting member 36 which hinges both ends to 2a.

伸縮連結部材36は、第1O図に示すように、一端にそ
れぞれ連結板37.37を有する2本ずつ2組のロッド
38.38、−−−・の他端にスプリング受は板39.
39を固定し、しかも各組のロッド38.38が相互に
他の組のロッド38.38のスプリング受は板39を貫
通するようにし、そしてスプリング受は板39.39間
に圧縮スプリング40(第12図では図示を省略してい
る)を挟んでなる。つまり、この伸縮連結部材36は圧
縮スプリング40により常に縮もうとする方向に付勢さ
れており、この付勢力が中間支持器2aの自重とバラン
スすることにより、支持ロープSが特に上方へ動く際に
中間支持器2がこの動きに追従し易くなっているもので
ある。
As shown in FIG. 1O, the telescopic connecting member 36 consists of two sets of two rods 38.38 each having a connecting plate 37.37 at one end, and a plate 39.38 having a spring receiver at the other end.
39 are fixed, and each set of rods 38.38 is such that the spring receivers of the rods 38.38 of the other set pass through the plate 39, and the spring receivers are arranged between the plates 39, 39 with a compression spring 40 ( (not shown in FIG. 12). In other words, the elastic connecting member 36 is always urged in the direction of contraction by the compression spring 40, and this urging force is balanced with the weight of the intermediate supporter 2a, so that when the support rope S moves particularly upward, The intermediate support 2 can easily follow this movement.

そして、このような構造により、支持ロープSが矢示X
の如く動くのに応じて、前述のように支持ロープSが半
固定状態となっていることにより中間支持器2aがこれ
に追随して動き、可動懸架部材32が一例として想像線
で示す状態になるように矢示β方向へ動く。その結果、
中間支持器2aとベース体31との間隔が自動的に変化
するものである。
With such a structure, the support rope S is directed by the arrow X.
As the support rope S moves as shown in FIG. Move in the direction of arrow β so that the result,
The distance between the intermediate support 2a and the base body 31 changes automatically.

このように、複数の中間支持器2を組にして用い、しか
も各中間支持器2か支持ロープSのカテナリ角に応じた
曲線上に自動的に配列するようにすることは、支持ロー
プSのカテナリ角が各中間支持器2に分割され各中間支
持器2に対する支持ロープSの角度が小さくて済むとい
うことで、これにより搬器3の通過性がより良くなる。
In this way, using a plurality of intermediate supports 2 as a set and arranging each intermediate support 2 automatically on a curve corresponding to the catenary angle of the support rope S is a method of Since the catenary angle is divided into each intermediate support 2 and the angle of the support rope S with respect to each intermediate support 2 is small, the passage of the carrier 3 is thereby improved.

第16図及び第18図に示す中間支持器63は大きな谷
部における引上げ力所用のもので、基本的には前述の中
間支持器2と同様であるが、引上げカ所用に適応するよ
うにいくつかの点で特別の工夫が凝らされている。
The intermediate support 63 shown in FIGS. 16 and 18 is used for lifting force in large valleys, and is basically the same as the intermediate support 2 described above, but the number of intermediate supports 63 shown in FIGS. Special efforts have been made in this respect.

ここで、引上げカ所というのは、例えば、第19図に示
すように、両側の鉄塔Tが山頂で、その間の鉄塔Tが谷
底にあるような谷部の場合のこの谷底の鉄塔Tのことで
、この谷底の鉄塔Tにおいては支持ロープS及び牽引ロ
ープJに常に上方へ引き上げるような力が働いているこ
とからこのように呼ばれる。
Here, the lifting point refers to the steel tower T at the bottom of a valley, for example, as shown in Fig. 19, in the case of a valley where the steel towers T on both sides are at the top of the mountain and the steel towers T between them are at the bottom of the valley. , so called because there is always an upward force acting on the support rope S and the traction rope J at the steel tower T at the bottom of the valley.

以下、この中間支持器63の主な相違点について説明す
る。
The main differences of this intermediate supporter 63 will be explained below.

この中間支持器63は、前述のものと異なって通常単独
で使用されるので、側部規制ローラ19a、19bか前
後にも対となるようにされている。
This intermediate support 63 is different from the above-mentioned one and is usually used alone, so it is arranged in pairs at the front and rear of the side regulating rollers 19a and 19b.

第1支持部13に補助上部規制ローラ64か1寸設され
ており、たまたま通過間隙22を通って上に抜けて来る
牽引ロープJをこの補助上部規制ローラ64により規制
するようにしている。尚、牽引ロープJは、搬器3が通
過する際には連結部43により強制されて自然に支持空
間21に戻ってくる。
An auxiliary upper regulating roller 64 is provided on the first support part 13 by one inch, and the auxiliary upper regulating roller 64 regulates the pulling rope J that happens to pass upward through the passing gap 22. Incidentally, when the carrier 3 passes, the traction rope J is forced by the connecting portion 43 and naturally returns to the support space 21.

第2支持部14には、支持ロープSが第18図に示すよ
うな状態になることを前提に、第17図に示すように、
支持ロープSの上側にも補助支持ローラ65を設けるよ
うにしている。また、これに伴って支持ロープSとの間
に段差が生じるので、この段差を解消するために前後一
対にしてガイド部材66.66を設けている。このガイ
ド部材66は、二つ割りのものを円錐形に組み合わせた
もので、支持ロープSにルーズに被さるようになってい
る。また、このガイド部材66は、保持クランプ24に
対し接続部材67を介して取り付けられており、支持ロ
ープSの動きに応じて矢示Uの如く回動するようになっ
ている。
As shown in FIG. 17, on the premise that the support rope S is in the state shown in FIG.
An auxiliary support roller 65 is also provided above the support rope S. Further, as a result of this, a difference in level occurs between the support rope S and the guide members 66 and 66 are provided as a pair at the front and rear in order to eliminate this difference in level. This guide member 66 is made by combining two parts into a conical shape, and is adapted to loosely cover the support rope S. Further, this guide member 66 is attached to the holding clamp 24 via a connecting member 67, and is configured to rotate as indicated by an arrow U in accordance with the movement of the support rope S.

側部上及び側部補助の両フレーム10.12には、それ
ぞれ固定用アイ環68が取り付けられており、この固定
用アイ環68を介して鉄塔に固定することにより中間支
持器63自体が支持ロープSにより引っ張り上げられる
のを防止するようにしている。
A fixing eye ring 68 is attached to both the side upper and side auxiliary frames 10.12, and by fixing to the steel tower via this fixing eye ring 68, the intermediate support 63 itself is supported. The rope S prevents it from being pulled up.

邂器 搬器3は、第11図及び第12図に示すように、搬器本
体3aと担持器3bよりなり、搬器本体3aは、支持ロ
ープS上を走行するための走行部42、牽引ロープJに
連結するための連結部43及び電線担持用の担持器3b
を吊下ロープ45を介して吊り下げるための吊下部46
を設けてなるものであるが、走行部42と連結部43と
は、中間支持器2における第1、第2の両支持部13.
14間の間隔と略同−の間隔で横方向に分離・並列する
ようにされている。
As shown in FIGS. 11 and 12, the iron carrier 3 consists of a carrier body 3a and a carrier 3b. Connecting part 43 for connecting and carrier 3b for supporting electric wires
A hanging part 46 for suspending the
However, the traveling portion 42 and the connecting portion 43 are connected to both the first and second supporting portions 13 .
They are separated and arranged in parallel in the horizontal direction at substantially the same intervals as the intervals between the 14.

走行部42は、前後・上下各一対の走行ローラ47.4
7、・−−−m−、前後一対の側部ローラ48.48及
び開閉フレーム49を備えており、走行ローラ47、側
部ローラ48及び開閉フレーム49にて囲繞・形成され
る閉空間50を有する構造とされたユニット状のもので
ある。
The running section 42 includes a pair of running rollers 47.4, each pair of front and back and upper and lower sides.
7,---m-, is equipped with a pair of front and rear side rollers 48, 48 and an opening/closing frame 49, and a closed space 50 surrounded and formed by the running roller 47, side rollers 48, and opening/closing frame 49. It is a unit-shaped structure with

このように閉空間50を形成するようにしたのは、支持
ロープSよりの脱線を防止し、より安全性を高めるため
である。
The reason why the closed space 50 is formed in this way is to prevent derailment from the support rope S and further improve safety.

開閉フレーム49は、閉空間50が中間支持器2の第2
支持部14を通過可能となるようにするためのものであ
ると共に、閉空間50内に支持ロープSを入れて搬器3
を支持ロープSにセットするためのドアでもある。
The opening/closing frame 49 has a closed space 50 located at the second intermediate support 2.
This is to allow the support rope S to pass through the support part 14, and also to allow the support rope S to be inserted into the closed space 50 to allow the carrier 3 to pass through.
It is also a door for setting the support rope S.

具体的には、この開閉フレーム49は、四隅か回り対偶
とされたパンタグラフ状のもので、通常はロッド状のロ
ック手段51が開閉フレーム49の下端に形成した係合
凹部52に係合することによりロックされているが、ロ
ック手段51を第11図中に示す矢示Yの如く回動させ
て外せば、パンタグラフ的な動きが可能となって第12
図中に想像線で示す如き状態Jこ開くようにされている
Specifically, the opening/closing frame 49 is shaped like a pantograph with pairs around the four corners, and a rod-shaped locking means 51 usually engages with an engagement recess 52 formed at the lower end of the opening/closing frame 49. However, if the locking means 51 is rotated in the direction of arrow Y shown in FIG.
The state J shown by the imaginary line in the figure is made to open.

そして、中間支持器2を通過する際には、第8図に示す
ような関係で、中間支持器2に設けられている船形状の
ロック解除手段26にロック手段51が押接して下方に
押されて矢示Yの如く回動することによりロック解除と
なり、この状態で開閉フレーム49か第2支持部14の
補助ブラケット23に当たることにより開き、通過が可
能となる。また、閉空間50内に支持ロープSを入れる
際には、人間の手によりロック解除及び開閉フレーム4
9の開閉が行われる。
When passing through the intermediate supporter 2, the locking means 51 comes into contact with the ship-shaped lock release means 26 provided on the intermediate supporter 2 and is pushed downward in the relationship shown in FIG. The opening/closing frame 49 hits the auxiliary bracket 23 of the second support part 14 in this state and opens, allowing passage. In addition, when putting the support rope S into the closed space 50, the locking and opening/closing frames 4 are manually unlocked.
9 opening and closing are performed.

連結部43は、走行部42の上端に一端をヒンジ結合で
接続され横方向に延設された接続アーム53の他端に設
けられるもので、第13図に示すように、円錐形のルー
ズ部54.54が前後対称とされている間に円柱形の固
持部55が設けられてなり、全体が紡錘形状をしている
The connecting portion 43 is provided at the other end of a connecting arm 53 which has one end hingedly connected to the upper end of the traveling portion 42 and extends laterally, and is a conical loose portion as shown in FIG. A cylindrical holding part 55 is provided between the parts 54 and 54 which are symmetrical in the front and rear, and the whole part has a spindle shape.

ルーズ部54は、第15図に示すように、それぞれブラ
ケット部56b、57bを有する一対の分割片56.5
7を合わせてなるもので、一方の分割片56はブラケッ
ト部56bを介して接続アーム53に固定されているが
、他方の分割片57はそのブラケット部57bを介して
一方の分割片56に対し着脱自在とされており、両分割
片56.57が合わさった状態で牽引ロープJの外径よ
りやや大きい内径のルーズ孔58が形成されるようにな
っている。尚、第15図中では固持部55の図示を省略
している。
As shown in FIG. 15, the loose portion 54 includes a pair of divided pieces 56.5 each having bracket portions 56b and 57b.
7, one divided piece 56 is fixed to the connecting arm 53 via a bracket part 56b, while the other divided piece 57 is fixed to one divided piece 56 through the bracket part 57b. It is designed to be detachable, and a loose hole 58 having an inner diameter slightly larger than the outer diameter of the pulling rope J is formed when the two divided pieces 56 and 57 are combined. Note that the holding portion 55 is not shown in FIG. 15.

固持部55は、第14図に示すように、ピン59を軸に
して二つ割りになるようになっており、ロックボルト6
0を締め付けることによりその固持孔61で牽引ロープ
Jを固持するものであるが、ルーズ部54.54に対し
分離されており、ルーズ部54.54に通された牽引ロ
ープJを固持することにより両ルーズ部54.54間に
収まるようになっている。
As shown in FIG. 14, the holding part 55 is divided into two parts with a pin 59 as an axis, and the lock bolt 6
By tightening the rope 0, the towing rope J is held firmly in the holding hole 61, but it is separated from the loose part 54.54, and by firmly holding the towing rope J passed through the loose part 54.54. It is designed to fit between both loose parts 54 and 54.

したがって、この連結部43は、牽引ロープJに対し前
後方向では固定されるが、牽引ロープJに対する回動は
自由となるものである。つまり、連結部43は牽引ロー
プJに対しヒンジ結合で接続するものである。
Therefore, although the connecting portion 43 is fixed to the towing rope J in the front-rear direction, it is free to rotate with respect to the towing rope J. That is, the connecting portion 43 is connected to the traction rope J by a hinge connection.

このように走行部42の上端に一端をヒンジ結合され横
方向に延設される接続アーム53の先端に牽引ロープJ
に対しヒンジ結合する連結部43を設ける構造は、牽引
ロープJを介して掛かる張力荷重を走行部42に負担さ
せずに済み、その結果必要な構造強度が数分の1で足る
ことになり、搬器3の軽量化を大きく図れるという利点
をもたらすと共に、搬送中における搬器3の反転も確実
に防止されて延線作業をより安定的なものにできるとい
う利点をもたらす。
A towing rope J is attached to the tip of the connecting arm 53, which has one end hinged to the upper end of the running section 42 and extends laterally.
The structure in which the connecting part 43 is hingedly connected to the tow rope J does not require the running part 42 to bear the tension load applied via the tow rope J, and as a result, the required structural strength is reduced to a fraction of the required structural strength. This brings about the advantage that the weight of the carrier 3 can be significantly reduced, and also brings about the advantage that reversing of the carrier 3 during transportation can be reliably prevented and the wire extending work can be made more stable.

吊下部46は、吊ブラケット62を介して走行部42に
取り付けられるものであるが、走行部42に対し第12
図中の矢示Zの如く回動するようにされている。したが
って、走行部42が支持ロープSの傾斜状態に応じて傾
斜しても吊下部46は常に垂直状態を保つことができる
The hanging part 46 is attached to the running part 42 via the hanging bracket 62, and the hanging part 46 is attached to the running part 42 by a
It is designed to rotate as indicated by arrow Z in the figure. Therefore, even if the traveling portion 42 is inclined according to the inclination state of the support rope S, the hanging portion 46 can always maintain a vertical state.

搬器3が中間支持器2を通過する関係は第8図中に想像
線で示すようなものである。
The relationship in which the carrier 3 passes through the intermediate support 2 is as shown by imaginary lines in FIG.

すなわち、第2支持部14に対しては前述のように開閉
フレーム49が開くことにより走行部42の通過が可能
となり、また第1支持部13に対してはその通過間隙2
2を接続アーム53が通ることにより連結部43の通過
が可能となる。
That is, by opening the opening/closing frame 49 as described above, the running part 42 can pass through the second support part 14, and the passage gap 2 can pass through the first support part 13.
By passing the connecting arm 53 through 2, the connecting portion 43 can pass through.

担持器3bは、第20図〜第22図に示されるように、
接続部71、一対の扉72.72.3個の担持ローラ7
3.73.73、ロック装置74及び把持体100を備
えている。
The carrier 3b, as shown in FIGS. 20 to 22,
Connecting part 71, pair of doors 72, 72. 3 carrying rollers 7
3.73.73, a locking device 74 and a gripping body 100 are provided.

接続部71は、搬器本体3aとの間に介在する吊下ロー
プ45を接続するアイ環76が取り付けられた接続レバ
ー77及び扉72.72が取り付けられる取付部78よ
りなるもので、接続レバー77は、取付部78のガイド
筒79内に摺接状態で嵌合しており、取付部78に対し
矢示■の如くスライドするようになっている。そして、
この接続レバー77は、通常は、接続レバー77に一体
的に形成されたフランジ状のロック爪解除体80と取付
部78の下端に取り付けられているナツト状の受は体8
1との間に張設されたスプリング82により矢示M方向
に引っ張られる状態となっている。
The connecting part 71 consists of a connecting lever 77 to which an eye ring 76 is attached for connecting the hanging rope 45 interposed between the carrier body 3a and a mounting part 78 to which the door 72.72 is attached. is fitted into the guide cylinder 79 of the mounting portion 78 in a sliding state, and is adapted to slide relative to the mounting portion 78 as shown by the arrow ①. and,
This connection lever 77 usually consists of a flange-shaped lock claw release body 80 integrally formed on the connection lever 77 and a nut-shaped receiver body 8 attached to the lower end of the mounting part 78.
1 and is pulled in the direction of arrow M by a spring 82 that is stretched between the two.

扉72.72は、前述のように取付部78に取り付けら
れるものであるが、具体的には、ボルト・ナツト83に
より取り付けられており、矢示Nの如く回動可能なよう
にされている。
The door 72.72 is attached to the mounting portion 78 as described above, but specifically, it is attached with bolts and nuts 83, so that it can be rotated as shown by the arrow N. .

担持ローラ73は、緩やかな円錐台形状をしており、前
後の2個が一方の扉72に、向きの異なる中の1個が他
方の扉72にそれぞれ固定されることにより担持溝84
を形成している。担持ローラ73の傾斜角については、
電線Wの荷重を扉72.72の開放用に働かせる役目を
負うと同時に、余り大きいと、扉72.72を開放させ
ようとする力が大きくなり過ぎ、後に説明されるロック
装置74の扉ロック枠85のスライド性を悪くするとい
う関係がある。
The supporting rollers 73 have a gentle truncated conical shape, and the two at the front and rear are fixed to one door 72, and one of the rollers facing different directions is fixed to the other door 72, thereby forming a supporting groove 84.
is formed. Regarding the inclination angle of the carrying roller 73,
The load of the electric wire W acts to open the door 72.72, and if it is too large, the force to open the door 72.72 becomes too large, and the door lock of the locking device 74, which will be explained later, There is a relationship in that the slideability of the frame 85 is deteriorated.

ロック装置74は、側面において上下一対ずつで設けら
れる4本のローラ86.86、−−−−m−及び前後面
において一本ずつ設けられる2本のローラ87.87を
側面において前後一対ずつ設けられる4個の接続フレー
ム88.88、− によす方形枠状に組み合わせた扉ロ
ック枠85と、一対のロック爪89.89と、それに扉
72.72にそれぞれ設けられている一対の上ストッパ
90.90及び一対の下ストッパ91.91とよりなる
The locking device 74 includes four rollers 86.86, ----m- provided on the side surfaces in pairs on the upper and lower sides, and two rollers 87.87 provided on the front and rear surfaces, one pair each on the front and rear surfaces. - A door lock frame 85 combined into a rectangular frame shape, a pair of lock claws 89, 89, and a pair of upper stoppers respectively provided on the door 72, 72. 90.90 and a pair of lower stoppers 91.91.

そして、扉ロック枠85は扉72.72を囲む状態で配
され、矢示Q方向(上下方向)にスライド可能なように
なっており、上下両ストッパ90.90.91,91に
よりスライドの上限と下限を規制されるようになってい
る。また、ロック爪89.89は、前述のボルト・ナツ
ト83により扉72.72と一緒に取付部78に取り付
けられ矢示αの如く回動するようにされており、それぞ
れ図示せぬ捻じりバネにより矢示V方向に付勢されてい
る。
The door lock frame 85 is arranged to surround the door 72, 72, and is slidable in the direction of arrow Q (vertical direction), and the upper and lower stoppers 90, 90, 91, 91 limit the sliding limit. The lower limit is now regulated. Further, the lock claws 89 and 89 are attached to the mounting portion 78 together with the door 72 and 72 by the aforementioned bolts and nuts 83, and are configured to rotate as shown by the arrow α, and each is supported by a torsion spring (not shown). is biased in the direction of arrow V.

尚、第22図中の92は、電線が扉72.72の角に触
れるのを防止するための規制ロールである。
In addition, 92 in FIG. 22 is a regulation roll for preventing the electric wire from touching the corner of the door 72, 72.

把持体100は、ゴム系素材のように摩擦係数の大きい
材料でライニングされた凹溝101を有するもので、こ
の凹溝101が担持溝84上の電線Wに押接自在となる
ようにされている。
The gripping body 100 has a groove 101 lined with a material having a large coefficient of friction, such as a rubber material, and the groove 101 can be pressed against the electric wire W on the support groove 84. There is.

すなわち、把持体100は、把持体100と担持溝84
との間隔が電線Wの径より一定量だけ大きくなるように
して取付部78に取り付けられており、担持溝84上の
電線Wが真っ直ぐである限りは電線Wに押接せずその把
持力を働かせないが、第2図に見られるように、各搬器
3間において電線Wに一定の「垂れ」つまり一定の「サ
ブデイツプ」が生じるような状態となって、担持溝84
上の電線Wが山なりになると押接して電線Wを把持する
ようになっている(第24図)。
That is, the gripping body 100 has the gripping body 100 and the holding groove 84.
It is attached to the mounting part 78 so that the distance between the wire W and the wire W is a certain amount larger than the diameter of the wire W. As shown in FIG.
When the upper electric wire W becomes a mountain, it is pressed against the electric wire W and gripped (FIG. 24).

このような把持体100による把持構造としたのは、勿
論、各搬器3ごとに電線Wを把持することにより、急傾
斜地での電線Wの下側への流れを防止すると共に電線W
の先端にその自重が集中するのを防止するという目的が
あるが、さらに各搬器3間の「サブデイツプ」を均一化
するためである。つまり、一定の「サブデイツプ」が生
じるまでは電線Wに対し担持器3bを自由に動かし、定
の「サブデイツプ」が生じたところで電線Wを把持する
ことにより各搬器3間に均一な「サブデイツプ」を生じ
させるものである。
Of course, the holding structure using the gripping body 100 is such that by gripping the electric wire W for each carrier 3, it is possible to prevent the electric wire W from flowing downward on a steep slope, and also to prevent the electric wire W from flowing downward on a steep slope.
The purpose is to prevent the weight from concentrating on the tip of the carrier 3, and also to equalize the "sub-dip" between the carriers 3. In other words, by freely moving the carrier 3b relative to the wire W until a certain "sub-dip" occurs, and then gripping the wire W when a certain "sub-dip" occurs, a uniform "sub-dip" is created between each carrier 3. It is something that causes

このように「サブデイツプjを均一化させることの目的
は、各搬器3の姿勢を垂直状態に保たせて中間支持器2
に対する通過性を良くするためである。
In this way, "the purpose of making the sub-dip j uniform is to maintain the posture of each carrier 3 in a vertical state and to
This is to improve the passage of the material.

この搬器3が電線Wを自動的に開放する場合の作動状態
は以下の通りである。
The operating state when this carrier 3 automatically releases the electric wire W is as follows.

すなわち、前述したように電線Wを引き上げることによ
り搬器3が反転して吊下ロープ75に一定以上の引張力
が加わるようになると、接続レバー77がスプリング8
2に抗して矢示M方向とは逆方向にスライドし、ロック
爪解除体80かロック爪89.89を第23図に示すよ
うな状態に回動させる。すると、ロック爪89.89に
よる支えを失った扉ロック枠85は、ストッパ90.9
0に当たって止まるまでその自重により落下するっその
結果、扉ロック枠85のローラ86.86が扉72.7
2の回動支点であるホルト・ナツト83の部位より下が
った状態となり、扉72.72が前述の電線の荷重によ
る力を受けつつ自重により第23図に示される状態にな
って開き、担持器17が電線Wより開放される。
That is, as described above, when the carrier 3 is reversed by pulling up the electric wire W and a tensile force of more than a certain level is applied to the hanging rope 75, the connection lever 77 is pulled up by the spring 8.
2 in the direction opposite to the direction of arrow M, and rotates the lock claw release body 80 or the lock claws 89, 89 to the state shown in FIG. Then, the door lock frame 85, which has lost its support from the lock claws 89.89, is moved to the stopper 90.9.
As a result, the rollers 86.86 of the door lock frame 85 move against the door 72.7.
2, the door 72.72 is lowered from the position of the bolt nut 83, which is the rotational fulcrum of the carrier 72, and the door 72, 72 receives the force from the load of the electric wire and opens under its own weight as shown in FIG. 17 is released from the electric wire W.

〔発明の効果〕〔Effect of the invention〕

この発明に係る搬送延線上メ去は、以上説明してきた如
きものなので以下の如き効果を有する。
Since the conveyance line removal according to the present invention is as described above, it has the following effects.

(a)支持ロープと牽引ロープとが水平方向で分離・並
列させられるので、支持ロープと牽引ロープとの混触と
いう現象が生じることかなく、よりスムースで安全な延
線を行える。また、大きな谷部のように支持ロープや牽
引ロープに引上げ力が働くところにも搬送延線工法を容
易に適用可能とすることができる。
(a) Since the support rope and the traction rope are separated and arranged in parallel in the horizontal direction, there is no occurrence of the phenomenon of contact between the support rope and the traction rope, and smoother and safer wire extension can be achieved. Further, the conveying wire extension method can be easily applied to places where a pulling force acts on the support rope or the traction rope, such as in a large valley.

(b)電線を各々独立的に搬送すると共に該当緊線区間
に到達した電線から順次板上げ乃至緊線を行いつつ後に
続く電線の搬送及び搬器の回収を行うようにしているの
で、単に搬器回収作業が工期の増殖要因となるのを避け
られるだけでなく、板上は及び緊線作業の時間さえも搬
送時間に含ませることができ、工期の短縮を大きく図れ
るものである。
(b) Each electric wire is transported independently, and the wires that reach the relevant tension section are sequentially boarded up or strung, and the subsequent wires are transported and the carriers are collected, so simply collecting the carriers is carried out. Not only can the work be avoided as a factor increasing the construction period, but also the time for board work and even the tension work can be included in the transportation time, thereby greatly shortening the construction period.

(C)搬器による電線の把持を組みきわせることにより
、どのような急傾斜の所でも搬器と搬器の間の電線分の
自重以上の張力が電線に生じることかなくなり、理想通
りの低張力延線を実現できる。また、把持は電線の回転
防止にも働くので、より一層の高品質化を実現できる。
(C) By combining the gripping of the electric wire with the carrier, no tension greater than the weight of the wire between the carriers will be generated on the wire, no matter how steep the slope, and ideal low-tension extension can be achieved. Lines can be realized. Furthermore, since the grip also works to prevent the electric wire from rotating, it is possible to achieve even higher quality.

(d)電線の板上げに伴う引き上げにより搬器を反転さ
せ、この搬器の反転状態を利用して搬器の扉を開くこと
により行う搬器からの電線の自動開放を組み合わせるこ
とにより、この開放作業の時間及び作業員を節約でき、
工期の短縮と共に工事の合理化をも図れる。
(d) By combining the automatic release of the wires from the carrier by inverting the carrier by pulling it up as the wire is raised, and opening the door of the carrier by utilizing the inverted state of the carrier, the time required for this opening work can be reduced. and saves labor,
It is possible to shorten the construction period and streamline the construction work.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は、支持ロープ及び牽引・ロープの延線状態図、 第2図は、電線の搬送状態図、 第3図は、端末搬器への電線の接続状態図、第4図及び
第5図は、電線の板上げ状態図、第6図は、電線板上げ
後の搬送及び搬器の回収状態図、 第7図は、0PGWについての第4図相当図、第8図は
、中間支持器の一部断面を含む概略側面図、 第9図は、中間支持器を組にした状態の一部断面を含む
概略側面、 第10図は、伸縮連結部材の部分概略斜視図、第11図
は、搬器の概略側面図、 第12図は、第11図中の矢示X■方向からみた搬器の
概略側面図、 第13図は、第11固相の矢示X■方向からみた連結部
の概略平面図、 第14図は、第13図中の矢示X■−XIV線に沿う概
略断面、 第15図は、第13図中の矢示xv−xv線に沿う概略
断面、 第16図は、他の実施例に係る中間支持器の一部断面を
含む概略側面図、 第17図は、第16図における第2支持部の概略断面図
、 第18図は、第16図中の矢示X■方向からみた中間支
持器の一部断面を含む概略側面図、第19図は、引上げ
カ所を示す概略側面図、第20図は、担持器の一部断面
を含む概略側面図、 第21図は、把持体の概略斜視図、 第22図は、第20図中の矢示XX■方向からみた一部
断面を含む概略側面図、 第23図は、反転して担持開放状態となった担持器の概
略側面図、そして 第24図は、把持体により電線が把持される状態を簡略
化して示す側面図である。 2−・・“・中間支持器 3・・・・・・・・搬器 S・・・・・・・支持ロープ J・・・−・・・牽引ロープ W・・・・・・電線 T−・・・・・−鉄塔 第12図 第14図 第15 図 9 0 第18図 第19図 第23図
Figure 1 is a diagram of the extension of the support rope and traction/rope, Figure 2 is a diagram of the conveyance of the electric wire, Figure 3 is a diagram of the connection of the electric wire to the terminal carrier, Figures 4 and 5. Figure 6 is a diagram showing the state of wire lifting, Figure 6 is a diagram showing the state of transport and recovery of the carrier after raising the wire, Figure 7 is a diagram equivalent to Figure 4 for 0PGW, and Figure 8 is a diagram of the intermediate supporter. FIG. 9 is a schematic side view including a partial cross section of the intermediate supports assembled as a set; FIG. 10 is a partial schematic perspective view of the telescopic connecting member; FIG. 11 is a schematic side view including a partial cross section; A schematic side view of the carrier; FIG. 12 is a schematic side view of the carrier as seen from the direction of arrow X■ in FIG. 11; FIG. A plan view, FIG. 14 is a schematic cross section along the arrow X-XIV line in FIG. 13, FIG. 15 is a schematic cross section along the arrow xv-xv line in FIG. 13, and FIG. , a schematic side view including a partial cross section of an intermediate supporter according to another embodiment, FIG. 17 is a schematic sectional view of the second support part in FIG. 16, and FIG. 18 is an arrow indicated in FIG. 16. 21 is a schematic side view including a partial cross section of the intermediate support device as viewed from the X direction; FIG. The figure is a schematic perspective view of the gripping body, Figure 22 is a schematic side view including a partial cross section seen from the direction of arrow XX■ in Figure 20, and Figure 23 is an inverted holding state. A schematic side view of the carrier, and FIG. 24 is a side view schematically showing a state in which the electric wire is held by the holding body. 2-..."Intermediate supporter 3...Carrier S...Support rope J...-Tow rope W...Electric wire T-... ... - Steel tower Figure 12 Figure 14 Figure 15 Figure 9 0 Figure 18 Figure 19 Figure 23

Claims (6)

【特許請求の範囲】[Claims] (1)、牽引ロープで数珠つなぎ状に牽引され支持ロー
プ上を走行する搬器により電線を搬送して延線する搬送
延線工法に於いて、 牽引ロープと支持ロープとを横方向で分離・並列するよ
うにしたことを特徴とする搬送延線工法。
(1) In the conveyance and extension method, in which the wire is carried and extended by a carrier that is towed in a chain by a tow rope and runs on a support rope, the tow rope and support rope are separated and paralleled in the horizontal direction. A conveyance line extension method characterized by the following:
(2)、牽引ロープで数珠つなぎ状に牽引され支持ロー
プ上を走行する搬器により電線を搬送して延線する搬送
延線工法に於いて、 予め緊線区間に対応する長さに切断した電線を、前後両
端が各々端末用搬器にて保持され中間部位が複数の中間
用搬器にて担持される状態で、各電線間に適宜の間隔を
与えて各々独立的に搬送し、電線が該当緊線区間に到達
したら、両端末用搬器を切り離した後、この電線を中間
用搬器から自動的に開放させ、 そして、中間用搬器から開放された電線を対応する鉄塔
アームに移動させて板上げ乃至緊線を行いつつ、牽引ロ
ープを巻き取り空になった各搬器を回収すると共に次の
電線を該当緊線区間に到達させ、この電線について先の
電線と同様の作業を行い、さらに以降に続く各電線につ
いて同様の作業を延線区間全体について延線が完了する
まで繰り返すようにしたことを特徴とする搬送延線工法
(2) In the conveyor extension method, in which electric wires are carried and extended by a carrier that is towed in a daisy chain shape with a tow rope and runs on a support rope, the electric wires are cut in advance to a length corresponding to the wire tension section. With the front and rear ends held by terminal carriers, and the intermediate part carried by multiple intermediate carriers, each wire is transported independently with an appropriate distance between them, and the wires are When the line section is reached, the carriers for both terminals are disconnected, the wires are automatically released from the intermediate carrier, and the wires released from the intermediate carrier are moved to the corresponding tower arms to raise the board or raise the wire. While tensioning the wire, wind up the tow rope and collect each empty carrier, bring the next wire to the relevant wire section, perform the same work on this wire as the previous wire, and continue onward. A conveying wire extension method characterized in that the same work for each electric wire is repeated until the wire extension is completed for the entire line extension section.
(3)、請求項(1)記載の搬送延線工法と請求項(2
)記載の搬送延線工法を組み合わせてなる搬送延線工法
(3), the conveying wire extension method described in claim (1) and claim (2).
) A conveyance line extension method that is a combination of the conveyance line extension methods described in ).
(4)、搬器が電線を把持するものであることを特徴と
する請求項(1)〜請求項(3)いずれか記載の搬送延
線工法。
(4) The wire transport method according to any one of claims (1) to (3), characterized in that the carrier grips the electric wire.
(5)、電線を引き上げることにより搬器を反転させ、
この搬器の反転状態を利用して搬器の扉を開くことによ
り搬器による電線の担持を自動的に開放するようにした
ことを特徴とする請求項(1)〜請求項(4)いずれか
記載の搬送延線工法。
(5) Reverse the carrier by pulling up the electric wire,
Claims (1) to (4), characterized in that the electric wire is automatically released from being held by the carrier by opening the door of the carrier by utilizing the inverted state of the carrier. Conveyance line extension method.
(6)、該当緊線区間に電線後端が到達したら、該当緊
線区間の手前側端の鉄塔において電線後端に引上げ作業
用のロープ類を取り付けると共に端末用搬器を電線から
切り離し、次いで電線前端が該当緊線区間の先側端の鉄
塔に到達するまで牽引ロープを巻き取り、それから電線
前端が前記先側端の鉄塔に到達したら、この鉄塔におい
て電線前端に引上げ作業用のロープ類を取り付けると共
に端末用搬器を電線から切り離し、そして引上げ作業用
のロープ類を利用して電線を引き上げるようにすること
を特徴とする請求項(1)〜請求項(5)いずれか記載
の搬送延線工法。
(6) When the rear end of the wire reaches the relevant wire section, attach ropes for pulling up the wire to the rear end of the wire at the steel tower at the near end of the wire section, and disconnect the terminal carrier from the wire. Wind up the towing rope until the front end reaches the tower at the front end of the wire section, and then, when the front end of the wire reaches the tower at the front end, attach ropes for pulling up the wire to the front end of the wire at this tower. At the same time, the terminal carrier is separated from the electric wire, and the electric wire is pulled up using ropes for pulling up. .
JP17700989A 1989-07-06 1989-07-06 Conveyance wire extension method Expired - Lifetime JPH0685604B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP17700989A JPH0685604B2 (en) 1989-07-06 1989-07-06 Conveyance wire extension method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP17700989A JPH0685604B2 (en) 1989-07-06 1989-07-06 Conveyance wire extension method

Publications (2)

Publication Number Publication Date
JPH0340703A true JPH0340703A (en) 1991-02-21
JPH0685604B2 JPH0685604B2 (en) 1994-10-26

Family

ID=16023573

Family Applications (1)

Application Number Title Priority Date Filing Date
JP17700989A Expired - Lifetime JPH0685604B2 (en) 1989-07-06 1989-07-06 Conveyance wire extension method

Country Status (1)

Country Link
JP (1) JPH0685604B2 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5713909A (en) * 1980-06-26 1982-01-25 Rikio Funasugi Method of aerially installing aerial wire
JPS598122A (en) * 1982-07-05 1984-01-17 Matsushita Electric Ind Co Ltd Magnetic recording medium

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5713909A (en) * 1980-06-26 1982-01-25 Rikio Funasugi Method of aerially installing aerial wire
JPS598122A (en) * 1982-07-05 1984-01-17 Matsushita Electric Ind Co Ltd Magnetic recording medium

Also Published As

Publication number Publication date
JPH0685604B2 (en) 1994-10-26

Similar Documents

Publication Publication Date Title
CN104527652B (en) Rail type rope traction aerial passenger device
CN204415380U (en) Rail-type rope-traction overhead manned device
KR101880691B1 (en) Worktable carriage system for suspension bridge cable and Repairing method of suspension bridge cable using worktable carriage
WO1987001081A1 (en) Aerial tramway grip assembly and method
CZ280994B6 (en) Device for running a wire, rope or the like material
JPH0685604B2 (en) Conveyance wire extension method
JPH05162633A (en) Cable stretching disposition method for suspending transport equipment for both supporting cable and track traveling
CN210478447U (en) Carrier cable pay-off device of electrified railway contact net
IT202300008856A1 (en) SUPPORT DEVICE FOR THE TRACTION ROPE OF AN AERIAL CABLE TRANSPORT SYSTEM WITH TWO LOAD-BEARING ROPES AND AERIAL CABLE TRANSPORT SYSTEM WITH ONE TRACTION ROPE, TWO LOAD-BEARING ROPES AND AT LEAST ONE SUCH TRACTION ROPE SUPPORT DEVICE
FR2778505A1 (en) Method of replacement of overhead power cables with prevention of dropping of cable
EP1832490B1 (en) Clamping system for carriers of an automatic cableway installation
JPH0130805Y2 (en)
CN223176585U (en) A cable-hanging device for an extra-long steel stranded cable
JPH0667075B2 (en) Electric wire carrier
JPS61295804A (en) Ropeway type extension method and tool
JPH0340704A (en) Drawing apparatus and drawing method using same
CN2346760Y (en) Towing construction lifter
CN219687301U (en) Ground low altitude cableway
JPH0697804B2 (en) Wire drawing method and its equipment
JPH02250605A (en) Method of conveying and extending wire
CN212402460U (en) Tensioning device and equipment with same
JPH0514488B2 (en)
JP2001095116A (en) Hanging sheave for re-cabling of four-core transmission line
JPS644274Y2 (en)
IT202200026529A1 (en) AERIAL CABLE TRANSPORT SYSTEM AND METHOD OF OPERATION OF SUCH SYSTEM