JPH0426552Y2 - - Google Patents
Info
- Publication number
- JPH0426552Y2 JPH0426552Y2 JP8979887U JP8979887U JPH0426552Y2 JP H0426552 Y2 JPH0426552 Y2 JP H0426552Y2 JP 8979887 U JP8979887 U JP 8979887U JP 8979887 U JP8979887 U JP 8979887U JP H0426552 Y2 JPH0426552 Y2 JP H0426552Y2
- Authority
- JP
- Japan
- Prior art keywords
- leader
- stage
- attached
- leaders
- screw
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 238000010276 construction Methods 0.000 claims description 13
- 239000003638 chemical reducing agent Substances 0.000 description 16
- 238000009412 basement excavation Methods 0.000 description 7
- 230000008602 contraction Effects 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
- Earth Drilling (AREA)
Description
【考案の詳細な説明】
A 産業上の利用分野
本考案は、油圧シヨベル等の基礎工事用建設機
械に用いられ、アースオーガ等の作業用アタツチ
メントの昇降を案内するリーダに関する。[Detailed Description of the Invention] A. Field of Industrial Application The present invention relates to a leader that is used in construction machines for foundation work such as hydraulic excavators and guides the lifting and lowering of working attachments such as earth augers.
B 従来の技術
この種のリーダにオーガ減速機を装着した従来
例を第6図に示す。第6図において、基礎工事用
建設機械本体1には、伸縮自在のステー2が設け
られ、このステー2の自由端部にブラケツト3を
介して第1リーダ4aが取付けられる。この第1
リーダ4aの下端には、中間リーダ4bの上端が
取付けられ、その下端には第2リーダ4cが取付
けられる。この第2リーダ4cは、ブラケツト1
aを介して本体1に固定される。一方、第1リー
ダ4aの上端には上部リーダ4dが取付けられ、
これら第1リーダ4a、中間リーダ4b、第2リ
ーダ4c、上部リーダ4dによりリーダ4が構成
される。また、本体1には、ウインチ12が設け
られ、このウインチ12に巻回されたワイヤーロ
ープ9は、リーダ先端のシーブ11を介してその
先端がオーガ減速機5に接続されている。オーガ
減速機5はリーダ4にガイドされて上下動可能で
あり、このオーガ減速機5の出力軸に下方に向け
て掘削用のスクリユー6が取付けられる。オーガ
減速機5の動力は、本体1に設置された電源ある
いは油圧源などの動力源7から接続部材8により
供給される。なお、10はシーブ11を支持する
トツプブラケツトである。B. Prior Art FIG. 6 shows a conventional example in which this type of reader is equipped with an auger reducer. In FIG. 6, a construction machine body 1 for foundation work is provided with a telescopic stay 2, and a first leader 4a is attached to the free end of the stay 2 via a bracket 3. This first
The upper end of the intermediate leader 4b is attached to the lower end of the leader 4a, and the second leader 4c is attached to the lower end thereof. This second leader 4c is connected to the bracket 1
It is fixed to the main body 1 via a. On the other hand, an upper leader 4d is attached to the upper end of the first leader 4a,
The leader 4 is constituted by the first leader 4a, intermediate leader 4b, second leader 4c, and upper leader 4d. The main body 1 is also provided with a winch 12, and the wire rope 9 wound around the winch 12 has its tip connected to the auger reducer 5 via a sheave 11 at the tip of the leader. The auger reducer 5 is guided by the leader 4 and can move up and down, and a screw 6 for excavation is attached to the output shaft of the auger reducer 5 so as to face downward. Power for the auger reducer 5 is supplied through a connecting member 8 from a power source 7 such as a power source or a hydraulic power source installed in the main body 1 . Note that 10 is a top bracket that supports the sheave 11.
このように構成されたアースオーガ装置により
掘削作業を行なうには、まず、オーガ減速機5を
駆動させてスクリユー6を回転させ、次いで、ワ
イヤーロープ9を繰り出してオーガ減速機5をリ
ーダに沿つて下降させる。その結果、オーガ減速
機5の自重によりスクリユー6が地面に押圧され
て孔が穿設される。 To perform excavation work using the earth auger device configured as described above, first, the auger reducer 5 is driven to rotate the screw 6, and then the wire rope 9 is let out to move the auger reducer 5 along the leader. lower it. As a result, the screw 6 is pressed against the ground by the weight of the auger reducer 5, and a hole is bored.
C 考案が解決しようとする問題点
従来のリーダにおいては、掘削する穴の深さに
応じて、作業現場で中間リーダ4bおよび上部リ
ーダ4dを接続したり、取外したりしてオーガ減
速機5の上下動の範囲を調整している。また、輪
送時には、第1リーダ4aや中間リーダ4b、第
2リーダ4c、上部リーダ4d、トツプブラケツ
ト10をそれぞれ取外している。これらリーダ4
やトツプブラケツト10の取付け、取外しは、数
十本ものボルトによつて行なわれるため、作業が
面倒で手間がかかり、また人力によつては行なえ
ず、クレーンなどを必要とするから、作業費用も
多大になる。さらに、各リーダを分解して個別に
輸送しなければならないため、多大な輸送費がか
かる。C. Problems to be solved by the invention In the conventional leader, depending on the depth of the hole to be excavated, the intermediate leader 4b and the upper leader 4d are connected or removed at the work site, and the upper and lower parts of the auger reducer 5 are connected or removed. Adjusting the range of motion. Further, during transport, the first leader 4a, intermediate leader 4b, second leader 4c, upper leader 4d, and top bracket 10 are removed. These leaders 4
The installation and removal of the top bracket 10 is done using dozens of bolts, which is troublesome and time-consuming, and cannot be done manually; a crane or the like is required, which increases the cost of the work. It becomes huge. Furthermore, each reader must be disassembled and transported individually, which incurs significant shipping costs.
さらにまた、作業時の掘進力はオーガ減速機5
およびスクリユー6の重量によつてのみ得られる
ため、地盤が固い場合などはスクリユー6が地盤
に食い込まず十分に掘削できない。 Furthermore, the digging force during work is reduced by the auger reducer 5.
This is achieved only by the weight of the screw 6, so if the ground is hard, the screw 6 will not dig into the ground and will not be able to dig sufficiently.
本考案の目的は、リーダを多段伸縮式として上
述した問題点を解決した建設機械の伸縮式リーダ
を提供することにある。 An object of the present invention is to provide a telescoping leader for construction machinery that solves the above-mentioned problems by using a multi-stage telescoping leader.
D 問題点を解決するための手段
一実施例を示す第1図および第4図により説明
すると、本考案は、基礎工事用機械1に装着され
て作業用アタツチメント32,33の昇降を案内
する建設機械の伸縮式リーダに適用される。そし
て上述の問題点は、基礎工事用機械1に装着され
る第1のリーダ21と、この第1のリーダ21に
対して伸縮する第2のリーダ22〜24と、この
第2のリーダ22〜24を伸縮させる駆動手段4
1〜43と、第2のリーダ24に設けられ、作業
用アタツチメント32,33が取付けられる取付
部材24aとを備え、第1、第2のリーダ21〜
23に取付部材24aが通過する案内孔21d〜
23dを形成することにより解決される。D Means for Solving the Problems To explain with reference to FIGS. 1 and 4 showing an embodiment, the present invention is a construction machine that is attached to a foundation construction machine 1 and guides the lifting and lowering of work attachments 32 and 33. Applicable to mechanical telescopic readers. The above-mentioned problem is caused by the first leader 21 attached to the foundation construction machine 1, the second leaders 22-24 that extend and contract with respect to the first leader 21, and the second leaders 22-24 that extend and contract with respect to the first leader 21. Driving means 4 for expanding and contracting 24
1 to 43, and a mounting member 24a provided on the second leader 24 to which working attachments 32 and 33 are attached, and the first and second leaders 21 to
23 through which the mounting member 24a passes through the guide hole 21d~
23d.
E 作用
オーガ減速機およびスクリユーを案内するリー
ダに本考案を適用した一実施例について説明す
る。E. Effect An embodiment in which the present invention is applied to an auger reducer and a leader for guiding a screw will be described.
掘削作業を行なうにあたり、まず、各駆動手段
41〜43を伸縮させて第1、第2のリーダ21
〜24の全長を定め、スクリユー33を地面に当
接させる。オーガ減速機32によりスクリユー3
3を回転駆動させた後、第2のリーダ22〜24
を収縮させると、取付部24aは各案内孔22d
〜21dを通過して下降する。これにより、スク
リユー33が下降して地面を掘削する。輸送時は
第2のリーダ22〜24を収縮させ第5図のよう
にリーダ全長を最小にする。 In carrying out excavation work, first, each driving means 41 to 43 is expanded and contracted to move the first and second leaders 21.
24 is determined, and the screw 33 is brought into contact with the ground. Screw 3 by auger reducer 32
3, the second readers 22 to 24 are rotated.
When the mounting portion 24a is contracted, each guide hole 22d
It passes through ~21d and descends. This causes the screw 33 to descend and excavate the ground. During transportation, the second leaders 22 to 24 are contracted to minimize the overall length of the leaders as shown in FIG.
F 実施例
第1図〜第5図に基づいて、本考案の一実施例
を説明する。F. Example An example of the present invention will be described based on FIGS. 1 to 5.
伸縮式リーダの内部構造を示す第1図およびそ
の上面図である第2図において、伸縮式リーダ
は、1段リーダ21に2段リーダ22が伸縮可能
に内挿され、2段リーダ22に3段リーダ23が
伸縮可能に内挿され、3段リーダ23に4段リー
ダ24が上下動可能に内挿されている。各リーダ
21〜24は矩形断面を持ち、第1シリンダ4
1、第2シリンダ42、第3シリンダ43により
それぞれ互いに伸縮される。 In FIG. 1 showing the internal structure of the telescoping leader and FIG. 2 showing its top view, the telescoping leader has a second-stage leader 22 telescopically inserted into the first-stage leader 21, and a three-stage leader 22 in the second-stage leader 22. A stage leader 23 is inserted into the third stage leader 23 so as to be extendable and retractable, and a fourth stage leader 24 is inserted into the third stage leader 23 so as to be vertically movable. Each leader 21 to 24 has a rectangular cross section, and the first cylinder 4
The cylinder 1, the second cylinder 42, and the third cylinder 43 extend and contract each other.
1段リーダ21の底板21aの両端部には、一
対の第1シリンダ41の基端部が固定されてい
る。この第1シリンダ41のピストンロド41a
は、2段リーダ22の両端に設けられた側部室2
2aの天板22bに固定され、ピストンロツド4
1aの伸縮により2段リーダ22が1段リーダ2
1に対して伸縮する。2段リーダ22の底板22
cには、左右の側部室22aの内側に一対の第2
シリンダ42の基端部がそれぞれ固定されてい
る。この第2シリンダ42のピストンロツド42
a先端は、第3リーダ23の両端に設けられた側
部室23aの天板23bに固定され、ピストンロ
ツド42aの伸縮により3段リーダ23が2段リ
ーダ22に対して伸縮する。ここで、これら1〜
3段リーダ21〜23の一側面P1,P2,P3
には上端部から切込まれた同形状の案内孔21
d,22d,23dがそれぞれ形成され、1段〜
3段リーダ21,22,23を互いに収縮させた
とき、各案内孔21d,22d,23dが重なり
合うようになつている。 Base ends of a pair of first cylinders 41 are fixed to both ends of the bottom plate 21 a of the first-stage leader 21 . Piston rod 41a of this first cylinder 41
is the side chamber 2 provided at both ends of the two-stage leader 22.
2a is fixed to the top plate 22b, and the piston rod 4
Due to the expansion and contraction of 1a, the second stage leader 22 becomes the first stage leader 2.
Expands and contracts with respect to 1. Bottom plate 22 of two-stage leader 22
c, a pair of second chambers are provided inside the left and right side chambers 22a.
The base end portions of the cylinders 42 are each fixed. The piston rod 42 of this second cylinder 42
The tip a is fixed to a top plate 23b of a side chamber 23a provided at both ends of the third leader 23, and the third-stage leader 23 expands and contracts with respect to the second-stage leader 22 as the piston rod 42a expands and contracts. Here, these 1~
One side P1, P2, P3 of three-stage leaders 21 to 23
A guide hole 21 of the same shape is cut from the upper end.
d, 22d, and 23d are formed respectively, and the first stage ~
When the three-stage leaders 21, 22, and 23 are contracted, the respective guide holes 21d, 22d, and 23d overlap.
更に、3段リーダ23の底板23cの中央部に
は第3シリンダ43の基端部が固定され、この第
3シリンダ43のピストンロツド43a先端は、
4段リーダ24に固着されている。このピストン
ロツド43aの伸縮により4段リーダ24が3段
リーダ23内部を上下移動する。4段リーダ24
には、第2図に示すように各リーダ21〜23の
案内孔21d〜23dから突出可能なアタツチメ
ント取付部24aが設けられ、このアタツチメン
ト取付部24aにオーガ減速機等の作業用アタツ
チメントATが取付けられる。また、第1リーダ
21の背面には、ステー止着部21eおよびリー
ダ支持部21fがそれぞれ取付けられている。以
上の1〜4段リーダ21〜24および第1〜第3
シリンダ41〜43により伸縮式リーダを構成す
る。 Further, the base end of a third cylinder 43 is fixed to the center of the bottom plate 23c of the third stage leader 23, and the tip of the piston rod 43a of the third cylinder 43 is
It is fixed to the four-stage leader 24. The expansion and contraction of the piston rod 43a causes the fourth stage leader 24 to move up and down within the third stage leader 23. 4-stage leader 24
As shown in FIG. 2, an attachment mounting portion 24a that can protrude from the guide holes 21d to 23d of each leader 21 to 23 is provided, and a working attachment AT such as an auger reducer is attached to this attachment mounting portion 24a. It will be done. Furthermore, a stay attachment part 21e and a leader support part 21f are attached to the back surface of the first leader 21, respectively. The above 1st to 4th stage leaders 21 to 24 and the first to third
The cylinders 41 to 43 constitute a telescoping leader.
上述の伸縮式リーダを基礎工事用本体1に装着
した例を第4図に示す。本体1の上部旋回体1a
に設けられたステー31にはステー止着部21e
を介して1段リーダ21の上部が連結され、ま
た、上部旋回体1aの前部に設けたブラケツト1
bにはリーダ支持部21fを介して1段リーダ2
1の下部が連結されている。4段リーダ24のア
タツチメント取付部24aにはオーガ減速機32
が取付けられ、その出力軸にスクリユー33が取
付けられている。 FIG. 4 shows an example in which the above-mentioned telescopic reader is attached to the main body 1 for foundation work. Upper rotating body 1a of main body 1
The stay 31 provided with the stay attachment part 21e
The upper part of the first stage leader 21 is connected through the bracket 1 provided at the front part of the upper revolving body 1a.
b is connected to the first stage leader 2 via the leader support section 21f.
The lower part of 1 is connected. An auger reducer 32 is attached to the attachment mounting portion 24a of the four-stage leader 24.
is attached, and a screw 33 is attached to its output shaft.
以上の実施例において、1段リーダ21が第1
のリーダを、2段〜4段リーダ22〜24が第2
のリーダを、アタツチメント取付部24aが取付
部材を、第1〜第3シリンダ41〜43が駆動手
段をそれぞれ構成する。 In the above embodiment, the first stage leader 21 is the first
2nd to 4th stage leaders 22 to 24 are the second
The attachment mounting portion 24a constitutes a mounting member, and the first to third cylinders 41 to 43 constitute a driving means.
次に、実施例の動作を説明する。 Next, the operation of the embodiment will be explained.
以上のように構成された建設機械により掘削作
業を行なうには、まず、各シリンダ41〜43を
伸縮させて1〜4段リーダ21〜24の全長を定
めスクリユー33を所定高さに設定し、スクリユ
ー33を所定掘削位置の上方に設定する。その
後、各リーダ21〜24の長さを調節してスクリ
ユー33を地面に当接する。次に、オーガ減速機
32を駆動してスクリユー33を回転させた後、
第1、第2シリンダ41,42を収縮させて2
段、3段リーダ22,23を収縮させ、さらに第
3シリンダ43を収縮させて4段リーダ24を下
降させる。これにより、スクリユー33が回転し
ながら下降して地面を掘削する。このとき、アタ
ツチメント取付部24aは各案内孔21d,22
d,23dを通過し、第3図に示すように2段、
3段リーダ22,23が完全に収縮し、4段リー
ダ24が完全に下降するまで掘削可能である。な
お、各シリンダ41〜43の伸縮は、スクリユー
33の長さに応じて適宜調節する。 In order to perform excavation work using the construction machine configured as described above, first, the cylinders 41 to 43 are expanded and contracted to determine the total length of the first to fourth stage leaders 21 to 24, and the screw 33 is set to a predetermined height. The screw 33 is set above the predetermined excavation position. Thereafter, the length of each leader 21 to 24 is adjusted to bring the screw 33 into contact with the ground. Next, after driving the auger reducer 32 and rotating the screw 33,
2 by contracting the first and second cylinders 41 and 42.
The stage and third stage leaders 22 and 23 are contracted, and the third cylinder 43 is further contracted to lower the fourth stage leader 24. As a result, the screw 33 descends while rotating to excavate the ground. At this time, the attachment mounting portion 24a is attached to each guide hole 21d, 22
d, 23d, and as shown in Figure 3, the second stage,
Excavation is possible until the third-stage leaders 22 and 23 are completely retracted and the fourth-stage leader 24 is completely lowered. Note that the expansion and contraction of each cylinder 41 to 43 is adjusted as appropriate depending on the length of the screw 33.
また、上述の油圧シヨベルを輸送する際、第5
図に示すように2〜4段リーダ22〜24を完全
に収縮させればリーダの取り外しが不要であり、
作業効率がよい。また、現場内での移動時、およ
び作業終了時に完全に収縮させておけば安全性が
向上する。 In addition, when transporting the above-mentioned hydraulic excavator,
As shown in the figure, if the 2nd to 4th stage leaders 22 to 24 are completely retracted, there is no need to remove the leaders.
Work efficiency is good. Additionally, safety can be improved by fully deflating the device when moving around the site and at the end of work.
なお、この実施例では、各リーダにそれぞれシ
リンダを取付けたものを示したが、多段シリンダ
や親子シリンダを用いることもできる。また、リ
ーダの組合せ数も4段に限定されない。さらに、
リーダの断面形状は矩形でなくてもよい。 In this embodiment, a cylinder is attached to each reader, but a multi-stage cylinder or a parent-child cylinder may also be used. Further, the number of reader combinations is not limited to four stages. moreover,
The cross-sectional shape of the leader does not have to be rectangular.
G 考案の効果
本考案によれば、リーダを多段伸縮式にしたの
で、作業時、輸送時にリーダの分解、組立て作業
が不要となり、作業効率が向上するとともに、輸
送費の低減が図れる。また、駆動手段によりリー
ダを伸縮させると、作業用アタツチメントに建設
機械本体の自重を加えることができるので、固い
地盤に対しても、掘削等の作業が容易に行なえ
る。G. Effects of the invention According to the invention, since the leader is made multi-stage telescoping, there is no need to disassemble and assemble the reader during work or transportation, improving work efficiency and reducing transportation costs. Further, when the leader is expanded and contracted by the driving means, the weight of the construction machine body can be applied to the working attachment, so that work such as excavation can be easily performed even on hard ground.
第1図〜第5図は本考案の一実施例を示し、第
1図はこの考案に係るリーダの断面を示し、第2
図のI−I線断面図、第2図は第1図の平面図、
第3図はリーダを収縮させた状態を示す断面図、
第4図および第5図はこのリーダを基礎工事用機
械に装着した状態を示す側面図であり、第4図が
リーダ伸出時、第5図がリーダ収縮時を示す。第
6図は、第4図に相当する従来例を示す図であ
る。
21……1段リーダ、21d……第1案内孔、
22……2段リーダ、22d……第2案内孔、2
3……3段リーダ、23d……第3案内孔、24
……4段リーダ、24d……アタツチメント取付
体、32……オーガ減速機、33……スクリユ、
41……第1シリンダ、42……第2シリンダ、
43……第3シリンダ。
1 to 5 show one embodiment of the present invention, FIG. 1 shows a cross section of a reader according to this invention, and FIG.
A sectional view taken along line I-I in the figure, Figure 2 is a plan view of Figure 1,
FIG. 3 is a sectional view showing the leader in a contracted state;
FIGS. 4 and 5 are side views showing the leader mounted on a foundation construction machine, with FIG. 4 showing the leader when it is extended and FIG. 5 showing the leader when it is retracted. FIG. 6 is a diagram showing a conventional example corresponding to FIG. 4. 21...1st stage leader, 21d...1st guide hole,
22...Two-stage leader, 22d...Second guide hole, 2
3...3rd stage leader, 23d...3rd guide hole, 24
...Four stage leader, 24d... Attachment mounting body, 32... Auger reducer, 33... Screw,
41...first cylinder, 42...second cylinder,
43...Third cylinder.
Claims (1)
ントの昇降を案内する建設機械の伸縮式リーダに
おいて、 前記基礎工事用機械に装着される第1のリーダ
と、 この第1のリーダに対して伸縮する第2のリー
ダと、 この第2のリーダを伸縮させる駆動手段と、 前記第2のリーダに設けられ、前記作業用アタ
ツチメントが取付けられる取付部材とを備え、前
記第1、第2のリーダに前記取付部材が通過する
案内孔を形成したことを特徴とする建設機械の伸
縮式リーダ。[Scope of Claim for Utility Model Registration] A telescoping leader for a construction machine that is attached to a foundation construction machine and guides the lifting and lowering of a working attachment, comprising: a first leader that is attached to the foundation construction machine; a second leader that extends and contracts with respect to the first leader; a driving means that extends and contracts the second leader; and a mounting member that is provided on the second leader and to which the working attachment is attached; . A telescoping leader for construction machinery, characterized in that a second leader is formed with a guide hole through which the mounting member passes.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP8979887U JPH0426552Y2 (en) | 1987-06-11 | 1987-06-11 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP8979887U JPH0426552Y2 (en) | 1987-06-11 | 1987-06-11 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS63198683U JPS63198683U (en) | 1988-12-21 |
| JPH0426552Y2 true JPH0426552Y2 (en) | 1992-06-25 |
Family
ID=30949105
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP8979887U Expired JPH0426552Y2 (en) | 1987-06-11 | 1987-06-11 |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0426552Y2 (en) |
-
1987
- 1987-06-11 JP JP8979887U patent/JPH0426552Y2/ja not_active Expired
Also Published As
| Publication number | Publication date |
|---|---|
| JPS63198683U (en) | 1988-12-21 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3725010B2 (en) | Reinforced rod transport built-in machine | |
| JP3124481B2 (en) | Construction steel demolition machine | |
| CN212641453U (en) | A construction pile foundation removal device | |
| JP4064320B2 (en) | Hollow digging equipment for hollow pile construction | |
| KR20220113062A (en) | Rock splitting device detachable on rock drill | |
| JP2001171986A (en) | Lifting device for heavy structures and jack-up method using the device | |
| CN220746909U (en) | Stake machine chassis and stake machine | |
| JPH08151887A (en) | Excavator | |
| KR102681867B1 (en) | Ascent and descent device of the core drill | |
| CN219343350U (en) | Telescopic pressurizing grab bucket | |
| EP0595614A1 (en) | Telescopic arm for grab bucket excavator | |
| JPS59134227A (en) | Pile driver | |
| CN220596858U (en) | Manual hole digging pile lifting frame with assembly type balancing weights | |
| JPH0841927A (en) | Deep digging machine | |
| KR102477617B1 (en) | Kelly bar with multi-stage piping for remicon injection and spraying solidifying agent | |
| JP2791262B2 (en) | Multifunctional excavator reinforcement equipment | |
| CN222025155U (en) | Expansion devices and excavation equipment | |
| JPH07292706A (en) | Multi-stage telescopic arm for construction machinery | |
| JP2583830B2 (en) | Construction method of concrete deep foundation pile | |
| KR200296406Y1 (en) | Smoll Vertical Hole Excavator | |
| JP3396025B2 (en) | Vertical excavation method and device | |
| JP2002201887A (en) | Excavator | |
| JPH0657711A (en) | Bridge foundation and pier construction method and movable work platform | |
| JPH11303563A (en) | Foundation construction machinery | |
| JPH03281833A (en) | Arm expanding mechanism for construction machine |