JPH04183236A - Supervisory remote controller - Google Patents

Supervisory remote controller

Info

Publication number
JPH04183236A
JPH04183236A JP2306659A JP30665990A JPH04183236A JP H04183236 A JPH04183236 A JP H04183236A JP 2306659 A JP2306659 A JP 2306659A JP 30665990 A JP30665990 A JP 30665990A JP H04183236 A JPH04183236 A JP H04183236A
Authority
JP
Japan
Prior art keywords
data
time
station
slave
change
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2306659A
Other languages
Japanese (ja)
Inventor
Kazuhiro Usui
臼井 一洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP2306659A priority Critical patent/JPH04183236A/en
Publication of JPH04183236A publication Critical patent/JPH04183236A/en
Pending legal-status Critical Current

Links

Landscapes

  • Selective Calling Equipment (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

PURPOSE:To realize synchronized collection of power system data registered with time between a large number of slave stations by transmitting a control signal to a local station or other slave station when the local slave station detects a variation of predetermined binary information or numeric information. CONSTITUTION:A computer 1 is connected with master stations 11, 21 each of which is further connected through transmission lines 120, 220, respectively, with slave stations 101, 201. The slave stations 101, 201 measure 105, 105' ON/ OFF state of CB, current values on a transmission line, and the like. When a variation of the predetermined amounts 105, 105' to be measured is detected, a variation detection signal is delivered from a state variation detection designating table through transmitters 108, 109 to another slave station. Subsequently, the slave station transfers data, stored in a memory, to the master stations 11, 12 and the computer 1 rearranges thus transferred data in the order of time and analyzes variation of numeric data at each time.

Description

【発明の詳細な説明】 [発明の目的] (産業上の利用分野) 本発明は遠方監視制御装置、特にリモートステーション
側の諸種のプロセスデータをマスターステーションに収
集する遠方監視制御装置に関する。
DETAILED DESCRIPTION OF THE INVENTION [Object of the Invention] (Industrial Application Field) The present invention relates to a remote monitoring and control device, and particularly to a remote monitoring and control device that collects various process data from a remote station into a master station.

(従来の技術) 電力系統のしゃ断器の開閉状態や送電線の電流や電圧等
のプロセスデータを計測する従来の遠方監視制御装置で
は、遠方監視制御装置子局(以後子局と称す)が計測し
た値を一定周期で遠方監視制御装置親局(以後親局と称
す)に転送していた。
(Prior art) In conventional remote monitoring and control equipment that measures process data such as the open/close status of power system circuit breakers and the current and voltage of power transmission lines, remote monitoring and control equipment slave stations (hereinafter referred to as slave stations) perform measurements. The obtained value was transferred to the remote monitoring and control device master station (hereinafter referred to as the master station) at regular intervals.

又、子局に時計装置と計測値を保存するメモリを設け、
しゃ断器などの開閉器の連続した変化を時刻と共に保存
しておき、親局からの制御信号によって親局へ転送し、
親局を制御している電子計算機などで複数子局からの時
刻付データを時刻順に並べかえることにより、監視する
電力系統全体のしゃ断器などの変化を把握し、事故時の
解析などに役立てていた。しかしながら、数値情報につ
いては2値情報の変化と同期したデータを収集しなり、
時刻を付けて収集してはいなかった。
In addition, the slave station is equipped with a clock device and memory for storing measured values.
Continuous changes in switches such as circuit breakers are stored together with time and transmitted to the master station using control signals from the master station.
By rearranging the time-stamped data from multiple slave stations in chronological order using a computer controlling the master station, changes in circuit breakers, etc. in the entire power system being monitored can be grasped, which is useful for analysis in the event of an accident. Ta. However, for numerical information, data must be collected in synchronization with changes in binary information.
There was no time stamp on the collection.

(発明が解決しようとする課題) 上記電力系統の監視方法において、従来は時刻付データ
はしゃ断器や断路器、保護リレーなどの2値情報が主で
あり、電流、電圧などの数値情報は、電力系統が常に変
化しているために、変化の都度保存する方法では保存メ
モリも膨大となり、時刻付データとして保存することは
現実的ではなかった。ス、1つの子局でしゃ断器の変化
があったときに、その子局で計測している数値情報を保
存するということは可能であるが、電力系統は広範囲で
あり、多数の子局により情報を収集しなければならない
。ある子局でデータを保存するときは、他の子局でも同
時にデータ保存しなければならないが、他の子局に対し
同時にデータ保存を指令する手段がなかったために、効
果的なタイミングでのデータ収集ができなかった。
(Problem to be Solved by the Invention) In the above-mentioned power system monitoring method, conventionally, the time data is mainly binary information such as circuit breakers, disconnectors, and protective relays, and the numerical information such as current and voltage is Because the electric power system is constantly changing, the method of saving data every time it changes would require a huge amount of storage memory, making it impractical to save it as timed data. Although it is possible to save the numerical information measured by a slave station when there is a change in the breaker at one slave station, the power system is wide-ranging, and it is difficult to store information using many slave stations. must be collected. When data is saved in one slave station, it must be saved in other slave stations at the same time, but since there was no way to instruct other slave stations to save data at the same time, it was necessary to save the data at an effective time. Could not collect.

しかしながら、電力系統の事故を解析する場合には、2
値情報の変化順序から解析するだけでなく、電圧や電流
の刻々の(例えば、数m5ec、の分解能)変化を解析
することか複雑化してきた電力系統の事故解析に必須と
なってきた。
However, when analyzing power system accidents, two
Analyzing not only the order of changes in value information, but also minute-to-moment changes in voltage and current (for example, with a resolution of several m5ec) has become essential for the increasingly complex accident analysis of electric power systems.

本発明は上記問題点を解決するためになされたものであ
り、多数の子局間で同期して時刻付電力系統データ収集
の可能な遠方監視制御装置を提供することを目的として
いる。
The present invention has been made in order to solve the above-mentioned problems, and an object of the present invention is to provide a remote monitoring and control device capable of synchronizing and collecting power system data with time among a large number of slave stations.

[発明の構成〕 (課題を解決するための手段) 本発明では、子局で予め指定された2値情報の変化、あ
るいは数値情報の指定値幅以上の変化を検出した場合に
、自局は勿論のこと、無線送信器経由で他の子局へも制
御信号を発信し、他の子局がその制御信号を受信しなと
き、制御手段が計測装置に制御信号を与えることにより
、多数の子局間で同期をとったデータの収集を可能とす
るよう構成した。
[Structure of the Invention] (Means for Solving the Problems) In the present invention, when a slave station detects a change in binary information specified in advance or a change in numerical information exceeding a specified value range, the slave station, of course, When a control signal is transmitted to other slave stations via a wireless transmitter and the other slave stations do not receive the control signal, the control means sends a control signal to the measuring device, thereby transmitting a control signal to a large number of slave stations. It was configured to enable data collection to be synchronized between the two.

(作 用) 変化検出手段が2値情報又は数値情報の変化を検出した
ときに、制御手段と信号発信手段にその旨通知する。制
御手段は予め決められた周期(例えば1111sec、
)で2値情報や数値情報を計測し、時刻と共にメモリに
保存している計測手段を制御し、変化信号受信後一定回
数計測データ保存後はデータの更新をしないようにする
。これにより変化信号受信前のデータと変化信号受信後
のデータが共に保存できる。信号発信手段は無線送信器
経由で他局へ変化信号を送出する。他の子局の受信手段
がその信号を受信し、制御手段へその旨通知する。
(Function) When the change detection means detects a change in binary information or numerical information, it notifies the control means and the signal transmission means accordingly. The control means operates at a predetermined period (for example, 1111 seconds,
) controls the measuring means that measures binary information and numerical information and stores it in the memory along with the time, so that the data is not updated after the measured data is stored a certain number of times after receiving the change signal. As a result, both the data before receiving the change signal and the data after receiving the change signal can be saved. The signal transmitting means transmits a change signal to other stations via a wireless transmitter. The receiving means of the other slave stations receive the signal and notify the control means accordingly.

その後、遠方監視制御装WH局経由電子計算機からデー
タ収集信号信号を受信すると、夫々の遠方監視制御装置
子局はメモリに保存したデータを親局に転送し、電子計
算機はそれを時刻順に並べ替えると共に、各時刻におけ
る数値情報の変化を分析する。
After that, when receiving a data collection signal from the computer via the remote monitoring and control device WH station, each remote monitoring and control device slave station transfers the data stored in its memory to the master station, and the computer sorts it in chronological order. At the same time, we analyze changes in numerical information at each time.

(実施例) 以下図面を参照して実施例を説明する。(Example) Examples will be described below with reference to the drawings.

第1図は本発明による遠方監視制御装置の一実施例のブ
ロック構成図である。
FIG. 1 is a block diagram of an embodiment of a remote monitoring and control device according to the present invention.

第1図において、1は電子計算機であって親局11、2
1が接続され、前記各親局は伝送路120及び220を
介して、各子局101 、2’01に接続している。そ
して各子局101 、201では被計測量105゜10
5′として、例えばCBの大切状態や送電線の電流値等
を計測して親局11.21を経由して電子計算機1へ転
送する。
In FIG. 1, 1 is an electronic computer, and master stations 11 and 2
1 is connected, and each master station is connected to each slave station 101 and 2'01 via transmission lines 120 and 220. In each slave station 101 and 201, the measured quantity is 105°10
5', for example, the important state of the CB, the current value of the power transmission line, etc. are measured and transferred to the computer 1 via the master station 11.21.

第2図は子局の詳細構成図である。FIG. 2 is a detailed configuration diagram of the slave station.

第2図(a)において、104.・・・104′は計測
部であり被計測量105.・・・105′を取込み、時
計110から時刻を取込んで送信バッファ112及び保
存エリア111.・・・111′に格納する。114は
状態変化検出指定テーブルで、予め指定されている被計
測量105.・・・105′の変化を検出したとき、送
信部108及び発信器109を経由して、他の子局へ変
化検出信号を送出する。107は受信器、106は受信
部であり、他の子局からの変化検出信号を受信して制御
部103へ伝える。
In FIG. 2(a), 104. . . . 104' is a measurement unit and the quantity to be measured 105. ... 105', the time from the clock 110, and the transmission buffer 112 and storage area 111. ...Stored in 111'. Reference numeral 114 denotes a state change detection specification table, in which prespecified measured quantities 105. ... 105', it sends out a change detection signal to other slave stations via the transmitter 108 and transmitter 109. 107 is a receiver, and 106 is a receiving section, which receives change detection signals from other slave stations and transmits them to the control section 103.

第2図(b)は状態変化検出指定テーブル114の構成
図であり、計測器間に対応して検出指定があり、当該計
測器が検出指定されているときr□。
FIG. 2(b) is a configuration diagram of the state change detection designation table 114, where there is a detection designation corresponding to each measuring instrument, and when the corresponding measuring instrument is designated for detection, r□.

→rljとし、そうでないときは「1」→「0」のよう
に設定する。ス、数値の変化幅を具体的に設定しておき
、この設定値を超えて変化したとき、状態変化ありとす
る。
→ rlj, and if not, set it as “1” → “0”. The range of change in the value is set specifically, and when the change exceeds this set value, it is determined that the state has changed.

第3図(a)は検討対象の電力系統の子局、親局の設置
例図である。
FIG. 3(a) is an example of the installation of slave stations and master stations in the power system under consideration.

第3図(a)では電力系統及びそれを監視制御する電子
計算Illと親局11.21、子局101 、201が
設置されているものとする1図において、破線で囲った
部分は制御所51、変電所61.62を示し、制御所5
1には電子計算機1とM局11.21が設置されており
、変電所61.62には子局101 、102が設置さ
れている。
In Fig. 3(a), it is assumed that the electric power system and the electronic computer Ill that monitors and controls it, the master station 11.21, and the slave stations 101 and 201 are installed. 51, shows substation 61.62, control center 5
A computer 1 and an M station 11.21 are installed at the substation 61.62, and slave stations 101 and 102 are installed at the substation 61.62.

子局はしゃ断器の人、切状態や送電線71.72の電流
1 、i、を計測しており、親局11.21と子局10
1 、201とは伝送@120 、220で結ばれてい
る。今、説明の都合上、子局101ではしゃ断器C80
10と送電線71の電流IAを計測しており、子局20
1ではしJe?断器CBO20と送電線72の電流iB
を計測しているものとする。今、送電線71で一過性の
短絡事故があったとすると、両端のしゃ断器CBO10
とCBO20がしゃ断され、再閉路装置によりCBOl
oとCBO20は再投入される。このとき、送電線71
.72の電流iA及び18は第3図[b)のグラフのよ
うに変化する。
The slave station measures the cut-off state of the breaker and the current 1, i of the transmission line 71.72, and the master station 11.21 and the slave station 10
1 and 201 are connected by transmission @120 and 220. For convenience of explanation, in slave station 101, breaker C80
10 and the power transmission line 71, and the slave station 20
1. Je? Current iB of disconnector CBO20 and transmission line 72
Assume that we are measuring . Now, if there is a temporary short circuit accident on power transmission line 71, the circuit breaker CBO10 at both ends
and CBO20 are cut off, and CBOl is shut off by the re-closing device.
o and CBO20 are reinserted. At this time, the power transmission line 71
.. The current iA of 72 and 18 change as shown in the graph of FIG. 3 [b).

この事故を本発明で監視する作用を述べる。The function of monitoring this accident using the present invention will be described.

先ず、第4図によって全体としての処理の流れを説明す
る。
First, the overall processing flow will be explained with reference to FIG.

ステップ401において、子局は自局で変化検出するま
で、又は他局から変化検出信号を受信するまで、データ
と時刻とを一定周期で保存エリアへ格納すると共に、送
信バ・ソファへデータを格納する。ステップ402では
変化検出又は変化検出信号受信を判断し、これかあるま
でステップ401の処理を行なう。ステップ402にお
いて変化を検出するとステップ403へ移り、一定回数
だけデータと時刻とを保存エリアへ格納する。そして電
子計算機から親局経由でデータ収集信号かくるまで繰り
返す。ステップ404ではデータ収集信号の受信により
保存エリア内のデータと時刻を親局へ転送する。
In step 401, the slave station stores data and time in a storage area at regular intervals until it detects a change in itself or receives a change detection signal from another station, and also stores the data in the transmitter sofa. do. In step 402, it is determined whether a change has been detected or a change detection signal has been received, and the process in step 401 is performed until a change has been detected. When a change is detected in step 402, the process moves to step 403, and the data and time are stored in the storage area a fixed number of times. The process is then repeated until a data collection signal is sent from the computer via the master station. In step 404, upon reception of the data collection signal, the data and time in the storage area are transferred to the master station.

第5図は子局の処理内容を示すフローチャートである。FIG. 5 is a flowchart showing the processing contents of the slave station.

制御部は電源人により起動され動作を始める。The control unit is activated by the power source and begins operation.

先ず、データ保存エリアの格納アドレスを初期化し、計
測部によってデータ105を、又時計110によって時
刻を取込み、送信バッファ112へ格納する(ステップ
501)。次に前回データを送信バッファから取出す(
初回は直前で格納したデータが入っているので) (ス
テップ502 > 、次いで計測部104からデータ1
05を読込み、時計110より時刻を読込み、保存エリ
ア111へ格納すると共に送信バッファ112へ格納す
る(ステップ503)。保存エリア111はサイクリッ
クに順に使用され、最終アドレスになると再び先頭から
データと時刻が上書きされて保存される使い方とする。
First, the storage address of the data storage area is initialized, data 105 is taken in by the measurement unit, and time is taken in by the clock 110, and these are stored in the transmission buffer 112 (step 501). Next, retrieve the previous data from the send buffer (
(Since the data stored immediately before is included for the first time) (Step 502 >, then data 1 is sent from the measurement unit 104.
05, the time is read from the clock 110, and stored in the storage area 111 and also in the transmission buffer 112 (step 503). The storage area 111 is used cyclically in sequence, and when the final address is reached, data and time are overwritten and stored again from the beginning.

送信バッファ112は伝送部102が親局11からの指
令を受けると、送信バッファ内のデータを親局11へ転
送する。従って、データを保存するか否かに拘らず、最
新のデータが親局へ転送される。
The transmission buffer 112 transfers the data in the transmission buffer to the master station 11 when the transmission section 102 receives a command from the master station 11 . Therefore, regardless of whether the data is saved or not, the latest data is transferred to the master station.

次に、変化検出指定テーブル114より予め指定された
変化検出データを取出す〈ステップ504 ) 。
Next, change detection data specified in advance is extracted from the change detection specification table 114 (step 504).

変化検出指定テーブル114は第2図fb)に示される
ように、計測器間、2値情報なら1→0.0→1変化の
いずれか又は両方で変化を検出するか、数値情報であれ
ば変化幅を指定するものとする。
The change detection specification table 114, as shown in FIG. The range of change shall be specified.

(例えば、O〜5■で数値情報を計測しているとすると
0.5Vを指定すルト、4.0 V−4,5V4:なっ
たとき変化を検出したとする) ステップ502で取出した前回値とステップ503で計
測した今回値を比較し、変化検出テーブルで指定されて
いた変化があれば変化ありとし、変化検出を記憶する(
ステップ505 、506 )。変化がなければステッ
プ506は行なわず、次回データと時刻保存のためのア
ドレスを更新する(ステップ507)。このとき、前述
したように保存エリアは先頭から順に使用し、最終アド
レスにくると先頭に戻り、これをサイクリックに使うこ
ととする。
(For example, if numerical information is being measured at O~5■, a change is detected when 0.5V is specified, 4.0 V-4, 5V4:) The previous value extracted in step 502 The value is compared with the current value measured in step 503, and if there is a change specified in the change detection table, it is determined that there is a change, and the change detection is stored (
Steps 505, 506). If there is no change, step 506 is not performed, and the address for storing the next data and time is updated (step 507). At this time, as described above, the storage area is used in order from the beginning, and when it reaches the final address, it returns to the beginning and is used cyclically.

次に、自局の変化信号を検出したか又は他局からの変化
信号を受信したかを調べる(ステップ508)。No(
いずれも検出しなければ)て′あれば必要な時間(例え
ば51sec、 )遅延して(ステップ509 ) 、
ステップ502へ戻る。以上の各処理は自局の変化を検
出するか他局からの変化信号を受信するまで繰り返す。
Next, it is determined whether a change signal from the own station has been detected or a change signal from another station has been received (step 508). No(
If neither is detected, the process is delayed for the necessary time (for example, 51 seconds) (step 509),
Return to step 502. The above processes are repeated until a change in the own station is detected or a change signal from another station is received.

ステップ508で他局の変化信号を受信しなか又は自分
で変化を検出した場合の処理を以下に説明する。
The processing to be performed when a change signal from another station is not received or a change is detected by the station itself in step 508 will be described below.

先ず、カウンタn=oとする。これは以下のためである
。事故前後のデータと時刻を保存するために、先ず、事
故前のデータと時刻は予めサイクリックに保存エリアへ
格納しである。事故後のデータと時刻の保存は、変化信
号受信又は変化検出から指定された回数だけデータと時
刻を保存することにより実現するものとする。例えばn
=4000回として、データと時刻読込みのdelay
が1回5nse仁とすると、事故(変化)検出から51
1SeC。
First, let counter n=o. This is because: In order to save the data and time before and after the accident, first, the data and time before the accident are stored cyclically in a storage area in advance. Saving data and time after an accident shall be realized by saving data and time a specified number of times after receiving or detecting a change signal. For example, n
= 4000 times, delay of data and time reading
If it is 5ns per time, it will take 51 seconds from accident (change) detection.
1SeC.

間隔で4000回、つまり20SeC,間のデータか保
存できることになる。
Data can be stored 4000 times at intervals of 20 SeC.

例えば全体で10000件分のデータを保存可能とする
と、変化前6000回(51sec、間隔で30秒間〉
、変化後4000回(50n+sec、間隔で20秒間
)のデータ保存ができる。全体の件数及びnの値につい
ては、任意に予め設定できることは勿論である。ステッ
プ511では自身(自局)で変化を検出したかを判断し
、検出すればステップ512にて変化検出信号を他局に
対して発信する、又、検出しなければステップ513へ
移る。次にデータ105及び時刻を計測部104及び時
計110より読込み、保存エリア及び送信バッファへ格
納する(ステップ513 ’) 、データ保存アドレス
を更新する(ステ・ツブ514、これは507と同様)
For example, if a total of 10,000 pieces of data can be saved, 6,000 times (51 seconds, 30 seconds at intervals) before changing
, data can be saved 4000 times (50n+sec, at intervals of 20 seconds) after changes. Of course, the total number of cases and the value of n can be set arbitrarily in advance. In step 511, it is determined whether the change has been detected by itself (its own station), and if detected, a change detection signal is transmitted to other stations in step 512, and if not detected, the process moves to step 513. Next, data 105 and time are read from the measurement unit 104 and clock 110, and stored in the storage area and transmission buffer (step 513'), and the data storage address is updated (step 514, which is the same as 507).
.

ステップ515ではn回完了しなかをチエ・ツクし、完
了すればステップ517へ、未完であればn=n+1し
てステップ516にて(x n5ec、遅延)してステ
ップ513へ戻る。n回完了すると、ステ・ンプ517
へ進み、データ105及び時刻を計測部104及び時計
110より読込み送信バッファ112へ格納する。これ
は電子計算機1より親局11経由データ読込み信号が送
出され、保存エリア111のデータと時刻が読出される
まで、現在のオンラインデータを送信するための処理で
ある。親局送信完了すれば、ステップ502からの処理
を繰り返す。未完であれば、XlFeIC,遅延して(
ステップ519)ステップ517へ戻り、完了するまで
ステップ517゜518 、519を繰り返す。
In step 515, it is checked whether the process has been completed n times, and if it is completed, the process goes to step 517; if it is not completed, n=n+1 is set, and in step 516 (x n5ec, delayed), and the process returns to step 513. When completed n times, step 517
Then, the data 105 and time are read from the measurement unit 104 and the clock 110 and stored in the transmission buffer 112. This is a process for transmitting current online data until the computer 1 sends a data read signal via the master station 11 and the data and time in the storage area 111 are read. When the master station transmission is completed, the process from step 502 is repeated. If incomplete, XlFeIC, delayed (
Step 519) Return to step 517 and repeat steps 517, 518 and 519 until completion.

以下子局における計測周期は511SeC,とじて説明
を行なう。
The following explanation will be given assuming that the measurement period in the slave station is 511 SeC.

先ず、子局101の制御部103は51s13c、周期
でCBOloとIAを計測し、時刻をつけて保存エリア
へ格納すると共に送信バッファへデータを格納し、その
データは伝送部経由親局へ、例えば3秒毎に送信してい
る(ステップ502〜509を繰返している)。子局2
01も同様である。ここで、事故が発生するとCBOl
oが入状態から切状態となり再び入状態となる。切から
人に10rasec、かかるものとする。子局101は
CBOIOの変化を検出し、変化検出信号を発信すると
共に、一定回数データと時刻の取込み保存を繰り返す(
ステップ510〜515 ) 。
First, the control unit 103 of the slave station 101 measures CBOlo and IA at intervals of 51s13c, stores them in a storage area with a time stamp, and stores the data in a transmission buffer.The data is sent to the master station via a transmission unit, for example. It is transmitted every 3 seconds (steps 502 to 509 are repeated). Child station 2
The same applies to 01. Here, if an accident occurs, CBOl
o changes from the ON state to the OFF state and then returns to the ON state. It will take 10rasec from start to finish. The slave station 101 detects a change in CBOIO, transmits a change detection signal, and repeats capturing and storing data and time a certain number of times (
Steps 510-515).

(この回数は事故前6000回、後4000回とする。(This number is 6,000 before the accident and 4,000 after.

)その後、電子計算機1よりデータ収集信号がくるまで
送信バッファにデータを更新する。
) Thereafter, data is updated in the transmission buffer until a data collection signal is received from the computer 1.

子局201では子局101よりの変化検出信号を受け、
同様に一定回数データと時刻の取込み保存を繰返し7、
その後はデータ収集信号がくるまで送信バッファにデー
タを更新する。これにより事故前6000回(30秒、
 511sec、間隔)、事故後4000回(20秒、
 5 rmsec、間隔)のデータが保存できたことに
なる。電子計算I11は事故後一定時間(この場合20
秒)以上待ってから各親局11.21経由デ一タ収集信
号を送出すると、子局は保存エリアのデータと時刻を親
局経由送信してくる。その後子局はステップ502〜5
09を次の事故検出まで繰り返す。
The slave station 201 receives the change detection signal from the slave station 101,
Similarly, repeat the import and save of data and time a certain number of times7.
After that, the data is updated in the transmission buffer until the data collection signal arrives. As a result, 6000 times (30 seconds,
511 seconds, interval), 4000 times after the accident (20 seconds,
This means that data of 5 rmsec, interval) can be saved. Electronic calculation I11 is calculated based on a certain period of time after the accident (in this case, 20
After waiting for more than 10 seconds), each master station 11.21 sends out a data collection signal via the master station, and the slave stations transmit the data and time in the storage area via the master station. After that, the slave station performs steps 502 to 5.
09 is repeated until the next accident detection.

データ収集については、子局か変化を検出した事故時の
みでなく、電子計算機や他の装置からの指令により、任
意の時間帯のデータを同時に収集することも可能である
。このときの作用は変化検出信号の送信タイミングが、
電子計算機や他の装置からであること以外は上記本発明
の実施例と同様である。
Regarding data collection, it is possible to collect data not only in the event of an accident when a change in the slave station is detected, but also in any time period at the same time based on instructions from a computer or other device. The effect at this time is that the transmission timing of the change detection signal is
It is the same as the embodiment of the present invention described above except that it is from an electronic computer or other device.

[発明の効果コ 以上説明したように、本発明によれば高度化。[Effects of invention As explained above, according to the present invention, the sophistication can be improved.

複雑化してきた電力系統から、事故時に広範囲に亘って
同時性のある2値情報や数値情報を数n+secの分解
能で収集するよう構成したので、高度の事数分析や監視
制御が可能となり、今後の電力系統運営に多大な信頼度
向上を与えるものである。
Since the power system has become increasingly complex, the system has been configured to collect simultaneous binary and numerical information over a wide range at the time of an accident with a resolution of several n+ seconds, making it possible to perform advanced incident analysis and monitoring control. This will greatly improve the reliability of power system operations.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は本発明による遠方監視制御装置の一実施例の構
成図、第2図は本発明の子局の詳細な構成図、第3図は
電力系統と子局、親局の設置例図、第4図は本発明によ
る全体の処理の流れを示すフローチャート、第5図は子
局のデータ計測とデータ保存、変化検出の処理フローチ
ャートである。 1・・・電子計算機    11.21・・・親局10
1 、201・・・子局   102・・・伝送部10
3・・・制御部     104 、 104’・・・
計測部105 、 105’・・・被計測部
Fig. 1 is a block diagram of an embodiment of a remote monitoring and control device according to the present invention, Fig. 2 is a detailed block diagram of a slave station of the present invention, and Fig. 3 is an installation example diagram of a power system, a slave station, and a master station. , FIG. 4 is a flowchart showing the overall processing flow according to the present invention, and FIG. 5 is a processing flowchart of data measurement, data storage, and change detection of the slave station. 1...Electronic computer 11.21...Master station 10
1, 201...Slave station 102...Transmission unit 10
3...Control unit 104, 104'...
Measuring parts 105, 105'...Measurement target part

Claims (1)

【特許請求の範囲】[Claims] リモートステーション側の計測器にメモリを備え計測し
た情報を時刻と共にそのメモリへ書込み、マスターステ
ーション側からの制御信号により計測器内のメモリに保
存された情報と時刻をマスターステーション側へ転送す
る遠方監視制御装置において、被計測データの変化を検
出したときに、他局に対して変化検出信号を発信するこ
とを特徴とする遠方監視制御装置。
Remote monitoring in which the measuring instrument on the remote station side has a memory and the measured information is written to the memory along with the time, and the information and time stored in the memory of the measuring instrument are transferred to the master station side by a control signal from the master station side. A remote monitoring and control device characterized in that the control device transmits a change detection signal to another station when a change in measured data is detected.
JP2306659A 1990-11-13 1990-11-13 Supervisory remote controller Pending JPH04183236A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2306659A JPH04183236A (en) 1990-11-13 1990-11-13 Supervisory remote controller

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2306659A JPH04183236A (en) 1990-11-13 1990-11-13 Supervisory remote controller

Publications (1)

Publication Number Publication Date
JPH04183236A true JPH04183236A (en) 1992-06-30

Family

ID=17959779

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2306659A Pending JPH04183236A (en) 1990-11-13 1990-11-13 Supervisory remote controller

Country Status (1)

Country Link
JP (1) JPH04183236A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002540751A (en) * 1999-03-24 2002-11-26 ゼネラル・エレクトリック・カンパニイ Fault data synchronization via peer-to-peer communication networks

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002540751A (en) * 1999-03-24 2002-11-26 ゼネラル・エレクトリック・カンパニイ Fault data synchronization via peer-to-peer communication networks
JP2011109911A (en) * 1999-03-24 2011-06-02 General Electric Co <Ge> Fault data synchronization via peer-to-peer communication network
JP4868645B2 (en) * 1999-03-24 2012-02-01 ゼネラル・エレクトリック・カンパニイ Failure data synchronization via peer-to-peer communication network

Similar Documents

Publication Publication Date Title
CA2333105C (en) Fault data synchronization via peer-to-peer communications network
US6005759A (en) Method and system for monitoring and controlling an electrical distribution network
US5027297A (en) System for time stamping events using a remote master clock
KR0176245B1 (en) Electric power system with remote monitoring and control of protective relays
CN103827678B (en) Method for distributed waveform recording in a power distribution system
US7698582B2 (en) Apparatus and method for compensating digital input delays in an intelligent electronic device
CN103812220B (en) Fault holographic system and method based on standardized processing technology
CN101881938A (en) Satellite synchronous master clock device
US20020145517A1 (en) Power system waveform capture
CN106558917A (en) A kind of secondary operational system protective relaying device inspection method
JPH09222445A (en) Power system supervisory control device and oscilloscope waveform data collection method
JPS62231580A (en) Remote monitoring control method
JP2774293B2 (en) Lightning Prediction Method Using Distribution Line Lightning Surge Information
JPS61221542A (en) Centralized monitoring control system
JPH04183236A (en) Supervisory remote controller
CN101881939A (en) Time synchronization device for electrical power system
JP2002352368A (en) Equipment monitoring system
Zeng et al. Wideband measurement data communication protocol: Scheme design, hardware implementation, and field application
CN110418403A (en) A kind of 35kV substation data record system and method based on wireless network
JPH07280970A (en) Monitoring control system with time synchronizing function
KR101462229B1 (en) Integrated data merging unit
CN114399893A (en) Method and device for transmitting temperature and humidity data of steel plant
JP3559398B2 (en) Remote operation monitoring system for protection relay
JP2003032914A (en) Distribution automation system and its monitoring method
JPH0450798B2 (en)