JPH0355596Y2 - - Google Patents

Info

Publication number
JPH0355596Y2
JPH0355596Y2 JP1986112623U JP11262386U JPH0355596Y2 JP H0355596 Y2 JPH0355596 Y2 JP H0355596Y2 JP 1986112623 U JP1986112623 U JP 1986112623U JP 11262386 U JP11262386 U JP 11262386U JP H0355596 Y2 JPH0355596 Y2 JP H0355596Y2
Authority
JP
Japan
Prior art keywords
sheave
bracket
block
arm
boom
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP1986112623U
Other languages
Japanese (ja)
Other versions
JPS6318559U (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP1986112623U priority Critical patent/JPH0355596Y2/ja
Publication of JPS6318559U publication Critical patent/JPS6318559U/ja
Application granted granted Critical
Publication of JPH0355596Y2 publication Critical patent/JPH0355596Y2/ja
Expired legal-status Critical Current

Links

Landscapes

  • Shovels (AREA)
  • Load-Engaging Elements For Cranes (AREA)
  • Jib Cranes (AREA)

Description

【考案の詳細な説明】 産業上の利用分野 この考案はアームの先端側に資材等を吊上げる
ためのフツクを設けた、油圧掘削機に関するもの
である。
[Detailed description of the invention] Industrial field of application This invention relates to a hydraulic excavator that is provided with a hook on the tip side of the arm for lifting materials, etc.

従来の技術 従来からの油圧掘削機にクレーン機能を有する
フツクを併設する方法としては、第3図、第4図
に示す公開実用新案公報昭58−20681が公知であ
る。すなわち、第3図はクレーン作業時の姿勢を
側面から見た図であり、ブーム4の基端がわ側面
にはウインチ11′が固着され、ブーム4の屈曲
部側面にはアイドラシーブ27が、ブーム4先端
側のアーム6枢着部近傍にはアイドラシーブ23
が、またアーム6の先端がわ側面にはアイドラシ
ーブ24が、それぞれ回転自在に支承されてお
り、ウインチ11′の巻取りドラムからワイヤロ
ープ14は、上記アイドラシーブ27,23,2
4をそれぞれ迂回し、アーム6の先端側より垂下
され、さらにフツク19′を取付けた動滑車2
2′を迂回して先端部はアーム6先端側において、
上記アイドラシーブ24の近傍に結着してある。
そうしてこの油圧掘削機をクレーンとして使用す
るときは、ブーム4およびアーム6を適当な高さ
に保持し、この状態で動滑車22′を降下させて
フツク19′に、吊上げるべき資材等を引掛け、
ウインチ11′でワイヤロープ14を巻上げる。
また、この油圧掘削機で掘削作業をするときに
は、第4図に示すようにフツク19′を有する動
滑車22′をワイヤロープ14より外して、ウイ
ンチ11′によりワイヤロープ14を弛緩しない
程度に緊張させれば、従来の油圧掘削機と同様に
使用することができる。
BACKGROUND ART As a method of attaching a hook having a crane function to a conventional hydraulic excavator, there is a known method as disclosed in the published utility model publication No. 58-20681 shown in FIGS. 3 and 4. That is, FIG. 3 is a side view of the posture during crane work, where a winch 11' is fixed to the side surface of the base end of the boom 4, and an idler sheave 27 is attached to the side surface of the bent portion of the boom 4. An idler sheave 23 is installed near the pivot point of the arm 6 on the tip side of the boom 4.
However, an idler sheave 24 is rotatably supported on the side surface of the end of the arm 6, and the wire rope 14 is connected to the idler sheave 27, 23, 2 from the winding drum of the winch 11'.
4, the movable pulley 2 hangs down from the tip side of the arm 6, and is further attached with a hook 19'.
2' and the tip is on the tip side of arm 6,
It is tied near the idler sheave 24.
When this hydraulic excavator is used as a crane, the boom 4 and arm 6 are held at appropriate heights, and in this state, the movable pulley 22' is lowered and the material to be hoisted onto the hook 19'. Hook the
The wire rope 14 is hoisted up by the winch 11'.
When excavating with this hydraulic excavator, the movable pulley 22' having a hook 19' is removed from the wire rope 14 as shown in FIG. It can be used like a conventional hydraulic excavator.

考案が解決しようとする問題点 上述の如き従来のクレーン機能を有する油圧掘
削機をクレーンまたは掘削機として使用するとき
は、その都度アイドラシーブ24の近傍に結着さ
れたワイヤロープ14の先端を取外し動滑車2
2′と共にフツク19′を脱着する必要がある。ま
た、掘削作業時にはアーム6の側面にワイヤロー
プ14が常時張設されているので、これに土砂が
付着する。従つて、掘削作業からクレーン作業に
移行する時には掃除、塗油等を施す必要があり、
また、掘削作業時には取外したフツク19′、動
滑車22′を別途に保管、管理を要する。更にク
レーン作業時に各シーブ、ウインチがブーム4、
アーム6の側面に取付けられているため、つり荷
を吊るとブーム4、アーム6に、ねじりモーメン
トが働き強度上の問題が発生する場合がある。
Problems to be Solved by the Invention When using a conventional hydraulic excavator with a crane function as described above as a crane or an excavator, the tip of the wire rope 14 tied near the idler sheave 24 must be removed each time. Moving pulley 2
It is necessary to attach and detach the hook 19' together with the hook 2'. Furthermore, since the wire rope 14 is always stretched on the side surface of the arm 6 during excavation work, earth and sand adhere to it. Therefore, when transitioning from excavation work to crane work, it is necessary to perform cleaning, oiling, etc.
Further, during excavation work, the detached hook 19' and movable pulley 22' must be stored and managed separately. Furthermore, during crane work, each sheave and winch are connected to boom 4,
Since it is attached to the side of the arm 6, when a load is hung, a torsional moment is applied to the boom 4 and the arm 6, which may cause strength problems.

課題を解決するための手段 上記の課題を解決するために講じた本考案の手
段は、 イ ブーム4の基端部付近の下面側にはウインチ
11を、また中間の屈曲部付近およびブーム4
とアーム6の枢着部付近には、それぞれアイド
ラシーブ20,20をピン17,17で、枢支
するシーブブロツク15,15′をまたそのシ
ーブブラケツト15,15′の中間にはシヤツ
クル21を係着するブラケツト26を固設し、
更にアーム6下面の先端付近には、ブラケツト
16を設け、そのブラケツト16にはシーブブ
ロツク18を上記アイドラシーブ20を取付け
る空間を有し、かつアイドラシーブ20を枢支
するピン17と同径のピンで係着するブラケツ
トを固設し、上記アイドラシーブ20,20に
よつて上記ウインチ11よりブーム4およびア
ーム6に沿つて繰出したワイヤロープ14を案
内させると共にアーム6先端側ブラケツト16
に係着したシーブブロツク18とフツク19お
よび動滑車22からなるフツクブロツク25と
の間を往復させるようにし、 ロ 油圧掘削機が掘削作業を行うときアーム6先
端部のブラケツト16に取付けたシーブブロツ
ク18をシーブブラケツト15′に取付替えす
るとともに、フツクブロツク25のフツク19
を上記シヤツクル21に引掛けて収納するよう
に構成した。
Means for Solving the Problems The means of the present invention taken to solve the above problems are as follows: (a) A winch 11 is installed on the bottom side near the base end of the boom 4, and a winch 11 is installed near the intermediate bending part and the boom 4
Near the pivot point of the arm 6, the idler sheaves 20, 20 are supported by pins 17, 17, respectively, and the sheave blocks 15, 15' are pivotally supported, and the shaft 21 is engaged between the sheave brackets 15, 15'. Fix the bracket 26 to be worn,
Further, a bracket 16 is provided near the tip of the lower surface of the arm 6, and the bracket 16 has a space for attaching the sheave block 18 and the idler sheave 20, and a pin having the same diameter as the pin 17 for pivotally supporting the idler sheave 20. The wire rope 14 let out from the winch 11 along the boom 4 and the arm 6 is guided by the idler sheave 20, 20, and the bracket 16 on the tip side of the arm 6 is fixedly installed.
When the hydraulic excavator performs excavation work, the sheave block 18 attached to the bracket 16 at the tip of the arm 6 is moved back and forth between the sheave block 18 attached to the sheave block 18 and the hook block 25 consisting of the hook 19 and the movable pulley 22. At the same time, replace the hook 19 of the hook block 25 with the sheave bracket 15'.
is configured to be hooked onto the shackle 21 and stored.

作 用 クレーン作業姿勢から、掘削作業姿勢に移行さ
せるには、アーム下面の先端部付近に設けたシー
ブブロツクをブラケツトに枢支するピンを抜きと
り、ブーム下面の先端部付近のアイドラシーブ枢
支用のブラケツトに、上記シーブブロツクをアイ
ドラシーブと取替えて取付け、フツクブロツクの
フツクはブーム下面の中間部のシヤツクルに掛
け、ウインチにより、ワイヤロープが弛緩しない
程度にワイヤロープを巻取る。この姿勢で掘削作
業をすると、アームにはクレーン作業姿勢時にシ
ーブブロツクを枢支するブラケツトが下面の先端
部付近にある以外クレーン装置を構成する部品
は、すべてブームに定着されるので掘削作業の障
害とならない。
Operation To shift from the crane working position to the excavating working position, remove the pin that pivots the sheave block provided near the tip of the bottom of the arm to the bracket, and remove the pin that pivots the sheave block near the tip of the bottom of the boom. Attach the above sheave block to the bracket in place of the idler sheave, hook the hook of the hook block to the shackle at the middle of the lower surface of the boom, and wind up the wire rope using a winch to the extent that the wire rope does not loosen. When excavating in this position, all the parts that make up the crane device are fixed to the boom, except for the bracket near the tip of the lower surface of the arm that pivots the sheave block when the crane is in the crane working position, so there are no obstacles to the excavating work. Not.

実施例 以下この考案の実施例を図にもとづいて詳述す
る。第1図において1は旋回体で履帯2を具えた
走行体3上に旋回自在に設けられており、この旋
回体1の前部には、ほぼへ字形をなすブーム4の
基端部が枢着されている。上記、ブーム4の屈曲
部と旋回体1の間にはブームシリンダ5が設けら
れて、このブームシリンダ5によりブーム4の先
端部が上下方向に回動自在となつていると共に、
ブーム4の先端部にはアーム6の基端部が枢着さ
れている。アーム6の基端側と上記ブーム4の間
にはアーム6の先端側を前後方向に回動させるア
ームシリンダ7が設けられていると共に、アーム
6の先端にはバケツト8が取付けられている。上
記バケツト8は基端部が上記アーム6に枢着さ
れ、アイドラリンク、プツシユロツド等から構成
されるリンク装置10を介して連結されたバケツ
トシリンダ9の伸縮により回動自在となつてい
る。一方、上記ブーム4の基端側下面にはウイン
チ11が固着されている。ウインチ11は油圧モ
ータ12等の動力により正逆転されるドラム13
を有しており、このドラム13にワイヤロープ1
4の一端が巻込まれる。ウインチ11のドラム1
3より繰出されたワイヤロープ14は、上記ブー
ム4の屈曲部下面に固設されたシーブブラケツト
15上で回転自在にピン17で支承されたアイド
ラシーブ20、ブーム先端側のアーム6枢着部付
近の下面に固設されたシーブブラケツト15′上
で回転自在にピン17で支承されたアイドラシー
ブ20を経て、アーム6の先端側下面に固着した
シーブブラケツト15′と内側寸法、ピン挿入穴
径の等しいブラケツト16にピン17で回動自在
に懸吊したシーブブロツク18に導かれ、該シー
ブブロツク18内のシーブとフツク19を有する
フツクブロツク25の動滑車22との間を往復さ
せ複数本吊りの滑車方式を形成させ、その端末は
シーブブロツク18(偶数本吊りの時)に、また
は、フツクブロツク25(奇数本吊りの時)に結
着されている。更にシーブブラケツト15および
15′の中間でブーム4の下面にはブラケツト2
6を固設し、該ブラケツト26の貫通穴にはシヤ
ツクル21を係合してある。本考案は以上詳述し
たような構造となつているので、バケツト8によ
る掘削作業を開始するに当つては、第2図に示す
如く、ブラケツト16にシーブブロツク18を枢
支しているピン17および、シーブブラケツト1
5′にシーブ20を枢支しているピン17を抜き、
シーブブロツク18をシーブブラケツト15′に
ピン17で取付けると共に、フツク19をブラケ
ツト26に取付けたシヤツクル21に引掛け、ウ
インチ11を作動せしめてワイヤロープ14が弛
緩しない程度にドラム13に巻込むと、シーブブ
ロツク18、フツクブロツク25は共にブーム4
の下面の定位置に収納される。なお、取外したシ
ーブブラケツト15′上のアイドラシーブ20は
掘削機本体内などに別途保管するか、またはブラ
ケツト16にピン17により係止してもよいよう
に、シーブブラケツト15′、ブラケツト16の
内側寸法およびピン17,17の挿入穴径は前述
の通り同一となつているので好都合である。
Embodiments Hereinafter, embodiments of this invention will be described in detail based on the drawings. In FIG. 1, reference numeral 1 denotes a revolving body which is rotatably mounted on a traveling body 3 having crawler tracks 2. At the front of the revolving body 1, a base end portion of a boom 4, which is substantially in the shape of an angle, is pivoted. It is worn. A boom cylinder 5 is provided between the bending part of the boom 4 and the revolving structure 1, and the boom cylinder 5 allows the tip of the boom 4 to freely rotate in the vertical direction.
A proximal end of an arm 6 is pivotally attached to the distal end of the boom 4. An arm cylinder 7 is provided between the proximal end of the arm 6 and the boom 4 for rotating the distal end of the arm 6 in the front-rear direction, and a bucket belt 8 is attached to the distal end of the arm 6. The base end of the bucket 8 is pivotally connected to the arm 6, and is rotatable by the expansion and contraction of a bucket cylinder 9 connected via a link device 10 consisting of an idler link, a push rod, and the like. On the other hand, a winch 11 is fixed to the bottom surface of the boom 4 on the base end side. The winch 11 has a drum 13 that is rotated forward and backward by the power of a hydraulic motor 12 or the like.
A wire rope 1 is attached to this drum 13.
One end of 4 is rolled up. winch 11 drum 1
The wire rope 14 let out from the boom 4 is attached to an idler sheave 20 rotatably supported by a pin 17 on a sheave bracket 15 fixed to the bent lower surface of the boom 4, and near the pivot point of the arm 6 on the tip side of the boom. The idler sheave 20 is rotatably supported by a pin 17 on a sheave bracket 15' fixed to the lower surface, and then the sheave bracket 15' fixed to the lower surface of the distal end side of the arm 6 is connected to the inner dimension and pin insertion hole diameter. It is guided by a sheave block 18 rotatably suspended from an equal bracket 16 by a pin 17, and is reciprocated between the sheave in the sheave block 18 and the moving pulley 22 of a hook block 25 having a hook 19. The end of the sheave block is tied to the sheave block 18 (when an even number is hung) or to the hook block 25 (when an odd number is hung). Furthermore, a bracket 2 is attached to the bottom surface of the boom 4 between the sheave brackets 15 and 15'.
6 is fixedly installed, and a shackle 21 is engaged with the through hole of the bracket 26. Since the present invention has the structure as described in detail above, when starting excavation work using the bucket belt 8, as shown in FIG. and sheave bracket 1
Remove the pin 17 that pivotally supports the sheave 20 at 5',
The sheave block 18 is attached to the sheave bracket 15' with the pin 17, the hook 19 is hooked to the shackle 21 attached to the bracket 26, and the winch 11 is activated to wind the wire rope 14 around the drum 13 to the extent that it does not loosen. Sheave block 18 and hook block 25 are both connected to boom 4.
It is stored in a fixed position on the underside of the The idler sheave 20 on the sheave bracket 15' that has been removed can be stored separately inside the excavator main body, or it can be locked to the bracket 16 with a pin 17, so that it can be stored inside the sheave bracket 15' and the bracket 16. This is convenient because the dimensions and the diameters of the insertion holes for the pins 17, 17 are the same as described above.

また、掘削作業の姿勢から、クレーン作業の姿
勢、すなわち、第2図から第1図の姿勢に移行す
るには、上記とほぼ逆の手順でブラケツト16に
シーブブロツク18を、アイドラシーブ20をシ
ーブブラケツト15′にそれぞれピン17,17
で枢支すればよい。
In addition, in order to shift from the excavation work position to the crane work position, that is, from the position shown in Fig. 2 to the position shown in Fig. 1, the sheave block 18 is attached to the bracket 16, and the idler sheave 20 is attached to the sheave in almost the reverse procedure to the above. Pins 17 and 17 on bracket 15', respectively.
All you have to do is support it.

考案の効果 本案によれば、従来の如くワイヤロープからフ
ツク、動滑車を脱着することもなく、ブラケツ
ト、シーブブラケツトのピンの差し替えのみで、
クレーン、掘削作業の交互使用が容易にでき、フ
ツクブロツクの保管、紛失等の心配もなく、掘削
作業中は収納したフツクブロツク、シーブブロツ
クは全く邪魔にならず、ワイヤロープはアームか
ら取除かれるので土砂、水により汚損されること
もない。また、荷重のかかるブラケツト、ウイン
チ類はブーム、アームの下面中心線上に位置して
いるのでブームやアームにねじりモーメントが働
かないため強度上有利である。
Effects of the invention According to this invention, there is no need to attach or detach the hook or movable pulley from the wire rope as in the past, and only the pins of the bracket and sheave bracket can be replaced.
The crane and the sheave block can be easily used alternately for excavation work, and there is no need to worry about storing or losing the hook block.During excavation work, the stored hook block and sheave block do not get in the way at all, and the wire rope is removed from the arm, so there is no need to worry about storing or losing the hook block. , and will not be contaminated by water. In addition, since the brackets and winches that carry loads are located on the center line of the bottom surface of the boom and arm, no torsional moment is applied to the boom or arm, which is advantageous in terms of strength.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本考案掘削機でのクレーン作業時の姿
勢を示す側面図、第2図は本考案掘削機での掘削
作業時の姿勢を示す側面図、第3図は従来実施例
におけるクレーン作業時の姿勢を示す側面図、第
4図は従来実施例における掘削作業時の姿勢を示
す側面図である。 1……旋回体、3……走行体、11′,11′…
…ウインチ、15′,15′……シーブブラケツ
ト、16……ブラケツト、18……シーブブロツ
ク、20……アイドラシーブ、21……シヤツク
ル、25……フツクブロツク。
Fig. 1 is a side view showing the posture of the excavator of the present invention during crane work, Fig. 2 is a side view showing the posture of the excavator of the present invention during excavation work, and Fig. 3 is the crane work of the conventional example. FIG. 4 is a side view showing the posture during excavation work in the conventional embodiment. 1... Revolving body, 3... Traveling body, 11', 11'...
...Winch, 15', 15'... Sheave bracket, 16... Bracket, 18... Sheave block, 20... Idler sheave, 21... Shackle, 25... Hook block.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 走行体の上部に旋回体を旋回可能に設け、その
旋回体のフロント部にブーム、アーム、バケツト
を順次前後方向に回動可能に連結し、上記ブーム
の基端部付近にウインチを設け、また上記アーム
の先端部にシーブブロツクを取付け、そのシーブ
ブロツク、及びフツクブロツク内の動滑車にウイ
ンチからのワイヤロープを巻掛け、ウインチ操作
によりフツクブロツクの巻上げを行うようにした
油圧掘削機であつて、ブーム4の基端部付近の下
面側にはウインチ11を、また中間の屈曲部付近
およびブーム4とアーム6の枢着部付近には、そ
れぞれアイドラシーブ20,20をピン17,1
7で、枢支するシーブブラケツト15,15′を
またそのシーブブラケツト15,15′の中間に
はシヤツクル21を係着するブラケツト26を固
設し、更にアーム6下面の先端付近には、ブラケ
ツト16を設け、そのブラケツト16にはシーブ
ブロツク18を上記アイドラシーブ20を取付け
る空間を有し、かつアイドラシーブ20を枢支す
るピン17と同径のピンで係着するブラケツトを
固設し、上記アイドラシーブ20,20によつて
上記ウインチ11よりブーム4およびアーム6に
沿つて繰出したワイヤロープ14を案内させると
共にアーム6先端側ブラケツト16に係着したシ
ーブブロツク18とフツク19及び動滑車22か
らなるフツクブロツク25との間を往復させるよ
うにし、油圧掘削機が掘削作業を行うときアーム
6先端部のブラケツト16に取付けたシーブブロ
ツク18をシーブブラケツト15′に取付替えす
るとともに、フツクブロツク25のフツク19を
上記シヤツクル21に引掛けて収納するように構
成したことを特徴とするクレーン機能を有する油
圧掘削機。
A revolving body is rotatably provided on the upper part of the traveling body, a boom, an arm, and a bucket are connected to the front part of the revolving body so as to be rotatable in the front and rear directions in sequence, a winch is provided near the base end of the boom, and A hydraulic excavator is equipped with a sheave block attached to the tip of the arm, a wire rope from a winch is wound around the sheave block and a movable pulley in the hook block, and the hook block is hoisted by winch operation. A winch 11 is attached to the lower surface near the base end of the boom 4, and idler sheaves 20 are attached to the pins 17 and 1 near the intermediate bending portion and near the pivot point between the boom 4 and the arm 6, respectively.
At 7, the sheave brackets 15, 15' for pivotal support are fixed, and a bracket 26 for securing the shackle 21 is fixed between the sheave brackets 15, 15'. A bracket 16 has a space for attaching the idler sheave 20 to the sheave block 18, and a bracket is fixed to the idler sheave 20 with a pin having the same diameter as the pin 17 that pivotally supports the idler sheave 20. It guides the wire rope 14 let out from the winch 11 along the boom 4 and the arm 6 by sheaves 20, 20, and is made up of a sheave block 18, a hook 19, and a movable pulley 22, which are attached to the bracket 16 on the front end side of the arm 6. When the hydraulic excavator performs excavation work, the sheave block 18 attached to the bracket 16 at the tip of the arm 6 is replaced with the sheave bracket 15', and the hook 19 of the hook block 25 is moved back and forth between the sheave block 25 and the hook block 25. A hydraulic excavator having a crane function, characterized in that it is configured to be hooked onto the shaft 21 and stored.
JP1986112623U 1986-07-21 1986-07-21 Expired JPH0355596Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1986112623U JPH0355596Y2 (en) 1986-07-21 1986-07-21

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1986112623U JPH0355596Y2 (en) 1986-07-21 1986-07-21

Publications (2)

Publication Number Publication Date
JPS6318559U JPS6318559U (en) 1988-02-06
JPH0355596Y2 true JPH0355596Y2 (en) 1991-12-11

Family

ID=30993671

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1986112623U Expired JPH0355596Y2 (en) 1986-07-21 1986-07-21

Country Status (1)

Country Link
JP (1) JPH0355596Y2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4816621B2 (en) * 2007-11-12 2011-11-16 コベルコ建機株式会社 Work machine

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5811826Y2 (en) * 1979-09-05 1983-03-05 株式会社小松製作所 Simple crane device
JPS5733192A (en) * 1980-08-06 1982-02-23 Oyodo Diesel Kk Winch device for power shovel

Also Published As

Publication number Publication date
JPS6318559U (en) 1988-02-06

Similar Documents

Publication Publication Date Title
JPH046640B2 (en)
JPS5821046B2 (en) Attachment type crane device
JP2824032B2 (en) Boom head attachment / detachment device
JPS5820681Y2 (en) Rotating excavator with crane function
JP3537233B2 (en) Apparatus and method for exchanging wire rope during jib overhang and storage
JP2017154838A (en) crane
JP6561574B2 (en) Mobile crane and method for raising or lowering an attachment in a mobile crane
JPH0553900B2 (en)
JP2019163645A (en) Shovel with hook
JPH11100191A (en) Jack-up device of construction machine and turning method for jack-up cylinder
JP2002371592A (en) Hanging wire connecting device for construction machinery
JPH0470452B2 (en)
JPS6318559U (en)
JPH0419085Y2 (en)
JPH10306675A (en) Leader attachment for civil engineering and construction machine
JPH0995964A (en) Working machine on surface of slope and the like
JP2516881Y2 (en) Mobile crane
JPH05105394A (en) Auxiliary jib device for crane
JP2003012268A (en) Swivel bucket
JP2003090191A (en) Earth drill
SU608885A2 (en) Single-bucket excavator working equipment
JP2004331313A (en) Winch attachment for shovel machine
JPH0333786Y2 (en)
JPS63130830A (en) Hydraulic shovel with crane device
JPH11311085A (en) Caisson type pile excavator