JPH0416575B2 - - Google Patents

Info

Publication number
JPH0416575B2
JPH0416575B2 JP27315086A JP27315086A JPH0416575B2 JP H0416575 B2 JPH0416575 B2 JP H0416575B2 JP 27315086 A JP27315086 A JP 27315086A JP 27315086 A JP27315086 A JP 27315086A JP H0416575 B2 JPH0416575 B2 JP H0416575B2
Authority
JP
Japan
Prior art keywords
reinforcing bar
bars
reinforcing bars
mesh
main reinforcing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP27315086A
Other languages
Japanese (ja)
Other versions
JPS63125730A (en
Inventor
Yasunori Kobayashi
Hiroshi Kaneko
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP27315086A priority Critical patent/JPS63125730A/en
Publication of JPS63125730A publication Critical patent/JPS63125730A/en
Publication of JPH0416575B2 publication Critical patent/JPH0416575B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)
  • Reinforcement Elements For Buildings (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明は、梁成の大きい鉄筋コンクリート構
造の地中梁の施工法に関するものである。
[Detailed Description of the Invention] [Industrial Application Field] The present invention relates to a method of constructing an underground beam for a reinforced concrete structure with a large beam size.

〔従来技術およびこの発明が解決すべき問題点〕[Prior art and problems to be solved by this invention]

梁成が2m以上にもなる地中梁の施工に際して
は、鉄筋の配筋を現場施工するのに多くの仮設資
材を必要とし、鉄筋の組立作業に多くの手間を要
する等種々の問題があつた。そこでプレハブ化さ
れたメツシユ鉄筋を利用し、自立させたメツシユ
鉄筋の剛性を利用して各鉄筋を保持させる工法
が、例えば特公昭61−14294号公報、特公昭61−
14295号公報等において開示されている。
When constructing underground beams with a beam length of 2 meters or more, there are various problems such as the need for a large amount of temporary materials to construct the reinforcing bars on-site, and the labor required to assemble the reinforcing bars. Ta. Therefore, there is a construction method that uses prefabricated mesh reinforcing bars and uses the rigidity of the freestanding mesh reinforcing bars to hold each reinforcing bar, for example, in Japanese Patent Publication No. 61-14294,
This is disclosed in Publication No. 14295, etc.

しかしこの従来の施工法でも、なお鉄筋の組立
てに際して面倒な作業が必要であり、さらに容易
に短時間で鉄筋の組立てを行うことのできる施工
法が望まれていた。
However, even with this conventional construction method, troublesome work is still required when assembling the reinforcing bars, and a construction method that can more easily assemble the reinforcing bars in a short time has been desired.

この発明は前述した事情に鑑みて創案されたも
ので、その目的は容易に短時間で地中梁形成用鉄
筋の組立てを行うことのできる鉄筋コンクリート
地中梁の施工法を提供することにある。
This invention was devised in view of the above-mentioned circumstances, and its purpose is to provide a method for constructing reinforced concrete underground beams that allows reinforcing bars for forming underground beams to be easily assembled in a short time.

〔問題点を解決するための手段〕[Means for solving problems]

この発明は基盤上に鉄筋組立支柱を設置すると
共に、この支柱上部の腕杆上に上部主鉄筋を配筋
し、次いで下部スタラツプが連続している側部ス
タラツプに複数の腹筋が設けられてなる第1メツ
シユ鉄筋を、側部スタラツプ上部において前記上
部主鉄筋に係止して設置すると共に、この第1メ
ツシユ鉄筋の下部スタラツプに下部主鉄筋を設置
し、次いで上部スタラツプが連続している側部ス
タラツプに複数の腹筋が設けられてなる第2メツ
シユ鉄筋を、上部スタラツプにおいて前記上部主
鉄筋上に係止して設置する鉄筋コンクリート地中
梁の施工法である。
In this invention, a reinforcing bar assembly column is installed on the foundation, upper main reinforcing bars are arranged on the arm rod at the top of this column, and then a plurality of abdominal bars are provided on the side braces to which the lower braces are continuous. A first mesh reinforcing bar is installed by locking it to the upper main reinforcing bar at the upper part of the side strut, and a lower main reinforcing bar is installed at the lower strut of the first mesh reinforcing bar, and then the lower main reinforcing bar is installed at the side part where the upper strut is continuous. This is a method of constructing a reinforced concrete underground beam in which a second mesh reinforcing bar, in which a plurality of abdominal bars are provided on the stirrup, is fixed and installed on the upper main reinforcing bar at the upper mast.

〔実施例〕〔Example〕

以下この発明を第1図〜第6図に示す実施例に
基いて説明する。
The present invention will be explained below based on the embodiments shown in FIGS. 1 to 6.

捨てコンクリート等の基盤A上に鉄筋組立支柱
1を設置すると共に、この支柱1の上部の腕杆1
a上に上部主鉄筋2を配筋する。(第1図および
第2図参照) 次いで下部スタラツプ3aが連続している側部
スタラツプ3bに複数の腹筋3cが設けられてな
る第1メツシユ鉄筋3を、側部スタラツプ3bの
上部において上部主鉄筋2に係止して設置すると
共に、この第1メツシユ鉄筋3の下部スタラツプ
3aに下部主鉄筋4を設置する。(第3図および
第4図参照) 次いで上部スタラツプ5aが連続している側部
スタラツプ5bに複数の腹筋5cが設けられてな
る第2メツシユ鉄筋5を、上部スタラツプ5aに
おいて上部主鉄筋2上に係止して設置する。(第
5図参照) そして第1および第2メツシユ鉄筋3,5の側
部スタラツプ3b,5bの腹筋3c,5cに、巾
止め筋6を取付ける。(第6図参照) このようにして地中梁用の配筋が完成したら、
周囲に型枠を設置すると共に、コンクリートの打
設および凝固後の脱型を行うことで地中梁の施工
が完了する。(図示せず) 〔発明の効果〕 この発明の施工法によれば仮設材として上部主
鉄筋を支持する支柱のみとすることができる。ま
たこの支柱にスタラツプ筋および腹筋でプレハブ
化された第1、第2メツシユ鉄筋を設置すると共
に、このメツシユ鉄筋に下部主鉄筋を設置するだ
けの簡単な作業で地中梁用配筋の組立てが行え
る。
A reinforcing steel assembly column 1 is installed on a base A made of waste concrete, etc., and an arm rod 1 at the top of this column 1 is installed.
Arrange the upper main reinforcing bars 2 on top a. (See Figures 1 and 2) Next, the first mesh reinforcing bar 3, which has a plurality of abdominal reinforcements 3c provided on the side strap 3b where the lower strap 3a is continuous, is attached to the upper main reinforcing bar at the upper part of the side strap 3b. At the same time, the lower main reinforcing bar 4 is installed on the lower mast 3a of the first mesh reinforcing bar 3. (See Figures 3 and 4) Next, the second mesh reinforcing bar 5, which has a plurality of abdominal reinforcements 5c provided on the side mast 5b to which the upper slurp 5a is continuous, is placed on the upper main reinforcing bar 2 at the upper slurp 5a. Lock and install. (See FIG. 5) Then, the stopper bars 6 are attached to the abdominal muscles 3c, 5c of the side stirrups 3b, 5b of the first and second mesh reinforcing bars 3, 5. (See Figure 6) Once the reinforcement for the underground beam is completed in this way,
Construction of the underground beam is completed by installing formwork around it, pouring concrete, and removing the mold after solidification. (Not shown) [Effects of the Invention] According to the construction method of the present invention, only the pillars supporting the upper main reinforcing bars can be used as temporary construction materials. In addition, the reinforcement for underground beams can be assembled by simply installing the first and second mesh reinforcing bars, which are prefabricated with starp bars and abdominal bars, on this column, and installing the lower main reinforcing bars on these mesh reinforcing bars. I can do it.

そのため地中梁の施工時間を短縮することがで
きると共に、施工費用を安価にすることができ
る。
Therefore, the construction time for underground beams can be shortened, and construction costs can be reduced.

【図面の簡単な説明】[Brief explanation of drawings]

第1図〜第6図は、この発明の施工過程順序に
示した縦断面図である。 A…基盤、1…鉄筋組立支柱、1a…腕杆、2
…上部主鉄筋、3…第1メツシユ鉄筋、3a…下
部スタラツプ、3b…側部スタラツプ、3c…腹
筋、4…下部主鉄筋、5…第2メツシユ鉄筋、5
a…上部スタラツプ、5b…側部スタラツプ、5
c…腹筋、6…巾止め筋。
1 to 6 are longitudinal sectional views showing the construction process sequence of the present invention. A...Foundation, 1...Reinforcement assembly column, 1a...Arm rod, 2
...Top main reinforcing bar, 3...First mesh reinforcing bar, 3a...Lower stirrup, 3b...Side stirrup, 3c...Abdominal muscle, 4...Lower main reinforcing bar, 5...Second mesh reinforcing bar, 5
a...Top strap, 5b...Side strap, 5
c...abdominal muscles, 6...dragging muscles.

Claims (1)

【特許請求の範囲】 1 基盤上に鉄筋組立支柱を設置すると共に、こ
の支柱上部の腕杆上に上部主鉄筋を配筋し、 次いで下部スタラツプが連続している側部スタ
ラツプに複数の腹筋が設けられてなる第1メツシ
ユ鉄筋を、側部スタラツプ上部において前記上部
主鉄筋に係止して設置すると共に、この第1メツ
シユ鉄筋の下部スタラツプに下部主鉄筋を設置
し、 次いで上部スタラツプが連続している側部スタ
ラツプに複数の腹筋が設けられてなる第2メツシ
ユ鉄筋を、上部スタラツプにおいて前記上部主鉄
筋上に係止して設置してなることを特徴とする鉄
筋コンクリート地中梁の施工法。
[Scope of Claims] 1. A reinforcing bar assembly column is installed on the foundation, and upper main reinforcing bars are arranged on the arm rods at the top of this column, and then a plurality of abdominal muscles are placed on the side braces where the lower braces are continuous. At the same time, the first mesh reinforcing bars provided are installed by being locked to the upper main reinforcing bars at the upper part of the side struts, and the lower main reinforcing bars are installed at the lower struts of the first mesh reinforcing bars, and then the upper struts are continuous. A method for constructing a reinforced concrete underground beam, characterized in that a second mesh reinforcing bar having a plurality of abdominal bars is installed on a side brace, which is attached to the upper main reinforcing bar at an upper mast.
JP27315086A 1986-11-17 1986-11-17 Construction of reinforced concrete underground beam Granted JPS63125730A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP27315086A JPS63125730A (en) 1986-11-17 1986-11-17 Construction of reinforced concrete underground beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP27315086A JPS63125730A (en) 1986-11-17 1986-11-17 Construction of reinforced concrete underground beam

Publications (2)

Publication Number Publication Date
JPS63125730A JPS63125730A (en) 1988-05-28
JPH0416575B2 true JPH0416575B2 (en) 1992-03-24

Family

ID=17523809

Family Applications (1)

Application Number Title Priority Date Filing Date
JP27315086A Granted JPS63125730A (en) 1986-11-17 1986-11-17 Construction of reinforced concrete underground beam

Country Status (1)

Country Link
JP (1) JPS63125730A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102296752B (en) * 2011-06-09 2013-04-10 北京工业大学 Galvanized welded steel wire mesh beam end structure and method for improving ductility of beam end bottom pressure zone

Also Published As

Publication number Publication date
JPS63125730A (en) 1988-05-28

Similar Documents

Publication Publication Date Title
CN213978605U (en) Prefabricated pier-column connection structure
GB1569816A (en) Reinforced concrete construction
KR200233599Y1 (en) Installation structure for reinforcing rod of bent
JP2671765B2 (en) Prefabricated reinforced concrete structure of reinforced concrete stepped beams
JPH0959933A (en) Filled coated steel tube concrete structure and construction method
JPS63125730A (en) Construction of reinforced concrete underground beam
JPS6351529A (en) Construction of reinforced concrete underground beam and slab
JP2522708B2 (en) Reinforcing bar tip assembly beam with formwork and reinforcing bar tip assembly method with formwork
JPH073727A (en) Column base structure and its construction method
JPS603844Y2 (en) reinforced concrete structure
JP2538528B2 (en) Slope stabilization method
JPH0448145B2 (en)
JPS61126272A (en) Building construction method
JPS6043547A (en) Mold frame and reinforcement iron integral assembling and constructing method
JPH0321755A (en) Concrete structural member
JPH0988348A (en) Foundation beam construction method
JPS645134B2 (en)
JPS62117938A (en) Concrete structure and its construction
JPH0448136B2 (en)
JP2651506B2 (en) How to apply underground beams
JPS61126259A (en) pillars of structures
JP3002681B2 (en) Building structure
JPS6114295B2 (en)
JPS62233340A (en) Installation of anchor bolt in column base of steel work
JPH0738390Y2 (en) Formwork for legal form

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees