JPH0368972B2 - - Google Patents

Info

Publication number
JPH0368972B2
JPH0368972B2 JP9751984A JP9751984A JPH0368972B2 JP H0368972 B2 JPH0368972 B2 JP H0368972B2 JP 9751984 A JP9751984 A JP 9751984A JP 9751984 A JP9751984 A JP 9751984A JP H0368972 B2 JPH0368972 B2 JP H0368972B2
Authority
JP
Japan
Prior art keywords
foundation
constructing
constructed
concrete
formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP9751984A
Other languages
Japanese (ja)
Other versions
JPS60242225A (en
Inventor
Yasushi Nakamura
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP9751984A priority Critical patent/JPS60242225A/en
Publication of JPS60242225A publication Critical patent/JPS60242225A/en
Publication of JPH0368972B2 publication Critical patent/JPH0368972B2/ja
Granted legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/36Concrete or concrete-like piles cast in position ; Apparatus for making same making without use of mouldpipes or other moulds

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Foundations (AREA)

Description

【発明の詳細な説明】 この発明は橋台、橋脚等の構造物の基礎の施工
方法に関するものである。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method for constructing foundations for structures such as bridge abutments and piers.

周知のように、河川沿等に構築される高架橋な
どにおいては、慨して地盤が軟弱であるため、地
中に基礎を構築して、その上方にフーチング、脚
柱を形成する。
As is well known, in elevated bridges built along rivers, etc., the ground is generally soft, so a foundation is constructed underground, and footings and pillars are formed above it.

基礎の構築に際して、この部分を予め地表にお
いて形成し、これを沈設する施工方法、いわゆる
ケーソン工法が従来は採用されていた。
When constructing a foundation, a construction method, the so-called caisson construction method, was conventionally employed in which this part was formed on the ground surface in advance and then submerged.

しかし、このケーソン工法は、良く知られてい
るように、高圧下での危険な作業を伴い、また、
作業能率が極めて悪いという問題があつた。
However, as is well known, this caisson construction method involves dangerous work under high pressure, and
There was a problem with extremely poor work efficiency.

このため、本出願人はケーソン工法によらない
で基礎部分を安全且つ効率よく構築できる方法を
開発し特開昭56−163323号公報で開示している。
For this reason, the present applicant has developed a method for constructing a foundation safely and efficiently without using the caisson construction method, and has disclosed it in Japanese Patent Application Laid-Open No. 163323/1983.

この方法では連続地中壁工法で構造物の基礎を
構築するため、上記効果に加え、低騒音、低振
動、どんな地質にも適用できるなどの施工上の特
徴とともに、場所打ち杭と同じように構築される
ため、地盤との摩擦力が大きく、且つ水平および
鉛直方向の耐力も大きくできるなどの各種の優れ
た特徴を有している。
In this method, the foundation of the structure is constructed using a continuous underground wall construction method, so in addition to the above effects, it also has construction features such as low noise, low vibration, and can be applied to any geology, and is similar to cast-in-place piles. Because it is constructed as a structure, it has various excellent features such as high frictional force with the ground and high horizontal and vertical strength.

しかしながら、この工法による基礎の構築は、
比較的大規模な橋梁などではその特質が有効に発
揮されるが、小規模な場合には以下のような問題
がある。すなわち、小規模な橋梁では当然のこと
ながら基礎の平面寸法も、例えば一辺が4〜5m
と小さくなる。
However, the construction of the foundation using this construction method is
This feature is effectively demonstrated in relatively large-scale bridges, but in small-scale construction, the following problems arise. In other words, for small-scale bridges, the planar dimensions of the foundation are, for example, 4 to 5 meters on each side.
becomes smaller.

このため、基礎に要求される地盤との摩擦力
も、それほど大きく確保する必要性がないため、
上述した工法でこれを構築すると工期・工費も嵩
むため実現的でない。
For this reason, there is no need to ensure that the frictional force with the ground that is required for the foundation is so large.
Constructing this using the construction method described above would increase the construction period and cost, making it impractical.

そこで、基礎の相当部分を地表から全面的に掘
削して場所打ち杭と同じ方法で中実状の基礎を構
築することが考えられるが、この方法では基礎が
中実であるため、基礎として本来必要としない部
分までコンクリートを打設しなければならず、極
めて不経済となる。
Therefore, it is possible to completely excavate a considerable part of the foundation from the ground surface and construct a solid foundation using the same method as cast-in-place piles, but since the foundation is solid with this method, it is necessary to Concrete must be poured to the areas that are not covered, which is extremely uneconomical.

この発明は上述した背景に鑑みてなされたもの
であつて、その目的とするところは、比較的小規
模な橋梁等の基礎を必要な耐力を確保しつつ経済
的に構築できる構造物の基礎の施工方法を提供す
るところにある。
This invention was made in view of the above-mentioned background, and its purpose is to provide foundations for structures such as relatively small-scale bridges that can be constructed economically while ensuring the necessary strength. It provides construction methods.

上記目的を達成するため、この発明は、橋台、
橋脚などの構造物の基礎を地中に構築するに際し
て、地表からこの基礎の形状に合せた縦孔を掘削
し、この後に前記縦孔内に鉄筋篭を建込みコンク
リートを打設して構造物の基礎を構築する方法に
おいて、前記鉄筋篭には予め構築される基礎の外
周面から所定の間隔を置いて密閉された中空部を
形成する型枠が取付けられていることを特徴とす
る。
In order to achieve the above object, the present invention provides bridge abutments,
When constructing the foundation of a structure such as a bridge pier underground, a vertical hole that matches the shape of the foundation is excavated from the ground surface, and then a reinforcing cage is built into the vertical hole and concrete is poured to build the structure. In the method for constructing a foundation, a formwork forming a sealed hollow portion is attached to the reinforcing bar cage in advance at a predetermined distance from the outer peripheral surface of the foundation to be constructed.

以下、この発明の好適な実施例について添附図
面を参照して詳細に説明する。
Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

第1図a〜eおよび第2図a〜eは、この発明
に係る構造物の基礎の施工方法の各施工段階を順
に追つて示したものである。
FIGS. 1 a to 2 e and 2 a to e sequentially show each construction step of the method for constructing the foundation of a structure according to the present invention.

同図に示す方法では、まず、第1図aおよび第
2図aに示すように、基礎構築予定地に作業床1
を設け、所定深度まで土留壁2を形成する。
In the method shown in the figure, first, as shown in Figures 1a and 2a, a work floor is placed at the site where the foundation is to be constructed.
The earth retaining wall 2 is formed to a predetermined depth.

土留壁2は構築すべき基礎の外周を囲むように
して、H形鋼などの補強材3と泥水固化壁4とか
ら形成される。
The earth retaining wall 2 surrounds the outer periphery of the foundation to be constructed and is formed from a reinforcing material 3 such as H-beam steel and a muddy water solidification wall 4.

そして、土留壁2の形成固化が終了すると、第
1図b、第2図bに示すように、土留壁2で囲繞
された部分を掘削機5を用い、且つ安定液6を満
たしながら縦孔7を掘削する。
When the formation and solidification of the earth retaining wall 2 is completed, as shown in FIG. 1b and FIG. Excavate 7.

構築される基礎形状に合致した縦孔7の掘削が
所定の深度まで行なわれると、鉄筋篭8の建込み
をクレーン9等を使用して行なう(第1図c、第
2図c参照)。
When the vertical hole 7 matching the shape of the foundation to be constructed is excavated to a predetermined depth, the reinforcing bar cage 8 is erected using a crane 9 or the like (see FIGS. 1c and 2c).

ここで注目すべきことは、鉄筋篭8には予め構
築される基礎の外周面から所定の間隔を置いて密
閉された中空部を形成する型枠10が取付けられ
ていることである。
What should be noted here is that a formwork 10 is attached to the reinforcing bar cage 8 at a predetermined distance from the outer circumferential surface of the foundation constructed in advance to form a sealed hollow section.

この型枠10は、例えば木、鋼、発泡スチロー
ルなどであつて、基礎の外周面からの間隔は、基
礎の形状、大きさ、フーチングおよび脚柱の重量
などから適宜設定される。
The formwork 10 is made of wood, steel, foamed polystyrene, or the like, and the distance from the outer peripheral surface of the foundation is appropriately set based on the shape and size of the foundation, the footing, the weight of the pillars, and the like.

そして、鉄筋篭8が建込まれると、第1図d、
第2図dに示すように、トレミー管11を用いて
安定液6と置換しながらコンクリート12の打設
が行なわれる。
Then, when the reinforcing bar cage 8 is erected, Fig. 1d,
As shown in FIG. 2d, concrete 12 is poured using a tremie tube 11 while replacing the stabilizing liquid 6.

打設されたコンクリート12が硬化して基礎の
構築が終わると、この基礎上に第1図eおよび第
2図eに示すように、フーチング13および脚柱
14の構築が行なわれる。
When the poured concrete 12 hardens and the construction of the foundation is completed, footings 13 and pedestals 14 are constructed on this foundation as shown in FIGS. 1e and 2e.

さて、上述した如き構成の基礎の施工方法にお
いては、基礎内に型枠10で形成された中空部が
存在するが、この部分は本来基礎としての耐力な
どにさ程の影響を与えない部分である。
Now, in the construction method of the foundation with the above-mentioned structure, there is a hollow part formed by the formwork 10 in the foundation, but this part originally does not have much influence on the strength of the foundation. be.

従つて、型枠10を取付けて基礎を構築して
も、基礎としての耐力が損われることがない。
Therefore, even if the formwork 10 is attached and a foundation is constructed, the strength of the foundation will not be impaired.

また、中空部を形成する型枠10内には、打設
されたコンクリート12が侵入しないため、コン
クリート12の打設量を大幅に削減できる。
Further, since the poured concrete 12 does not enter the formwork 10 forming the hollow portion, the amount of poured concrete 12 can be significantly reduced.

さらに、構築される基礎の外周面と型枠10と
の間に打設形成されるコンクリート12は、比較
的薄くなり、このためコンクリート硬化時の発熱
が少く、発熱した後の冷却の際に生ずるコンクリ
ートのひび割れも低減できる。
Furthermore, the concrete 12 poured and formed between the outer peripheral surface of the foundation to be constructed and the formwork 10 is relatively thin, and therefore generates less heat when the concrete hardens, and less heat is generated during cooling after the concrete has generated heat. Cracks in concrete can also be reduced.

以上、実施例で詳細に説明したように、この発
明に係る構造物の基礎の施工方法においては、鉄
筋篭に密閉中空部を形成する型枠を取付けておく
という比較的簡単な構成でもつて、基礎の耐力低
下を伴うことなく、これを経済的に構築できるな
どの優れた効果が得られる。
As described above in detail in the examples, in the method for constructing the foundation of a structure according to the present invention, even with a relatively simple structure in which a formwork for forming a sealed hollow part is attached to a reinforcing bar cage, Excellent effects such as being able to construct this economically without reducing the strength of the foundation can be obtained.

【図面の簡単な説明】[Brief explanation of drawings]

第1図aからeおよび第2図aからeは、この
発明の一実施例を工程順に示すものであつて、第
1図aからeは縦断面図、第2図aからeは第1
図aからeに対応する上面図である。 1……作業床、2……土留壁、3……補強剤、
4……泥水固化壁、5……掘削機、6……安定
液、7……縦孔、8……鉄筋篭、9……クレー
ン、10……型枠、11……トレミー管、12…
…コンクリート、13……フーチング、14……
脚柱。
Figures 1a to e and Figures 2a to e show an embodiment of the present invention in the order of steps. Figures 1a to e are longitudinal sectional views, and Figures 2a to
FIG. 3 is a top view corresponding to figures a to e; 1...Working floor, 2...Earth retaining wall, 3...Reinforcing agent,
4... Mud water solidification wall, 5... Excavator, 6... Stabilizing liquid, 7... Vertical hole, 8... Rebar cage, 9... Crane, 10... Formwork, 11... Tremie pipe, 12...
...Concrete, 13...Footing, 14...
pedestal.

Claims (1)

【特許請求の範囲】[Claims] 1 橋台、橋脚などの構造物の基礎を地中に構築
するに際して、地表から該基礎の形状に合せた縦
孔を掘削し、この後に該縦孔内に鉄筋篭を建込み
コンクリートを打設して構造物の基礎を構築する
方法において、該鉄筋篭には予め構築される基礎
の外周面から所定の間隔を置いて密閉された中空
部を形成する型枠が取付けられていることを特徴
とする構造物の基礎の施工方法。
1. When constructing the foundations of structures such as bridge abutments and piers underground, a vertical hole matching the shape of the foundation is excavated from the ground surface, and then a reinforcing bar cage is built into the vertical hole and concrete is poured. A method for constructing a foundation for a structure using a method for constructing a foundation for a structure, characterized in that a formwork forming a sealed hollow portion is attached to the reinforcing cage in advance at a predetermined distance from the outer peripheral surface of the foundation to be constructed. construction method for the foundation of a structure.
JP9751984A 1984-05-17 1984-05-17 Construction of foundation of structure Granted JPS60242225A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9751984A JPS60242225A (en) 1984-05-17 1984-05-17 Construction of foundation of structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9751984A JPS60242225A (en) 1984-05-17 1984-05-17 Construction of foundation of structure

Publications (2)

Publication Number Publication Date
JPS60242225A JPS60242225A (en) 1985-12-02
JPH0368972B2 true JPH0368972B2 (en) 1991-10-30

Family

ID=14194502

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9751984A Granted JPS60242225A (en) 1984-05-17 1984-05-17 Construction of foundation of structure

Country Status (1)

Country Link
JP (1) JPS60242225A (en)

Also Published As

Publication number Publication date
JPS60242225A (en) 1985-12-02

Similar Documents

Publication Publication Date Title
JP3423394B2 (en) Underwater frame structure
JP2001107319A (en) Aseismic reinforcing method of pier and aseismic reinforced structure
JPH1077644A (en) Earthquake resisting pile foundation construction method
JP2000096976A (en) How to build a shaft
JPH0368972B2 (en)
JP2599299B2 (en) Retaining wall and retaining method in soft ground
JPS63280153A (en) Reverse construction method for underground framework
JP2022060628A (en) Composite foundation structure of expanded foundation structure and reinforced ground and its construction method
KR102947380B1 (en) Method for demolishing expanded sps type underground building
JP7480069B2 (en) How to reinforce existing revetments
JP2001159141A (en) Floating foundation
JPH0726569A (en) Pile foundation construction method for structures subjected to uneven earth pressure
JPS63107612A (en) Cast-in-place concrete pile
JPH0237452B2 (en) KAICHUKISOKOHO
JPH0649987B2 (en) Underground continuous wall foundation construction method
JPS62202125A (en) Underwater foundation work using steel plate shell
JP2576902B2 (en) Construction methods and buildings in landfills
JPH0734449A (en) Independent mountain retaining wall method
CN114396067A (en) A rapid construction method for low pile caps suitable for rock foundations
SU844693A1 (en) Pile foundation constructing method
CN117868204A (en) Construction method of super-large rectangular continuous open caisson underground station in soft soil stratum
CN118167312A (en) Construction technology of vortex well and support structure of vortex well
JPH0261573B2 (en)
JPS62202124A (en) Underwater foundation work using steel plate shell
JPH0216817B2 (en)