JPH036723B2 JP14337985A JP14337985A JPH036723B2 JP H036723 B2 JPH036723 B2 JP H036723B2 JP 14337985 A JP14337985 A JP 14337985A JP 14337985 A JP14337985 A JP 14337985A JP H036723 B2 JPH036723 B2 JP H036723B2
Authority
JP
Japan
Prior art keywords
side wall
existing
space
extension
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP14337985A
Other languages
Japanese (ja)
Other versions
JPS627314A (en
Inventor
Nobuaki Hashimoto
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BONDO KENSETSU KK
Original Assignee
BONDO KENSETSU KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BONDO KENSETSU KK filed Critical BONDO KENSETSU KK
Priority to JP60143379A priority Critical patent/JPS627314A/en
Publication of JPS627314A publication Critical patent/JPS627314A/en
Publication of JPH036723B2 publication Critical patent/JPH036723B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Electric Cable Installation (AREA)
  • Laying Of Electric Cables Or Lines Outside (AREA)

Description

【発明の詳細な説明】 [産業上の利用分野] 本発明は地中に埋設された電力ケーブル用管路
の増設工法に関するものである。
DETAILED DESCRIPTION OF THE INVENTION [Industrial Field of Application] The present invention relates to a method for expanding a power cable conduit buried underground.

[従来の技術] 従来から電力ケーブル用管路は一般道路を利用
して設けられ、しかも都市部では交通頻繁な道路
に集中して埋設されている。そして、電力需要の
増大に伴ない増設する場合には交通を規制したり
遮断し、かつ工事を分割したりして短期間に行な
うようにしている。しかるに従来工法は第2図に
示すように断面方形状の既設管路1の幅W1と、
増設管路11の幅W2と、さらに矢板の打込み等
の作業用スペースW3,W3′を見込んだ幅にて
路面Rを既設管路1の全体が露出する深さまで掘
削し、作業用スペースW3,W3′の両側に矢板
の打込み等により土畄めを行なつた状態で、露出
させた既設管路1に隣接して増設管8,8,8を
配置し、ついでこれらの既設管路1及び各増設管
8をすべて包囲するように鉄筋群13を多数配置
して、これらの既設管路1、各増設管8及び鉄筋
群13をすべて包囲するようにコンクリート被覆
層14を打設することにより増設管路11を形成
するようにしている。
[Prior Art] Conventionally, power cable conduits have been installed using general roads, and moreover, in urban areas, they are buried mainly on roads with frequent traffic. When expanding the number of facilities due to an increase in power demand, traffic is restricted or blocked, and the construction work is divided into sections to complete the work in a short period of time. However, in the conventional construction method, as shown in Fig. 2, the width W1 of the existing pipe 1 having a rectangular cross section,
The road surface R is excavated to a depth that the entire existing pipeline 1 is exposed, taking into account the width W2 of the expansion pipeline 11 and the working spaces W3, W3' for driving sheet piles, etc., and the working spaces W3, W3' are excavated. With soil piling done by driving sheet piles etc. on both sides of W3', extension pipes 8, 8, 8 are placed adjacent to the exposed existing pipe 1, and then these existing pipes 1 and By arranging a large number of reinforcing bars 13 so as to completely surround each extension pipe 8, and placing a concrete covering layer 14 so as to surround all of these existing pipes 1, each extension pipe 8, and reinforcing bars 13. He is trying to form the extension pipe line 11.

このような従来工法は、例えば路面に設けられ
たマンホールの間を単位としたり、さらにはこの
間を適宜分割して、第2図に示するうに(W1+
W2+W3+W3′)×Dなる断面で掘削する必要が
あるために、多量の土砂を排出して工期を長びか
せ、かつ排出した土砂の運搬、さらには工事後の
埋戻しといつたように膨大な関連作業を必要とす
るばかりか、頻繁な交通量の道路の使用を長期間
防げて社会問題ともなるものであつた。
In this conventional construction method, for example, the space between manholes installed on the road surface is used as a unit, and furthermore, this space is divided as appropriate, as shown in Figure 2 (W1+
Since it is necessary to excavate with a cross section of W2 + W3 + W3') x D, a large amount of earth and sand is ejected, prolonging the construction period. Not only did it require related work, but it also posed a social problem by preventing heavy traffic from using the road for a long period of time.

[発明の目的] 本発明はこのような従来の問題を解決して、掘
削面積を最少にし、さらには管路を抱埋する鉄筋
群の配置やコンクリート被覆層の打設を不要にで
きて、工期を短縮すると共に道路専有面積を著し
く減少して交通障害を最小になし得る工法を提案
することを目的とするものである。
[Object of the Invention] The present invention solves these conventional problems, minimizes the excavation area, and further eliminates the need for arranging reinforcing bars to bury the pipes and placing a concrete covering layer. The purpose of this project is to propose a construction method that can shorten the construction period, significantly reduce the area occupied by the road, and minimize traffic disturbances.

[発明の構成] 地中に埋設された既設管路の一側面に接して管
路を増設すべきスペース並びに該増設スペースに
対向する既設管路の側壁を露出させ、さらに該側
壁に連なる天面の一部を露出させるように掘削
し、前記増設スペースの外側面に土畄めを施こす
と共に該増設スペースに対向する既設管路の側壁
全面を洗浄した後、該増設スペースには底面に鉄
筋を配してその上方に増設管を配置し、洗浄した
前記側壁全面に接着剤を塗布してその直後に増設
スペースにコンクリートを打設して増設管路を形
成するものである。
[Structure of the Invention] A space in which a conduit is to be expanded in contact with one side of an existing conduit buried underground, a side wall of the existing conduit facing the expansion space is exposed, and a top surface connected to the side wall is provided. After excavating to expose a part of the expansion space and installing earthen pilings on the outer surface of the expansion space and cleaning the entire side wall of the existing pipeline facing the expansion space, reinforcing bars were installed on the bottom of the expansion space. An extension pipe is placed above the pipe, an adhesive is applied to the entire surface of the cleaned side wall, and immediately after that, concrete is poured into the extension space to form an extension pipe.

[作用] 既設管路の側壁を洗浄してその全面に接着剤を
塗布し、その直後にコンクリートを打込んで増設
管路を形成することで該増設管路を既設管路に接
着固定させることができ、従来工程の如くに既設
管路並びに増設管路をコンクリート被覆層で包埋
する必要をなくする。一方、このように既設管路
並びに増設管路をコンクリート被覆層で包埋する
ことを必要としないことで地中の掘削量、埋戻し
量を著るしく減少し、工期の短縮をなし得る。
[Operation] The side wall of the existing pipe is cleaned and an adhesive is applied to the entire surface thereof, and immediately after that, concrete is poured to form the extension pipe, thereby adhesively fixing the extension pipe to the existing pipe. This eliminates the need to embed existing pipes and additional pipes with a concrete covering layer as in conventional processes. On the other hand, since it is not necessary to bury the existing pipes and the additional pipes with a concrete covering layer, the amount of underground excavation and backfilling can be significantly reduced, and the construction period can be shortened.

[実施例] 第1図において1は路面Rの所要深さ位置に埋
設されて、夫々電力ケーブルを挿通させる管2を
六本を一括した状態でコンクリート3で固定させ
た既設管路であり、コンクリート3は断面方形状
に固化させ、その下面に基礎4が打込まれてい
る。このようにして路面R下で地中Eに埋設され
ている既設管路1はコンクリート3の一方側壁5
とこの側壁5に連なる天面6の一部(第1図では
該天面6の幅D1の約1/2)が露出するように掘
削し、同時に前記側壁5に対向して増設管路11
を設ける幅W2と作業用スペースW3とを合計し
た幅を掘削する。そして、作業用スペースW3に
土畄めを施こし、既設管路1の前記側壁5の全面
を高圧洗浄水で洗浄して清浄にし、増設管路11
を設ける底面に鉄筋7を並べ、該鉄筋7より上方
へ電力ケーブルを挿通させる増設管8,8,8を
配置する。一方、前記のように清浄した既設管路
1の側壁5の全面にエポキシ樹脂系接着剤9を塗
布し、その直後にコンクリート10を打込んで鉄
筋7及び各増設管8を埋入させて増設管路11を
完成させる。
[Example] In Fig. 1, reference numeral 1 indicates an existing pipe line in which six pipes 2, through which power cables are inserted, are fixed with concrete 3, which are buried at a required depth in the road surface R. The concrete 3 is solidified to have a rectangular cross section, and a foundation 4 is poured into the lower surface of the solidified concrete. In this way, the existing pipe 1 buried in the ground E under the road surface R is connected to one side wall 5 of the concrete 3.
Excavating is done so that a part of the top surface 6 connected to the side wall 5 (approximately 1/2 of the width D1 of the top surface 6 in FIG.
The total width of the width W2 and the work space W3 is excavated. Then, the work space W3 is paved with earth, the entire surface of the side wall 5 of the existing pipe line 1 is cleaned with high-pressure washing water, and the expanded pipe line 11 is cleaned.
Reinforcing bars 7 are arranged on the bottom surface where the reinforcing bars 7 are provided, and extension pipes 8, 8, 8 are arranged above the reinforcing bars 7 through which the power cables are inserted. On the other hand, epoxy resin adhesive 9 is applied to the entire surface of the side wall 5 of the existing pipe line 1 that has been cleaned as described above, and immediately after that, concrete 10 is poured and reinforcing bars 7 and each extension pipe 8 are embedded in the extension pipe. Complete the conduit 11.

このようにして形成された増設管路11はその
一方側壁12がエポキシ樹脂系接着剤9により既
設管路1の側壁5に一体的に接合され、かつ強固
に連結されるために、第2図に示す従来工法のよ
うに既設管路1並びに増設管路11を鉄筋群13
及びコンクリート被覆層14で包埋する必要がな
いために、鉄筋やコンクリートの使用量を著るし
く減少することができ、また、施工のための作業
を減少して工期を短縮することができる。
The extension pipe line 11 formed in this way has one side wall 12 integrally joined to the side wall 5 of the existing pipe line 1 with an epoxy resin adhesive 9, and is firmly connected to the side wall 12 as shown in FIG. As shown in the conventional construction method, the existing pipeline 1 and the additional pipeline 11 are reinforced with reinforcing bars 13.
Since there is no need to embed it in the concrete covering layer 14, the amount of reinforcing bars and concrete used can be significantly reduced, and the construction work can be reduced to shorten the construction period.

さらに、本発明の工法は地中の掘削量を大量に
減少することができると共に、掘削した土砂の運
搬や埋戻しの作業等をすべて減少し、通路専有面
積の交通規制を最小限に緩和したり、短縮するこ
とができる。
Furthermore, the construction method of the present invention can greatly reduce the amount of underground excavation, reduce all the work of transporting and backfilling the excavated earth, and minimize traffic restrictions on the exclusive area of the passage. It can be shortened or shortened.

[発明の効果] 以上に述べたように本発明の電力ケーブル用地
中埋設管路の増設工法は、既設管路の側壁を洗浄
して清浄にし、この側壁に接着剤を塗布し、この
接着剤で増設管路の側壁を固設させ、既設管路と
増設管路とを一体に接合するものであり、従来工
法のように既設管路と増設管路との周囲に鉄筋群
を配したり、コンクリート被覆層を設けたりする
必要はなく、さらにこのようなコンクリート被覆
層を設けることが必要でないことで地中の掘削も
少なくて済み、工事量や使用材料が減少でき、ま
た工期も短縮できると共にさらには道路専有面積
が少なくすみ交通規制を著るしく軽減することが
できるといつたように多くの利点がある。
[Effects of the Invention] As described above, the method for expanding underground conduits for power cables of the present invention involves cleaning and cleaning the side wall of the existing conduit, applying an adhesive to the side wall, and applying the adhesive to the side wall of the existing conduit. This method involves fixing the side walls of the expansion pipeline and joining the existing pipeline and expansion pipeline together, and unlike conventional construction methods, reinforcing bars are placed around the existing pipeline and expansion pipeline. , there is no need to provide a concrete covering layer, and since it is not necessary to provide such a concrete covering layer, there is less underground excavation, reducing the amount of construction work and materials used, and shortening the construction period. Additionally, there are many advantages, such as the fact that the area occupied by the road is reduced and traffic regulations can be significantly reduced.

【図面の簡単な説明】[Brief explanation of the drawing]

図は本発明に係わるもので第1図は断面図、第
2図は従来工法を示す断面図である。 1……既設管路、5……側壁、6……天面、7
……鉄筋、8……増設管、9……接着剤、10…
…コンクリート、11……増設管路。
The figures relate to the present invention; FIG. 1 is a sectional view, and FIG. 2 is a sectional view showing a conventional construction method. 1...Existing pipe, 5...Side wall, 6...Top surface, 7
...Reinforcing bar, 8...Extension pipe, 9...Adhesive, 10...
...Concrete, 11...Expansion pipe.

Claims (1)

【特許請求の範囲】[Claims] 1 地中に埋設された既設管路の一側面に接して
管路を増設すべきスペース並びに該増設スペース
に対向する既設管路の側壁を露出させ、さらに該
側壁に連なる天面の一部を露出させるように掘削
し、前記増設スペースの外側面に土畄めを施こす
と共に該増設スペースに対向する既設管路の側壁
全面を洗浄した後、該増設スペースには底面に鉄
筋を配設してその上方に増設管を配置し、洗浄し
た前記側壁全面に接着剤を塗布してその直後に増
設スペースにコンクリートを打設して増設管路を
形成することを特徴とする電力ケーブル用地中埋
設管路の増設工法。
1. Expose the space where a conduit is to be expanded in contact with one side of the existing conduit buried underground, as well as the side wall of the existing conduit that faces the expansion space, and further expose a part of the top surface that connects to the side wall. After excavating the area to expose it and applying earthen pilings to the outer surface of the expansion space and cleaning the entire side wall of the existing pipeline facing the expansion space, reinforcing bars were installed on the bottom of the expansion space. Underground installation for power cables, characterized in that an extension pipe is placed above the cleaned side wall, an adhesive is applied to the entire surface of the cleaned side wall, and immediately after that, concrete is poured in the extension space to form an extension pipe. Pipe extension construction method.
JP60143379A 1985-06-28 1985-06-28 Extension of underground buried pipeline for power cable Granted JPS627314A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP60143379A JPS627314A (en) 1985-06-28 1985-06-28 Extension of underground buried pipeline for power cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP60143379A JPS627314A (en) 1985-06-28 1985-06-28 Extension of underground buried pipeline for power cable

Publications (2)

Publication Number Publication Date
JPS627314A JPS627314A (en) 1987-01-14
JPH036723B2 true JPH036723B2 (en) 1991-01-30

Family

ID=15337405

Family Applications (1)

Application Number Title Priority Date Filing Date
JP60143379A Granted JPS627314A (en) 1985-06-28 1985-06-28 Extension of underground buried pipeline for power cable

Country Status (1)

Country Link
JP (1) JPS627314A (en)

Also Published As

Publication number Publication date
JPS627314A (en) 1987-01-14

Similar Documents

Publication Publication Date Title
US5836115A (en) Foundation waterproofing and drainage system
JP7540678B1 (en) System and method for backfilling narrow excess trenches in a mine with liquefied hardened soil
KR20190079588A (en) Construction Method of Duplex Tunnel
KR20210078779A (en) Underground roadway removed upper structure between upper slab and surface of road after constructing the steel continuous wall in the earth by top-down method and method for constructing the same
CN109763518A (en) A kind of construction method of basement post-pouring zone
CN207512777U (en) Assembled underground pipe gallery
CN210380191U (en) Lightweight power communication combination prefabricated cable channel
KR100455247B1 (en) Cast-in-site diaphragms wall and the method with benoto method and grouting method of high pressure
KR100432782B1 (en) Supporting structure for tunnel and underground tunnel construction method using the same
KR20210055980A (en) Underground roadway by top-down method using steel continuous wall in the earth without traffic control and temporary road and method for constructing the same
JP3194192B2 (en) Open shield method
CN215630142U (en) Modular combined prefabricated electric working well
JPS627314A (en) Extension of underground buried pipeline for power cable
KR20040023915A (en) Underaround continued wall structure using a large diameter cast-in-place pile installed by Benoto method and construction method thereof
KR20210055981A (en) Underground roadway using steel continuous wall in the earth with minimum traffic control in constructing by top-down method and method for constructing the same
JPH0415878B2 (en)
CN114718116A (en) Municipal pipe network construction and support integrated structure under unfavorable geological conditions and construction method
KR200247005Y1 (en) Cast-in-site diaphragms wall with benoto method and grouting method of high pressure
JP3352951B2 (en) Installation method of invert and underground drainage in mountain tunnel
KR101352429B1 (en) Water-proofing type temporary soil sheathing construction method using crrugated steel plate segments
KR200279246Y1 (en) Supporting structure for tunnel
JP3615594B2 (en) Piping laying method and piping structure
JP4319122B2 (en) Branch and junction structure of branching tunnel and its construction method
JP3114093B2 (en) Concrete box used for open shield method
JP3473915B2 (en) Small diameter pipe burial method