JPH0410943B2 - - Google Patents
Info
- Publication number
- JPH0410943B2 JPH0410943B2 JP29250886A JP29250886A JPH0410943B2 JP H0410943 B2 JPH0410943 B2 JP H0410943B2 JP 29250886 A JP29250886 A JP 29250886A JP 29250886 A JP29250886 A JP 29250886A JP H0410943 B2 JPH0410943 B2 JP H0410943B2
- Authority
- JP
- Japan
- Prior art keywords
- hanging
- roof
- roofing material
- steel frame
- assembled
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Landscapes
- Roof Covering Using Slabs Or Stiff Sheets (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Description
【発明の詳細な説明】
(産業上の利用分野)
本発明は折板屋根の施工方法及びこれに使用す
る吊り装置に関するものである。DETAILED DESCRIPTION OF THE INVENTION (Field of Industrial Application) The present invention relates to a method for constructing a folded plate roof and a hanging device used therein.
(従来の技術)
屋根母屋鉄骨と屋根材とを予め組立てたものを
吊つて屋根施工する工法(大組工法)では、従来
吊上げ用玉掛ワイヤを屋根母屋鉄骨の両端に直掛
けして吊り上げて、所定位置にセツトした後、吊
上げ用玉掛ワイヤを外し、この玉掛ワイヤを掛け
るために鉄骨の両端側に屋根板を取り付けずに開
けてある開口部(駄目)をそれぞれ屋根板で覆う
ことが行われている。(Conventional technology) In the method of constructing a roof by suspending a pre-assembled roof purlin steel frame and roofing material (large assembly method), conventional lifting sling wires are hung directly on both ends of the roof purlin steel frame and hoisted. After setting in place, the lifting sling wire was removed, and the openings (unused) left on both ends of the steel frame without roof plates attached were covered with roof plates in order to hang the sling wires. ing.
(発明が解決しようとする問題点)
従来、ワイヤを鉄骨に直掛けするために、屋根
材の両側に広い開口部(駄目)を設ける必要があ
り、この開口部の屋根工事が完了するまで開口部
が残るために、開口部の周りに手すりまたは安全
設備を必要とし、最終的にこれらを撤去し、さら
にその開口部を覆う作業をしなければならなかつ
た。このため屋根をセツトした後の屋根工事が多
いので作業効率が悪かつた。また吊りワイヤの取
り外しも、屋根材上から開口部へ身体を乗り出し
て不安定な姿勢で行わなければならず、或いは開
口部内の屋根鉄骨材の上に乗つて行う必要があ
り、作業上非常に危険であつた。(Problem to be Solved by the Invention) Conventionally, in order to directly hang wires on a steel frame, it was necessary to provide wide openings on both sides of the roofing material, and these openings remained open until the roofing work was completed. The remaining parts required handrails or safety equipment around the openings, which ultimately had to be removed and further work to cover the openings. For this reason, roof work was often done after the roof had been set, resulting in poor work efficiency. In addition, removing the hanging wire requires leaning over the roof material into the opening in an unstable position, or climbing on top of the roof steel frame inside the opening, making the work extremely difficult. It was dangerous.
本発明の目的は屋根施工の作業能率の向上を図
り、作業の安全性を高め、組立屋根を安定して吊
ることができるようにすることにある。 The purpose of the present invention is to improve work efficiency in roof construction, increase work safety, and enable stable hanging of assembled roofs.
(問題点を解決するための手段)
本発明の屋根の施工方法は、吊り支持体4を立
上げている屋根鉄骨1上に屋根材2を載置固定し
た組立屋根Aの上面から突出している吊り支持体
4の取付け部4a1に吊り体5を取り付けて、こ
の吊り体に吊りワイヤ7を掛止めて組立屋根を吊
り上げて所定位置に設置し、鉄骨組立て後に、必
要に応じて吊り体5を外すものである。(Means for Solving the Problems) In the roof construction method of the present invention, a roof material 2 is placed and fixed on a roof steel frame 1 on which a hanging support 4 is erected, protruding from the upper surface of an assembled roof A. The hanging body 5 is attached to the attachment part 4a1 of the hanging support 4, and the hanging wire 7 is hooked to this hanging body to lift the assembled roof and install it in a predetermined position.After assembling the steel frame, the hanging body 5 can be attached as necessary. It must be removed.
本発明の折板屋根の施工に使用する吊り装置
は、屋根鉄骨1上に吊り支持体4を立上げ、この
吊り支持体上部に設けてある取付け部4a1が屋
根材2より突出する位置にあり、上記取付け部に
は吊り体5を着脱可能に取り付け、この吊り体は
屋根材を上記吊り支持体とで挟持するものであ
り、上記吊り体には吊りワイヤ7が掛止め可能の
ものである。 The suspension device used in constructing the folded plate roof of the present invention has a suspension support 4 erected on the roof steel frame 1, and a mounting portion 4a1 provided at the top of the suspension support is located at a position protruding from the roof material 2. A hanging body 5 is removably attached to the mounting portion, and this hanging body holds the roof material between the hanging support body and a hanging wire 7 can be hooked to the hanging body. .
(作用)
吊りワイヤ7は屋根材2上に突出する吊り支持
体の取付け部4a1を利用して組立屋根Aを吊
り、屋根材に開口部を必要としない。吊り支持体
は屋根材2を支持する作用と吊り体5とともに吊
り作用とを備えている。(Function) The hanging wire 7 suspends the assembled roof A using the attachment portion 4a1 of the hanging support body protruding above the roofing material 2, and no opening is required in the roofing material. The hanging support has the function of supporting the roof material 2 and the function of suspending it together with the hanging body 5.
(実施例)
以下本発明の実施例を図面を参照して説明す
る。(Example) Examples of the present invention will be described below with reference to the drawings.
まず、本発明に係る屋根の施工方法に使用する
吊り装置を説明し、その後に施工方法を説明す
る。 First, a suspension device used in the roof construction method according to the present invention will be explained, and then the construction method will be explained.
第1〜3図において、H形鋼からなる屋根鉄骨
1は、上側のフランジ1a上に折板屋根材2の波
形に合わせた形状の鋼板製のフレーム3を長手方
向に取り付けてある。フレーム3の各山部頂部に
ボルト3aを起立させ、このボルトに屋根材をナ
ツト3bで固定する。上側フランジ1a上に2個
所にフレーム3の山部と並んで吊り支持体4を設
けてある。吊り支持体4はボルト4aと受け板4
bとからなる。ボルト4aはフランジ1a上に立
設し、ボルト上部は外周に雄ねじを形成した取付
け部4a1となつている。取付け部4a1は隣り
合うフレーム3の山部の頂部より高く位置し、屋
根材2の山部上方に突出できる。受け板4bはボ
ルト4aの両側部を補強するもので、ボルトとフ
ランジ1aに溶接により固着してある。受け板は
フレームの山部と同一形状に形成し、上端部で屋
根材2を受ける。ボルトの取付け部4a1にはU
字状の吊り体5を取付け孔5aを介して取り付け
てある。そして取付け部4a1に取り付け、固定
手段であるナツト6を締め付けて吊り体5を受け
体4b側に固定している。吊り体5には水平状態
に吊り棒5bが渡してあり、これを両端のナツト
5cで固定してある。この吊り棒5bに吊りワイ
ヤ7を掛止める。 1 to 3, a roof steel frame 1 made of H-shaped steel has a frame 3 made of a steel plate having a shape matching the waveform of the folded plate roofing material 2 attached in the longitudinal direction on an upper flange 1a. Bolts 3a are erected at the tops of the respective peaks of the frame 3, and the roofing material is fixed to the bolts with nuts 3b. Hanging supports 4 are provided at two locations on the upper flange 1a in line with the peaks of the frame 3. The suspension support 4 includes a bolt 4a and a receiving plate 4.
It consists of b. The bolt 4a is erected on the flange 1a, and the upper part of the bolt is a mounting portion 4a1 having a male thread formed on the outer periphery. The attachment portion four a1 is located higher than the tops of the peaks of adjacent frames 3, and can protrude above the peaks of the roofing material 2. The receiving plate 4b is for reinforcing both sides of the bolt 4a, and is fixed to the bolt and the flange 1a by welding. The receiving plate is formed in the same shape as the peak of the frame, and receives the roof material 2 at its upper end. There is a U on the bolt mounting part 4a1.
A letter-shaped hanging body 5 is attached through a mounting hole 5a. Then, it is attached to the attachment portion 4a1, and a nut 6, which is a fixing means, is tightened to fix the hanging body 5 to the receiving body 4b side. A hanging rod 5b is horizontally extended over the hanging body 5, and is fixed with nuts 5c at both ends. A hanging wire 7 is hooked onto this hanging rod 5b.
次に屋根の施工方法を説明する。 Next, we will explain how to construct the roof.
屋根鉄骨1を並べ、その上方から屋根材2をフ
レーム3上に載せて屋根材の山部をフレームの山
部および吊り支持体4に合せる。すると、吊り支
持体4のボルト4aの取付け部4a1は、第3図
示の例では屋根材の4個所から所定長突出するの
で、この突出端に吊り体5を取り付けて、ナツト
6で締め付けて固定する。なお、フレーム2上で
もボルト3aとナツト3bとで屋根材2を固定す
る。この結果、第3図に示すように組立屋根Aが
形成される。こうしておいてから、各吊り体5の
吊り棒5bに吊りワイヤ7を掛止めてこの組立屋
根を吊り上げ、所定位置にセツトし、そして鉄骨
を組立てた後、取付け部4a1からナツト6を外
して、吊り体を取付け部4a1から外して取付け
部にパツキング等の防水体を施し、ナツト6を再
び締め付けて屋根施工を終える。 Roofing steel frames 1 are arranged, a roofing material 2 is placed on a frame 3 from above, and the peaks of the roofing material are aligned with the peaks of the frame and a hanging support 4. Then, in the example shown in the third figure, the mounting portions 4a1 of the bolts 4a of the hanging support 4 protrude from four locations of the roof material by a predetermined length, so the hanging body 5 is attached to these projecting ends and fixed by tightening with nuts 6. do. Note that the roof material 2 is also fixed on the frame 2 with bolts 3a and nuts 3b. As a result, an assembled roof A is formed as shown in FIG. After this, the hanging wires 7 are hooked to the hanging rods 5b of each hanging body 5, and the assembled roof is lifted up and set in a predetermined position. After assembling the steel frame, the nuts 6 are removed from the mounting portions 4a1. The hanging body is removed from the mounting part 4a1, a waterproof material such as packing is applied to the mounting part, and the nut 6 is tightened again to finish the roof construction.
吊り体5の固定手段は上例ではナツト6を用い
たが、例えば取付け孔5a内周に雌ねじを設け
て、このねじを取付け部4a1のねじと結合させ
る構成してもよい。 Although the nut 6 is used as the fixing means for the hanging body 5 in the above example, it may be configured such that, for example, a female screw is provided on the inner periphery of the attachment hole 5a and this screw is connected to the screw of the attachment portion 4a1.
(発明の効果)
以上説明したように本発明によれば、吊りワイ
ヤ用の屋根材の開口部を残す必要がないので、従
来のような手すりやネツト等の安全設備が不要と
なり、安全設備取付け撤去の作業が全くなくな
り、屋根工事の能率化に寄与し、また吊りワイヤ
の取外しを屋根材上で安定した作業姿勢でできる
ので、作業がきわめて安全となる。また吊り支持
体を屋根材の支持手段として利用でき、安定して
吊ることができ、吊り体を転用できるので経済的
に有利である。(Effects of the Invention) As explained above, according to the present invention, there is no need to leave openings in the roofing material for hanging wires, so conventional safety equipment such as handrails and nets is no longer required, and safety equipment installation is easy. This eliminates the need for removal work at all, contributing to the efficiency of roof construction, and also makes the work extremely safe as the hanging wire can be removed in a stable working position on the roofing material. In addition, the hanging support can be used as a means for supporting the roofing material, it can be hung stably, and the hanging body can be used for other purposes, which is economically advantageous.
第1図は鉄骨に屋根材を固定した状態を示す正
面図、第2図は屋根鉄骨と屋根材との位置関係を
示す斜視図、第3図は組立屋根を吊る状態を示す
斜視図、第4図は吊り体の斜視図である。
1……屋根鉄骨、2……屋根材、4……吊り支
持体、4a1……取付け部、5……吊り体、7…
…吊りワイヤ、A……組立屋根。
Figure 1 is a front view showing the state in which the roofing material is fixed to the steel frame, Figure 2 is a perspective view showing the positional relationship between the roofing steel frame and the roofing material, and Figure 3 is a perspective view showing the state in which the assembled roof is suspended. FIG. 4 is a perspective view of the hanging body. DESCRIPTION OF SYMBOLS 1... Roof steel frame, 2... Roofing material, 4... Hanging support body, 4a1... Attachment part, 5... Hanging body, 7...
...hanging wire, A...assembly roof.
Claims (1)
材を載置固定して組立てた組立屋根の上面から突
出している吊り支持体の取付け部に吊り体を取り
付けて、この吊り体に吊りワイヤを掛止めて組立
屋根を吊り上げて所定位置に設置することを特徴
とする折板屋根の施工方法。 2 屋根鉄骨上に立上げてあり、屋根材を受けか
つ上部に設けてある取付け部が屋根材より突出す
る吊り支持体と、 上記取付け部に着脱可能に取り付けると共に屋
根材を上記吊り支持体との間で挟持する吊り体
と、 上記吊り体に掛止めるワイヤと を具備する折板屋根の施工に使用する吊り装置。[Claims] 1. A hanging body is attached to an attachment part of a hanging support that protrudes from the upper surface of an assembled roof that is assembled by placing and fixing roofing material on a roof steel frame on which the hanging support is erected, A method for constructing a folded plate roof, which comprises hanging a hanging wire to the hanging body to lift the assembled roof and install it in a predetermined position. 2. A hanging support that is raised on a roof steel frame, receives the roofing material, and has an attachment part provided at the top that protrudes from the roofing material; A hanging device for use in constructing a folded plate roof, comprising: a hanging body held between the hanging bodies; and a wire hooked to the hanging body.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP29250886A JPS63147048A (en) | 1986-12-10 | 1986-12-10 | Construction method of folded plate roof and hanging device used for it |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP29250886A JPS63147048A (en) | 1986-12-10 | 1986-12-10 | Construction method of folded plate roof and hanging device used for it |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS63147048A JPS63147048A (en) | 1988-06-20 |
| JPH0410943B2 true JPH0410943B2 (en) | 1992-02-26 |
Family
ID=17782724
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP29250886A Granted JPS63147048A (en) | 1986-12-10 | 1986-12-10 | Construction method of folded plate roof and hanging device used for it |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS63147048A (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0425343U (en) * | 1990-06-25 | 1992-02-28 | ||
| JP3744446B2 (en) * | 2002-03-18 | 2006-02-08 | 松下電工株式会社 | Functional member mounting structure on the folded plate roof |
| JP7509023B2 (en) * | 2020-12-18 | 2024-07-02 | Jfeスチール株式会社 | Steel bridge girder cover structure and steel bridge equipped with same |
-
1986
- 1986-12-10 JP JP29250886A patent/JPS63147048A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS63147048A (en) | 1988-06-20 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPH0410943B2 (en) | ||
| JPH0243928Y2 (en) | ||
| JP2549261Y2 (en) | Switch breaker lifting tool for construction | |
| JPS6041387Y2 (en) | Hanging jig for scaffolding | |
| JPH0317350A (en) | Scaffold for building structure | |
| JP2767013B2 (en) | Hanging scaffold for deep foundation | |
| CN220931247U (en) | Furred ceiling constant humidity machine | |
| JPH0321578Y2 (en) | ||
| JPH08114302A (en) | Boiler installing method and boiler installation structural body | |
| JPH0451458Y2 (en) | ||
| JP2585742Y2 (en) | Bathroom unit suspension rack | |
| JPH04203168A (en) | Fixing method for wing wall | |
| JPS58120942A (en) | Attachment of wall panel | |
| JPS6135658Y2 (en) | ||
| JP3044822U (en) | Lightweight auxiliary scaffold for boiler furnace hopper | |
| JP2575796Y2 (en) | External curing frame | |
| JPH0650456Y2 (en) | Horizontal pillar prefabricated rebar erection device | |
| JPH07268950A (en) | Rooftop balcony unit and hanging hardware | |
| JPS6237896Y2 (en) | ||
| JPH0612054Y2 (en) | Concrete block for manhole | |
| JP2869359B2 (en) | Gondola hanging hardware | |
| JPH08162771A (en) | Cover unit for installing electric machine | |
| JPH0619085B2 (en) | How to attach wall members to large buildings | |
| JP2795025B2 (en) | Roof unit suspension structure | |
| JPH086956Y2 (en) | Support structure for bottom formwork |