JPH042736B2 - - Google Patents
Info
- Publication number
- JPH042736B2 JPH042736B2 JP59221076A JP22107684A JPH042736B2 JP H042736 B2 JPH042736 B2 JP H042736B2 JP 59221076 A JP59221076 A JP 59221076A JP 22107684 A JP22107684 A JP 22107684A JP H042736 B2 JPH042736 B2 JP H042736B2
- Authority
- JP
- Japan
- Prior art keywords
- anchor bolt
- anchor
- fixing
- main reinforcement
- frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 230000002787 reinforcement Effects 0.000 claims description 46
- 230000003014 reinforcing effect Effects 0.000 claims description 18
- 238000000034 method Methods 0.000 claims description 14
- 238000010276 construction Methods 0.000 claims description 12
- 238000009434 installation Methods 0.000 claims description 5
- 239000011150 reinforced concrete Substances 0.000 claims description 3
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 239000004567 concrete Substances 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000009415 formwork Methods 0.000 description 2
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000012447 hatching Effects 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Foundations (AREA)
Description
【発明の詳細な説明】
(イ) 発明の技術分野
本発明はアンカー定着板を有するアンカーボル
トを梁筋等内部に定着させるに際してそのアンカ
ー定着板から惹起する不具合を除き得るように工
夫したアンカーボルトの取付け工法に関する。[Detailed Description of the Invention] (a) Technical Field of the Invention The present invention provides an anchor bolt that is devised to eliminate problems caused by the anchor fixing plate when fixing the anchor bolt having the anchor fixing plate inside the beam reinforcement etc. Regarding the installation method.
(ロ) 技術の背景
原子力発電所等で機器据付け用に用いられるア
ンカーボルトには、通常定着効果を高めるために
直径300mm前後のアンカー定着板が固設されてい
る。そして、アンカーボルトの位置精度は非常に
高く要求される。そのため、アンカーボルトの梁
筋等内部への定着において特に配筋工事との位置
の干渉が生じ、その強度上、配筋品質上、工程上
等の各種問題が生ずるが、それら問題を解決し得
てアンカーボルトを梁筋等の首尾よく取り付け得
ることが強く要望されている。(b) Background of the technology An anchor bolt used for installing equipment at nuclear power plants, etc. is usually fixed with an anchor fixing plate of around 300 mm in diameter to enhance the fixing effect. Furthermore, extremely high positional accuracy of the anchor bolt is required. For this reason, when anchor bolts are anchored inside beam reinforcements, interference occurs particularly with the position of reinforcement work, which causes various problems in terms of strength, reinforcement quality, process, etc. However, these problems cannot be solved. There is a strong desire to be able to successfully attach anchor bolts to beam reinforcements and the like.
(ハ) 従来技術と問題点
梁等の鉄筋内部にアンカー定着板が固設された
アンカーボルトを取り付ける工法は第4図に示す
ように、梁下端型枠を設置し(ステツプS1)、
そして梁下端主筋(梁筋のうちの下部鉄筋)及び
下側のスターラツプ(第5図のb1)を配筋してそ
の主筋を圧接し(ステツプS2)、梁上端主筋
(梁筋のうちの上部鉄筋)受け架台を取り付け
(ステツプS3)、梁上端主筋及び上側のスターラ
ツプ(第5図のa,b2参照)を配筋してその主筋
を圧接等により継ぎ(ステツプS4)、その梁上
端主筋及びスターラツプ上方にアンカーボルト固
定専用架台(第5図のc参照)を組み立て(ステ
ツプS5)、アンカーボルトの位置スミ出しを行
ない(ステツプS6)、その位置にアンカーボル
トが入れ込まれたならそのアンカーボルトと干渉
してしまうであろう梁上端主筋を切断し(ステツ
プS7)、かくして梁上端主筋に形成される挿入
空間を経てアンカーボルト(第5図のd1,d2参
照)を梁筋内に入れ込んでそのアンカーボルトを
既に架設済みのアンカーボルト固定専用架台cに
固定し(ステツプS8)、上述の切断された梁上
端主筋を重ね継手にて修復した後、(ステツプS
9)、コンクリートを打設して(ステツプS10)
梁を形成するものである。(c) Conventional technology and problems As shown in Figure 4, the method of installing anchor bolts with anchor fixing plates fixed inside reinforcing bars of beams, etc. is to install a formwork at the lower end of the beam (step S1),
Then, the main reinforcement at the lower end of the beam (the lower reinforcing bar among the beam reinforcements) and the lower stirrup (b 1 in Figure 5) are arranged, and the main reinforcements are pressed together (step S2), and the main reinforcement at the upper end of the beam (the lower reinforcement among the beam reinforcements) is placed. Attach the support frame for the upper reinforcing bars (step S3), arrange the main reinforcement at the upper end of the beam and the upper stirrup (see a and b 2 in Figure 5), and connect the main reinforcement by pressure welding, etc. (step S4), and attach the upper end of the beam. Assemble a special frame for fixing anchor bolts (see c in Fig. 5) above the main reinforcement and stirrups (step S5), measure the position of the anchor bolts (step S6), and when the anchor bolts are inserted in that position, The main reinforcement at the top of the beam that would interfere with the anchor bolt is cut (step S7), and the anchor bolt (see d 1 and d 2 in Figure 5) is inserted into the beam through the insertion space formed in the main reinforcement at the top of the beam. After fixing the anchor bolt to the already erected anchor bolt fixing frame c (step S8), and repairing the cut beam upper end main reinforcement with lap joints, (step S8)
9) Place concrete (step S10)
It forms a beam.
上述の如く、梁上端主筋aを配筋すると、アン
カーボルトd1を梁上端主筋a内部に入れ込むため
には、第5図にハツチングで示す梁上端主筋aの
切断が上述の如く不可欠の事項となる。この切断
を修復する手段は上述した通り、何段にも亘る梁
上端主筋を重ね継手にて補強するものであるが、
強度的に、又、配筋品質に劣るばかりでなく、そ
の作業に困難を極めて手間、工程に大きな損失と
なる。 As mentioned above, when the main reinforcement a at the top of the beam is arranged, in order to insert the anchor bolt d1 into the main reinforcement a at the top of the beam, it is essential to cut the main reinforcement a at the top of the beam, which is shown by hatching in Fig. 5, as described above. becomes. As mentioned above, the means to repair this cut is to reinforce the main reinforcement at the upper end of the beam over several stages with overlap joints.
Not only is the strength and reinforcement quality inferior, but the work is extremely difficult, resulting in a large loss in time and process.
これを避けるために梁上端主筋の配筋前にアン
カーボルトをアンカーボルト固定専用架台に固定
しようとすると、今度は梁上端主筋の配筋ができ
ないことになる。 In order to avoid this, if you try to fix the anchor bolt to a frame dedicated to fixing anchor bolts before arranging the main reinforcement at the top of the beam, you will not be able to arrange the main reinforcement at the top of the beam.
(ニ) 発明の目的
本発明は上述の如き技術的課題を解決せんとし
て発明されたもので、その目的はアンカーボルト
を入れ込む領域に存在する鉄筋の切断を行なうこ
となく、その鉄筋構造内部にアンカーボルトを取
り付け得るようになして上述の技術的課題の解決
を図つたアンカーボルトの取付け工法を提供する
ことにある。(iv) Purpose of the Invention The present invention was invented to solve the above-mentioned technical problem, and its purpose is to remove the reinforcing steel inside the reinforcing structure without cutting the reinforcing bars existing in the area where the anchor bolt is inserted. It is an object of the present invention to provide a method for attaching an anchor bolt, which solves the above-mentioned technical problem by allowing the anchor bolt to be attached.
(ホ) 発明の構成
この目的達成のため、本発明工法は、複数本の
鉄筋が立体配置されて成る構造物の鉄筋構造内部
にアンカー定着板を固設したアンカーボルトを取
り付ける工法において、アンカーボルト受け架台
を設置し、そのアンカーボルト受け架台にアンカ
ーボルトを仮固定し、該アンカーボルトを避ける
ようにして鉄筋構造を構成する鉄筋を配筋し、主
筋の継手、助筋の組立て完了後、その鉄筋構造上
方にアンカーボルト固定専用架台を設置し、該ア
ンカーボルト固定専用架台に前記仮固定のアンカ
ーボルトを本固定するようにしたものである。(E) Structure of the Invention In order to achieve this object, the construction method of the present invention is a construction method for attaching an anchor bolt with an anchor fixing plate fixed inside the reinforcing structure of a structure in which a plurality of reinforcing bars are arranged three-dimensionally. Install a receiving frame, temporarily fix the anchor bolt to the anchor bolt receiving frame, arrange the reinforcing bars that make up the reinforcing bar structure avoiding the anchor bolts, and after completing the assembly of the joints of the main bars and the auxiliary bars, A frame exclusively for fixing anchor bolts is installed above the reinforcing steel structure, and the temporarily fixed anchor bolts are permanently fixed to the frame exclusively for fixing anchor bolts.
(ヘ) 発明の実施例
以下、添付図面を参照しながら、本発明の実施
例を説明する。(F) Embodiments of the invention Examples of the invention will be described below with reference to the accompanying drawings.
第1図は本発明の取付け工法によつてアンカー
定着板1Aの固設されたアンカーボルト1が梁筋
内部に取り付けられた状態での斜視図である。2
は梁下端主筋、3はスターラツプ、4は梁上端主
筋で、これらによつて梁筋が構成される。5は梁
上端主筋受け架台である。6はアンカーボルト仮
受け架台で、これは梁上端主筋受け架台5に固着
された梁上端主筋受け架設トラス(無支保工工法
の場合、吊り型枠を支える架設トラスが内蔵され
る場合があるが、その架設トラスであつてもよ
い。)7、該トラス7に固着された腕8、該腕8
に固着された受け材9及び梁上端主筋受け架台5
に固着された倒れ防止材10から成る(第2図も
参照)。又、アンカーボルト1を梁筋内部に取り
付けるに当つて、本発明においても従来と同様に
(第5図参照)、アンカーボルト固定専用架台(第
5図のc)が梁上端主筋4上方に組み立てられる
が、図面の明瞭性を保つため、又、その図示がな
いことによつて発明の把握に支障を来さないと考
えられることから、第1図にはアンカーボルト固
定専用架台を示していない。 FIG. 1 is a perspective view of the anchor bolt 1 fixed to the anchor fixing plate 1A installed inside the beam reinforcement by the installation method of the present invention. 2
3 is the main reinforcement at the lower end of the beam, 3 is the stirrup, and 4 is the main reinforcement at the upper end of the beam, and these constitute the beam reinforcement. 5 is a beam upper end main reinforcement support frame. Reference numeral 6 denotes an anchor bolt temporary support frame, which is a beam upper end main reinforcement support construction truss that is fixed to the beam upper end main reinforcement support frame 5 (in the case of unsupported construction method, a construction truss that supports the hanging formwork may be built-in). ) 7. An arm 8 fixed to the truss 7;
The support material 9 fixed to the beam upper end main bar support frame 5
(See also FIG. 2). In addition, when attaching the anchor bolt 1 inside the beam reinforcement, in the present invention, as in the conventional case (see FIG. 5), a frame exclusively for fixing the anchor bolt (c in FIG. 5) is assembled above the main reinforcement 4 at the upper end of the beam. However, in order to maintain the clarity of the drawing, and because it is thought that its absence will not impede understanding of the invention, the frame dedicated to anchor bolt fixing is not shown in Figure 1. .
第1図に示すように、梁筋内部にアンカーボル
ト1を取り付ける工程は次の通りである。その工
程中、梁上端主筋受け架台5の取付けまでは従来
工法と同じである(第1図及び第3図のステツプ
S1乃至S3参照)。 As shown in FIG. 1, the process of attaching the anchor bolt 1 inside the beam reinforcement is as follows. During this process, the steps up to the installation of the beam upper end main reinforcement support pedestal 5 are the same as in the conventional construction method (see steps S1 to S3 in FIGS. 1 and 3).
その梁上端主筋受け架台5の取付け後、梁上端
主筋受け架台5にアンカーボルト仮受け架台6を
取り付け(第3図のステツプS20)、そのアン
カーボルト仮受け架台6にアンカーボルト1を取
り付けて仮固定する(第3図のステツプS21)。
この仮固定処理は受け材8にアンカーボルト1の
アンカーボルト定着板1Aが固設されている一方
の端部を載置し、アンカーボルト1の他方の端部
側にその長さ方向にスライド可能に嵌着されてい
る二重管1Bに突設された部材1Cを倒れ防止材
10に仮溶接することにより施工される(第2図
参照)。 After installing the beam upper end main reinforcement support frame 5, the anchor bolt temporary support frame 6 is attached to the beam upper end main reinforcement support frame 5 (step S20 in Fig. 3), and the anchor bolt 1 is attached to the anchor bolt temporary support frame 6. It is fixed (step S21 in FIG. 3).
In this temporary fixing process, one end of the anchor bolt 1 on which the anchor bolt fixing plate 1A is fixed is placed on the receiving material 8, and it can be slid toward the other end of the anchor bolt 1 in its length direction. The construction is carried out by temporarily welding the member 1C protruding from the double pipe 1B fitted to the collapse prevention material 10 (see Fig. 2).
然る後に、梁上端主筋4及びスターラツプ3を
仮固定されて取り付けられているアンカーボルト
1を避けるようにして梁上端主筋4及びスターラ
ツプ3を配筋して主筋4の継手処理をする(第3
図のステツプS22)。 After that, the beam upper end main reinforcement 4 and stirrup 3 are arranged so as to avoid the anchor bolt 1 which is temporarily fixed and installed, and the main reinforcement 4 is jointed (third
Step S22 in the figure).
かくして形成された梁上端鉄筋構造上方にアン
カーボルト固定専用架台(第5図のcと同様のも
の)を組み立てた後(第3図のステツプS23)、
そのアンカーボルト固定専用架台にアンカーボル
ト1をボルト締め等により本固定する(第5図の
左側部分参照、第3図のステツプS24)。 After assembling a frame exclusively for fixing anchor bolts (similar to c in Fig. 5) above the beam upper end reinforcing structure thus formed (step S23 in Fig. 3),
The anchor bolt 1 is permanently fixed to the frame exclusively for fixing the anchor bolt by bolt tightening or the like (see the left part in FIG. 5, step S24 in FIG. 3).
このようにしてアンカー定着板1Aを有するア
ンカーボルト1は第1図に示す如く梁筋内部に取
り付けられ、その鉄筋構造を所要の仕切板にて囲
んでからコンクリートを打設して(第3図のステ
ツプS25)梁を形成する。 In this way, the anchor bolt 1 having the anchor fixing plate 1A is installed inside the beam reinforcement as shown in Fig. 1, and after surrounding the reinforcing structure with the required partition plates, concrete is poured (Fig. 3). Step S25) Forming beams.
なお、上記実施例はアンカーボルトの取付け箇所
を梁とする例について説明したが、その他の箇所
例えば床等でも本発明を実施し得る。又、架台6
のトラスは必要に応じて鉄骨鉄筋コンクリート造
のような場合の本設のトラスとされてもよい。In the above embodiment, the anchor bolt is attached to a beam, but the present invention can be applied to other locations such as the floor. Also, pedestal 6
If necessary, the truss may be used as a permanent truss in cases such as steel reinforced concrete construction.
(ト) 発明の効果
以上説明したところから明らかなように、本発
明によれば、
鉄筋の切断の必要性がなくなり、強度、配筋
品質の向上となる上、
工程の簡易化が図れると共に、
作業性が向上する、等の効果が得られる。(G) Effects of the Invention As is clear from the above explanation, according to the present invention, there is no need to cut the reinforcing bars, the strength and reinforcement quality are improved, and the process is simplified. Effects such as improved work efficiency can be obtained.
第1図は本発明工法によりアンカーボルトを梁
筋上端主筋内部に取り付けた状態での鉄筋構造の
斜視図、第2図は第1図中のアンカーボルト取付
け部分の一部拡大図、第3図は本発明工程を示す
図、第4図は従来工法工程を示す図、第5図は従
来工法の欠点の説明に供する図である。
図中、1はアンカーボルト、2は梁下端主筋、
3はスターラツプ、4は梁上端主筋、5は梁上端
主筋受け架台、6はアンカーボルト仮受け架台、
cはアンカーボルト固定専用架台である。
Figure 1 is a perspective view of the reinforcing steel structure with anchor bolts installed inside the main reinforcement at the upper end of the beam using the construction method of the present invention, Figure 2 is a partially enlarged view of the anchor bolt attachment part in Figure 1, and Figure 3 4 is a diagram showing the process of the present invention, FIG. 4 is a diagram showing the process of the conventional construction method, and FIG. 5 is a diagram for explaining the drawbacks of the conventional construction method. In the figure, 1 is the anchor bolt, 2 is the main reinforcement at the lower end of the beam,
3 is a stirrup, 4 is a beam upper end main reinforcement, 5 is a beam upper end main reinforcement support frame, 6 is an anchor bolt temporary support frame,
c is a stand exclusively for fixing anchor bolts.
Claims (1)
クリート構造物あるいは鉄骨鉄筋コンクリート構
造物の鉄筋内部にアンカー定着板を固設したアン
カーボルトを取り付ける工法において、アンカー
ボルト受け架台を設置し、そのアンカーボルト受
け架台に前記アンカーボルトを仮固定し、該アン
カーボルトを避けるようにして鉄筋構造を構成す
る鉄筋を配筋し、主筋の継手、助筋の組立て完了
後、その鉄筋構造上方にアンカーボルト固定専用
架台を設置し、該アンカーボルト固定専用架台に
前記仮固定のアンカーボルトを本固定することを
特徴とするアンカーボルトの取付け工法。 2 前記主筋の継手は圧接又は機械式継手である
ことを特徴とする特許請求の範囲第1項記載のア
ンカーボルトの取付け工法。[Claims] 1. A construction method for installing an anchor bolt with an anchor fixing plate fixed inside the reinforcing bars of a reinforced concrete structure consisting of a plurality of reinforcing bars arranged three-dimensionally or a steel-framed reinforced concrete structure, in which an anchor bolt receiving frame is installed. , temporarily fix the anchor bolt to the anchor bolt receiving frame, arrange the reinforcing bars that make up the reinforcing bar structure avoiding the anchor bolt, and after completing the assembly of the joints of the main bars and the auxiliary bars, place the reinforcing bars above the reinforcing bar structure. An anchor bolt installation method comprising: installing a frame exclusively for fixing anchor bolts, and permanently fixing the temporarily fixed anchor bolts to the frame exclusively for fixing anchor bolts. 2. The anchor bolt installation method according to claim 1, wherein the joint of the main reinforcement is a pressure weld or a mechanical joint.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP59221076A JPS6198825A (en) | 1984-10-20 | 1984-10-20 | Anchor bolt installation method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP59221076A JPS6198825A (en) | 1984-10-20 | 1984-10-20 | Anchor bolt installation method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS6198825A JPS6198825A (en) | 1986-05-17 |
| JPH042736B2 true JPH042736B2 (en) | 1992-01-20 |
Family
ID=16761105
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP59221076A Granted JPS6198825A (en) | 1984-10-20 | 1984-10-20 | Anchor bolt installation method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS6198825A (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP6454591B2 (en) * | 2015-04-15 | 2019-01-16 | 大成建設株式会社 | Construction method of seismic isolation foundation |
-
1984
- 1984-10-20 JP JP59221076A patent/JPS6198825A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS6198825A (en) | 1986-05-17 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR101713862B1 (en) | the rigid connection structure between precast concrete column and precast concrete beam using the temporary bracket installing precast concrete column, the modular system using the same | |
| KR101962853B1 (en) | Joint for Precast Beam and Columns | |
| JP2927402B2 (en) | Column-beam joint structure of concrete building | |
| JP2999126B2 (en) | Foundation base for installation of various machines | |
| GB2131849A (en) | Structural framework | |
| JP2000073448A (en) | Connection method and structure for precast concrete beam and column | |
| JPH042736B2 (en) | ||
| JP2008179944A (en) | Construction method of steel beam of beam end rc construction to column | |
| JPH047435A (en) | Steel framed reinforced concrete rigid-framed structure using partially precast beam | |
| JP3849234B2 (en) | Reinforced concrete underground outer wall construction method | |
| JP2600961B2 (en) | Connection structure between reinforced concrete columns and steel beams | |
| JP2706431B2 (en) | Column and beam connection and connection method | |
| KR200182688Y1 (en) | H section steel for steel-frame structure having fireproof construction | |
| JPH1150538A (en) | Building and its construction method | |
| JP2619323B2 (en) | Assembling method of steel columns and beams in steel reinforced buildings | |
| JPH07113260A (en) | How to join columns and beams | |
| JP2614000B2 (en) | Basics of steel frame | |
| JP2002206238A (en) | Coupling tool for strut in strut earth-retaining method | |
| JPH06317015A (en) | Method of assembling beam formwork | |
| JP2669305B2 (en) | Structure using covered steel tube concrete columns | |
| JPH0454771B2 (en) | ||
| JP2910551B2 (en) | Lap joint method of main reinforcement of SRC column | |
| JPH03290565A (en) | Beam construction method | |
| JP2000240151A (en) | Building | |
| JP2556757B2 (en) | Reinforcement structure of column / beam connection and its construction method |