JPH0448145B2 - - Google Patents

Info

Publication number
JPH0448145B2
JPH0448145B2 JP61181341A JP18134186A JPH0448145B2 JP H0448145 B2 JPH0448145 B2 JP H0448145B2 JP 61181341 A JP61181341 A JP 61181341A JP 18134186 A JP18134186 A JP 18134186A JP H0448145 B2 JPH0448145 B2 JP H0448145B2
Authority
JP
Japan
Prior art keywords
mesh
beam member
concrete
reinforcements
main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP61181341A
Other languages
Japanese (ja)
Other versions
JPS6340029A (en
Inventor
Kusuo Honda
Akio Shinozaki
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Original Assignee
Shimizu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd filed Critical Shimizu Construction Co Ltd
Priority to JP18134186A priority Critical patent/JPS6340029A/en
Publication of JPS6340029A publication Critical patent/JPS6340029A/en
Publication of JPH0448145B2 publication Critical patent/JPH0448145B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Description

【発明の詳細な説明】 [産業上の利用分野] この発明は、先組み工法において用いられる梁
部材に関するものである。
DETAILED DESCRIPTION OF THE INVENTION [Industrial Field of Application] The present invention relates to a beam member used in a pre-assembled construction method.

[従来の技術] 先組み工法は、型枠等を地上において予め組み
付けておき、これを建設箇所に運び込んで建設物
を構築するようにしたものであり、多層階の建設
物を構築する際に多く採用されている。この先組
み工法によれば、足場のよい地上において作業の
多くを行うので、作業の安全性を確保することが
できるのみならず、工期を短縮することができる
等の利点が得られる。
[Conventional technology] The pre-assembled construction method is a method in which formwork, etc. is assembled on the ground in advance, and then transported to the construction site to construct the structure. It is widely adopted. According to this pre-assembled construction method, most of the work is performed on the ground with good footing, which not only ensures the safety of the work but also has the advantage of shortening the construction period.

この種の先組み工法に用いられる梁部材として
は、第5図および第6図に示すものがある。この
梁部材Aは、断面U字状をなすコンクリート製躯
体1と、その内面側に設けられた4本の主筋2お
よびこれら主筋2に巻き付けられた複数の肋筋3
とからなるものであり、下側の2本の主筋2と肋
筋3とがコンクリート躯体1に一体的に固着され
る一方、上側の主筋2が肋筋3に固着され、これ
によつて全体が一体化されている。
Examples of beam members used in this type of pre-assembled construction method are those shown in FIGS. 5 and 6. This beam member A includes a concrete frame 1 having a U-shaped cross section, four main reinforcements 2 provided on the inner surface thereof, and a plurality of ribs 3 wrapped around these main reinforcements 2.
The lower two main reinforcements 2 and the cost reinforcements 3 are integrally fixed to the concrete frame 1, while the upper main reinforcements 2 are fixed to the cost reinforcements 3, thereby making the entire structure are integrated.

そして、このような梁部材Aを用いてコンクリ
ート梁を構築する場合には、第7図および第8図
に示すように柱4,4上に梁部材Aを架け渡し、
その後梁部材Aの内部にコンクリートを打ち込
む。打ち込んだコンクリートは硬化後、梁部材A
と一体化し、全体として梁を構成するものであ
る。なお、この場合には、梁部材Aの上に床部材
5を設置するとともに、床スラブ鉄筋6を配し、
床部材5の上にコンクリートを打ちこむことによ
つて床部を梁と同時に作成するようにしている。
When constructing a concrete beam using such a beam member A, as shown in FIGS. 7 and 8, the beam member A is placed over the columns 4 and 4,
After that, concrete is poured into the inside of the beam member A. After the poured concrete hardens, beam member A
It is integrated with the beam to form a beam as a whole. In this case, the floor member 5 is installed on the beam member A, and the floor slab reinforcing bars 6 are arranged,
By pouring concrete onto the floor member 5, the floor part is created at the same time as the beam.

[発明が解決しようとする問題点] ところで、上記の梁部材Aにおいては、内部に
打ち込んだコンクリートが硬化して一体化し、全
体としてコンクリート梁を構成するまでの間は、
その強度が不足し、このため下方に撓む危険性が
ある。そこで、従来においては床面7と梁部材A
との間に多数のサポート8を設け、梁部材1を支
持するようにしている。
[Problems to be Solved by the Invention] By the way, in the above-mentioned beam member A, until the concrete poured inside hardens and integrates to form a concrete beam as a whole,
Its strength is insufficient and there is therefore a risk of it bending downward. Therefore, in the past, the floor surface 7 and the beam member A
A large number of supports 8 are provided between the beam member 1 and the beam member 1 to support the beam member 1.

ところが、多数のサポート8を設けると、内装
工事の邪魔になる。したがつて、コンクリートの
養生に必要な3〜4週間は内装工事をほとんど行
うことができず、このため先組み工法の利点を十
分に生かしきれないという問題がある。
However, if a large number of supports 8 are provided, it becomes a hindrance to interior construction work. Therefore, almost no interior work can be done during the 3 to 4 weeks required for the concrete to cure, resulting in the problem that the advantages of the pre-assembled construction method cannot be fully utilized.

[発明の目的] この発明は、上記問題を解消するためになされ
たもので、サポートを全く必要としないか、ある
いはその数を大幅に削減することができる先組み
工法用梁部材を提供することを目的とする。
[Object of the invention] The present invention was made to solve the above problems, and an object of the present invention is to provide a beam member for pre-assembled construction that does not require any supports or can significantly reduce the number of supports. With the goal.

[目的を達成するための手段] この発明は、上記目的を達成するために、断面
略U字状をなすコンクリート製躯体の内面側に、
その長手方向に延びる2対の主筋およびこの主筋
全体に亙つて巻回された肋筋が一体的に設けられ
てなる先組み工法用梁部材において、上記肋筋を
多数の線材を縦横に組んでなるメツシユ筋で構成
するとともに、上下の主筋と上記線材とが略三角
形を形成するように、線材を主筋に対して傾斜さ
せさらに、上記メツシユ筋とコンクリート製躯体
との間にコンクリート止め部材を設けたものであ
る。
[Means for Achieving the Object] In order to achieve the above-mentioned object, the present invention includes a concrete structure having a substantially U-shaped cross section;
In a beam member for the pre-assembled construction method, which is integrally provided with two pairs of main reinforcements extending in the longitudinal direction and a reinforcing steel wound around the entire main reinforcing steel, the reinforcing bars are made by assembling a large number of wire rods vertically and horizontally. The wire rods are inclined with respect to the main reinforcements so that the upper and lower main reinforcements and the wire rods form a substantially triangular shape, and a concrete stopper member is provided between the mesh reinforcements and the concrete frame. It is something that

[作用] この発明の梁部材においては、肋筋であるメツ
シユ筋を構成する線材を主筋に対して傾斜させ
て、上下の主筋と線材とが三角形を形成するよう
にし、しかもメツシユ筋が多数の線材を縦横に組
んでなるものであるから、主筋と線材が多数のト
ラス構造を構成することになり、剪断力に対する
強度が大幅に向上する。この結果、梁部材を柱に
架け渡した後、その内部にコンクリートを打ち込
んでも梁部材が下方に向つて撓むことがない。し
たがつて、サポートを全く必要としないか、ある
いはサポートを必要とする場合にもその数を大幅
に削減することができる。
[Function] In the beam member of the present invention, the wire rods constituting the mesh reinforcements, which are the ribs, are inclined with respect to the main reinforcement so that the upper and lower main reinforcements and the wire rods form a triangle. Since it is made of wire rods arranged vertically and horizontally, the main reinforcing bars and wire rods constitute a large number of truss structures, which greatly improves the strength against shearing forces. As a result, even if concrete is poured into the inside of the beam after the beam is spanned over the pillar, the beam will not bend downward. Therefore, no support is required, or even if support is required, the number of supports can be significantly reduced.

[実施例] 以下、この発明の一実施例について第1図〜第
4図を参照して説明する。なお、上記従来例と同
様な部分には同一符号を付してその説明を省略す
る。
[Example] Hereinafter, an example of the present invention will be described with reference to FIGS. 1 to 4. Note that the same parts as in the conventional example described above are given the same reference numerals, and the explanation thereof will be omitted.

第1図および第2図は、この発明に係る梁部材
Bを示すもので、この梁部材Bにおいては、主筋
に直交するように巻回された従来の肋筋に代えて
メツシユ筋9が用いられている。しかも、メツシ
ユ筋9は、それを構成する各線材(肋筋)9aが
主筋2に対して傾斜(この場合には、ほぼ45°方
向に傾斜)するようにして主筋2に巻回されてい
る。この結果、各線材9aと2本の主筋2,2と
によつて主筋2,2間に多数の三角形が形成され
ている。なお、メツシユ筋9としては、D10−
100〜D13−200程度のものが用いられている。
1 and 2 show a beam member B according to the present invention. In this beam member B, mesh reinforcements 9 are used in place of the conventional cost reinforcements wound perpendicularly to the main reinforcements. It is being Furthermore, the mesh reinforcement 9 is wound around the main reinforcement 2 in such a way that each wire rod (rib reinforcement) 9a that constitutes the mesh reinforcement 9 is inclined with respect to the main reinforcement 2 (in this case, inclined at approximately 45°). . As a result, a large number of triangles are formed between the main reinforcing bars 2, 2 by each wire 9a and the two main reinforcing bars 2, 2. In addition, the mesh muscle 9 is D10−
100 to D13-200 are used.

また、この梁部材Bにおいては、メツシユ筋9
とコンクリート躯体1との間に、コンクリート躯
体1を形成する際に型枠に代えて用いられるメツ
シユ(コンクリート止め部材)10が設けられて
いる。さらに、メツシユ筋9には、コンクリート
躯体1の上端に沿つて延びる養生筋11が固定さ
れている。
In addition, in this beam member B, mesh reinforcement 9
A mesh (concrete fixing member) 10 is provided between the concrete frame 1 and the concrete frame 1, which is used in place of a formwork when forming the concrete frame 1. Furthermore, a curing reinforcement 11 extending along the upper end of the concrete frame 1 is fixed to the mesh reinforcement 9.

次に、上記構成の梁部材Bの製造方法について
述べると、その方法としては例えば第3図または
第4図に示すものがある。
Next, a method for manufacturing the beam member B having the above structure will be described. Examples of the method include those shown in FIG. 3 or FIG. 4.

第3図に示す方法は、型枠12の内側に型枠1
2からコンクリート躯体1の肉厚の分だけ離間さ
せてメツシユ10を配置し{第3図A参照}、次
にメツシユ筋が一方の養生筋11から下側の主筋
2,2に至り、他方の養生筋11まで巻回されて
なる下部鉄筋13aをメツシユ10の内側に装入
し、その後型枠12とメツシユ10との間にコン
クリートを打ち込む。このコンクリートが硬化し
た後、上側の主筋2,2にメツシユ筋を固定して
なる上部鉄筋13bを養生筋11,11に固定
し、これによつて梁部材Bを製造するものであ
る。なお、主筋2、メツシユ筋および養生筋11
の互いの固定は溶接によつて行つている。
The method shown in FIG.
The mesh 10 is placed at a distance equal to the wall thickness of the concrete body 1 from 2 (see Fig. 3A), and then the mesh reinforcement runs from one curing reinforcement 11 to the lower main reinforcement 2, 2, and the other A lower reinforcing bar 13a wound up to the curing bar 11 is charged inside the mesh 10, and then concrete is poured between the formwork 12 and the mesh 10. After this concrete hardens, the upper reinforcing bars 13b, which are formed by fixing mesh bars to the upper main bars 2, 2, are fixed to the curing bars 11, 11, thereby manufacturing the beam member B. In addition, main muscle 2, mesh muscle and curing muscle 11
are fixed to each other by welding.

また、第4図に示す製造方法は、二対の主筋
2,2,2,2全体に亙つてメツシユ筋9を巻回
してなる鉄筋13をメツシユ10の内側に装入す
るようにしたものであり、その他の手順は上記の
製造方法と同様である。なお、この製造方法にお
いては、4本の主筋2全体に亙つてメツシユ筋9
を巻回するようにしており、鉄筋13全体が予め
一体化しているから、養生筋は不要である。
In addition, the manufacturing method shown in FIG. 4 is such that a reinforcing bar 13 formed by winding a mesh bar 9 over two pairs of main bars 2, 2, 2, 2 is inserted inside a mesh 10. The other steps are the same as the above manufacturing method. In addition, in this manufacturing method, mesh muscles 9 are formed over the entire four main reinforcements 2.
Since the entire reinforcing bar 13 is integrated in advance, no curing bar is required.

しかして、上記の梁部材Bを用いて梁を構築す
るには、前述した従来の梁部材Aを用いる場合と
同様にするのであるが、この発明の梁部材Bを用
いた場合には、メツシユ筋9の各線材9aと上下
一対の主筋2,2とが三角形を形成して、いわゆ
るトラス構造を構成するから、梁部材Bの剪断強
度が従来のものに比して大幅に向上し、梁部材B
にコンクリートを打ちこんでもそれが下方に向つ
て撓むことがない。したがつて、従来必要であつ
たサポートが全く不要になるか、また必要とする
場合であつてもサポートの数を大幅に削減するこ
とができる。また、サポートが不要であるから、
梁の構築と同時に内装工事を行うことができ、工
期の短縮を図ることができ、さらにサポートの削
減分だけ経費を低減することができる。
Therefore, in order to construct a beam using the beam member B described above, the procedure is the same as when using the conventional beam member A described above, but when the beam member B of the present invention is used, the mesh Since each wire 9a of the reinforcement 9 and the pair of upper and lower main reinforcements 2, 2 form a triangle and constitute a so-called truss structure, the shear strength of the beam member B is greatly improved compared to conventional ones, and the beam Part B
Even if concrete is poured into the area, it will not bend downward. Therefore, the supports that were conventionally required can be completely eliminated, or even if they are required, the number of supports can be significantly reduced. Also, since no support is required,
Interior work can be done at the same time as beam construction, shortening the construction period and reducing costs by the reduction in support.

また、この実施例のように、型枠に代えてメツ
シユ10を用いる場合には、型枠12とメツシユ
10との間にコンクリートを打ち込んで、梁部材
Bを製造する際に、メツシユ10が型枠12の内
側へ向つて膨出するおそれがあるが、そのような
メツシユ10の膨出をメツシユ筋9によつて防止
することができる。
In addition, as in this embodiment, when the mesh 10 is used instead of the formwork, when concrete is poured between the formwork 12 and the mesh 10 and the beam member B is manufactured, the mesh 10 is Although there is a risk that the mesh 10 may bulge out toward the inside of the frame 12, such bulge of the mesh 10 can be prevented by the mesh lines 9.

[発明の効果] 以上説明したように、この発明の先組み工法用
梁部材によれば、肋筋であるメツシユ筋を多数の
線材を縦横に組んで構成し、線材を主筋に対して
傾斜させて、上下の主筋と線材とが三角形を形成
するようにしたので、主筋と線材とが多数のトラ
ス構造を構成することになり、梁部材自体の強度
を大幅に向上させることができ、したがつて従来
必要であつたサポートを全く不要とし、あるいは
サポートを大幅に削減することができる。そし
て、この結果工期の短縮および経費の削減を図る
ことができる等の効果が得られる。
[Effects of the Invention] As explained above, according to the pre-assembled beam member of the present invention, the mesh reinforcement, which is a rib, is constructed by assembling a large number of wire rods vertically and horizontally, and the wire rods are inclined with respect to the main reinforcement. Since the upper and lower main reinforcements and the wire rods form a triangular shape, the main reinforcements and wire rods form a large number of truss structures, which greatly improves the strength of the beam member itself. Therefore, the support that was conventionally required can be completely eliminated or can be significantly reduced. As a result, effects such as shortening the construction period and reducing costs can be obtained.

メツシユ筋とコンクリート製躯体との間にコン
クリート止め部材を設けたので、型枠とコンクリ
ート止め部材との間にコンクリートを打ち込んで
コンクリート製躯体を形成する際に、コンクリー
ト止め部材の形枠内側への膨出をメツシユ筋によ
つて防止することができる。
Since concrete retaining members were provided between the mesh reinforcement and the concrete frame, when pouring concrete between the formwork and the concrete retaining members to form the concrete frame, the concrete retaining members were placed inside the form. Bulging can be prevented by the meshwork muscles.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図および第2図はこの発明の一実施例を示
すもので、第1図は第2図の−線矢視断面図
は、第2図は梁部材Bの長手方向視図、第3図、
第4図はそれぞれ第1図および第2図に示す梁部
材Bを製造する方法を示す図、第5図および第6
図は従来の梁部材の一例を示し、第5図はその長
手方向視図、第6図は第5図の−線矢視断面
図、第7図および第8図は第5図および第6図に
示す梁部材を用いて梁を構築する方法を示し、第
7図は第8図の円部の拡大X矢視断面図、第8
図は側面図である。 B……梁部材、1……コンクリート躯体、2…
…主筋、9……メツシユ筋、9a……線材。
1 and 2 show one embodiment of the present invention, FIG. 1 is a sectional view taken along the line - in FIG. 2, FIG. 2 is a longitudinal view of beam member B, and FIG. figure,
FIG. 4 is a diagram showing a method for manufacturing the beam member B shown in FIGS. 1 and 2, and FIGS. 5 and 6 respectively.
The figures show an example of a conventional beam member, FIG. 5 is a longitudinal view thereof, FIG. 6 is a cross-sectional view taken along the - line in FIG. 5, and FIGS. A method of constructing a beam using the beam members shown in the figure is shown.
The figure is a side view. B... Beam member, 1... Concrete frame, 2...
...Main bar, 9...Mesh bar, 9a...Wire rod.

Claims (1)

【特許請求の範囲】[Claims] 1 断面略U字状をなすコンクリート製躯体の内
面側に、その長手方向に延びる2対の主筋および
この主筋全体に亙つて巻回された肋筋が一体的に
設けられてなる先組み工法用梁部材において、上
記肋筋を多数の線材を縦横に組んでなるメツシユ
筋で構成するとともに、上下の主筋と上記線材と
が略三角形を形成するように、線材を主筋に対し
て傾斜させさらに、上記メツシユ筋とコンクリー
ト製躯との間にコンクリート止め部材を設けたこ
とを特徴とする先組み工法用梁部材。
1 For pre-assembled construction method, in which two pairs of main reinforcements extending in the longitudinal direction and ribs wound around the entire main reinforcement are integrally provided on the inner surface of a concrete frame with a substantially U-shaped cross section. In the beam member, the ribs are constituted by mesh reinforcements made by assembling a large number of wire rods vertically and horizontally, and the wire rods are inclined with respect to the main reinforcements so that the upper and lower main reinforcements and the wire rods form a substantially triangular shape, and A beam member for pre-assembled construction, characterized in that a concrete stopper member is provided between the mesh reinforcement and the concrete frame.
JP18134186A 1986-08-01 1986-08-01 Beam members for pre-assembled construction method Granted JPS6340029A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP18134186A JPS6340029A (en) 1986-08-01 1986-08-01 Beam members for pre-assembled construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP18134186A JPS6340029A (en) 1986-08-01 1986-08-01 Beam members for pre-assembled construction method

Publications (2)

Publication Number Publication Date
JPS6340029A JPS6340029A (en) 1988-02-20
JPH0448145B2 true JPH0448145B2 (en) 1992-08-05

Family

ID=16099003

Family Applications (1)

Application Number Title Priority Date Filing Date
JP18134186A Granted JPS6340029A (en) 1986-08-01 1986-08-01 Beam members for pre-assembled construction method

Country Status (1)

Country Link
JP (1) JPS6340029A (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07103636B2 (en) * 1989-06-27 1995-11-08 大末建設株式会社 Building structure building pillar member and manufacturing method thereof
JP2729543B2 (en) * 1991-05-22 1998-03-18 義郎 渡辺 Beam framing method using oblique mesh bars
JP5996883B2 (en) * 2012-02-21 2016-09-21 株式会社フジタ Building with composite beams
JP2016098504A (en) * 2014-11-19 2016-05-30 五洋建設株式会社 Construction method for reinforced concrete structure, and reinforced concrete structure

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5145165A (en) * 1974-10-16 1976-04-17 Meisei Kinzoku Kogyosho Kk GOSEIJUSHI SHASHUTSUSEIKEIYOKANAGATASOCHI
JPS5413625A (en) * 1977-07-01 1979-02-01 Kobe Steel Ltd Method of building assembled reinforcement beam

Also Published As

Publication number Publication date
JPS6340029A (en) 1988-02-20

Similar Documents

Publication Publication Date Title
JP5996883B2 (en) Building with composite beams
JPS6340029A (en) Beam members for pre-assembled construction method
JPH0519384Y2 (en)
JPH0959933A (en) Filled coated steel tube concrete structure and construction method
JPH0420457B2 (en)
JP3014987U (en) Reinforcement equipment for existing buildings
EP1848867B1 (en) Strengthening structure
JPH05230935A (en) Precast concrete beam formwork members
JP2617399B2 (en) Synthetic beam
JP2538528B2 (en) Slope stabilization method
JPH07217069A (en) Construction method of reinforced concrete columns and precast concrete members for the column construction
JP2522708B2 (en) Reinforcing bar tip assembly beam with formwork and reinforcing bar tip assembly method with formwork
JPS6316530B2 (en)
JP3419506B2 (en) Steel cage
JP2654597B2 (en) Reinforcement method of wall type rigid frame structure
JP2542283B2 (en) Joining Method of Beam Reinforcement in Wall-type Ramen Column
JP2910551B2 (en) Lap joint method of main reinforcement of SRC column
JPH08105157A (en) Reinforced concrete members and reinforcing steel for concrete reinforcement
JPH0448136B2 (en)
JPH0723456Y2 (en) Square steel pipe concrete member
JPH0122023Y2 (en)
JP2514859B2 (en) Precast Steel Reinforced Concrete Concrete Column
JP3225446B2 (en) Reinforced concrete columns
JP3108828B2 (en) Beam-to-column reinforced body and method of arranging beam-to-column reinforcement
JPS6149049A (en) PC parts such as beams