JPH0347319A - Permeable pipe kettle equipment and excavation method - Google Patents
Permeable pipe kettle equipment and excavation methodInfo
- Publication number
- JPH0347319A JPH0347319A JP18027389A JP18027389A JPH0347319A JP H0347319 A JPH0347319 A JP H0347319A JP 18027389 A JP18027389 A JP 18027389A JP 18027389 A JP18027389 A JP 18027389A JP H0347319 A JPH0347319 A JP H0347319A
- Authority
- JP
- Japan
- Prior art keywords
- water
- permeable pipe
- drained
- submersible pump
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009412 basement excavation Methods 0.000 title claims description 24
- 238000000034 method Methods 0.000 title claims description 15
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 73
- 230000003014 reinforcing effect Effects 0.000 claims description 23
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims description 9
- 238000010276 construction Methods 0.000 description 7
- 239000004576 sand Substances 0.000 description 5
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 4
- 230000000694 effects Effects 0.000 description 3
- 101100008048 Caenorhabditis elegans cut-4 gene Proteins 0.000 description 2
- 239000003673 groundwater Substances 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 230000035699 permeability Effects 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 239000013049 sediment Substances 0.000 description 2
- 239000010802 sludge Substances 0.000 description 2
- 244000007853 Sarothamnus scoparius Species 0.000 description 1
- 230000002411 adverse Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
Landscapes
- Earth Drilling (AREA)
Abstract
(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.
Description
【発明の詳細な説明】
(産業上の利用分野)
本発明は、建築現場における、掘削工事に伴う地下水を
揚水するための釜場の構造と、それを使用した掘削工法
に関する。DETAILED DESCRIPTION OF THE INVENTION (Field of Industrial Application) The present invention relates to the structure of a kettle for pumping up groundwater accompanying excavation work at a construction site, and an excavation method using the same.
(従来の技術)
一般に、建築現場の掘削工事においては、根切底より地
盤周囲の水位が高いと、水が根切底にたまり、その水の
流れにより前記根切底の弱い所に水の流れが集まり、や
がて付近の地盤を洗掘したような状態となる。このよう
な現象をパイピング現象と呼び、前記根切底がヘドロ化
して、掘削を行うのが困難になる。(Prior art) Generally, during excavation work at a construction site, if the water level around the ground is higher than the base of the root cut, water accumulates at the bottom of the root cut, and the flow of water causes water to flow into weak areas of the root cut. The flow gathers and eventually becomes like it has scoured the nearby ground. This phenomenon is called a piping phenomenon, and the root truncation becomes sludge, making it difficult to excavate.
このような場合には、止水壁を構築してから掘削するの
が好ましいものであるが、工期と工費の点から問題があ
り、これに対処するために、横矢板工法を採用して、更
に、その掘削に先行して、水を総揚げる冬場を設けて水
中ポンプで地上へと排水していた。In such cases, it is preferable to construct a cut-off wall before excavating, but there are problems in terms of construction period and cost, and to deal with this, the horizontal sheet pile method is adopted. Furthermore, prior to the excavation, a winter period was set aside for all the water to be pumped up and drained to the surface using submersible pumps.
この冬場は、例えば、第6図に示すように、根切底20
に所要の孔21を穿設する。そして亀 この孔21に透
水マット22を巻き付けたドラム缶23を設置する。そ
して、周囲の水を集めるために通水孔23aが複数穿孔
されている。このドラム缶23の中に、貯溜した水24
を排水させる水中ポンプ25を備えて、排水パイプ26
で前記水24を地上に排水させる。このようにして、地
中の水を透水マット22で細砂、シルトの侵入を阻止し
て、水のみを前記ドラム缶23に集まるようにし、水中
ポンプ25で排水する冬場27なるものが知られている
。In this winter, for example, as shown in Figure 6, the root truncation is 20.
A required hole 21 is drilled in the hole 21. Then, a drum 23 wrapped with a water-permeable mat 22 is installed in this hole 21. A plurality of water passage holes 23a are bored in order to collect surrounding water. Water 24 stored in this drum 23
A drainage pipe 26 is provided with a submersible pump 25 for draining water.
The water 24 is drained to the ground. In this way, the water permeable mat 22 prevents the intrusion of fine sand and silt into the underground water, allowing only the water to collect in the drum 23 and draining the water using the submersible pump 25. There is.
(発明が解決しようとする課題)
ところで、上述した従来の冬場27では、冬場を作る時
に前記ドラム缶23を前記孔21に埋設しようとしても
、すでに孔21底に貯った水で浮力が働き、前記ドラム
缶23を埋め込むのが困難であり、更に、前記透水マッ
ト22によりしだいに目詰まりが生じて、やがて周囲の
水は、第6図の実線で示す矢印のようなドラム缶23へ
の浸入状態から、破線で示す矢印のような浸入状態とな
り、前記ドラム缶23の内に細砂、シルト等が上方から
侵入してしまう。従って、水中ポンプが詰まってしまい
、場合によっては冬場が埋もれてしまうこともある。ま
た、最近は、冬場を施工、管理する専門土工が減少して
おり、掘削工法に前記冬場を採用するのが困難となって
いるほか、この冬場に替えてディープウェルやウェルポ
イント等の排水工法もあるが、その施工が大ががりとな
り、コストがかさむと言った欠点が存在した。(Problem to be Solved by the Invention) By the way, in the above-mentioned conventional winter area 27, even if the drum 23 is buried in the hole 21 when making the winter area, buoyancy is exerted by the water already accumulated at the bottom of the hole 21, It is difficult to embed the drum can 23, and furthermore, the water-permeable mat 22 gradually becomes clogged, and eventually the surrounding water starts to enter the drum can 23 as shown by the solid line arrow in FIG. , an intrusion state occurs as shown by the broken arrow, and fine sand, silt, etc. enter the drum can 23 from above. Therefore, the submersible pump may become clogged, and in some cases, the water may be buried during the winter. In addition, recently, there has been a decrease in the number of specialized earthworks that perform winter construction and management, making it difficult to use the winter excavation method, and alternative drainage methods such as deep wells and well points. However, the disadvantage was that the construction was extensive and costly.
本発明の目的は、上述した欠点に鑑みなされたもので、
施工の簡単な冬場にするとともに、土砂等の流入による
目詰まりを防止した冬場とし、更に、この冬場を使用し
た掘削工法を提供することにある。The object of the present invention has been made in view of the above-mentioned drawbacks.
It is an object of the present invention to provide a winter excavation method that is easy to perform construction, prevents clogging due to inflow of earth and sand, and can be used in this winter.
(課題を解決するための手段)
本発明に係る透水管冬場の上記課題を解決し、目的を達
成するための要旨は、根切底に穿設した孔に、集水管と
該集水管への土砂等の侵入を防ぐフィルターを前記集水
管に巻き付けて、これらを埋設してなり、前記集水管に
集まった地盤周囲の水を前記集水管の内に設置した水中
ポンプで地上に排水する冬場において、運搬用の掛止部
を設けた円筒型の鉄筋籠の底部に、水中ポンプ載置用の
台座を形成し、前記鉄筋籠にコンクリート製の透水管を
設置したことに存する。(Means for Solving the Problems) The gist for solving the above-mentioned problems and achieving the purpose of the permeable pipe in winter according to the present invention is to install a water collection pipe and a water collection pipe to the water collection pipe in a hole drilled at the bottom of the root cut. In winter, a filter that prevents the intrusion of earth and sand is wrapped around the water collection pipe and buried, and the water around the ground that collects in the water collection pipe is drained to the ground using a submersible pump installed inside the water collection pipe. , a pedestal for mounting a submersible pump is formed at the bottom of a cylindrical reinforcing cage provided with a hook for transportation, and a concrete water permeable pipe is installed in the reinforcing cage.
本発明に係る掘削工法の上記課題を解決し、目的を達成
するための要旨は、根切底を複数箇所に区画して、所定
の箇所に孔を穿設して、運搬用の掛止部を設けた円筒型
の鉄筋籠の底部に水中ポンプ載置用の台座を形成し、前
記鉄筋籠にコンクリート製の透水管を設置してなる透水
管冬場装置を前記孔に埋設し、該透水管冬場装置内に集
めた水を水中ポンプで排水し、これにより水抜きされた
他の区画の地盤を掘削し、前記透水管冬場装置を設置し
て水を排水することと、これにより水抜きされた他の区
画を掘削することを交互に繰り返すことに存する。The gist of the excavation method according to the present invention to solve the above-mentioned problems and achieve the purpose is to divide the root cut into a plurality of locations, drill holes at predetermined locations, and create a hook for transportation. A pedestal for mounting a submersible pump is formed at the bottom of a cylindrical reinforcing cage provided with a water pump, a water permeable pipe winter device consisting of a concrete water permeable pipe installed in the reinforcing steel cage is buried in the hole, and the water permeable pipe is installed in the hole. The water collected in the winter device is drained by a submersible pump, the ground of another section from which the water has been drained is excavated, and the water is drained by installing the permeable pipe winter device, and the water is drained by this. It consists in repeating alternately excavating other sections.
(作用)
この様に本発明に係る透水管冬場装置によれば、この冬
場の周囲の水は前記コンクリート製透水管の内部に浸入
して貯溜し、この水は水中ポンプによって地上へと排水
される。また、前記鉄筋籠は運搬用の掛止部を設けであ
るので、例えば、ワイヤ等で吊り上げて他の排水場所に
移転可能である。(Function) As described above, according to the permeable pipe winter device of the present invention, the surrounding water in winter enters and accumulates inside the concrete permeable pipe, and this water is drained to the ground by the submersible pump. Ru. Furthermore, since the reinforcing bar cage is provided with a hook for transportation, it can be lifted up with a wire or the like and moved to another drainage location.
更に、前記鉄筋籠には台座が設けられているので、この
上に水中ポンプを載置すれば、直接泥土を水中ポンプの
吸入口から吸い込むこともなく、水中ポンプの排水能力
の低下を防止できる。Furthermore, since the reinforcing bar cage is provided with a pedestal, by placing the submersible pump on this pedestal, mud is not directly sucked in from the suction port of the submersible pump, and a decrease in the drainage capacity of the submersible pump can be prevented. .
また、鉄筋籠を使用するので、根切底に穿設された孔に
埋設する際も、この孔に貯った水による浮力の影響も受
けることがない。Furthermore, since a reinforcing bar cage is used, when the cage is buried in a hole drilled in the bottom of the root cut, it is not affected by the buoyancy of water accumulated in the hole.
本発明による掘削工法によれば、上記透水管冬場装置を
掘削工事に先行して冬場に設けて、根切底の地盤周囲の
水を排水するので、前記透水管冬場装置を設置した区画
以外の区画部分は排水処理がなされて、根切底より水位
を低下させることができ、この区画の掘削工事をスムー
ズに進めることができる。According to the excavation method of the present invention, the permeable pipe winter device is installed in the winter prior to excavation work to drain water around the ground at the bottom of the root cut, so that the permeable pipe winter device is installed in a section other than the section where the permeable pipe winter device is installed. Drainage treatment is carried out in the section, allowing the water level to be lowered from the bottom of the cut, allowing the excavation work in this section to proceed smoothly.
この斎場設置作業と掘削工事を交互に行うことにより、
地下水に掘削作業の進行を妨げられることもなく、掘削
工事を行うことができることとなる。By performing this funeral hall installation work and excavation work alternately,
This means that excavation work can be carried out without being hindered by groundwater.
(実施例)
以下、添付図面に従って1本発明の一実施例を説明する
。第1図は、本発明の透水管冬場装置1の縦断面図であ
る。図において、2は鉄筋籠、3はコンクリート製の透
水管、4は掘削工事における根切底、5は冬場用に穿設
した孔、6は排水用の水中ポンプを示している。(Example) Hereinafter, an example of the present invention will be described with reference to the accompanying drawings. FIG. 1 is a longitudinal sectional view of a permeable pipe winter device 1 of the present invention. In the figure, 2 is a reinforcing cage, 3 is a concrete water permeable pipe, 4 is a bottom cut during excavation work, 5 is a hole drilled for winter use, and 6 is a submersible pump for drainage.
前記透水管3は、コンクリート製で、その透水能力は、
透水係数2.0cm/secであり、空隙率は32%で
ある。尚、これは一実施例であり、前記透水係数は0.
5〜2.0cm/sec+ 前記空隙率は20〜32
%であれば本発明の目的を達成できるものである。The water permeable pipe 3 is made of concrete, and its water permeability is as follows:
The permeability coefficient is 2.0 cm/sec, and the porosity is 32%. Note that this is just one example, and the hydraulic conductivity is 0.
5~2.0cm/sec+ The porosity is 20~32
%, the object of the present invention can be achieved.
第2図は、この透水管の縦断面図を含む正面図である。FIG. 2 is a front view including a longitudinal cross-sectional view of this water permeable pipe.
前記鉄筋W2は、第3図乃至第4図に示すように、全体
を略円筒状にして、円形のフラットパー7.8を上下に
配置し、このフラットパー7.8の外周に複数本の側壁
用のフラットパー9.10を当接させるとともに溶接し
て、一体化する。前記フラットパー9.10には、これ
らを屈曲させて、水中ポンプ6の載置用台座11を形成
する。As shown in FIGS. 3 and 4, the reinforcing bar W2 has a substantially cylindrical shape as a whole, and circular flat pars 7.8 are arranged above and below, and a plurality of circular flat pars 7.8 are arranged on the outer periphery of the flat pars 7.8. The flat pars 9 and 10 for the side walls are brought into contact with each other and welded to integrate them. The flat pars 9 and 10 are bent to form a pedestal 11 for mounting the submersible pump 6.
また、前記フラットパー7.8の中間に補強用の円形鉄
筋12を溶接する。この補強用の円形鉄筋12を、−本
に限らず複数本を前記フラットパー9、10に溶接する
ようにしてもよい。Further, a reinforcing circular reinforcing bar 12 is welded to the middle of the flat par 7.8. This reinforcing circular reinforcing bar 12 is not limited to one, but a plurality of reinforcing bars 12 may be welded to the flat bars 9 and 10.
また、前記フラットパー9.10の上端部には、この鉄
筋籠2を運搬するための掛止部13.13・・・が湾曲
部を有して形成されている。Further, at the upper end of the flat parr 9.10, hooking portions 13.13 for transporting the reinforcing bar cage 2 are formed with curved portions.
このようにして、前記鉄筋籠2に前記透水管3を置き、
この透水管冬場装置lを第1図に示すように、ワイヤー
14.14で吊り上げて、根切底4に穿設した孔5に埋
設させて使用するものである。即ち、地盤周囲の水は前
記透水管冬場装置1の透水管3の中に浸入し、そしてこ
の貯溜した水を水中ポンプ6の吸入口6aから水中ポン
プ8本体に吸い込み、排水管6bを介して地上に排水す
るものである。In this way, the water permeable pipe 3 is placed in the reinforcing bar cage 2,
As shown in FIG. 1, this permeable pipe winter device 1 is used by being suspended by wires 14 and 14 and buried in a hole 5 drilled in the root cut 4. That is, water around the ground enters the permeable pipe 3 of the permeable pipe winter device 1, and this stored water is sucked into the main body of the submersible pump 8 through the suction port 6a of the submersible pump 6, and is then pumped through the drain pipe 6b. It drains water above ground.
次に、この透水管冬場装置1を使用した、本発明の掘削
工法を説明する。この掘削工法は、第5図(イ)〜(ニ
)に順次その手順を示すように、まず、掘削工事おける
根切底4を2区画に区分し、排水しようとする区画の方
を一段深(掘り下げて、さらに冬場用の孔5を穿設する
。そして、この孔5に前記透水管冬場装置1を埋設して
、地盤周囲の水を前記水中ポンプ6で排水する。この排
水作業により水位の下がった他の区画の方を掘削する。Next, the excavation method of the present invention using this permeable pipe winter equipment 1 will be explained. In this excavation method, as shown in the steps in Figures 5 (a) to (d), first, the root cut 4 in the excavation work is divided into two sections, and the section to be drained is one step deeper. (Dig down and drill a hole 5 for winter use.Then, the permeable pipe winter device 1 is buried in this hole 5, and the water around the ground is drained by the submersible pump 6.The water level Excavate in the other section where the area is lowered.
そして、前記透水管冬場装置1と同程度の位置まで掘削
した後、続けて、冬場用の孔5aを穿設しく第5図(ロ
)参照)、透水管冬場装置1を前記孔5からクレーン等
(図示せず)で持ち上げて移動させ、前記孔5aに埋設
する。そして、貯溜した水を排水ポンプ8で排水させ、
水抜きされた前記孔5を設けた区画を掘削する。After excavating to the same level as the permeable pipe winter device 1, a winter hole 5a is subsequently drilled (see FIG. 5(b)), and the permeable pipe winter device 1 is removed from the hole 5 using a crane. etc. (not shown) and move it, and bury it in the hole 5a. Then, the accumulated water is drained by the drain pump 8,
A section in which the water-drained hole 5 is provided is excavated.
このようにして、交互に、斎場設置と掘削工事を繰り返
して、常に掘削する区画を水抜きし、ドライワーク可能
にして行うものである。In this way, the construction of the funeral hall and the excavation work are repeated alternately, and the area to be excavated is always drained of water, making dry work possible.
本実施例では、2区画に区分したが、更に2区画以上に
区画して、順次、冬場の設置と掘削工事を巡らせるよう
にして行ってもよいものである。In this embodiment, the area is divided into two sections, but it may be further divided into two or more sections and the winter installation and excavation work may be carried out sequentially.
以上、本発明の係る一実施例を示したが、これに限らず
要旨を変更しない範囲で適宜変更できるのは勿論である
。Although one embodiment of the present invention has been described above, it is needless to say that the present invention is not limited to this and can be modified as appropriate without changing the gist.
(発明の効果)
以上説明したように、本発明に係る透水管冬場を運搬用
の掛止部を設けた円筒型の鉄筋籠の底部に、水中ポンプ
載置用の台座を形成し、前記鉄筋箆にコンクリート製の
透水管を設置したこと、また、本発明に係る掘削工法を
根切底を複数箇所に区画して、所定の箇所に孔を穿設し
て、運搬用の掛止部を設けた円筒型の鉄筋籠の底部に水
中ポンプ載置用の台座を形成し、前記鉄筋籠にコンクリ
ート製の透水管を設置してなる透水管冬場装置を前記孔
に埋設し、該透水管斎場装置内に集めた水を水中ポンプ
で排水し、これにより水抜きされた他の区画の地盤を掘
削し、前記透水管歪場装置を設置して水を排水すること
と、これにより水抜きされた他の区画を掘削することを
交互に繰り返すこととしたので、次の様な効果が有る。(Effects of the Invention) As explained above, a pedestal for mounting a submersible pump is formed at the bottom of a cylindrical reinforcing cage provided with a hook for transporting the permeable pipe in winter, and the reinforcing steel In addition, the excavation method according to the present invention involves installing a concrete water permeable pipe in the broom, dividing the bottom of the cut into multiple locations, drilling holes at predetermined locations, and creating a hook for transportation. A pedestal for mounting a submersible pump is formed at the bottom of the provided cylindrical reinforcing cage, a water permeable pipe winter device consisting of a concrete water permeable pipe installed in the reinforcing steel cage is buried in the hole, and the water permeable pipe funeral home is installed. Draining the water collected in the device with a submersible pump, excavating the ground of another section from which the water was drained, installing the permeable pipe strain field device and draining the water, and draining the water by this. Since we decided to alternately repeat excavating other sections, we have the following effects.
■ まず、透水管歪場装置の外壁は鉄筋能であるので、
この透水管歪場装置を埋設するときは、穿設した孔の貯
溜水による浮力がな(、埋設作業が容易である。■ First, since the outer wall of the permeable pipe strain field device is made of reinforcing steel,
When burying this permeable pipe strain field device, there is no buoyancy due to the water stored in the drilled hole (the burying work is easy).
■ 従来の様な土砂等による目詰まりが少なく、土砂流
入による水中ポンプの目詰まりなどの弊害も軽減され、
また、従来のようにドラム管等に流入した土砂を取り除
く作業が減少した。■ There is less clogging caused by sediment, etc., as in conventional systems, and adverse effects such as clogging of submersible pumps due to inflow of sediment are also reduced.
In addition, the work required to remove earth and sand that has flowed into drum pipes, etc., as required in the past, has been reduced.
■ 本発明の透水管歪場装置は、鉄筋能の上端部に掛止
部を設けであるので、移転等が容易となった。(2) The permeable pipe strain field device of the present invention is provided with a hook at the upper end of the reinforcing bar, making it easy to relocate.
■ 透水管歪場装置を使用して排水し、・水抜きされた
区画を掘削するので、掘削面がヘドロ化することがなく
、掘削作業能率の向上を図ることができる。■ Since water is drained using a permeable pipe strain field device and the area from which the water has been drained is excavated, the excavated surface will not become sludge and the efficiency of excavation work can be improved.
■ 透水管歪場装置は、簡単な構造であり、軽量である
ので、コストの低減と取扱い作業を容易にした。■ The permeable pipe strain field device has a simple structure and is lightweight, which reduces costs and facilitates handling.
このように、価値ある透水管歪場装置と掘削工法を提供
できることとなった。In this way, we have been able to provide a valuable permeable pipe strain field device and excavation method.
第1図は、本発明の透水管歪場装置の縦断面図、第2図
は、コンクリート製透水管の正面図、第3図は、鉄筋能
の縦断面図、第4図は、同じくその平面図、第5図(イ
)〜(ニ)は、本発明の透水管歪場装置を使用した掘削
工法の説明図、第6図は、従来の歪場装置の縦断面図で
ある。
1・・・透水管歪場装置、2・・・鉄筋能、3・・・コ
ンクリート製透水管、4・・・根切底、5・・・孔、6
・・・水中ポンプ、
7、 8. 9. 10・・・フラットバー、11・・
・台座、12・・・補強用円形鉄筋、13・・・掛止部
。
第1図
第8図
第2図
第4因Fig. 1 is a longitudinal cross-sectional view of the permeable pipe strain field device of the present invention, Fig. 2 is a front view of the concrete permeable pipe, Fig. 3 is a longitudinal cross-sectional view of the reinforcement capacity, and Fig. 4 is the same. The plan view and FIGS. 5(a) to 5(d) are explanatory diagrams of an excavation method using the permeable pipe strain field device of the present invention, and FIG. 6 is a longitudinal sectional view of the conventional strain field device. 1... Permeable pipe strain field device, 2... Reinforcement capacity, 3... Concrete water permeable pipe, 4... Root truncation, 5... Hole, 6
...submersible pump, 7, 8. 9. 10...Flat bar, 11...
- Pedestal, 12... Circular reinforcing bar, 13... Hanging part. Figure 1 Figure 8 Figure 2 Figure 4 Cause
Claims (2)
砂等の侵入を防ぐフィルターを前記集水管に巻き付け、
これらを埋設してなり、前記集水管に集まった地盤周囲
の水を前記集水管内に設置した水中ポンプで地上に排水
する釜場装置において、運搬用の掛止部を設けた円筒型
の鉄筋籠の底部に、水中ポンプ載置用の台座を形成し、
前記鉄筋籠にコンクリート製の透水管を設置したことを
特徴としてなる透水管釜場装置。(1) Wrap a water collection pipe around the hole drilled in the bottom of the root cut, and a filter that prevents dirt, etc. from entering the water collection pipe;
In a kettle system in which these are buried and water around the ground collected in the water collection pipe is drained to the ground using a submersible pump installed in the water collection pipe, a cylindrical reinforcing bar with a hook for transportation is provided. A pedestal for mounting a submersible pump is formed at the bottom of the basket,
A permeable pipe kettle apparatus characterized in that a concrete permeable pipe is installed in the reinforcing cage.
穿設して、運搬用の掛止部を設けた円筒型の鉄筋籠の底
部に水中ポンプ載置用の台座を形成し、前記鉄筋籠にコ
ンクリート製の透水管を設置してなる透水管釜場装置を
前記孔に埋設し、該透水管釜場装置内に集めた水を水中
ポンプで排水し、これにより水抜きされた他の区画の地
盤を掘削し、前記透水管釜場装置を設置して水を排水す
ることと、これにより水抜きされた他の区画を掘削する
ことを交互に繰り返すことを特徴とする掘削工法。(2) The cut bottom is divided into multiple locations, holes are drilled at predetermined locations, and a pedestal for mounting a submersible pump is placed at the bottom of a cylindrical reinforcing cage with hooks for transportation. A permeable pipe boiler device comprising a concrete water permeable pipe installed in the reinforcing cage is buried in the hole, and the water collected in the water permeable pipe kettle device is drained by a submersible pump. The method is characterized by alternately repeating the steps of excavating the ground of another section from which the water has been drained, installing the permeable pipe boiler device to drain the water, and excavating the other section from which the water has been drained. Excavation method.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP18027389A JPH0347319A (en) | 1989-07-14 | 1989-07-14 | Permeable pipe kettle equipment and excavation method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP18027389A JPH0347319A (en) | 1989-07-14 | 1989-07-14 | Permeable pipe kettle equipment and excavation method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH0347319A true JPH0347319A (en) | 1991-02-28 |
Family
ID=16080345
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP18027389A Pending JPH0347319A (en) | 1989-07-14 | 1989-07-14 | Permeable pipe kettle equipment and excavation method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0347319A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2020116877A (en) * | 2019-01-25 | 2020-08-06 | 株式会社奥村組 | Concrete manufacturing plant |
-
1989
- 1989-07-14 JP JP18027389A patent/JPH0347319A/en active Pending
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2020116877A (en) * | 2019-01-25 | 2020-08-06 | 株式会社奥村組 | Concrete manufacturing plant |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US7909535B2 (en) | Soil drainage system | |
| CN210066791U (en) | A precipitation combined system that is used for foundation ditch pressure release precipitation and dredges precipitation | |
| KR100476331B1 (en) | a under drainage method for building using perforated drain pipes | |
| CN110004935A (en) | A local deep pit diversion drainage ditch system and construction method | |
| CN211395714U (en) | Novel building foundation pit drainage structure | |
| CN214169122U (en) | Interim plugging device of precipitation well | |
| JP5182903B2 (en) | Osmotic structure, water collecting facility with osmotic structure, and installation method of osmotic structure | |
| JP6870969B2 (en) | How to extubate an existing well | |
| KR19980082059A (en) | Groundwater depth section collection device and collection method | |
| CN219080334U (en) | Foundation pit with be favorable to drainage structures | |
| CN219033271U (en) | Well point pipe dewatering system for water treatment of foundation pit of unsealed investigation hole | |
| CN219031950U (en) | Well point filter tube | |
| JP2003328344A (en) | High lift wellpoint apparatus | |
| JP2001173028A (en) | Manchurian well type water collecting method and it water buried collecting conduit device | |
| JP3536270B2 (en) | Construction method of underground continuous wall | |
| CN210066792U (en) | Rich water quicksand stratum foundation ditch instrument formula precipitation well device | |
| KR100655383B1 (en) | Basement floor drainage method | |
| CN214993990U (en) | Precipitation system | |
| KR200314875Y1 (en) | Connector for apparatus draining | |
| JP2001020291A (en) | Groundwater draining method | |
| CN208328962U (en) | A kind of drainage of foundation pit device under the head positioned at low pressure water | |
| JP2809105B2 (en) | How to build an underground tank | |
| CN116290045B (en) | A method for treating water gushing from foundation pits in unsealed exploration holes | |
| JPS61211414A (en) | Reduction well construction method | |
| JPH09228362A (en) | Continuous wall with continuous cast hollow piles equipped with lifting and draining equipment |