JPH04112934U - Prefabricated foundations for wooden houses - Google Patents

Prefabricated foundations for wooden houses

Info

Publication number
JPH04112934U
JPH04112934U JP2382891U JP2382891U JPH04112934U JP H04112934 U JPH04112934 U JP H04112934U JP 2382891 U JP2382891 U JP 2382891U JP 2382891 U JP2382891 U JP 2382891U JP H04112934 U JPH04112934 U JP H04112934U
Authority
JP
Japan
Prior art keywords
unit
foundation
unit base
blocks
connecting bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2382891U
Other languages
Japanese (ja)
Other versions
JPH0732599Y2 (en
Inventor
義男 鈴木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP1991023828U priority Critical patent/JPH0732599Y2/en
Publication of JPH04112934U publication Critical patent/JPH04112934U/en
Application granted granted Critical
Publication of JPH0732599Y2 publication Critical patent/JPH0732599Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

(57)【要約】 (修正有) 【目的】 単位ブロックを、列状に敷設して、それらを
一体的に連結することでプレバブ基礎を構築する際に、
単位ブロックの継目部分を緊密に連結するとともに、接
続部分に狂いがないようにする。 【構成】 左右の長さLを所定の単位長さとした単位基
礎1とそれより短くした単位ベース2とを鉄筋コンクリ
ートにより一体に連続させた単位ブロックAを成形し、
その単位ブロックAの単位基礎1には、上端面1aの両
端部位に連結板締着用の締付ボルト12・12を植設
し、左右の両端部位には、連結ボルトより幾分長い長さ
で左右方向に連続する連結ボルト挿通孔40を、それの
開口が左右の側端面に開放するように装設するととも
に、前後の壁面の前記連結ボルト挿通孔40の長手方向
の中間に対応する部位に操作口10…を開設し、かつ、
単位基礎1の左右の両端部の下縁には、単位ベース2の
左右の両側に形成される空間wに向けて垂下する延出部
11・11をそれぞれ装設しておく。
(57) [Summary] (with amendments) [Purpose] When constructing a prefabricated foundation by laying unit blocks in rows and connecting them together,
To tightly connect the joint parts of unit blocks and to prevent the connected parts from being distorted. [Structure] A unit block A is formed by integrally connecting a unit foundation 1 whose left and right length L is a predetermined unit length and a unit base 2 which is shorter than that with reinforced concrete,
In the unit foundation 1 of the unit block A, tightening bolts 12 for fastening the connecting plates are installed at both ends of the upper end surface 1a, and bolts with a length slightly longer than the connecting bolts are installed at both left and right ends. Connecting bolt insertion holes 40 that are continuous in the left and right direction are installed so that the openings thereof are open to the left and right side end surfaces, and are provided at a portion corresponding to the longitudinal middle of the connecting bolt insertion holes 40 on the front and rear walls. Open the operation port 10, and
At the lower edges of both the left and right ends of the unit foundation 1, extending parts 11, 11 are installed, respectively, to hang down toward the space w formed on both the left and right sides of the unit base 2.

Description

【考案の詳細な説明】[Detailed explanation of the idea]

【0001】0001

【産業上の利用分野】[Industrial application field]

本考案は、木造家屋を建築する際に、その木造家屋の土台を支承させるために 敷地に構築する基礎のうちで、その基礎を、予め鉄筋コンクリートにより所定の 大きさの単位基礎に成形しておき、その単位基礎を、敷地に根切りして栗石を敷 き込んだ上に列状に敷設し、それらを一体的に連結させることで構築する木造家 屋用のプレハブ基礎についての改良に関する。 This invention is for supporting the foundation of a wooden house when building a wooden house. Among the foundations to be constructed on the site, the foundations are made of reinforced concrete in advance. The unit foundation is formed into a unit foundation of the same size, and the root of the unit foundation is cut on the site and chestnut stone is laid. A wooden house constructed by laying rows of wood on top of wood and connecting them together as one. Concerning improvements to prefabricated foundations for buildings.

【0002】0002

【従来の技術】[Conventional technology]

上述の形態の木造家屋用のプレハブ基礎には、本考案の出願人が開発した実開 昭63−116550号公報にある手段がある。 The prefabricated foundation for the wooden house of the type described above is based on the practical application developed by the applicant of the present invention. There is a method described in Japanese Patent No. 116550/1983.

【0003】 この手段は、図1に示している如く、予め所定の大きさに成形しておく単位基 礎1とそれを載置せしめるよう予め成形しておく単位ベース2とを、単位ベース 2を単位基礎1より左右の長さを短く設定して、一体に連続させて鉄筋コンクリ ートにより成形することで、単位基礎1と単位ベース2とが一体に連続する単位 ブロックAを成形し、この単位ブロックAを、図2の如く敷地に根切りして形成 した溝B内に栗石Kを敷き込み、その上に図3の如くモルタルMを張り込んだと ころに、列状に敷設し、それらを連結板aにより連結し、隣接する単位ブロック Aの単位ベース1と単位ベース2との間に形成される空間wに、コンクリートを 流し込んで、単位ベース2…が連続する状態に仕上げることにより、プレハブ基 礎を構築するようにした手段である。0003 As shown in FIG. The foundation 1 and the unit base 2, which has been formed in advance so that it can be placed on it, are combined into a unit base. Set the left and right lengths of unit foundation 2 shorter than that of unit foundation 1, and install reinforced concrete in a continuous manner. A unit in which unit base 1 and unit base 2 are integrally continuous by forming by Form block A, and form this unit block A by cutting the roots on the site as shown in Figure 2. A piece of chestnut stone K is placed in the groove B, and mortar M is placed on top of it as shown in Figure 3. The rollers are laid in rows, connected by a connecting plate a, and adjacent unit blocks Concrete is placed in the space w formed between unit base 1 and unit base 2 of A. By pouring and finishing the unit base 2 in a continuous state, the prefabricated base It is a means of building a foundation.

【0004】 この手段は、根切りして栗石を敷き込んだ上に列状に並べて敷設する単位ブロ ックAを、連結板a…により一体的に連結する状態に緊縛するのに、単位ブロッ クAの単位基礎1の前後方向の左右の両端部位に、軸線方向を前後方向に沿わせ た連結ボルトbを植設しておいて、単位ブロックAを列状に敷設した後に、隣接 する単位ブロックA間に連結板aを渡架して、その連結板aに開設しておくボル ト穴を前述の連結ボルトbに挿通し、絞付ナットcにより締着することで、この 連結板aにより、隣接する単位ブロックAが一体的に連結する状態としている。0004 This method involves cutting the roots, laying the chestnut stones, and then laying the unit blocks in rows. Unit block The axial direction is aligned in the front and back direction on both the left and right end parts of the unit foundation 1 of the unit foundation 1 in the front and back direction. After installing the connecting bolts b and laying the unit blocks A in a row, A connecting plate a is spanned between the unit blocks A, and a bolt is opened on the connecting plate a. This can be achieved by inserting the aforementioned connection bolt b into the hole and tightening it with the tightening nut c. Adjacent unit blocks A are integrally connected by the connecting plate a.

【0005】[0005]

【考案が解決しようとする課題】[Problem that the idea aims to solve]

上述の手段には、列状に敷設した単位ブロツクAの隣接したもの同志を連結す る連結板aには、単位ブロックA・Aを互いに引き寄せる方向の力を働かせるこ とが困難なことから、列状に並べて敷設した単位ブロックA…の継目を密着させ ることが難しく、そのため、この継目部分に狂いが出てくる問題がある。 The above method involves connecting adjacent unit blocks A laid out in a row. A force is applied to the connecting plate a that pulls the unit blocks A and A together. Since it is difficult to As a result, there is a problem in that the seams become misaligned.

【0006】 また、構築する建物の土台を載架する土台支持面となる単位ブロックAの単位 基礎1の上端面が、隣接する単位ブロックAの単位基礎1の上端面と、きれいに 揃わず、単位ブロックAと単位ブロックAとの継目部位において狂いがでてくる 問題がある。[0006] In addition, the unit of unit block A that will be the foundation support surface on which the foundation of the building to be constructed is placed. The top end surface of foundation 1 is neatly aligned with the top end surface of unit foundation 1 of adjacent unit block A. They are not aligned, and there is a misalignment at the joint between unit block A and unit block A. There's a problem.

【0007】 また、列状に敷設した単位ブロックAの単位ベース2と隣接する単位ブロック Aの単位ベース2との間に形成される空間wにコンクリートを流し込んで、それ ら単位ベース2…をコンクリートで一体的に連結するよう成形するときに、単位 ブロックAが、それの上半側を形成している単位基礎1よりも下半側の単位ベー ス2の左右方向の長さを短く形成していることで、この下半側の単位ベース2を 支点として旋回するように動くことがあり、そのため、打込んだコンクリートと 単位基礎1の下縁との間に隙間を生ぜしめたり、建物の土台を載架する単位基礎 1の上端面の継目部分を不揃いにしたりする問題が出てくる。[0007] In addition, a unit block adjacent to unit base 2 of unit block A laid in a row Pour concrete into the space w formed between A and the unit base 2, and When forming the unit base 2... to be integrally connected with concrete, the unit base 2... Block A has a lower unit base than unit base 1 forming its upper half. By forming the length of the base 2 in the left and right direction to be short, the unit base 2 on the lower half side can be It may move in a pivoting manner as a fulcrum, and as a result, the concrete that has been poured and A unit foundation that creates a gap with the lower edge of the unit foundation 1 or on which the foundation of a building is placed. A problem arises in that the joint portions of the upper end surfaces of 1 are not aligned.

【0008】 本考案は、従来手段に生じているこれらの問題を解消せしめるためになされた ものであって、単位基礎1とそれよりも左右の長さの短い単位ベース2とを、鉄 筋コンクリートにより一体に連続するよう成形して単位ブロックA…を形成し、 その単位ブロックA…を、敷地に根切りして栗石を敷込んだところに列状に並べ て敷設し、それら単位ブロックA…を連結部材で連結するとともに隣接する単位 ブロックAの単位ベース2と単位ベース2との間の空間wにコンクリートを流し 込んで連続状態とすることで、プレハブ基礎を構築するようにしながら、並列敷 設した単位ブロツクA・A同志が互いに引き合う状態として継目部分をきれいに 密着させた状態として連結し、かつ、土台の支承面となる上端面における継目部 分を狂いのないように揃え、しかも、単位ブロックAの単位ベース2と単位ベー ス2との間に形成される空間wに流し込んで成形するコンクリートが、単位基礎 1の下縁との間に狂いのないようきれいに仕上げられる新たな手段を提供するこ とを目的とする。[0008] The present invention was made in order to solve these problems that have arisen with conventional means. The unit foundation 1 and the unit base 2, which has a shorter left and right length than the unit foundation 1, are made of iron. The unit block A is formed by forming it in a continuous manner with reinforced concrete, The unit blocks A... are arranged in a row on the site where the roots have been cut and chestnut stones have been laid. The unit blocks A... are connected by connecting members, and the adjacent units Pour concrete into the space w between unit base 2 and unit base 2 of block A. By constructing a continuous state, parallel construction is possible while constructing a prefabricated foundation. Clean the joints so that the set unit blocks A and A are attracted to each other. A joint at the upper end surface that is connected in a close contact state and serves as the support surface for the foundation. Align the minutes without any deviation, and also make sure that the unit base 2 of unit block A and the unit base The concrete poured and formed into the space w formed between the unit foundation and To provide a new means for finishing neatly without any deviation between the lower edge of 1. aimed to.

【0009】[0009]

【課題を解決するための手段】[Means to solve the problem]

そして、本考案においては、上述の目的を達成するための手段として、建物の 土台を載架せしめる上端面の左右の両端部位に連結板を締着する締付ボルトを植 設し、左右の両端部には、連結ボルトより幾分長い長さで左右方向に連続する連 結ボルト挿通孔をそれの開口が左右の側端面に開放するよう装設するとともに、 前後の壁面の前記連結ボルト挿通孔の長手方向の中間に対応する部位に操作口を 開設した単位基礎と、側断面が略台形の平盤状で前記単位基礎より左右の長さを 短くした単位ベースとを、単位基礎の両端部の下縁が単位ベースの左右の両側に 延出部として垂下する形状に、鉄筋コンクリートにより一体に連続成形した単位 ブロックを形成し、この単位ブロックを、敷地に根切りして形成した溝に列状に 並列させて敷設し、それら単位ブロックの隣接する単位基礎と単位基礎とを、前 記連結ボルト挿通孔内に予め装入しておく連結ボルトとそれに操作口を介して螺 合する締付ナットとにより緊縛するとともに上端面の端部間に渡架する連結板に より連結し、隣接する単位ブロックの単位ベースと単位ベースとの間に形成され る空間にコンクリートを打込み、単位ベースと倣う形状に成形して、単位ブロッ クを結合することにより構築することを特徴とする木造家屋用のプレハブ基礎を 提起するものである。 In this invention, as a means to achieve the above purpose, the building Tightening bolts to fasten the connecting plate are planted at both left and right ends of the upper end surface on which the foundation is placed. At both the left and right ends, there is a connection bolt that is slightly longer than the connection bolt and continues in the left and right direction. The connecting bolt insertion hole is installed so that its opening opens on the left and right side end surfaces, and An operation port is provided at a location corresponding to the longitudinal middle of the connecting bolt insertion hole on the front and rear walls. The unit foundation that has been opened is a flat plate with a side cross section of approximately trapezoid, and the length from the left and right of the unit foundation is Place the shortened unit base so that the lower edges of both ends of the unit base are on both the left and right sides of the unit base. A unit made of reinforced concrete and continuously formed into a shape that hangs down as an extension. Blocks are formed, and these unit blocks are placed in rows in a groove formed by root cutting on the site. The unit blocks are laid in parallel, and the adjacent unit foundations and unit foundations of the unit blocks are laid in parallel. Insert the connecting bolt into the connecting bolt insertion hole in advance and screw it into the connecting bolt through the operation port. It is tightened by a matching tightening nut, and the connecting plate spans between the ends of the upper end surface. connected between the unit bases of adjacent unit blocks. Concrete is poured into the space created by the unit block, and is formed into a shape that follows the unit base. A prefabricated foundation for a wooden house that is constructed by joining together This is something I would like to raise.

【0010】0010

【実施例】【Example】

次に実施例を図面に従い詳述する。なお、図面符号は従前手段のものと同効の 構成部材については同一の符号を用いるものとする。 Next, embodiments will be described in detail with reference to the drawings. In addition, the drawing symbols have the same effect as those in the previous means. The same reference numerals will be used for the constituent members.

【0011】 図4は本考案を実施せる単位ブロックAの斜視図で、同図において1は単位基 礎、2は単位ベース、10は単位基礎1の前後方向の壁面に設けた連結ボルト締 付け用の操作口、11は単位基礎1の下縁側で、単位ベース2から左右に張り出 部位に、下方の空間wに向け垂下するように延出させた延出部、12は建物の土 台3を載架する単位基礎1の上端面1aの両端部位に植設した連結板締付用の締 付ボルトを示す。[0011] FIG. 4 is a perspective view of a unit block A in which the present invention can be implemented, and in the figure, 1 is a unit base. Foundation, 2 is the unit base, 10 is the connection bolt tightening provided on the front and rear walls of the unit foundation 1. The operation port 11 for attachment is located on the lower edge side of the unit base 1, and extends from the unit base 2 to the left and right. An extension part 12 extends downwardly toward the space w below, and 12 is the earth of the building. Fasteners for tightening connecting plates installed at both ends of the upper end surface 1a of the unit foundation 1 on which the platform 3 is mounted. The attached bolt is shown.

【0012】 単位基礎1は、上端面1aに木造家屋の土台3を載架するよう通常構築する基 礎を、一定の単位長さに分割した形態のものであって、型枠内に鉄筋を配位して コンクリートを流し込むことにより、高さと巾方向となる前後の厚さとが建築基 準に適応する寸法で、長手方向となる左右方向の長さLが1米前後の適宜寸法に 選定する単位長さとなるように形成してある。0012 The unit foundation 1 is a foundation that is normally constructed so that the foundation 3 of a wooden house is placed on the upper end surface 1a. It is a form in which the foundation is divided into fixed unit lengths, and reinforcing bars are arranged within the formwork. By pouring concrete, the thickness of the front and back in the height and width direction is the same as the building base. The length L in the left and right direction (longitudinal direction) is approximately 1 meter. It is formed to have the selected unit length.

【0013】 該単位基礎1の上端面1aには、少なくとも両端部位を浅いチャンネル状に形 成した通気溝13が長手方向に連続するよう形成してあり、長手方向の中間部位 には、その通気溝13を該単位基礎1の前後方向の外部に連通させる水切り14 が形設してある。また、前記通気溝13の長手方向の両端部には、連結板4(後 述する)を締着するための前記締付ボルト12・12が溝底から上方に短く突出 するように植設してある。[0013] The upper end surface 1a of the unit foundation 1 has at least both end portions shaped into a shallow channel shape. The ventilation grooves 13 are formed so as to be continuous in the longitudinal direction. , there is a drainer 14 that communicates the ventilation groove 13 with the outside of the unit foundation 1 in the front and back direction. has been established. Further, a connecting plate 4 (rear The tightening bolts 12, 12 for tightening (described above) protrude briefly upward from the groove bottom. It is planted to do so.

【0014】 さらに、この単位基礎1の上端面1aには、そこに載架した土台3を固定する ためのアンカーボルト15…が適宜位置に植設され、また、基礎を構築し終えて それに建物を構築したときにその建物の床下空間を換気するための換気窓用の切 欠窓16が、適宜位置に形設される。この切欠窓16は、全ての単位ブロックA の単位基礎1に具備させるのではなく、所望に選択される単位ブロックAの単位 基礎1にだけ形設するようにする。[0014] Furthermore, a foundation 3 mounted thereon is fixed to the upper end surface 1a of this unit foundation 1. Anchor bolts 15 for In addition, when a building is constructed, ventilation windows are installed to ventilate the space under the floor of the building. A cutout window 16 is formed at an appropriate position. This cutout window 16 is provided in all unit blocks A. The units of the unit block A that are selected as desired instead of being provided in the unit base 1 of Make sure to form only on foundation 1.

【0015】 また、この単位基礎1の長手方向の両端部には、その長手方向の端面に開放す る開口50から長手方向に沿い内部に向けて嵌入していく連結ボルト挿通孔5… が、上下に並列して複数個設けてある。この連結ボルト挿通孔5…は、図7に示 している如く、並列させて敷設した単位ブロックAと単位ブロツクAとを、互い に引き寄せるよう緊縛する連結ボルト5を挿通するための挿通孔であり、同図7 における最上位の連結ボルト挿通孔5にあるよう、開口50から内部に嵌入して いく深さが、使用する連結ボルト6の長さよりも幾分長くなるように形成される 。[0015] In addition, at both ends of the unit foundation 1 in the longitudinal direction, openings are provided on the end faces of the unit foundation 1 in the longitudinal direction. A connecting bolt insertion hole 5 is inserted into the opening 50 along the longitudinal direction toward the inside. A plurality of them are arranged in parallel vertically. This connecting bolt insertion hole 5 is shown in Fig. 7. As shown in the figure, unit block A and unit block A installed in parallel are connected to each other. This is an insertion hole for inserting the connecting bolt 5 that is tightened so as to be pulled toward the Insert it into the inside from the opening 50 so that it is in the uppermost connecting bolt insertion hole 5 in The depth of the connecting bolt 6 is formed to be somewhat longer than the length of the connecting bolt 6 used. .

【0016】 そして、前述の連結ボルト操作用の操作口10…は、この連結ボルト挿通孔5 の長手方向の丁度中間に位置する部位を横切るように配位して、該単位基礎1の 前後の壁面のうちの、建物の内部側となる壁面に装設してあって、これにより、 連結ボルト6を、前記連結ボルト挿通孔5内に予め装入しておいて、その単位ブ ロックAを図7の如く既に敷設し終えている単位ブロックAに継ぎ合わせたとき に、この操作口10…から差し込む手または適宜の工具により、連結ボルト6を 、図7において中段位および下段位の連結ボルト挿通孔5…の内部に示している 如く動かして、隣接する単位ブロックAの単位基礎1に設けてある連結ボルト挿 通孔5との間に渡架される状態とする。そして、このとき、連結ボルト6の各軸 端部のねじ部6a・6aに、前記操作口10…から装入する締付ナット7…を螺 合し、それを、図8に示しているように、操作口10の壁面に床板70を介し圧 接さすよう締付けていくことで、継ぎ合わせた単位ブロックAと単位ブロックA とを、連結ボルト6により互いに引き寄せ、図9に示しているように連続するよ うにしている。[0016] The aforementioned operation port 10 for operating the connecting bolt is the connecting bolt insertion hole 5. The unit foundation 1 It is installed on the inside wall of the building among the front and rear walls, and as a result, The connecting bolt 6 is inserted into the connecting bolt insertion hole 5 in advance, and the unit bolt 6 is inserted into the connecting bolt insertion hole 5 in advance. When lock A is joined to unit block A that has already been laid as shown in Figure 7. Then, insert the connecting bolt 6 by hand or with an appropriate tool through the operation port 10. , shown inside the middle and lower connecting bolt insertion holes 5 in Figure 7. Insert the connecting bolts installed on the unit foundation 1 of the adjacent unit block A. It is placed in a state where it is suspended between it and the through hole 5. At this time, each axis of the connecting bolt 6 Screw the tightening nut 7, which is inserted through the operation port 10, into the threaded portions 6a, 6a at the ends. As shown in FIG. By tightening them so that they touch, unit block A and unit block A are joined together. are drawn together by the connecting bolt 6 so that they are continuous as shown in FIG. I'm doing it.

【0017】 しかして、単位基礎1は、上述の如き形態として型枠に流し込むコンクリート により、単位ベース2と一体に連続させて成形するが、その際、該単位基礎1の 長さLが前述の図4にあるよう単位ベース2の左右方向の長さより長く形成する 。そして、単位ベース2の左右の端部から側方に張り出すようになる該単位基礎 1の左右の両端部は、それの下縁側に、単位ベース2の両端部に形成される空間 wに向けて、単位ベース2の上面よりも下方に突出する延出部11・11が形設 してある。[0017] Therefore, the unit foundation 1 is made of concrete poured into formwork as described above. , it is molded integrally and continuously with the unit base 2, but at that time, the unit base 1 The length L is longer than the length of the unit base 2 in the left and right direction as shown in FIG. 4 above. . The unit foundation extends laterally from the left and right ends of the unit base 2. Both left and right ends of unit base 2 have spaces formed at both ends of unit base 2 on the lower edge side thereof. Extending portions 11, 11 are formed to protrude downward from the upper surface of the unit base 2 toward w. It has been done.

【0018】 上記単位基礎1と一体に連続させてコンクリートにより成形する単位ベース2 は、図6に示している如く、前後の巾を前記単位基礎1の前後の巾の数倍に広げ た側面視において、略台形の盤状に成形する通常のものである。該単位ベース2 は、前述の単位基礎1の左右の長さLより短い長さに成形してあって、左右の両 端部の各外側で単位基礎1の左右の両端部の各下方となる部位に空間wを形成す るようにしてある。[0018] Unit base 2 formed with concrete and continuous with the unit foundation 1 above As shown in Figure 6, the front and rear widths are expanded to several times the front and rear widths of the unit foundation 1. When viewed from the side, it is a normal type formed into a substantially trapezoidal disk shape. Unit base 2 is formed to a length shorter than the left and right length L of the unit foundation 1 mentioned above, and A space w is formed below each of the left and right ends of the unit foundation 1 on the outside of each end. It is designed so that

【0019】 そして、該単位ベース2の左右の両端面には、内部に配設した鉄筋から延出さ せた鉄筋20…が、この空間wに向けて突出させてあって、単位ブロックAに成 形してその単位ブロックAを並列敷設し空間wにコンクリートを流し込むときに 、この鉄筋20…が流し込むコンクリートの内部配筋となるようにしてある。[0019] On both the left and right end surfaces of the unit base 2, there are reinforcing bars installed inside. The reinforced reinforcing bars 20... are made to protrude toward this space w, forming a unit block A. When forming and laying the unit blocks A in parallel and pouring concrete into the space w. , these reinforcing bars 20... are designed to serve as internal reinforcement for the concrete to be poured.

【0020】 次に図10は、列状に並列させて敷設した単位ブロックA…の隣接する単位基 礎1の上端面1aと上端面1aとを連結する連結板4を示している。この連結板 4は、単位基礎1の上端面1aに形設せる通気溝13に嵌合する巾の帯板状に作 られた金属板であり、継ぎ合わされている単位基礎1と単位基礎1との各上端面 1aの端部に植設してある締付ボルト12・12間に渡架する長さに形成してあ って、締付ボルト12・12と対応する部位には、ボルト穴40…が開設してあ る。[0020] Next, FIG. 10 shows the adjacent unit blocks of unit blocks A... laid in parallel in a row. A connecting plate 4 connecting the upper end surface 1a and the upper end surface 1a of the foundation 1 is shown. This connecting plate 4 is made in the shape of a strip with a width that fits into the ventilation groove 13 formed on the upper end surface 1a of the unit foundation 1. Each upper end surface of the unit foundation 1 and the unit foundation 1 which are metal plates joined together It is formed to a length that spans between the tightening bolts 12 installed at the end of 1a. Therefore, bolt holes 40... are opened in the parts corresponding to the tightening bolts 12, 12. Ru.

【0021】 次に、図12は、本考案による単位ブロックAの変形例を示している。図4乃 至図6に示した単位ブロックAは、構築する基礎の中間部位に用いられる最も普 遍的な形態のものであり、コーナー部分または、分岐部分には、それらに適応す る形態のものに変更して形成されたものが使用される。[0021] Next, FIG. 12 shows a modification of the unit block A according to the present invention. Figure 4 The unit block A shown in Figure 6 is the most commonly used intermediate part of the foundation to be constructed. It has a universal shape, and corners or branching parts have an appropriate shape. A modified form is used.

【0022】 即ち、コーナー部分に用いられる単位ブロックAは、前述した単位ブロックA ’の単位基礎1および単位ベース2が、平面視においてL字形に屈曲した形態の ものに成形し、また、分岐部分に用いる単位ブロックA”にあっては、単位ブロ ックAの単位基礎1および単位基礎1が、平面視においてT字形または十字形と なるように成形する。[0022] That is, the unit block A used for the corner portion is the unit block A described above. ’ unit base 1 and unit base 2 are bent into an L-shape in plan view. For the unit block A'', which is molded into a product and used for branching parts, the unit block Unit foundation 1 and unit foundation 1 of block A are T-shaped or cross-shaped in plan view. Shape it to look like this.

【0023】 これら、コーナー部分に用いる単位ブロックA’及び分岐部分に用いる単位ブ ロックA”は、それらの単位基礎1および単位ベース2が、平面視でL字形また はT字形に連続する形状となるだけで、その余の構成は、単位ブロックAと変わ りなく作られている。[0023] These are the unit block A' used for the corner part and the unit block used for the branch part. Rock A" has unit base 1 and unit base 2 that are L-shaped or is a continuous T-shape, and the rest of the configuration is different from unit block A. It is made without any hassle.

【0024】[0024]

【作用】[Effect]

このように構成せる実施例装置は次のように作用する。 プレハブ基礎を構築する際、敷地に、図2および図3に示している如く、根切 りして形成した溝Bの底に栗石Kを敷き込み、その上にモルタルMを流して均平 に仕上げておき、そのモルタルMの上に、単位ブロックA…を載置していくこと は従来手段と同様である。 The embodiment device constructed in this manner operates as follows. When constructing a prefabricated foundation, root cuts are made on the site as shown in Figures 2 and 3. Place chestnut stone K at the bottom of groove B formed by scraping, and pour mortar M on top of it to level it. Finish it up and place unit block A on top of that mortar M. is the same as the conventional means.

【0025】 しかし、このとき、各単位ブロックAの単位基礎1の長手方向の両端部に装設 してある連結ボルト挿通孔5…内には、それらのうちの長手方向の一端側の連結 ボルト挿通孔5…に、別に形成してある連結ボルト6…をそれぞれ装入しておく 。[0025] However, at this time, the unit foundation 1 of each unit block A is installed at both ends of the unit foundation 1 in the longitudinal direction. In the connecting bolt insertion hole 5... there is a connecting bolt at one end in the longitudinal direction. Separately formed connecting bolts 6 are inserted into each of the bolt insertion holes 5. .

【0026】 そして、一つの単位ブロックAを所定の位置に据え、次いで、隣接位置に次の 単位ブロックAを継ぎ合わせるように配置したとき、単位基礎1の壁面に開設し てある連結ボルト締付用の操作口10…から手または適宜の工具を差し込んで、 その操作口10内に露出している連結ボルト6の長手方向の中間部を掴んで、継 ぎ合わせた側の単位ブロックAの側の連結ボルト挿通孔5に向けて送り込み、そ の操作で、連結ボルト6の端部が、継ぎ合わされている2つの単位ブロックA・ Aのそれぞれの操作口10・10に露出してくる状態とする。[0026] Then, one unit block A is placed in a predetermined position, and then the next unit block A is placed in an adjacent position. When unit blocks A are arranged so as to be joined together, Insert your hand or an appropriate tool into the operation port 10 for tightening the connecting bolt, Grasp the longitudinal middle part of the connecting bolt 6 exposed in the operation port 10, and Insert the bolt into the connecting bolt insertion hole 5 on the side of the unit block A that has been joined together, and then With this operation, the ends of the connecting bolts 6 are connected to the two unit blocks A. The operation ports 10 and 10 of A are exposed to each other.

【0027】 次に、この状態において、操作口10・10から座板70および締付ナット7 を挿入して、連結ボルト6の各端部に嵌挿し、締付ナット7を螺じ込んでいく。[0027] Next, in this state, the seat plate 70 and the tightening nut 7 are are inserted into each end of the connecting bolt 6, and the tightening nut 7 is screwed in.

【0028】 これにより、継ぎ合わせた2つの単位ブロックA・Aは、連結ボルト6に螺合 する締付ナット7の締付けで、互いに引き寄せられるようになって強力に密接し ていく。[0028] As a result, the two unit blocks A and A that have been joined together are screwed into the connecting bolt 6. By tightening the tightening nut 7, they will be drawn to each other and come into close contact with each other. To go.

【0029】 次に、単位ブロックA・Aの上端面1a・1aの継ぎ合わせ部位に、連結板4 を渡架して、ボルト穴40・40を前記上端面1a・1aに植設してある締付ボ ルト12・12に嵌挿して締付ナット41・41により締着し、この上端面1a ・1aの継ぎ合わせ部を固定する。[0029] Next, a connecting plate 4 is attached to the joint portion of the upper end surfaces 1a, 1a of the unit blocks A, A , and tighten the bolt holes 40 and 40 on the upper end surfaces 1a and 1a. the upper end surface 1a. ・Fix the joint part 1a.

【0030】 次いで、継ぎ合わされた単位ブロックA・Aの単位ベース2間に形成される空 間w・wに突出してきている鉄筋20…を緊縛し、そこにコンクリートを流し込 み、単位ベース2・2に倣う形状に成形する。このとき、各単位基礎1の両端部 の下縁に形設してある延出部11・11が、空間w・wに流し込んで成形するコ ンクリートの中に埋没していき、コンクリートの固結によりこの延出部11・1 1を抱き込んだ状態となる。[0030] Next, the space formed between the unit bases 2 of the joined unit blocks A and A is Tighten the reinforcing bars 20 that are protruding between w and w, and pour concrete there. and mold it into a shape that follows the unit base 2. At this time, both ends of each unit foundation 1 The extending parts 11 formed on the lower edge of the mold are formed by pouring into the space w. The extension part 11.1 is buried in the concrete and solidified by the concrete. It becomes a state where 1 is embraced.

【0031】 次に、次々位に並ぶ別の単位ブロックAを継ぎ合わせ、同様の操作により連結 する。そして、これにより、図13に示している如く、プレハブ基礎に構築する 。[0031] Next, connect other unit blocks A that are lined up one after the other and connect them by the same operation. do. As a result, as shown in Figure 13, it is constructed on a prefabricated foundation. .

【0032】[0032]

【考案の効果】[Effect of the idea]

以上説明したように本考案による木造家屋用のプレハブ基礎は、単位基礎1と 単位ベース2とを鉄筋コンクリートにより一体に連続させて成形した単位ブロッ クA…を敷地に根切りして形成した溝Bに、列状に敷設して、継ぎ合わせた部位 を一体的に接続することで構築するに際し、単位ブロックAの単位基礎1と単位 ブロックAの単位基礎1との継ぎ合わせ部位の連結を、それら単位基礎1…に形 設しておく連結ボルト挿通孔5…に予め嵌挿しておいた連結ボルト6を、単位基 礎1の壁面に形設した操作口10…からの操作で、隣接する単位基礎1・1の連 結ボルト挿通孔5と連結ボルト挿通孔5との間に渡架される状態として、それぞ れの操作口10・10の壁面10a・10a間を近づけるように緊縛し、また、 上端面1a・1aの両端部を連結板4により連結するようにし、さらに、隣接す る単位ベース2・2間に形成される空間wに流し込むコンクリートの中に、単位 基礎1の両端部の下縁に形設した延出部11・11が、埋没していくようにして いるのだから、並列させて継ぎ合わせた単位ブロックA…の継ぎ合わせ部が、互 いに引き寄せられて密着し、また、上端面1a・1aの継ぎ合わせ部位がきれい に揃い、しかも、空間wにコンクリートを流し込んたときに、単位ブロックAが 長さを短くしている単位ベース2を支点として旋回するのが延出部11・11に より阻止されるようになる。 As explained above, the prefabricated foundation for a wooden house according to the present invention is the unit foundation 1. A unit block formed by integrally and continuously forming the unit base 2 with reinforced concrete. A section where the roots of A... are laid in a row in a groove B formed by cutting the roots on the site, and the parts are joined together. When constructing by integrally connecting unit block A, unit base 1 of unit block A and unit The connection of the joint parts with the unit foundation 1 of block A is shaped into those unit foundations 1... Connecting bolts 6 that have been inserted in advance into connecting bolt insertion holes 5 are inserted into the unit base. By operating from the operation port 10 formed on the wall of foundation 1, the connection between adjacent unit foundations 1 and 1 is As a state of being bridged between the connecting bolt insertion hole 5 and the connecting bolt insertion hole 5, each The walls 10a and 10a of the operation ports 10 and 10 are tied together so that they are brought close to each other, and Both ends of the upper end surfaces 1a and 1a are connected by a connecting plate 4, and The unit base 2 is poured into the space w formed between the unit bases 2 and 2. The extension parts 11 formed at the lower edges of both ends of the foundation 1 are buried in the ground. Therefore, the joint parts of unit blocks A... which are connected in parallel are The joints of the upper end surfaces 1a and 1a are clean. , and when concrete is poured into space w, unit block A is The extension parts 11 and 11 pivot around the unit base 2 whose length is shortened as a fulcrum. become more blocked.

【0033】 従って、単位基礎1とそれよりも左右の長さの短い単位ベース2とを、鉄筋コ ンクリートにより一体に連続するよう成形して単位ブロックA…を形成し、その 単位ブロックA…を、敷地に根切りして栗石を敷込んだところに列状に並べて敷 設し、それら単位ブロックA…を連結部材で連結するとともに隣接する単位ブロ ックの単位ベースと単位ベースとの間の空間にコンクリートを流し込んで連続状 態とすることで、プレハブ基礎を構築するようにしながら、並列敷設した単位ブ ロツク同志が互いに引き合う状態として継目部分をきれいに密着させた状態とし て連結し、かつ、土台の支承面となる上端面1aにおける継目部分を狂いのない ように揃え、しかも、単位ブロックAの単位ベース2と単位ベース2との間に形 成される空間wに流し込んで成形するコンクリートが、単位基礎1の下縁との間 の狂いがないようきれいに仕上げられるようになる。[0033] Therefore, the unit foundation 1 and the unit base 2, which has a shorter left and right length, are connected to the reinforcing bar. The unit block A is formed by integrally continuous molding with concrete, and the Unit blocks A... are laid out in rows on the site where the roots have been cut and chestnut stones have been laid. The unit blocks A... are connected by a connecting member, and the adjacent unit blocks Concrete is poured into the space between the unit bases of the blocks to create a continuous shape. By constructing a prefabricated foundation, unit blocks laid in parallel can be constructed. The joints should be in a state in which the locks are attracted to each other, and the joints should be in close contact with each other. and connect the joints at the upper end surface 1a, which will be the supporting surface of the foundation, without any deviation. In addition, there is a shape between unit base 2 and unit base 2 of unit block A. The concrete to be poured and formed into the created space w is between the lower edge of the unit foundation 1. You will be able to finish it neatly so that there are no irregularities.

【図面の簡単な説明】[Brief explanation of drawings]

【図1】従前手段の単位ブロックの斜視図である。FIG. 1 is a perspective view of a unit block of a conventional means.

【図2】同上単位ブロックを敷設する根切りした溝の断
面図である。
FIG. 2 is a cross-sectional view of a cut groove in which the unit blocks are laid.

【図3】同上溝のモルタルで仕上だ状態の断面図であ
る。
FIG. 3 is a cross-sectional view of the groove finished with mortar.

【図4】本考案を実姉せる単位ブロックの斜視図であ
る。
FIG. 4 is a perspective view of a unit block that embodies the present invention.

【図5】同上単位ブロックの後面図である。FIG. 5 is a rear view of the unit block.

【図6】同上単位ブロックの側面図である。FIG. 6 is a side view of the unit block same as above.

【図7】同上単位ブロックの継ぎ合わせた状態における
部分の一部破断した後面図である。
FIG. 7 is a partially cutaway rear view of the unit blocks in a joined state;

【図8】同上単位ブロックの連結ボルトによる連結の操
作工程の説明図である。
FIG. 8 is an explanatory diagram of the operation process for connecting the unit blocks with the connecting bolts.

【図9】同上単位ブロックの連結ボルトにより連結し終
えた状態の説明図である。
FIG. 9 is an explanatory view of the unit block in a state in which the unit blocks have been connected using connection bolts.

【図10】同上単位ブロックの上端面部およびその上端
面を連結する連結板の斜視図である。
FIG. 10 is a perspective view of an upper end surface of the unit block and a connecting plate connecting the upper end surfaces.

【図11】同上単位ブロックの上端面部の連結板により
連結した状態の斜視図である。
FIG. 11 is a perspective view of the unit blocks connected by a connecting plate on the upper end surface thereof.

【図12】同上単位ブロックの変形例の説明図である。FIG. 12 is an explanatory diagram of a modified example of the unit block same as above.

【図13】同上単位ブロックを敷設して構築したプレハ
ブ基礎の斜視図である。
FIG. 13 is a perspective view of a prefabricated foundation constructed by laying unit blocks same as above.

【符号の説明】[Explanation of symbols]

A…単位ブロック、a…連結板、b…連結ボルト、c…
締付ナット、B…溝、K…栗石、M…モルタル、L…長
さ、w…空間、1…単位基礎、1a…上端面、10…操
作口、10a…壁面、11…延出部、12…締付ボル
ト、13…通気溝、14…水切、15…アンカーボル
ト、16…切欠窓、2…単位ベース、20…鉄筋、3…
土台、4…連結板、40…ボルト穴、41…締付ナッ
ト、5…連結ボルト挿通孔、50…開口、6…連結ボル
ト、6a…ねじ部、7…締付ナット、70…床板。
A...Unit block, a...Connection plate, b...Connection bolt, c...
Tightening nut, B...Groove, K...Chestnut stone, M...Mortar, L...Length, w...Space, 1...Unit foundation, 1a...Top end surface, 10...Operation port, 10a...Wall surface, 11...Extension part, 12... Tightening bolt, 13... Ventilation groove, 14... Drainer, 15... Anchor bolt, 16... Notch window, 2... Unit base, 20... Rebar, 3...
Base, 4... Connecting plate, 40... Bolt hole, 41... Tightening nut, 5... Connecting bolt insertion hole, 50... Opening, 6... Connecting bolt, 6a... Threaded portion, 7... Tightening nut, 70... Floor plate.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 建物の土台3を載架せしめる上端面1a
の左右の両端部位に連結板4を締着する締付ボルト12
・12を植設し、左右の両端部には、連結ボルト6より
幾分長い長さで左右方向に連続する連結ボルト挿通孔5
…をそれの開口50が左右の側端面に開放するよう装設
するとともに、前後の壁面の前記連結ボルト挿通孔5の
長手方向の中間に対応する部位に操作口10を開設した
単位基礎1と、側断面が略台形の平盤状で前記単位基礎
1より左右の長さを短くした単位ベース2とを、単位基
礎1の両端部の下縁が単位ベース2の左右の両側に延出
部11・11として垂下する形状に、鉄筋コンクリート
により一体に連続成形した単位ブロックAを形成し、こ
の単位ブロックAを、敷地に根切りして形成した溝Bに
列状に並列させて敷設し、それら単位ブロックA…の隣
接する単位基礎1と単位基礎1とを、前記連結ボルト挿
通孔5内に予め装入しておく連結ボルト6とそれに操作
口10を介して螺合する締付ナット7とにより緊縛する
とともに上端面1a・1aの端部間に渡架する連結板4
により連結し、隣接する単位ブロックAの単位ベース2
と単位ベース2との間に形成される空間wにコンクリー
トを打込み、単位ベース2と倣う形状に成形して、単位
ブロックA…を結合することにより構築することを特徴
とする木造家屋用のプレハブ基礎。
[Claim 1] Upper end surface 1a on which the foundation 3 of the building is placed.
Tightening bolts 12 that fasten the connecting plate 4 at both left and right end portions of the
・A connection bolt insertion hole 5 is provided at both left and right ends of the connection bolt 6 with a length that is somewhat longer than that of the connection bolt 6 and continues in the left and right direction.
... is installed so that its opening 50 opens on the left and right side end surfaces, and an operating port 10 is provided at a location corresponding to the longitudinal middle of the connecting bolt insertion hole 5 on the front and rear walls. , a unit base 2 having a flat plate shape with a substantially trapezoidal side cross section and having a shorter left and right length than the unit foundation 1; 11.11, unit blocks A are integrally and continuously molded from reinforced concrete in a hanging shape, and these unit blocks A are laid in parallel in rows in grooves B formed by root cutting on the site. Adjacent unit foundations 1 and unit foundations 1 of unit blocks A are connected by a connecting bolt 6 inserted in advance into the connecting bolt insertion hole 5 and a tightening nut 7 screwed into the connecting bolt 6 through the operating port 10. A connecting plate 4 that is tied together and spanned between the ends of the upper end surfaces 1a and 1a.
Unit base 2 of adjacent unit block A is connected by
A prefabricated wooden house characterized in that it is constructed by pouring concrete into the space w formed between the unit base 2 and the unit base 2, forming it into a shape that follows the unit base 2, and joining the unit blocks A... Basics.
JP1991023828U 1991-03-18 1991-03-18 Prefabricated foundation for wooden houses Expired - Lifetime JPH0732599Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1991023828U JPH0732599Y2 (en) 1991-03-18 1991-03-18 Prefabricated foundation for wooden houses

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1991023828U JPH0732599Y2 (en) 1991-03-18 1991-03-18 Prefabricated foundation for wooden houses

Publications (2)

Publication Number Publication Date
JPH04112934U true JPH04112934U (en) 1992-10-01
JPH0732599Y2 JPH0732599Y2 (en) 1995-07-26

Family

ID=31908925

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1991023828U Expired - Lifetime JPH0732599Y2 (en) 1991-03-18 1991-03-18 Prefabricated foundation for wooden houses

Country Status (1)

Country Link
JP (1) JPH0732599Y2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102848765B1 (en) * 2024-07-23 2025-08-21 김헌중 Fastening system for fabricate foundation stone and wall panel of wooden house

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5014802A (en) * 1973-06-18 1975-02-17
JPS63116550U (en) * 1987-01-20 1988-07-27

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5014802A (en) * 1973-06-18 1975-02-17
JPS63116550U (en) * 1987-01-20 1988-07-27

Also Published As

Publication number Publication date
JPH0732599Y2 (en) 1995-07-26

Similar Documents

Publication Publication Date Title
US5845445A (en) Insulated concrete form
RU2136821C1 (en) Wall structure of expanded material and concrete, method and device for its manufacture
US4211043A (en) Precast concrete building module form
US5803669A (en) Thermal-insulated concrete forming system
US7958687B2 (en) Concrete panel construction system
US5901521A (en) Apparatus for dimensionally uniform building construction using interlocking connectors
US6260320B1 (en) Concrete panel construction system
US7837174B2 (en) Modular formwork wall with dovetail joint connectors
US6494004B1 (en) Self jigging concrete wall structure and method of construction
US20080104909A1 (en) Modoular Wall System with Footing Form
CA2038524C (en) Form and method of constructing a wall from pourable concrete material
US6321496B1 (en) Insulated form assembly for a poured concrete wall
JPH04112934U (en) Prefabricated foundations for wooden houses
JP3643809B2 (en) Connection structure of precast concrete foundation blocks
US1955584A (en) Plank construction system
JP3677073B2 (en) Concrete foundation construction unit
AU647783B2 (en) Improved building techniques
JPH07216906A (en) Building foundation and building method
AP100A (en) Shuttering for use in building construction.
KR200147067Y1 (en) Internal and external wall assembly device for building
JPH0352822Y2 (en)
JP3689168B2 (en) Insulated foundation block combined with formwork
CA2522665C (en) Modular wall system with footing form
JPH0447248Y2 (en)
JPH0225064Y2 (en)