JPH0369427B2 - - Google Patents
Info
- Publication number
- JPH0369427B2 JPH0369427B2 JP16537486A JP16537486A JPH0369427B2 JP H0369427 B2 JPH0369427 B2 JP H0369427B2 JP 16537486 A JP16537486 A JP 16537486A JP 16537486 A JP16537486 A JP 16537486A JP H0369427 B2 JPH0369427 B2 JP H0369427B2
- Authority
- JP
- Japan
- Prior art keywords
- steel
- upper plate
- screw
- clamping piece
- formwork
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
- Mutual Connection Of Rods And Tubes (AREA)
Description
【発明の詳細な説明】
[産業上の利用分野]
本発明は土中等に打込まれたH鋼に装着された
矢板と、該矢板から所定間隔を置いてセツトされ
た型枠との間にコンクリートを打設するに当つ
て、下方部をH鋼に挟着保持して所定間隔を維持
し、更に上方部に型枠を締付け保持するH鋼止め
金具に関するものである。[Detailed Description of the Invention] [Industrial Application Field] The present invention provides a structure between a sheet pile attached to an H steel driven into soil, etc., and a formwork set at a predetermined distance from the sheet pile. This invention relates to an H-steel fastener that clamps and holds the lower part to the H-steel to maintain a predetermined interval and further tightens and holds the formwork in the upper part when pouring concrete.
[従来の技術]
従来、この種H鋼止め金具としては実公昭52−
15964号に開示されたものが知られていた。この
実公昭52−15964号に開示されたものは、L型金
具の一片に、その他片に対してほぼ垂直に連結棒
を固着せしめると共に、L型金具の他片に対し板
ばねが平行に配置されるよう板ばねの一端をL型
金具の一片に固着して形成されている。[Prior art] Conventionally, this type of H steel fastener was manufactured using
The one disclosed in No. 15964 was known. The device disclosed in Utility Model Publication No. 52-15964 has a connecting rod fixed to one piece of the L-shaped fitting almost perpendicularly to the other piece, and a leaf spring arranged parallel to the other piece of the L-shaped fitting. The leaf spring is formed by fixing one end of the leaf spring to one piece of the L-shaped fitting.
[発明が解決しようとする問題点]
上記従来の止め金具は、土木工事等に於いてコ
ンクリート打設前の型枠の取付作業時に使用され
ているが、セパレーターにより所定間隔を設定し
た後、セパレーターの回転を阻止して止め金具を
型枠に一体に固定する場合、人手によつてセパレ
ーターと連結棒とを溶接や螺子ロツク材を使用し
て固定していた。そのため作業能率が悪いだけで
なく、止め金具の取付けや全螺子ボルトより成る
セパレーターの調整時に時間と労力がかかるとい
う問題点があり、また降雨時や漏水している所で
は止め金具を型枠に固定する作業ができないとい
う問題点があつた。[Problems to be Solved by the Invention] The above-mentioned conventional fasteners are used in civil engineering work when installing formwork before pouring concrete. In order to prevent rotation of the separator and to integrally fix the stopper to the formwork, the separator and the connecting rod are manually fixed by welding or using screw locking material. This not only results in poor work efficiency, but also requires time and effort when installing the stoppers and adjusting the separator, which is made up of fully threaded bolts.In addition, when it rains or where there is water leakage, the stoppers cannot be used in the formwork. There was a problem that it was not possible to fix it.
本発明はかかる問題点に着目してなされたもの
で、H鋼の所定肉厚のフランジに基板の下方部を
確固に挟着保持でき、且全螺子ボルトの螺挿深度
の具合を目盛で目視して調整できると共に、所定
の深度に螺挿された全螺子ボルトを溶接や螺子ロ
ツク材を使用することなく回転しないよいに固定
することができるH鋼止め金具を提供せんとする
ことを目的とする。 The present invention was made in view of this problem, and it is possible to securely hold the lower part of the board between the flanges of H steel with a predetermined wall thickness, and to visually check the screw insertion depth of the fully threaded bolt using a scale. The purpose of the present invention is to provide an H-steel fastener that can be adjusted to prevent rotation, and can also fix a fully threaded bolt screwed to a predetermined depth without the need for welding or thread locking material. do.
[問題点を解決するための手段]
上問題点を解決するため、本発明は基板の下方
部にH鋼のフランジに挟着保持できる間隙を存し
させて、ベース板と挟着片を基板に対して直角に
突設して、H鋼のフランジにハンマー等により叩
打して強制的に圧入密嵌させて挟着保持できるよ
うにし、且挟着片上の基板の長手方向に目盛を表
示して全螺子ボルトの螺挿深度を目視して調整で
きるようにすると共に、基板の上方部を倒U字状
に折曲して連結部を設け、且該連結部の上方板と
下方板の中央部の垂直軸線上に全螺子ボルトを螺
挿する螺子孔を夫々穿設し、更に螺子孔を突設し
た上方板の水平軸線上の両側端部に夫々切欠部を
設けて、上方板の先端部をハンマー等により叩打
することにより強度の弱い切欠部分より折曲し
て、上方板の螺子孔に全螺子ボルトに喰い込み、
全螺子ボルトの回転を阻止するよう構成されてい
る。[Means for Solving the Problems] In order to solve the above problems, the present invention provides a gap in the lower part of the board that can be held by the flange of the H steel, so that the base plate and the clamping piece can be attached to the board. The board is protruded at right angles to the board, and is forcibly pressed into the flange of the H steel by hitting it with a hammer or the like so that it can be tightly fitted and held, and a scale is displayed in the longitudinal direction of the board on the clamping piece. In addition, the upper part of the board is bent into an inverted U shape to provide a connecting part, and the connecting part is located at the center of the upper plate and the lower plate. Screw holes into which all screw bolts are screwed are bored on the vertical axis of the upper plate, and notches are provided on both ends of the upper plate on the horizontal axis from which the screw holes protrude. By hitting the part with a hammer etc., bend it from the weaker notch part, and insert the entire threaded bolt into the threaded hole in the upper plate.
Constructed to prevent rotation of the fully threaded bolt.
[作用]
上記構成の本発明によれば、基板の下方背部よ
りハンマー等により叩打するのみで、強制的にフ
ランジにベース板と挟着片の間隙部が圧入密嵌さ
れて挟着保持され、全螺子ボルトの螺挿深度は目
盛によつて正確に目視して調整でき、また調整し
て所定深度に全螺子ボルトが達したときは連結部
の上方板の先端部をハンマー等により、叩打する
ことにより上方板を折曲せしめて上方板の螺子孔
を全螺子ボルトに喰い込ませて全螺子ボルトの回
転を阻止する。[Function] According to the present invention having the above configuration, the gap between the base plate and the clamping piece is forcefully and tightly fitted into the flange by simply hitting the base plate from the lower back with a hammer or the like, and the clamping piece is held tightly. The thread insertion depth of the fully threaded bolt can be adjusted by accurately visualizing the scale, and when the fully threaded bolt reaches the specified depth after adjustment, the tip of the upper plate of the connecting part is struck with a hammer, etc. By bending the upper plate, the screw holes in the upper plate are inserted into all the threaded bolts, thereby preventing the rotation of all the threaded bolts.
[実施例]
本発明の実施の一例を図に就いて詳細に説明す
るに、長方形状の鋼板より成る基板1の下底部の
一方側にベース板2を直角に折曲連設し、更に基
板1の下方部を底辺を残して方形状に打抜いた打
抜片3をベース板2に平行になるように一方側へ
折曲して挟着片4とし、ベース板2と挟着片4と
の間に一定の高さの間隙5を備えさせ、且該挟着
片4上の基板1の一方側長手方向に目盛6を表示
する。前記間隙5の巾は後述の規格化されたH鋼
14のフランジ16の肉厚に適合するよう複数種
類製作しておくことによりすべてのH鋼14に対
応できる。[Example] An example of the implementation of the present invention will be described in detail with reference to the drawings. A base plate 2 is bent at right angles to one side of the lower bottom of a substrate 1 made of a rectangular steel plate, and A punching piece 3 is punched out into a rectangular shape from the lower part of 1, leaving the bottom side, and is bent to one side so as to be parallel to the base plate 2 to form a clamping piece 4, and the base plate 2 and the clamping piece 4 are A gap 5 of a constant height is provided between the two, and a scale 6 is displayed on one side of the substrate 1 on the clamping piece 4 in the longitudinal direction. By manufacturing a plurality of widths of the gap 5 to match the wall thickness of the flange 16 of the standardized H steel 14, which will be described later, all H steels 14 can be accommodated.
そして、基板1の上方部を一方側に倒U字状に
折曲して水平な上方板7と下方板8とを有する連
結部9を設け、且該連結部9の上方板7と下方板
8の中央部の垂直軸線上に螺子孔10,11を
夫々穿設し、且上方板7に穿設された螺子孔10
の両側の上方板7の端縁部に夫々切欠部12,1
2′が設けてある。また、上方板7の先端部13
は特に限定する必要はないが、好ましくは上方へ
稍傾斜させた構成にすることが推奨される。 Then, the upper part of the substrate 1 is bent to one side into an inverted U shape to provide a connecting part 9 having a horizontal upper plate 7 and a lower plate 8, and the upper plate 7 and the lower plate of the connecting part 9 are provided. Screw holes 10 and 11 are respectively drilled on the vertical axis of the central part of 8, and the screw hole 10 is drilled in the upper plate 7.
Notches 12 and 1 are provided at the edges of the upper plate 7 on both sides of the
2' is provided. In addition, the tip portion 13 of the upper plate 7
Although there is no need to specifically limit the angle, it is recommended that the angle be slightly tilted upward.
実施例の作用について説明すると、本発明止め
金具は第2図の示すように、土木工事現場に於い
て適宜間隔を置いて打設された本数本のH鋼14
に矢板15をセツトした後、間隙5部にH鋼14
のフランジ16を押し当て、基板1の背部をハン
マー等により叩打してベース板2と挟着片4間の
間隙5にH鋼14のフランジ16を圧入密嵌させ
て帙着保持する。そして、基端面側より全螺子ボ
ルト17の基端部を螺挿できる袋螺子18を設け
ると共に、垂直な先端面19の中央部に螺子山2
0を周設したボルト21を突設して調整具22を
形成し、且該調整具22の袋螺子18に全螺子ボ
ルト17の基端部を螺挿してその基端面を袋螺子
18の端縁部18′に密接固定させ、更に全螺子
ボルト17の先方部を螺子孔10,11に夫々貫
通螺挿し、その螺挿の深度を全螺子ボルト17の
先端縁17′の位置を目盛6で読み取ることによ
つて調整して、予め設定された矢板15からのコ
ンクリートCの打設の巾寸法とベース板2底部か
ら調整具22の先端面19までの長さとを一致さ
せる。そして、この寸法が一致した時点で全螺子
ボルト17が再び回転してその寸法が狂わないよ
うに、連結部9の先端部13をハンマー等で叩打
すると、切欠部12,12′の存在により螺子孔
10部分の強度が弱くなつているために螺子孔1
0部分より上方板7が折曲して、螺子孔10部分
が全螺子ボルト17の周面に強く喰い込んで全螺
子ボルト17の回転が阻止され、ベース板2底部
から調整具22の先端面19までの長さ寸法は固
定される。その後、ボルト21に型枠23を貫挿
して型枠23の内側壁を前記調整具22の先端面
19に密着せしめることによりコンクリートCの
打設巾が自動的に設定される。そして、型枠23
は外側壁側より縦パイプ材24、横パイプ材25
を縦横に接合すると共に、横パイプ材25を貫通
してホームタイボルト26の先方部に前記型枠2
3外に突出したボルト21を螺着することにより
確固に固定される。 To explain the function of the embodiment, as shown in FIG.
After setting the sheet pile 15 in the gap 5, insert the H steel 14
The flange 16 of the H steel 14 is pressed against the base plate 1, and the back of the board 1 is struck with a hammer or the like, so that the flange 16 of the H steel 14 is press-fitted into the gap 5 between the base plate 2 and the clamping piece 4, and the flange 16 of the H steel 14 is tightly fitted. A cap screw 18 is provided into which the base end of the fully threaded bolt 17 can be screwed in from the base end side, and a screw thread 2 is provided at the center of the vertical end face 19.
An adjustment tool 22 is formed by protruding a bolt 21 having a circumference of 0, and the base end of the fully threaded bolt 17 is screwed into the cap screw 18 of the adjustment tool 22, so that the base end surface is connected to the end of the cap screw 18. The front end of the fully threaded bolt 17 is screwed through into the screw holes 10 and 11, respectively, and the depth of the screw insertion is determined by measuring the position of the tip edge 17' of the fully threaded bolt 17 using the scale 6. Adjustment is made by reading the width of the concrete C cast from the sheet pile 15 set in advance and the length from the bottom of the base plate 2 to the tip surface 19 of the adjustment tool 22. Then, when these dimensions match, the tip end 13 of the connecting part 9 is struck with a hammer or the like to prevent the entire threaded bolt 17 from rotating again and its dimensions becoming out of order. Because the strength of the hole 10 part is weakened, the screw hole 1
The upper plate 7 is bent from the 0 portion, and the screw hole 10 portion strongly bites into the circumferential surface of the full screw bolt 17, preventing the rotation of the full screw bolt 17, and the end face of the adjuster 22 is bent from the bottom of the base plate 2. The length dimension up to 19 is fixed. Thereafter, the casting width of the concrete C is automatically set by inserting the formwork 23 through the bolts 21 and bringing the inner wall of the formwork 23 into close contact with the tip surface 19 of the adjustment tool 22. And formwork 23
From the outside wall side, vertical pipe material 24, horizontal pipe material 25
The formwork 2 is connected vertically and horizontally, and the formwork 2 is passed through the horizontal pipe material 25 and attached to the front part of the home tie bolt 26.
It is firmly fixed by screwing in the bolt 21 that protrudes from 3.
前記のようにコンクリートCの打設巾が設定さ
れた後、矢板15と型枠23間にコンクリートC
を打設し、その固化後ホームタイボルト26、縦
パイプ材24、横パイプ材25、型枠23を取外
すと共に、H鋼14をクレーン等により上方へ抜
き去るのである。この場合H鋼14のフランジ1
6にベース板2及び挟着片4が密嵌しているが、
固定されていないので簡単に抜き去ることができ
る。 After the casting width of the concrete C is set as described above, the concrete C is placed between the sheet pile 15 and the formwork 23.
After hardening, the home tie bolts 26, vertical pipe material 24, horizontal pipe material 25, and formwork 23 are removed, and the H steel 14 is pulled upward by a crane or the like. In this case, flange 1 of H steel 14
6, the base plate 2 and the clamping piece 4 are tightly fitted,
Since it is not fixed, it can be easily removed.
[発明の効果]
本発明は上述のようであるから、予め規格で定
められたH鋼のフランジの肉厚と一致する巾の間
隙を設けた止め金具を製作しておくことによりす
べてのH鋼に取付け可能であり、そのH鋼のフラ
ンジへの取付けも基板の下方背底部をハンマーで
叩打することにより強制的に止め金具がフランジ
に圧入密接されて挟着保持され、そして全螺子ボ
ルトを各螺子孔に貫通螺挿して目盛を目視しなが
ら適宜回転させてその螺挿深度を調整し、所定の
目盛位置に於いて全螺子ボルトの固定位置が設定
されると、単に上方板の先端部をハンマー等によ
り叩打することにより上方板が切欠部分より折曲
して、螺子孔が全螺子ボルトに喰い込み、全螺子
ボルトはその位置に於いて確実に回転することな
く固定され、その後型枠取付工程に入ればよく、
従来のように溶接とか、螺子ロツク材を使用する
必要がなく、降雨時や漏水があつても取付けるこ
とができるので経費が安く工期も短縮することが
できるのである。[Effects of the Invention] Since the present invention is as described above, all H steels can be used by manufacturing a stopper with a gap of a width that matches the wall thickness of the H steel flange specified in advance in the standard. It can be attached to the H steel flange by hitting the lower back bottom of the board with a hammer, the stopper is forcibly pressed into the flange and held tightly, and all the threaded bolts are attached to each Insert a through screw into the screw hole and rotate it appropriately while checking the scale visually to adjust the depth of screw insertion. When the fixed position of all screw bolts is set at the predetermined scale position, simply tighten the tip of the upper plate. By hitting with a hammer, etc., the upper plate is bent from the notch, the screw hole bites into all the screw bolts, and all the screw bolts are securely fixed in that position without rotating, and then the formwork is attached. As long as you get into the process,
There is no need for welding or the use of screw locking materials as in the past, and it can be installed even during rain or water leakage, resulting in lower costs and shorter construction times.
図は本発明の実施例を示すもので、第1図は全
体の斜視図、第2図は施工状態を示す横断面図、
第3図は型枠の取付状態を示す拡大横断面図であ
る。
図中、1は基板、2はベース板、4は挟着片、
5は間隙、6は目盛、7は上方板、8は下方板、
9は連結部、10,11は螺子孔、12,12′
は切欠部、17は全螺子ボルトである。
The figures show an embodiment of the present invention, in which Figure 1 is an overall perspective view, Figure 2 is a cross-sectional view showing the construction state,
FIG. 3 is an enlarged cross-sectional view showing the attached state of the formwork. In the figure, 1 is a substrate, 2 is a base plate, 4 is a clamping piece,
5 is the gap, 6 is the scale, 7 is the upper plate, 8 is the lower plate,
9 is a connecting part, 10 and 11 are screw holes, 12 and 12'
1 is a notch, and 17 is a fully threaded bolt.
Claims (1)
間隙を存しさせてベース板と挟着片を夫々平行に
突設し、且挟着片上の基板の長手方向に目盛を表
示すると共に、基板の上方部を倒U字状に折曲し
て連結部を設け、且該連結部の上方板と下方板の
中央部の垂直軸線上に夫々螺子孔を穿設し、且螺
子孔を穿設した上方板の水平軸線上の両側端部に
夫々切欠部を設け、前記各螺子孔に全螺子ボルト
を貫通螺挿したことを特徴とするH鋼止め合具。1. A base plate and a clamping piece are respectively protruded in parallel to each other with a gap in the lower part of the board allowing the flange of the H steel to be tightly fitted, and a scale is displayed on the clamping piece in the longitudinal direction of the board, A connecting portion is provided by bending the upper portion of the substrate into an inverted U-shape, and screw holes are bored on the vertical axes of the central portions of the upper plate and the lower plate of the connecting portion, respectively. An H-steel fastening fitting characterized in that notches are provided at both ends of the upper plate on the horizontal axis, and a fully threaded bolt is screwed through each of the screw holes.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP16537486A JPS6319369A (en) | 1986-07-14 | 1986-07-14 | H-steel clamp metal jig |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP16537486A JPS6319369A (en) | 1986-07-14 | 1986-07-14 | H-steel clamp metal jig |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS6319369A JPS6319369A (en) | 1988-01-27 |
| JPH0369427B2 true JPH0369427B2 (en) | 1991-11-01 |
Family
ID=15811160
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP16537486A Granted JPS6319369A (en) | 1986-07-14 | 1986-07-14 | H-steel clamp metal jig |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS6319369A (en) |
-
1986
- 1986-07-14 JP JP16537486A patent/JPS6319369A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS6319369A (en) | 1988-01-27 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US6017014A (en) | Holder for vertical steel rebar | |
| US3479785A (en) | Installation of fasteners in concrete | |
| JPH0369427B2 (en) | ||
| JPH0369429B2 (en) | ||
| JPH0369428B2 (en) | ||
| JPS63251572A (en) | H-shaped steel clamp metal fitting | |
| JP2566470Y2 (en) | Anchor bolt fixing device for construction | |
| JP2005330797A (en) | Anchor bolt holder | |
| JP3699548B2 (en) | Anchor bolt installation bracket set | |
| JPH0620838Y2 (en) | Side sheet metal stopper | |
| JPH0736006Y2 (en) | Interval holding bracket | |
| JP2548953Y2 (en) | Connection holding bracket | |
| JPH0722439Y2 (en) | Fixing device pushing device for concrete form interval controller | |
| KR900007402B1 (en) | H section steel clamp | |
| US20250347104A1 (en) | Concrete panel bolted foundation connection and method | |
| JP3048981B2 (en) | Width stopper for foundation concrete formwork | |
| JPH0618987Y2 (en) | Separator fixing device for spacing metal fittings | |
| JPH0343297Y2 (en) | ||
| JPS6020698Y2 (en) | Pit groove edge frame piece | |
| JPS6033253Y2 (en) | Concrete formwork spacing retainer | |
| JPS6347248Y2 (en) | ||
| JP2580578Y2 (en) | Separator fixture for sheet pile pipe | |
| JP2583049B2 (en) | Floor panel mounting equipment | |
| JPS6332262Y2 (en) | ||
| JPS5841121A (en) | Anchor bolt construction method and positioning members used therein |