JPH0345943Y2 - - Google Patents
Info
- Publication number
- JPH0345943Y2 JPH0345943Y2 JP1983163326U JP16332683U JPH0345943Y2 JP H0345943 Y2 JPH0345943 Y2 JP H0345943Y2 JP 1983163326 U JP1983163326 U JP 1983163326U JP 16332683 U JP16332683 U JP 16332683U JP H0345943 Y2 JPH0345943 Y2 JP H0345943Y2
- Authority
- JP
- Japan
- Prior art keywords
- plug
- brick
- iron plate
- refractory
- molten metal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Landscapes
- Treatment Of Steel In Its Molten State (AREA)
Description
【考案の詳細な説明】
本考案は溶融金属中に、主としてアルゴン等の
不活性ガスを吹込むための、ガス吹込み用耐火物
の構造に関するものであつて、溶融金属容器への
施工を安全で確実にし、多数回使用にも耐え得る
ことを目的とする。[Detailed description of the invention] The present invention relates to the structure of a gas injection refractory for injecting inert gas, mainly argon, into molten metal, and is designed to ensure safe and reliable construction into molten metal containers. The purpose is to withstand repeated use.
近年溶融金属中における、非金属介在物の浮
上、温度調整及び均一化、或いは反応促進等を目
的として、アルゴン、窒素等の不活性ガスを吹込
む技術が一般化して来ている。特に特殊精練では
不可欠な技術として、現在では主として、ランス
パイプによる上吹き方法とポーラスプラグによる
下吹き方法が一般的に行なわれている。このう
ち、下吹き方法に使用されるガス吹込み用ポーラ
スプラグとしては多孔質耐火物の外周と底部をガ
ス供給管付き鉄板ケースで囲繞した構造、多孔質
耐火物の外周を緻密質耐火物で囲み、多孔質耐火
物又は緻密質耐火物の外周と底全面をガス供給管
付き鉄板ケースで囲繞した構造、更に多断結合構
造(例えば特開昭58−34146号公報参照)或いは
直線状貫通細孔構造(例えば実開昭58−27347号
公報、実開昭58−34943号公報参照)等各種の構
造の物が採用されまた提案されている。 BACKGROUND ART In recent years, a technique of blowing inert gas such as argon or nitrogen into molten metal has become popular for the purpose of floating nonmetallic inclusions, regulating and uniformizing temperature, or promoting reactions in molten metal. Particularly in special scouring, the top blowing method using a lance pipe and the bottom blowing method using a porous plug are commonly used at present. Among these, the porous plug for gas injection used in the down-blowing method has a structure in which the outer periphery and bottom of the porous refractory are surrounded by an iron plate case with a gas supply pipe, and a structure in which the outer periphery of the porous refractory is surrounded by a dense refractory. enclosure, a structure in which the entire outer periphery and bottom of a porous refractory or a dense refractory are surrounded by an iron plate case with a gas supply pipe; Various structures such as hole structures (see, for example, Japanese Utility Model Application Publication No. 58-27347 and Japanese Utility Model Application Publication No. 58-34943) have been adopted or proposed.
しかしながら、これらは何れの場合も第1図に
示すように、プラグれんが2とマスれんが3が個
別に製造され、施工現場で溶融金属容器1に施工
されたマスれんが3の孔部に、プラグれんが2、
或いは事前に組合されたプラグれんが2とスリー
ブれんが(図示せず)を、それらの周囲に耐火性
モルタルを付けて、溶融金属容器1の外側底部か
ら施工する手段が採用されているため、次のよう
な問題がある。 However, in both cases, as shown in Fig. 1, plug bricks 2 and mass bricks 3 are manufactured separately, and the plug bricks are placed in the holes of mass bricks 3 that are installed in molten metal container 1 at the construction site. 2,
Alternatively, a method has been adopted in which plug bricks 2 and sleeve bricks (not shown) are assembled in advance, and refractory mortar is attached around them, and the construction is carried out from the outside bottom of the molten metal container 1. There is a problem like this.
(1) 溶融金属容器1の外側底部から施工するた
め、少なくともプラグれんが2の最大外径以上
の孔を溶融金属容器1の底部に開ける必要があ
り、またプラグれんが2を固定するために、例
えばコツター方式、或いはバヨネツト方式によ
る固定治具5を取付ける必要がある。(1) Since the construction is carried out from the outside bottom of the molten metal container 1, it is necessary to make a hole at least larger than the maximum outer diameter of the plug brick 2 in the bottom of the molten metal container 1, and in order to fix the plug brick 2, for example. It is necessary to install a fixing jig 5 using a cotter method or a bayonet method.
(2) プラグれんが2を固定するためには、溶融金
属容器1内側底部に施工したプラグれんが2の
背部に、受けれんが4が必要となる場合があ
る。(2) In order to fix the plug brick 2, a receiving brick 4 may be required on the back of the plug brick 2 installed at the inner bottom of the molten metal container 1.
(3) プラグれんが2をマスれんが3に施工する場
合、溶融金属容器1を傾転し、耐火性モルタル
で施工する必要がある。(3) When constructing plug bricks 2 to mass bricks 3, it is necessary to tilt the molten metal container 1 and construct with refractory mortar.
(4) 溶融金属容器1に外側底部から耐火性モルタ
ルを用いてプラグれんが2を施工するため、プ
ラグれんが2が確実に施工されない場合は、目
地が厚くなつたり或いは傾く恐れがあり、目地
部から漏鋼する恐れがある。(4) Since the plug bricks 2 are applied to the molten metal container 1 from the outside bottom using refractory mortar, if the plug bricks 2 are not installed securely, there is a risk that the joints will become thick or slant. There is a risk of steel leakage.
本考案はかゝる問題を解決して、外周は吊り下
げ可能な孔を有する鉄板ケースで囲繞し、底部は
ガス供給管を有する鉄板ケースで囲繞したプラグ
れんがと、スリーブれんがとの組立体の周囲に配
設するマスれんがとを事前に一体化施工した構造
にすることにより、溶融金属容器への施工を安全
で確実にし、多数回使用にも耐え得るガス吹込み
用耐火物を提供するものである。 The present invention solves such problems and is an assembly of plug bricks and sleeve bricks, the outer periphery of which is surrounded by an iron plate case with holes that allow hanging, and the bottom part of which is surrounded by an iron plate case with a gas supply pipe. A refractory for gas injection that can be safely and reliably installed in a molten metal container by having a structure in which the surrounding mass bricks are integrated in advance and can withstand multiple uses. It is.
以下、本考案の一実施例を示す第2図乃至第3
図に基いて詳しく説明する。 Below, Figures 2 to 3 show an embodiment of the present invention.
This will be explained in detail based on the diagram.
所定の形状で製造したプラグれんが2の外周と
底部(ガス吹込み側)を鉄板ケース8,9で囲繞
する。外周側を囲繞する鉄板ケース8は、後述す
る不定形耐火物で形成したマスれんが相当部分と
一体施工した物を、溶融金属容器1に施工する際
に必要な、吊り下げ可能な孔7を有する鉄板ケー
ス8を用いて囲繞し、施工時鉄棒或いはワイヤー
を通して吊り下げるため、15〜20φm/m程度の
吊り下げ用に孔を設ける。底部はガス供給管6を
有する鉄板ケース9で囲繞する。次いでプラグれ
んが2に嵌合可能に製造したスリーブれんが11
を用い鉄板ケース8,9で囲繞したプラグれんが
2にスリーブれんが11を目地部に耐火性モルタ
ルを用いて組合せる。このようにして準備した事
前に組立体とされたプラグれんが2とスリーブれ
んが11の周囲を、不定形耐火物10を用いて所
定の形状を形成し、一体化施工をすることにより
ガス吹込み用耐火物を構成する。 The outer periphery and bottom (gas injection side) of a plug brick 2 manufactured in a predetermined shape are surrounded by iron plate cases 8 and 9. The iron plate case 8 surrounding the outer periphery has a hole 7 through which it can be hung, which is necessary when constructing the molten metal container 1 with a mass brick equivalent portion made of monolithic refractory material, which will be described later. It is surrounded using an iron plate case 8, and a hole with a diameter of about 15 to 20 φm/m is provided for hanging through an iron rod or wire during construction. The bottom part is surrounded by an iron plate case 9 having a gas supply pipe 6. Next, a sleeve brick 11 manufactured to be able to fit into the plug brick 2
The plug bricks 2 surrounded by the iron plate cases 8 and 9 are assembled with the sleeve bricks 11 using refractory mortar at the joints. By forming the predetermined shape around the plug brick 2 and sleeve brick 11, which have been assembled in advance in this way, using the monolithic refractory 10, and carrying out the integral construction, it is possible to use for gas injection. Consists of refractories.
外周を囲繞する鉄板ケース8の高さは、実施例
ではプラグれんが2の上面(ガス吐出側)まで延
ばし、外周全面を囲繞して構成したが、使用中に
鉄板ケース8が溶け地金差しによる漏鋼をできる
だけ防止するためには、プラグれんが2の高さの
2/5程度まで低くし、底部側の外周のみ囲繞して
吊り下げ用の孔7を有する部分のみ延ばしても良
い。しかし、何れの場合も吊り下げ用の孔7を有
する部分は、プラグれんが2の高さよりも長くす
ると共に、不定形耐火物10で所定の形状を形成
し一体化施工した物の重量が40〜80Kg程度になる
ため、この重量物を吊り下げるためには鉄板ケー
ス8の吊り下げ用の孔7部分の強度が、引張り及
び剪断破壊に耐え得るようにする必要があり、使
用する鉄板ケース8の厚さにもよるが、第3図図
示の如く孔部の引張り破壊方向の寸法(w)は3
〜8m/m程度、剪断破壊方向の寸法(h)は10
〜15m/m程度確保することが安全上からも大切
である。孔部鉄板の外形は半円形、四角形、多角
形等種々な形状があり、吊り下げ用の孔7も円形
形状だけに限定するものではなく、また鉄板ケー
ス8,9で囲繞する手段としては、焼ばめによる
手段があり、外周を囲繞する鉄板ケース8の高
さ、及び囲繞手段について規制はなく、プラグれ
んが2自体の構造、材質にも制約されない。 In the example, the height of the iron plate case 8 that surrounds the outer periphery is extended to the top surface (gas discharge side) of the plug brick 2, and is constructed by surrounding the entire outer periphery. In order to prevent steel leakage as much as possible, the height of the plug brick 2 may be reduced to about 2/5, and only the outer periphery of the bottom side may be surrounded and only the portion having the hanging hole 7 may be extended. However, in any case, the part with the hanging hole 7 is made longer than the height of the plug brick 2, and the monolithic refractory 10 is formed into a predetermined shape and the weight of the integrally constructed part is 40~ The weight is about 80 kg, so in order to suspend this heavy object, the strength of the suspension hole 7 of the steel plate case 8 must be strong enough to withstand tensile and shear failure. Although it depends on the thickness, the dimension (w) of the hole in the tensile failure direction is 3 as shown in Figure 3.
~8m/m, the dimension (h) in the shear failure direction is 10
It is important for safety to maintain a distance of ~15m/m. The outer shape of the hole iron plate has various shapes such as semicircle, square, and polygon, and the hanging hole 7 is not limited to only a circular shape. There is a method of shrink fitting, and there are no restrictions on the height of the iron plate case 8 surrounding the outer periphery and the surrounding means, and there are no restrictions on the structure or material of the plug brick 2 itself.
鉄板ケース8,9で外周と底部を囲繞したプラ
グれんがにスリーブれんが11を事前に組合せた
組立体の周囲を、不定形耐火物10を用いて所定
の形状を形成し一体化施工する手段としては、所
定形状に製作した金枠或いは木枠を用い、前記プ
ラグれんが2とスリーブれんが11との組立体を
前記枠内に収め、周囲に不定形耐火物10を充填
し、振動成形施工、つき固め施工、流し込み施工
等の手段により所定の形状を形成し、脱枠後は十
分な乾燥を行なうことにより一体物を構成する。 As a means of integrally constructing the periphery of an assembly in which sleeve bricks 11 are assembled in advance to plug bricks whose outer periphery and bottom are surrounded by iron plate cases 8 and 9, a predetermined shape is formed using monolithic refractories 10. , Using a metal frame or a wooden frame manufactured in a predetermined shape, the assembly of the plug brick 2 and the sleeve brick 11 is placed in the frame, the periphery is filled with the monolithic refractory 10, vibration molding is performed, and compaction is performed. A predetermined shape is formed by means of construction, pouring, etc., and after removing the frame, it is sufficiently dried to form an integrated product.
このような構造にした本考案のガス吹込み用耐
火物を用い、施工時吊り下げ用の孔に鉄棒或いは
ワイヤーを通してクレーン等で吊り上げ、溶融金
属容器の所定位置に内側から施孔することによ
り、溶融金属容器の底部にはガス供給管が通るだ
けの孔を開けるだけで良く、溶融金属容器を傾転
させることなく極めて安全で確実に且つ容易な施
工が可能となり、コツターやバヨネツト等の固定
治具が不要で、吊り下げ用の孔に鉄棒或いはワイ
ヤーを通してクレーン等で吊り上げて施工でき、
極めて簡単に施工ができると共に、一体物のた
め、目地部からの漏鋼がなく安全に多数回使用が
できる等の作用効果を有するものである。 By using the gas injection refractory of the present invention with such a structure, passing an iron rod or wire through the suspension hole during construction, lifting it with a crane, etc., and drilling the hole from the inside at a predetermined position of the molten metal container. It is only necessary to make a hole in the bottom of the molten metal container that is large enough for the gas supply pipe to pass through, making construction extremely safe, reliable, and easy without having to tilt the molten metal container. No tools are required, and it can be installed by passing an iron rod or wire through the hanging hole and lifting it with a crane, etc.
It is extremely easy to construct, and since it is a one-piece product, there is no steel leakage from the joints and it can be safely used many times.
第1図は溶融金属容器に従来のガス吹込み用プ
ラグを施工した場合の縦断面図、第2図及び第3
図は本考案実施例を示し、第2図は事前に組合せ
たプラグれんがとスリーブれんがの周囲を、不定
形耐火物で所定形状を形成し一体化した物の縦断
面図、第3図は吊り下げ用孔部の部分詳細図。
図中、1は溶融金属容器、2はプラグれんが、
3はマスれんが、4は受けれんが、5は固定治
具、6はガス供給管、7は吊り下げ用の孔、8は
鉄板ケース、9は鉄板ケース、10は不定形耐火
物、11はスリーブれんが。
Figure 1 is a vertical cross-sectional view of a conventional gas injection plug installed in a molten metal container, Figures 2 and 3
The figure shows an embodiment of the present invention. Figure 2 is a longitudinal cross-sectional view of a pre-assembled plug brick and sleeve brick that are integrated into a predetermined shape with monolithic refractory material, and Figure 3 is a hanging A partial detailed view of the lowering hole. In the figure, 1 is a molten metal container, 2 is a plug brick,
3 is a mass brick, 4 is a receiving brick, 5 is a fixing jig, 6 is a gas supply pipe, 7 is a hole for hanging, 8 is an iron plate case, 9 is an iron plate case, 10 is a monolithic refractory, 11 is a sleeve Brick.
Claims (1)
で囲繞し、底部はガス供給管6を有する鉄板ケー
ス9で囲繞したプラグれんが2にスリーブれんが
11を嵌装し、この組立体の周囲を、不定形耐火
物10を用いて所定の形状を形成し、施行前に一
体化したことを特徴とするガス吹込み用耐火物。 Iron plate case 8 having a hole 7 that allows the outer periphery to be hung
A sleeve brick 11 is fitted into a plug brick 2 surrounded by an iron plate case 9 having a gas supply pipe 6 at the bottom, and a predetermined shape is formed around this assembly using a monolithic refractory 10. A refractory for gas injection, characterized in that it is integrated before installation.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP16332683U JPS6071656U (en) | 1983-10-24 | 1983-10-24 | Refractories for gas injection |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP16332683U JPS6071656U (en) | 1983-10-24 | 1983-10-24 | Refractories for gas injection |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS6071656U JPS6071656U (en) | 1985-05-21 |
| JPH0345943Y2 true JPH0345943Y2 (en) | 1991-09-27 |
Family
ID=30358410
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP16332683U Granted JPS6071656U (en) | 1983-10-24 | 1983-10-24 | Refractories for gas injection |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS6071656U (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5391810B2 (en) * | 2009-04-28 | 2014-01-15 | 新日鐵住金株式会社 | Structure of gas blowing part of molten metal container |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE3110204A1 (en) * | 1981-03-17 | 1982-10-14 | Didier-Werke Ag, 6200 Wiesbaden | DEVICE FOR INTRODUCING GASES IN METALLURGICAL VESSELS |
-
1983
- 1983-10-24 JP JP16332683U patent/JPS6071656U/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS6071656U (en) | 1985-05-21 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| FI77913C (en) | STATIVROER MED ETT ANTAL KONSOLARMAR, VARI BETONG INJICERAS, SAERSKILT FOER UPPBAERANDE AV BALKONGDAECK. | |
| US6017487A (en) | Lid of preformed refractory material for metallurgical melting furnace | |
| CN113802562B (en) | Steel reinforcement cage circulating hanging bar device and use method thereof | |
| US5919392A (en) | Pouring tube structure and assembly | |
| JP2781353B2 (en) | Construction method and apparatus of prefabricated block for industrial kiln | |
| JPH076693U (en) | Precast blocks for containers for molten metal | |
| JP2000017643A (en) | Pile head construction method for angled piles | |
| JPS6410838A (en) | Box pulling basket retaining mold of iron pillar fixing part in src building | |
| JPS5953993B2 (en) | Segment installation method for segment underground tanks | |
| KR200267053Y1 (en) | A Steel Cage for Reinforced of Head in a Steel Pipe Pile | |
| JPH0612054Y2 (en) | Concrete block for manhole | |
| JPH102010A (en) | Construction method of reinforced concrete columns | |
| JP3225447B2 (en) | Wall panels | |
| JPS5953981B2 (en) | Formwork method and its equipment | |
| JPH0343222Y2 (en) | ||
| JP3972408B2 (en) | Top slab for concrete reactor containment | |
| JP2026029087A (en) | Apparatus and method for slipform construction | |
| JPH0450726Y2 (en) | ||
| JPS6140757Y2 (en) | ||
| JPH10110428A (en) | Pile head hollow forming tool for concrete pile | |
| KR200326502Y1 (en) | Improved Upper Flange Structure for Ladle | |
| JPS599107A (en) | Method for assembling refractory material block in outflow part of separation pan for molten slag | |
| JPH06307774A (en) | Lining construction of ladle | |
| JPH0742501U (en) | Support structure for trunk liner in containment vessel | |
| JP2006089964A (en) | Structure installation method and structure |